Loading...
Consultant - 2019 - Horseshoe Bend Rd / Hwy 55 Water Main - 9/24/2019TASK ORDER REQUEST FOR CITY OF EAGLE ENGINEERING SERVICES City Task Order No.: 19-02 Eagle Water Department Horseshoe Bend Rd/Hwy 55 Water Main, 19-0058D THIS TASK ORDER, entered into between the City of Eagle, hereinafter referred to as EAGLE, and HECO Engineers (Holladay Engineering), City Engineer, hereinafter referred to as RECO, is subject to the provisions of the Agreement for Engineering Services, City Engineering Services dated October 27, 2010, hereinafter referred to as the AGREEMENT. WITNESSETH: WHEREAS, EAGLE intends to have HECO undertake work as follows: Prepare Plans, Specifications, and Bid Documents for the construction of a water main extension complete with valves, hydrants, fittings, and surface repair for the following sections, otherwise known as the Project: 1. 16 -inch main on Old Horseshoe Bend Road between Campsite Lane and State Highway 55 near W. Janie Road. 2. Bore and install steel casing and 16 -inch main across State Highway 55 near W. Janie Road to terminate in the area near the City Entrance sign on the west side of State Highway 55. Obtain required construction approvals from Idaho Department of Environmental Quality, Ada County Highway District, Idaho Transportation Department and additional agencies having jurisdiction within the construction area. Project scope of engineering services include assisting with agency permitting, design, plan preparation, topographic mapping, right-of-way determination, preparing a bid advertisement for City publication, responding to bidders' questions, attending bid opening, evaluating bids received, attending a preconstruction meeting, and providing support services during construction (payment applications, change orders, record drawings). All on-site construction observation and construction meetings will be available as additional services if requested. CITY OF EAGLE INFORMATION AND RESPONSIBILITIES: EAGLE will provide to HECO the data and/or services specified in the AGREEMENT. EAGLE will perform a review of plans, assist with permitting as required, pay agency fees associated with 11P a g e Tsk Order 19-02 permitting and/or license agreements, construction observations, submittal reviews, and provide facilities for meetings as required to administer the Project. EAGLE shall be represented by Ken Acuff, Water Department Superintendent. SCHEDULE OF SERVICES TO BE PERFORMED: HECO will perform said services within 240 calendar days of the date of this TASK ORDER. FEES AND BILLING SCHEDULE: EAGLE will pay HECO for services on the basis of: A Lump Sum amount of $45,800.00 (Forty-five thousand, eight hundred dollars). IN WITNESS WHEREOF, the parties hereto have executed this TASK ORDER AGREEMENT as of the day and year written below. OWNER: City of Eagle 660 E. Civic Lane Eagle, Idaho 83616 CITY APPROVAL: By: Stan Ridgeway, Mayor Date: ATTEST: q-,16/-19 Sharon Bergmann, City Clerk/Treas(irer 2I ' CITY ENGINEER: HECO Engineers 32 N. Main Street Payette, ID 83661 BY: tt), , Michael W. Davis, PE, City Engineer Date: 9-6-2019