Loading...
Findings - PZ - 2002 - FPUD-1-02/FP-3-02 - Riversend Subd No 1/54-Lot/31.98 Acre ORIG\NAL BEFORE THE EAGLE PLANNING AND ZONING COMMISSION /~. ( IN THE MATTER OF AN APPLICATION FOR A FINAL DEVELOPMENT PLAN AND FINAL PLAT FOR RIVERSEND PUD SUBDIVISION PHASE NO.1 FOR HOWELL-KISER DEVELOPMENT CORP. ) ) ) ) FINDINGS OF FACT AND CONCLUSIONS OF LAW CASE NUMBER FPUD-1-02 & FP-3-02 The above-entitled final development plan and final plat applications came before the Eagle Planning and Zoning Commission for their recommendation on April 15, 2002. The Commission having heard and taken oral and written testimony, and having duly considered the matter, makes the following Findings of Fact and Conclusions of Law; FINDINGS OF FACT: A. PROJECT SUMMARY: Howell-Kiser Development Corp., represented by Matt Munger with Hubble Engineering, is requesting final development plan and final plat approval for RiversEnd Subdivision No.1, a 54-lot (41-buildable, 13-common) residential subdivision. This 31.98-acre phase of RiversEnd Subdivision PUD is located between the North and South Channels of the Boise River approximately V2 -mile east of Eagle Road on East Island Woods Drive. B. HISTORY: The City Council approved the PUD for RiversEnd Subdivision on October 23,2001. The Findings of Fact and Conclusions of Law for the annexation, rezone, preliminary plat and preliminary development plan are attached. c. PRELIMINARY PUD/PLAT FINDINGS: Council Findings and Conclusions dated October 23,2001, are incorporated herein by reference. D. FINDINGS OF FACT REQUIRED BY EAGLE CITY CODE SECTION 8-6-6-3 (B): The Commission shall find that the facts submitted with the application and presented to them establish that: 1. The proposed development can be initiated within one year of the date of approval; 2. Each individual unit of the development, as well as the total development, can exist as an independent unit capable of creating an environment of sustained desirability and stability or that adequate assurance will be provided that such objective will be attained and the uses proposed will not be detrimental to present and potential surrounding uses, but will have a beneficial effect which would not be achieved under standard district regulations; 3. The streets and thoroughfares proposed are suitable and adequate to carry anticipated traffic, and increased densities will not generate traffic in such amounts as to overload the street network outside the PUD; 4. Any proposed commercial development can be justified at the locations proposed; 5. Any exception from standard district requirements is warranted by the design and other amenities incorporated in the final development plan, in accordance with the PUD and the adopted policy of the Council; 6. The area surrounding said development can be planned and zoned in coordination and Page 1 of 4 K:\Planning Dept\Eagle Applications\SUBS\2002\RiversEnd #1 fpud pzf.doc substantial compatibility with the proposed development; 7. The PUD is in general conformance with the Comprehensive Plan; and 8. The existing and proposed utility services are adequate for the population densities and nonresidential uses proposed. E. FINDINGS OF FACT REQUIRED BY EAGLE CITY CODE SECTION 8-6-6-3 (C): Upon granting or denying the application, the Council shall specify: 1. The ordinance and standards used in evaluating the application; 2. The reasons for approval or denial; and 3. The actions, if any, that the applicant could take to obtain a permit. STAFF ANALYSIS PROVIDED WITHIN THE STAFF REPORT: The City Engineer and Planning staff have reviewed the final development plan and final plat for this phase 1 of RiversEnd PUD. It is staff s opinion that this flfSt phase of the final development plan can meet the Findings of Fact required in Eagle City Code Section 8-6-6-3 B and C (as noted herein) with the conditions recommended herein. REVIEW BY THE COMMISSION: A review by the Planning and Zoning Commission was completed on April 15, 2002. The Commission made their recommendation at that time. The minutes are incorporated herein by reference. COMMISSION DECISION: The Commission voted 2 to 0 (Bloom abstained, Cadwell, Nordstrom absent) to recommend approval of FPUD-I-02 & FP-3-02 for a final development plan and final plat approval for RiversEnd Subdivision No.1 with the staff recommended site specific conditions of approval provided below. SITE SPECIFIC CONDITIONS OF APPROVAL: 1. Comply with all conditions of the City Engineer. 2. Comply with all applicable conditions of A-I-OI/RZ-I-01lCU-3-01/PPUD-I-0I/PP-2-01. 3. Comply with the conditions ofDR-78-01. 4. Comply with all requirements offload Plain Development Permit No. FPDP-3-01. 5. The applicant shall submit payment to the City for all Engineering fees incurred for reviewing this project, prior to the City Engineer signing the final plat. 6. Any subdivision signage, sign lighting, and sign landscaping shall be reviewed and approved by the Design Review Board prior to the City Clerk signing the final plat. 7. The setbacks noted in the RiversEnd Subdivision PUD findings (Site Specific Condition No. 19) shall apply. 8. Revise Section 4.6.14 ofthe CC&R's to read as follows with the underlined text to be added: "This subdivision proposes to provide public access to both the North Channel and South Channel of the Boise River upon subsequent platting of future phases. Unless and until subsequent phases of this subdivision are built, and built as currently planned, (which Declarant has no duty or obligation to do) there is no access, nor any easements, from this subdivision to either the North or South Channel of the Boise River. Remainder ofparagraph to remain as stated. 9. Provide a recorded copy of the temporary easement for river maintenance and pathway construction (extending to the greenbelt abutting the North Channel of the Boise River) prior to this application being heard by the City Council. Page 2 of 4 K:\Planning Dept\Eagle Applications\SUBS\2002\RiversEnd #1 fpud pzf.doc 10. Provide a copy of the recorded CC&R's for the subdivision and a copy of the recorded plat of RiversEnd Subdivision No.!, prior to the issuance of any building permits. 11. The applicant shall provide documentation that "Digline" has been contacted prior to the commencement of any subsurface construction. 12. Upon submittal of a final development plan and final plat for phase three, the applicant shall provide the City Engineer a cost schedule for the maintenance of the private roads to be constructed within phase three. (A plan for the future repair and maintenance of the private street and drainage facilities has been included within the CC&R's). CONCLUSIONS OF LAW: A. The application for this item was received by the City of Eagle on January 23,2002. B. In accordance Eagle City Code Section 8-6-6-3 B the Commission finds that the facts submitted with the application and presented to the Commission, with the conditions herein, establish that: 1. The rust phase of development will be initiated within one year of the date of approval based upon the testimony and documentation presented by the developer; 2. Each individual unit of the development, as well as the total development, will exist as an independent unit capable of creating an environment of sustained desirability and stability or that adequate assurance can be provided that such objective will be attained and the uses will not be detrimental to present and potential surrounding uses, but will have a beneficial effect which would not be achieved under standard district regulations because of the conditions placed on this development; 3. The streets and thoroughfares to be constructed are suitable and adequate to carry anticipated traffic, and increased densities will not generate traffic in such amounts as to overload the street network outside the PUD since the principal road serving the development is designed as a collector and, the developer has contributed funds for the installation of a traffic signal at the intersection ofIsland Woods Drive and Eagle Road; 4. No commercial development is proposed; 5. Any exception from standard district requirements is warranted by the design and other amenities incorporated in the [mal development plan, in accordance with the PUD and the adopted policy of the Council because the varied lot sizes and setbacks as specifically approved by the City, will allow for a mix of housing types in accordance with the Comprehensive Plan; 6. The area surrounding said development can be planned and zoned in coordination and substantial compatibility with the proposed development since no intensive uses, that might impact the planned residential areas surrounding the development, are proposed; 7. The PUD is in general conformance with the Comprehensive Plan; and 8. The existing and required utility services are adequate for the population densities as noted by the agencies which will serve the development. Page 3 of 4 K:\Planning Dept\Eagle Applications\SUBS\2002\RiversEnd #1 fpud pzf.doc DATED this I5ih day of April 2002. PLANNING AND ZONING COMMISSION OF THE CITY OF EAGLE Ada CountY. Ida ATTEST: Page 4 of 4 K:\Planning Dept\Eagle Applications\SUBS\2002\RiversEnd #1 fpud pzf.doc