Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Minutes - 2026 - City Council - 10/13/2026 - Regular
EAGLE CITY COUNCIL MEETING MINUTES October 13, 2026 1. PLEDGE OF ALLEGIANCE: Mayor Pike leads the Pledge of Allegiance. 2. CALL TO ORDER: Mayor Pike calls the meeting to order at 5:30 p.m. 3. ROLL CALL: Present: GILLIS, KVAMME, MAY MERRILL. A quorum is present. 4. ADDITIONS, DELETIONS OR MODIFICATIONS TO THE AGENDA: None. 5. RECOGNITION: A. Volunteer Recognition: The Mayor would like to acknowledge members from Money Metals Exchange for their volunteer efforts to the City of Eagle. (BKP) Mayor Pike expresses his gratitude for the volunteerism that Money Metals contributed to the Eagle Community and presents them with a token of appreciation. 6. PUBLIC COMMENT: This time is reserved for the public to address their elected officials regarding topics of general interest or concern. Comments regarding Public Hearing and land use items are to be made during the open public hearing for said item(s)in accordance with Idaho Code. We desire to have all interactions between the public, staff and elected officials to be conducted in a professional and civil manner. Therefore, comments are to addressed solely to the Council as a whole, and focus on the issue, avoiding personalized debate, and shall not make personal, impertinent, slanderous or profane remarks to any member of the Council, staff or other members of the public. Out of courtesy for all who wish to speak, the City Council requests each speaker limit their comments to three (3) minutes. Bob Van Arnem, 3049 S. Whitepost Way, Eagle, Idaho. Mr. Van Arnem displays a video showing illegal fireworks being fired off by one of his neighbors. He also provides physical evidence of the mortars that were shot off. He does not feel that these fireworks should be discharged in residential areas. Mr. Van Arnem encourages that laws be written in a manner which they are enforceable and sensible to allow law enforcement to address the matters. Burke Mantell. 4690 N. Hartley Road, Eagle, Idaho. Notes that Sheriff's Deputy spent several hours on multiple evenings up on the federal land that is managed by the BLM educating people utilizing the BLM land and encourage safe use of the same. Part of what the deputy did was to direct those discharging firearms to another, safter area. Mr. Mantell states that the City should be enforcing the laws and hasn't seen a marked improvement to improve safety in this area in the last five years. Buck Hall 132 S. Young Lane, Eagle, Idaho. Mr. Hall was awakened at 4:00 a.m. by a garbage truck, emptying a dumpster and using the backup beeper. When he called City Hall he was directed to an exemption in City Code for garbage trucks. Mr. Hall would like the exemptions for garbage trucks to be removed. Deborah Jackson, 2625 N. Synergy Ave, Eagle, Idaho. Ms. Jackson attended a free speech symposium held by Phil McGrane; she comments Eagle on the allowance of the open door public comment portions of the agenda. It encourages the exchange of ideas. Noah Dailey is a formerly an employee of the Idaho Statesman. Mr. Dailey has had the pleasure of covering the City of Eagle. He expresses his appreciation of the conduct of the Council and their desire to protect and preserve the character Eagle community. Page 1 KACOUNCIL\MINUTES\Temporary Minutes Work Area\CC-10-13-26min.docx Mark Butler, 1675 E. Bishop Way, Eagle, Idaho. Mr. Butler concurs that Mr. Dailey was an excellent reporter for Eagle. 7. REPORTS: A. Mayor and Council: Gillis expresses his condolences to the family of Windson Sanders, who was a great contributor to the Eagle community. Council echoes their condolences. 8. CONSENT AGENDA: ALL CONSENT AGENDA ITEMS ARE CONSIDERED ACTION ITEMS. Consent Agenda items are considered to be routine and are acted on with one motion. There will be no separate discussion on these items unless the Mayor, a Councilmember or member of City Staff requests an item to be removed from the Consent Agenda for discussion. Items removed from the Consent Agenda will be placed on the Regular Agenda in a sequence determined by the City Council. Any item on the Consent Agenda which contains written Conditions of Approval from the City of Eagle City Staff, Planning & Zoning Commission, or Design Review Board shall be adopted as part of the City Council's Consent Agenda approval motion unless specifically stated otherwise. A. Claims Against the City. B. Minutes of July 28, 2026. (TEO) C. Minutes of August 25, 2026. (TEO) D. Minutes of September 1, 2026. (TEO) E. Minutes of September 8, 2026. (TEO) F. Appointment to the Eagle Historical Commission: In accordance with Resolution 23-17, Mayor Pike is requesting Council confirmation of the appointment of Nichole Starman to the Eagle Historical Preservation Commission. Ms. Starman will be serving a three (3) year term that will expire in September of 2029. G. Reauthorization of Ada County Highway District Cost Share Agreement for Linder Road Landscaping (previously authorized on August 25, 2026): The Ada County Highway District has requested to update the cost share agreement for landscaping along North Linder Road, from State Highway 44 to West Floating Feather Road, previously authorized on August 25, 2026. The requested update applies to Section V: Construction of Non -Transportation Components and includes a reimbursement of five percent (5%) of the City's construction costs as payment toward the additional costs incurred by ACHD. On August 25, 2026, the City authorized a contribution to the project of $713,962.50. By reauthorizing this agreement with updated language requested by ACHD, the City's contribution shall not exceed $749,660.31. (ASG) H. Cooperative Agreement Between the City of Eagle and the Idaho Department of Fish and Game (IDFG): An agreement to accept grant funding for the construction of vault toilet and cantilever gate at Eagle Archery Park (aka Eagle Shooting Park). This will be a reimbursement grant wherein the City will expend budgeted funds and be reimbursed by IDFG in an amount not to exceed $71,000. (ELZ) 1. Resolution No 26-16 - Removing Eagle Urban Renewal Agency Board Term Limits: A Resolution of the City of Eagle, Idaho, Amending Resolution No. 24-05 Establishing a Policy for Appointment Procedures for the Eagle Urban Renewal Agency Board; And providing an effective date. (TEO) J. Resolution No 26-17 - Solid Waste Collection Fee pass through increase due to increase by Ada County Landfill: A Resolution Of The City Of Eagle, Idaho, Amending The Fee Schedule For Solid Waste Collection Services, Pursuant To The Franchise Agreement For The Collection, Hauling And Disposal Of Municipal Solid Waste Collection And Demolition Waste As Stated In Section 9 "Rate Adjustments", Subsection B "Disposal And Governmental Fee Cost Adjustments" And Providing For Effective Date. (TEO) K. Findings of Fact and Conclusions of Law for the Approval of RZ-2021-03-MOD1 - Modification to the Development Agreement for Carrara Estates Subdivision - Toll Southwest, LLC: Toll Southwest, LLC, represented by Becky McKay with Engineering Solutions, LLP, requests approval of a rezone with development agreement modification to replace the required architectural elevations and amend the fencing standards within the development Page 2 IC:\COUNCIL\MINUTES\Temporary Minutes Work Area\CC-30-13-26min.docx agreement for Carrara Estates Subdivision. The 66.00-acre site is located on the north side of West Floating Feather Road, approximately 2,280-feet west of North Eagle Road. (HSD) L. Development Agreement for RZ-2021-03-MOD1 - Carrara Estates Subdivision: Council authorization for Mayor to execute the development agreement associated with Carrara Estates Subdivision. The 66.00-acre site is located on the north side of West Floating Feather Road, approximately 2,280-feet west of North Eagle Road. (HSD) M.Permanent Pathway Easement Agreements Between ECW River Birch, LLC and the Citv of Eagle for Public Pathways Within Flats Sixteen No. 1: ECW River Birch, LLC is requesting approval of permanent pathway easement agreements for public pathways located within Flats Sixteen Subdivision No. 1. The 14.49-acre site is located on the west side of State Highway 16 approximately 1,320-feet north of West Beacon Light Road at 3705 North Highway 16. (KRD) N. Findings of Fact and Conclusions of Law for the Approval of DR-2026-49 - Creekside Bible Church Building - Creekside Bible Church & The Pacific Companies: Creekside Bible Church and The Pacific Companies, represented by Walter Lindgren with Lindgren Labrie Architecture, is requesting design review approval for a 10,740-square foot church building. The 3.26-acre site is located on the north side of East State Street approximately 386-feet east of North 2nd Street at 350 East State Street. (ERF) O. Findings of Fact and Conclusions of Law for the Approval of DR-2026-50 - One Monument Sign for Creekside Bible Church - Creekside Bible Church & The Pacific Companies: Creekside Bible Church and The Pacific Companies, represented by Walter Lindgren with Lindgren Labrie Architecture, is requesting design review approval for one externally illuminated monument sign. The 3.26 -acre site is located on the north side of East State Street approximately 386-feet east of North 2nd Street at 350 East State Street. (ERF) P. Findings of Fact and Conclusions of Law for the Approval of FPUD-2026-03/FP-2026-06 - Final Development Plan and Final Plat for Whitehurst Village Subdivision - Urban LLC and Marc and Sky Hamilton: Urban LLC and Marc and Skye Hamilton, represented by Becky McKay with Engineering Solutions, LLP, are requesting final development plan and final plat approval for Whitehurst Village Subdivision, a 16-lot (11-buildable, 1-existing, 4-common) residential planned unit development. The 5.98-acre site is located approximately 830-feet east of the intersection of North Park Lane and West Flint Drive, at 3660 West Flint Drive. (KRD) Q. Water Easement Agreement Between the City of Eagle and Two Corral Creek LLC for City of Eagle Water System Improvements within Terra View Subdivision No. 6: Two Corral Creek, LLC is requesting approval of a Water Easement Agreement for water system improvements located within Terra View Subdivision No. 6. The 25.7 acre site is located at the northeast corner of State Highway 16 and West Beacon Light Road. (ELZ) R. The 148 Mixed Use Building Art Mural: Meg Glasgow with Glasgow Group, LLC, is requesting City Council approval for a mural proposed on the west elevation of The 148 Mixed Use Building. The 0.17-acre site is located on the north side of East State Street at 148 East State Street. This item is for the mural design only. (RLB) Mayor Pike introduces the item. Jesus Merrill requests item J be removed. Osborn requests item A be removed. Kvamme moves to approve Consent Agenda items A-R, excluding A and J. Seconded by May. KVAMME; AYE; MAY; AYE; MERRILL; AYE; GILLIS; AYE. ALL AYE ... MOTION CARRIES. A. Claims Against the City. Mayor Pike introduces the item. Osborn notes that there are no claims for approval, thus no action is required. Page 3 KACOUNCIL\MINUTES\Temporary Minutes Work Area\CC-10-13-26min.docx J. Resolution No 26-17 - Solid Waste Collection Fee pass through increase due to increase by Ada County Landfill: A Resolution Of The City Of Eagle, Idaho, Amending The Fee Schedule For Solid Waste Collection Services, Pursuant To The Franchise Agreement For The Collection, Hauling And Disposal Of Municipal Solid Waste Collection And Demolition Waste As Stated In Section 9 "Rate Adjustments", Subsection B "Disposal And Governmental Fee Cost Adjustments" And Providing For Effective Date. (TEO) Mayor Pike introduces the item. Merrill quotes an excerpt from the franchise agreement that establishes the hours of service that are identified, the hours just need to be enforced. Discussion. Merrill makes a motion to approve item 8J. Seconded by May. MERRILL; AYE; MAY; AYE; KVAMME; AYE; GILLIS; AYE. ALL AYE ... MOTION CARRIES. 9. NEW BUSINESS: ACTION ITEM: Arts Advisory Committee Recommendation to Grant Donation Requested by Meg Glasgow with Glasgow Group LLC for Mural: On May 28, 2026, the Eagle Arts Advisory Committee recommended Council approval of the request by Meg Glasgow for a donation of city monies in the amount of $10,000 to Glasgow Group LLC to be used for a mural to be installed on the building owned by Glasgow Group LLC. The Mixed Use Building is located at 148 E. State Street. These funds would be allotted from the Arts Advisory Committee budget of fiscal year 2025-2026 and accounted for in accordance with appropriate accounting procedures. Mayor Pike introduces the item. Meg Glasgow with the Glasgow Group LLC reviews the donation request for the mural on the building located at 148 E. State Street building. Ms. Glasgow states that the owner of the building will provide project coordination, site preparation support and commit to long term maintenance. In addition to the $10,000 in funds, they are asking the city to provide assistance with the promotion of the project and for it to be listed in Eagle's Public Art Program. Discusses the commitment by Glasgow LLC, the artist team, subject and theme of the mural. and what the expectation from the City, as well as their own, would be in addition to the monetary donation. The mural rendering is provided from the aspect of the third story of the Hemmingway building. Mike Williams with South Beck and Baird, 202 S. Vista Ave. Boise, Idaho discusses conditions included in the Design Review approval pertaining to maintenance. Discussion amongst Council. The Council is overall supportive of the project. Kvamme moves to approve new business item 9A Arts Advisory Committee Recommendation to Grant Donation Requested by Meg Glasgow with Glasgow Group LLC for Mural in the amount of $10,000. Seconded by May. GILLIS; AYE; MERRILL; AYE; MAY; AYE; KVAMME; AYE. ALLA AYE ... MOTION CARRIES. 10. PUBLIC HEARINGS: ALL PUBLIC HEARING ITEMS ARE CONSIDERED ACTION ITEMS. A. RZDA-2020-05-MOD1 - Modification to the Development Agreement for Quarry Village to Establish A New Termination Date - Ouarry Village LLC: Quarry Village LLC, represented by Cindy Greco, is requesting a modification to the rezone with a development agreement for Quarry Village to establish a new termination date of July 19, 2031, an additional five (5) years from the original termination date. The 27.31-acre site is comprised of two (2) parcels (S0510449410 and S0510449210) and is located on the north side of Hill Road between State Highway 55 and North Horseshoe Bend Road. Staff is requesting this item be continued to the October 27, 2026 meeting. (DLM) Page 4 IC:\COUNCIL\MINUTES\Temporary Minutes Work Area\CC-10-13-26min.docx Mayor Pike introduces the item. May moves to continue item 10A and 10B to the October 27, 2026 meeting. Seconded by Kvamme. ALL AYE ... MOTION CARRIES. B. RZDA-2026-03/CUP-2026-08/PPUD-2026-03/PP-2026-03 - Rezone with a Development Agreement, Conditional Use Permit, Preliminary Development Plan, and Preliminary Plat for Ridgeside Subdivision - Skies Development, LLC: Skies Development, LLC, represented by Mike Williams with South Beck and Baird, is requesting a rezone from A-R (Agricultural - Residential) to R-6-DA-P (Residential with a development agreement — PUD), conditional use permit, preliminary development plan, and preliminary plat approvals for Ridgeside Subdivision, a 28-lot (20-residential [6-single family attached, 14-single family detached], 8-common [1-private street, 7-open space]) residential planned unit development. The 3.82-acre site is comprised of two (2) parcels (S0510325605 and 50509417250) and is located on the northwest corner of Hill Road and North Edgewood Lane. Staff is requesting this item be continued to the October 27, 2026 meeting. (HSD) C. A-2026-01/RZDA-2026-01/CPA-2026-01/CUP-2026-05/PPUD-2026-01/PP-2026-01 — Wellspring Subdivision — Rob R. Nash, represented by Dave Yorgason with Tall Timber Consulting: Rob R. Nash, represented by Dave Yorgason with Tall Timber Consulting, is requesting annexation and rezone from RUT (Rural -Urban Transition — Ada County Designation) to R-1-DA-P (Residential with a development agreement — Planned Unit Development), Comprehensive Plan map amendment to change the Future Land Use Map designation from Estate Residential to Large Lot Residential, conditional use permit, preliminary development plan, and preliminary plat approvals for Wellspring Subdivision, a 49-lot (42-buildable, 7-common [6-open space, 1-private street]) residential planned unit development. The 45.88-acre site is comprised of two (2) parcels (R8123020011 and R8123020060) and is generally located north of Trout Road, approximately 2,100-feet east of South Linder Road. This item was continued from the September 22, 2026 City Council Meeting due to a power outage. (HSD) Mayor Pike introduces the item and opens the public hearing. Dave Yorgason with Tall Timber Consulting, 13965 W. Chinden Blvd., Boise, Idaho reviews the application. Items which the applicant have revised or are providing additional information regarding include: Though in compliance with current Eagle City Code, the applicant has agreed to raise the finished floor elevation to a minimum of three fee. Removing one lot to further reduce density. How the development plans to address snow removal and storage. Agree to add a pathway easement along the Boise River, adding a common lot for the dedicated area. They remain in agreement with all of the staff specific conditions of approval. Council discussion regarding proposed changes, snow removal plan. City Planner, Hailey Durham briefly discusses the snow removal and storage plan and makes herself available for additional questions. Mayor Pike opens the public testimony. Doug Foote, 656 Pitkin Lane, Eagle, Idaho. Mr. Foote states that the widening of Linder is not scheduled to begin 2030, and with the phasing of the project, the signal light at Linder and Hatchery Road will not be installed until near the end of the third phase. The road will eventually be widened to two lanes in each direction with a center turn lane and will not be completed until 2032 — six years from now. Linder Road cannot handle construction sized vehicles; there have been accidents already. He is concerned with the smaller lot sizes that will impact on their way of life, wildlife Page 5 KACOUNCIL\MINUTES\Temporary Minutes Work Area\CC-10-13-26min.docx and the peacefulness that is currently out there. It will negatively impact those neighboring living on properties. Jamie Sharp, 228 S. Alder Lane, Eagle, Idaho. Mr. Sharp lives across the river from this development. He is in favor of development; however, he has concerns with this proposed development. The 6.5 acres of wetland has been identified as being impact by this application, and yet the preservation of the wetlands is not addressed. The preservation of the greenbelt is important. He is opposed to the project. Josh Liddell. 1485 Artesian Road, Eagle, Idaho. Mr. Liddell does not feel the application submitted tonight as being substantially different from other variations of the project. Mr. Liddell has concerns with the behavior of an elected officials pertaining to the project. The project has been denied two other times, and feels this version is not substantially different than others presented. He states that there are a significant number of neighbors who oppose the project that are not in attendance tonight that are either worn out by the multiple submittals or couldn't put their lives on hold again to speak out in opposition of the project. He believes the preservation of the residential estates designation should be retained. Mark Butler, 1675 E. Bishop Way, Eagle, Idaho. Mr. Butler was not in favor of the original application, after the developer revised the application he was comfortable supporting it. He encourages Eagle to approve this lest the applicant go to the County where higher density could be achieved. Michael Montgomery, 1200 Artesian Road, Eagle Idaho, a resident of Elevate Eagle Mobile Home Community. In 2017, Eagle Island experienced severe flooding, with approximately 18-24" of water throughout the mobile home community. In 1983, a similar water event occurred, so they do occur more often than every 100 years. The impact of raising the Wellspring development 3 feet would in essence build a diversion dam which would route the water to the surrounding properties. To elevate the 45 acres would increase the flooding in the surrounding areas. Robert Minch, 701 W. Bankside Drive, Eagle, Idaho. Mr. Minch is a board member of the Foundation for Native Canyon Trail Systems, he provides a handout which states the position of FACTS, the Foundation for Ada/Canyon Trail System. The information provided tonight appears to be compatible with the interests of FACTS, with the allowance of a pathway easement along the west side of the development. They request that Council ensure that nothing in the approval unnecessarily limits the city's future ability to establish the Boise River Greenbelt pathway corridor either through this property, adjacent public lands or coordinated planning with other agencies. Chris Pitkin is the property owner and is in favor of the proposed application. Mr. Ptikin believes the project is well thought out and has addressed the concerns expressed by the Council. The positive offerings to the neighboring properties is the extension of sewer, water, and fire suppression which have been challenges for decades in this area. The engineering and ponds will allow water to flow through naturally and not back up onto the state park side or down Hatchery Road as in years past. He encourages Council to approve the application. Kaitlin Smith, 1200 Artesian Road, Eagle, Idaho. The area is rural in nature and wildlife is abundant. The impact will be great on the area. Flooding has historically impacted those in the area, with not only water damage but loss of power. The neighboring property residents do not feel that the extension of water and sewer would be of substantial benefits. It would in fact make the park more susceptible to being sold, thereby displacing over 44 households. Construction traffic would also be of great concern. She encourages Council to deny the application. Dave Roylance, 4171 Old Valley Road, Eagle, Idaho. Mr. Roylance believes that Eagle has great codes in place to protect from flooding. He is an engineer and has developed in Eagle and is fully aware of the flood code requirements. There is a very high-water table and any type of subsurface Page 6 K:\COUNCIL\MINUTES\Temporary Minutes Work Area\CC-10-13-26min.docx disposal system is irresponsible. Bring central water and sewer is the right thing to do environmentally. He believes it is a thoughtful development and will benefit surrounding properties and the City. Stephanie Kemp, 325 N. Sierra View Way, Eagle, Idaho. Ms. Kemp believes that the sellers are making a good and heartfelt choice by selling to the developer. The improvement and extension of water and sewer would benefit the community. She is in full support of the application and hopes the Council will support it as well. Mayor Pike closes the public testimony. Dave Yorgasson rebuts testimony concerning traffic concerns and the commitment to continue to work with ACHD and the City to escalate the roadway improvements, clarification on the three feet above base flood elevation, compliance with the comprehensive plan, discussion on wetland improvements, sewer and water extensions. Council discussion. Gillis appreciates the efforts with the proposal tonight; however, he still has concerns with the floodplain issue. He remains concerned with the impact of the neighboring trailer park, and lack of infrastructure to address traffic. The balance of property rights and the impact on current Eagle residents is something he takes seriously. Gillis is not in favor of the application. Kvamme believes the improvement of wetlands is positive. There will be an impact on wildlife but believe it will be minimal. He is supportive of the application. May states that it is appealing for the City to have control of the development should be annexed. The extension of city services is a significant positive. Pathway connectivity would be preserved and that is important. Merrill is in favor of the application. The engineers report addresses flood control and meets code. The extension of water and sewer is critical, and it has been a long time coming. She is in favor of the application. Mayor Pike is in favor of Eagle being in control of the development and feels the developer has made needed and significant changes. Discussion. Merrill moves to approve A-2026-01/RZDA-2026-01/CPA-2026-01/CUP-2026-05/PPUD- 2026-01/PP-2026-01— Wellspring Subdivision. Seconded by Kvamme. Discussion. Merrill amends to add the site specific and standard conditions of approval. MERRILL; AYE; KVAMME; AYE; MAY; AYE; GILLS; NAY. MOTION CARRIES. D. RZDA-2022-09/PP-2022-15 - Rezone with a Development Agreement and a Preliminary Plat for Shekinah Subdivision - Mark Bottles: MGB Investments, LLC, represented by Jim Milian with South, Beck, and Baird, is requesting a rezone from R-2 (Residential) to C-2-DA (General Business District with a development agreement [in lieu of a conditional use permit]) and preliminary plat approvals for Shekinah Subdivision, a 9-lot (8-buildable, 1-common) commercial subdivision. The 6.08-acre site consists of three parcels (S0520141886, 50520141952, and 50520141906) and is located at the southwest corner of South Eagle Road and West Colchester Drive at 130 and 135 West Jakona Lane and 2573 South Eagle Road. This item was continued from the September 22, 2026 City Council Meeting due to a power outage. (ASG) Mayor Pike introduces the item and opens the public hearing Emilee Mueller, 839 South Bridgeway Place, Eagle, Idaho representing Mark Bottles. Ms. reviews the application. Discussion regarding the types of businesses allowed, drive thru stacking and building height. City Planner Andrew Glasgow reviews the staff report and items for special consideration. Mayor Pike opens public testimony. Page 7 K:\COUNCIL\MINUTES\Temporary Minutes Work Area\CC-10-13-26min.docx Dana Erdman, 156 W. Colchester Drive, Eagle, Idaho is in support of the application. Ms. Erdman lives nearby and has met with the applicant. They have been a pleasure to work with and are supportive of the proposal. Chuck Page, president of Banbury Meadows HOA. The HOA has had the opportunity to meet with and work with Mr. Bottles. The association voted overwhelmingly in support of the project. Mayor Pike closes public testimony. Emilee Mueller rebuts testimony. They are open to the condition that a letter from their engineer detailing street width showing it could accommodate any delivery vehicles. The focus is to bring local shops into the development, not nationwide franchises. Visibility is important to tenants. Council discussion regarding berming and fencing, signage, deliveries and traffic impact. Kvamme moves to approve agenda item D RZDA-2022-09/PP-2022-15 - Rezone with a Development Agreement and a Preliminary Plat for Shekinah Subdivision - Mark Bottles. With the addition of three conditions of approval. 1) The applicant have the project engineer develop and deliver a letter that entrances are wide enough for expected heavy traffic and trucks. 2) The CC&R's have specific language that the deliveries must be done withing the confines of the development not on Colchester Road. 3) A specific condition 3.7 would be a four foot screening vs a three foot screening, at least for the length of the drive through restaurants. Seconded by May. Discussion. ALL AYE ... MOTION CARRIES. E. RZDA-2026-06/CUP-2026-15 - Rezone from MU to MU-DA (DA in lieu of a Conditional Use Permit) for a Commercial Entertainment Facility and a Conditional Use Permit for a Building a Heieht Exception for Premier Sports Pavilion - PSP Holdings LLC: PSP Holdings LLC, represented by Stephanie Hopkins with KM Engineering LLP, is requesting a rezone from MU (Mixed Use) to MU-DA (Mixed Use with a development agreement in lieu of a conditional use permit) for a Commercial Entertainment Facility (indoor and outdoor) for Premier Sports Pavilion. The applicant is also requesting a separate conditional use permit for a building height exception to 45-feet. The 6.24-acre site is located on the south side of State Highway 44, approximately 0.22 miles west of North Horseshoe Bend Road. (ASG) Mayor Pike introduces the item and opens the public hearing. Stephanie Hopkins with KM Engineering, 5725 N. Discovery Way, Boise, Idaho representing PSP Holdings LLC. Ms. Hopkins reviews the application. Discussion regarding screening, building height, screening and other aspects of the application. City Planner Andrew Glaspell reviews the staff report and items for special consideration. Anthony Bertagnolli, 2386 N. Viscaya Lane, Eagle Idaho. Mr. Bertagnolli addresses roof top screening, and architectural elements. Mayor Pike opens public testimony. Philip Clark ,1635 S. Whitby Lane, Eagle, Idaho. Mr. Clark states the proposal will impact his view shed. He would like to see the proposal but is concerned with the noise, as well as the request for an exception to 45' height exception. Bob Ward, 3007 E. Lakeland Lane, Eagle, Idaho. Mr. Ward questions the operating hours, and seeks confirmation that the hours proposed are 6:00 am to 10:00 p.m. He is hopeful that there will be enough buffering to counteract the noise. Page 8 I(:\COUNCIL\MINUTES\Temporary Minutes Work Area\CC-30-13-26m1n.docx Debbie Bryson, 10279 Lakeland Drive, Garden City, Idaho. Ms. Bryson is concerned with noise. She questions if the dark sky requirement will be addressed. Mateo Bertagnolli rebuts testimony. Provides clarification that the height is at the entrance of the building. Discussion regarding hours of operation, building height, trash enclosure location, court materials and impact to existing neighbors. Merrill moves to approve RZDA-2026-06/CUP-2026-15 - Rezone from MU to MU-DA (DA in lieu of a Conditional Use Permit) for a Commercial Entertainment Facility and a Conditional Use Permit for a Building a Height Exception for Premier Sports Pavilion - PSP Holdings LLC. To include discussion with the design review and Hardin Sanitation as to the different location that is more commensurate with the location for trash enclosures. Seconded by Gillis. ALL AYE ... MOTION CARRIES. 11. EXECUTIVE SESSION: 74-206 (1) An executive session at which members of the public are excluded may be held, but only for the purposes and only in the manner set forth in this section. The motion to go into executive session shall identify the specific subsections of this section that authorize the executive session. There shall be a roll call vote on the motion and the vote shall be recorded in the minutes. An executive session shall be authorized by a two-thirds (2/3) vote of the governing body. An executive session may be held: (f) To communicate with legal counsel for the public agency to discuss the legal ramifications of and legal options for pending litigation, or controversies not yet being litigated but imminently likely to be litigated. The mere presence of legal counsel at an executive session does not satisfy this requirement; No executive session is required. A. ACTION ITEM: Action Regarding Pendine/Threatened Litigation. 12. ADJOURNMENT: May moves to adjourn. Seconded by Merrill. ALL AYE...MOTION CARRIES. Hearing no further business, the Council meeting was adjourned. Res ctfully submitted: 6"c_ TRACY O ORN, CMC CITY CLERK APPROVED: BRAD PIKE, MAYOR •••`� •j OF EA '•••• •.• G��••N••••••C�� �•, :•GD�eORq�c�,os * SEAL Je • PORAIV 0"• o •. `lT ••••...•• N\ 01. AN AUDIO RECORDING OF THIS MEETING IS AVAILABLE FOR DOWNLOAD AT WWW.CITYOFEAGLE.ORG. Page 9 K:\COUNCIL\MINUTES\Temporary Minutes Work Area\CC-10-13-26min.docx October 13, 2026 PUBLIC COMMENT SIGN-UP This time is reserved for the public to address their elected officials regarding topics not on the agenda of general interest or concern. This is not the time slot to give formal testimony on a public hearing matter or comment on a pending application or proposal. Public Hearing and land use testimony is to be made during the open public hearing for said item(s)in accordance with Idaho Code. We desire to have all interactions between the public, staff and elected officials to be conducted in a professional and civil manner. Therefore, comments are to addressed solely to the Council as a whole, and focus on the issue, avoiding personalized debate, and shall not make personal, impertinent, slanderous or profane remarks to any member of the Council, staff or other members of the public. Out of courtesy for all who wish to speak, the City Council requests each speaker limit their comments to three (3) minutes. PLEASE PRINT LEGIBLY ADDRESSNAME •' V/�'u "�p u2l�j�¢�`FL q�9,1) A/, `�r��LY �� �i nYs4�ic ���ear�w� October 13, 2026 PUBLIC HEARING: 10C \ SUBJECT: A-2026-01/RZDA-2026-01/CPA-2026-01/CUP-2026-05/PPUD-2026-01/PP- 2026-01— Wellspring Subdivision — Rob R. Nash, represented by Dave YorEason with Tall Timber Consulting. NAME ADDRESS IZ El NEUTRAL �/ , ( (/� ShC� % jI p� li K I �-C! v\ � FN° C � cC'f a L� �'2k E NO L`a,, Jcs Cede A4&4 ic,, T--J H NO S\ Mm'A � � �� � \S t �17 H El"FA IN) IZ M I fah"/G�e 1 A (� ��S'% RT El c��/� YES 1 C, t ) �L YES M P�b o�errf / " l 70/ G� �3aw�s�:te Yr 91 NO me , �+CImo. ► v (� vv� p ® Pro �J 9CY& FX-l4Aa C✓ C� /C� El e ' 2 vv r-,\ eSIG,-c,\v-j *-3 YES � 0) \J October 13, 2026 PUBLIC HEARING: 10C SUBJECT: A-2026-01/RZDA-2026-01/CPA-2026-01/CUP-2026-05/PPUD-2026-01/PP- 2026-01— Wellspring Subdivision — Rob R. Nash, represented by Dave Yorgason with Tall Timber Consulting. NAME ADD' 9904 c k�k 2-�'�31 I`� ` � of � �1 � '�L YES H NEUTRAL 'p � a t1 U _?L" �Vv-,X�l 6Z ��J Q- YES E \ ,� 33 E E 1 r� El® VGA H NO YES NO YES NO YES NO YES NO YES NO YES NO YES E YES NO YES El_ October 13, 2026 PUBLIC HEARING: 10E SUBJECT: RZDA-2026-06/CUP-2026-15 - Rezone from MU to MU-DA (DA in lieu of a Conditional Use Permit) for a Commercial Entertainment Facility and a Conditional Use Permit for a Building a Height Exception for Premier Sports Pavilion - PSP Holdings LLC NAME j ADDRESS NO E NEUTRAL E ElK NO YES NO NO E EE YES E YES NO YES E YES E YES NO YES NO YES NO YES NO October 13, 2026 PUBLIC HEARING: 10D SUBJECT: RZDA-2022-09/PP-2022-15 - Rezone with a Development Agreement and a Preliminary Plat for Shekinah Subdivision - Mark Bottles NAME L'"La qr-dL'l/�.Gl Vl ADD' I S�Q W Co fC 4--e S fvr D-. Y NO NEUTRAL MFNol YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO fop 4, ANC dAr J4, a#W to coxx.4 r / JMLI r Officers: Trai/ President: Vice President: Mayor Brad Pike City Council Members City of Eagle Re: Wellsprings Subdivision Application 5700 East Franklin Road, GO Nampa, Idaho 93 „ Wm. F. Gigray, III _ 40 Bill Mullane Secretory: Sharon Hubler Treasurer: Philip A. Peterson October 6, 2026 Dear Honorable Mayor and City Council Members: The Board of Directors of the Foundation for Ada/Canyon Trail Systems, Inc., ("FACTS") has authorized Robert Minch (who is a member of the Board of Directors) who lives at 701 W. Bankside Drive in Eagle, to speak on behalf of FACTS regarding the above referenced Application. FACTS is a regional nonprofit organization dedicated to promoting the planning, development, construction, and long-term maintenance of interconnected pedestrian and bicycle pathways throughout Ada and Canyon Counties. One of our principal initiatives is the completion of a continuous Boise River Greenbelt Pathway extending from Boise through Caldwell to the confluence of the Boise and Snake Rivers, connecting communities, parks, schools, businesses, and public lands along both sides of the Boise River. To advance this initiative, the FACTS Board of Directors adopted Resolution No. 2026-02 establishing the Boise River Pathways Promotion Committee as a standing committee of the Board. The Committee is charged with promoting the development, recognition, preservation, and implementation of a unified regional plan for continuous public non -motorized pathways along both sides of the Boise River, extending from Boise through Caldwell to the confluence of the Boise and Snake Rivers. Among its specific responsibilities, the Committee monitors subdivision and other land -use applications involving property along or near the Boise River that may affect an existing or F.A.C.T.S. Established in 1987 MISSION STATEMENT Our mission is to close the gaps on the greenbelt along the Boise River, creating connective pathways from Lucky Peak Dom to the Snake River confluence, and to promote coherent corridors for active transportation throughout the valley. future pathway corridor, and identifies locations where development could eliminate or substantially impair a reasonable opportunity for continuation of the pathway, so that those matters can be brought to the attention of the appropriate governmental agency early enough to permit consideration of alternatives. in establishing the Committee, the FACTS Board found that a continuous Boise River pathway system cannot be accomplished by any single city, county, highway district, state agency, or private organization, and that subdivision approvals, development agreements, dedications, and casements provide important opportunities to preserve portions of the future pathway system as development occurs. Robert Minch serves as Vice Chairman of the Committee, which held its organizational meeting on October 6, 2026, and this letter is submitted as part of the Committee's work. The Wellsprings Subdivision Application presents exactly the kind of decision the Committee was created to address. FACTS appreciates the considerable work that has gone into reviewing this application. Robert Minch has reviewed portions of the public record, including the discussions before the Parks, Pathway and Recreation Commission and the Planning and Zoning Commission. It is clear that the importance of future pathway connectivity has received thoughtful consideration. Those discussions also demonstrate that there are still unresolved questions involving Eagle island State Park, the Idaho Department of Lands, future access opportunities, and connections farther west toward Linder Road. We also understand that the City is updating its Pathway Master Plan, making it even more important that today's decisions preserve future planning options. From FACTS' perspective, those uncertainties make long-term planning even more important. Subdivision approvals are often the only opportunity local government has to preserve future public pathway corridors before development permanently establishes property boundaries, infrastructure, and access limitations that become much more difficult —and far more expensive —to address later. The City of Eagle has earned an outstanding reputation for planning and constructing one of Idaho's finest pathway systems. FACTS hopes that leadership will continue as Eagle works with neighboring jurisdictions to complete a continuous Boise River Greenbelt Pathway connecting Boise, Garden City, Eagle, Star. Middleton, and ultimately Caldwell. FACTS is currently working with the City of Eagle, the City of Star, and the Ada County Highway District to support construction of a future pedestrian underpass beneath the planned Linder Road widening project. That crossing will become one of the key regional links in the Boise River Greenbelt Pathway system. The decisions made today should preserve the City's ability to connect to that future facility. Accordingly, FACTS respectfully requests that, in acting upon this application, the Council ensure that nothing in its decision unnecessarily forecloses or limits the City's future ability to establish the Boise River Greenbelt Pathway corridor, whether through this property, adjacent public lands, or coordinated planning with other public agencies. F.A.C.T.S. Establisher! in 1987 MISSION STATEMENT Our mission is to close the gaps on the greenbelt along the Boise River, creating connective pathways from Lucky Peak Dam to the Snake River confluence, and to promote coherent corridors for active transportation throughout the valley. If additional easements, right-of-way dedications, pathway alignments, or other conditions of subdivision approval can reasonably be included now to preserve future regional connectivity consistent with the City's Pathway Master Plan and its ongoing planning efforts, FACTS respectfully encourages the Council to do so. Regional pathway systems are built one subdivision at a time. Every development approval either preserves future opportunities for regional connectivity or makes those connections more difficult to achieve. FACTS respectfully asks the Council to ensure that today's decision preserves, rather than limits, Fagle's long-term vision for the Boise River Greenbelt Pathway. FACTS looks at development proposals not just for what they accomplish today, but for what they make possible (illy years from now. Our objective is not to delay this development or to comment on the many other issues before you this evening. Our objective is simply to help preserve the opportunity for future generations to enjoy a continuous regional pathway system along the Boise River. Thank you for your time, your thoughtful consideration of this application, and your continued leadership in developing Eagle's exceptional pathway system. Sincerely, Sincerely %r r. Wm. F. Gigray, IT Robert Minch President Director rF.A.C.T.S. Established in 1987 MISSION STATEMENT Our mission is to close the gaps on the greenbelt along the Boise River, creating connective pathways from Lucky Peak Dam to the Snake River confluence, and to promote coherent corridors for active transportation throughout the valley. 10/30/2026 1 AGENDA INTRO 2 MEET THE TEAM 3 VISION &PURPOSE 4 COMMUNITY BENEFITS 5 PROPOSED PARTNERSHIP 6 ; NEXT STEPS 1 1 10/30/2026 3 ROOTED HERE Public Art Mural Native wildflower mural located at 148 E State Street 25' x 35' Local Artist Team Designed and lead by local artist Emily Biethman 3 Celebrating Idaho's Natural Beauty The mural connects Eagle's growing downtown with the natural beauty that defines our community 4 4 FA 10/30/2026 5 ROOTED HERE Vision & Purpose Create a meaningful and lasting public art work that... ■ Celebrates Eagle's connection to nature ■ Enhances the visual character & vibrancy of downtown ■ Creates iconic landmark for visitors & residents ■ Encourages engagement with public spaces ■ Inspires civic pride through accessible & uplifting public art MEET THE TEAM Meg Glasgow Steve Glasgow Emily Jessica Henry Glasgow Group Glasgow Group Biethman Assistant President Lead Artist Meg, an Idaho Steve leads Emily Biethman Jessica is a life - native, founded Glasgow Group is an Idaho -born long painter and Finer Frames in a family -owned artist with a fine arts educator 1999 and is an real estate arts degree from working in author, designer development The College of acrylics. You can and national and Idaho. Her work is often find her educator in the construction inspired by the painting along framing industry. business natural the river with her landscapewhere dog Rebel s y� she grew up. I K 10/30/2026 Rooted Here reflects the plants and the people who call Idaho home. It speaks to memory, belonging, heritage, and the ways our roots continue to grow. BENEFITS STRATEGIC DOWNTOWN IMPACT Supporting the Future of Downtown Eagle 1 The mural contributes to... A vibrant city center and stronger sense of place 2 Cultural Tourism Community gathering space connecting pedestrian corridor from parking to main street 3 Community Connection As Eagle continues to grow, public art helps preserve character, authenticity, and community connection. 3 10/30/2026 COMMUNITY BENEFITS Economic Benefit"%� 7� x 9 y i Encourages !, tourism and visitor spending,,,` 3 Creates a recognizable destinationA 3 Gene rates socialmediavisibiIityandcommunitymarketing " k' Community Benefits Strengthens Eagle's identity&civic pride t Adds beauty and cultural value - Provides free, accessible art for everyone Placemaking Benefits Activates blank wall space � Improves pedestrian experience<' Enhances the downtown streetscape a I PARTNERSHIP OPPORTUNITY A Collaborative Investment in Eagle's Future Glasgow Group Contributions Project coordination Site preparation support Longterm maintenance commitment Requested City / EAAC Partnership e Public art funding support Assistance with promotion and visibility Participation in Eagle's Public Art Program p a gN This project is more than a mural — it is an investment in community identity, culture, and place. 10 10/30/2026 ROOTED HERE Budaet Artistic Design & Project Management $3500 Lead Artist Compensation $4500 Assistant Artist Compensation $3000 Surface Preparation & Surface Coating $2000 Paint, Supplies& Materials $2500 Lift & Equipment Rental $2000 Anti -Graffiti Coating $1000 Contingency $1500 Estimated Total Project Cost $20,000 11 NEXT STEPS STEP 1 Adopt ROOTEDHERE as Eagle's next public art project and commit to financial support STEP 2 Artistic team creates the mural STEP 3 Celebrate with the community at the mural's dedication Fall 2026 12 MURAL PROJECT BUDGET Total Estimated Gast: $20,000 . *.t b "5W PNxt Wrapds,W sr3.5%.i.. � teat arc curt,wroarott 94,5E�t' w;wnancu-�.9EKE.-. tr��t aO p�"s,u«Es stow swwa co aup !W%% �! Pdre.8a6 fI,SoO iieb E�z.s+M, LtnrEa�w+�+urwnm $L9W..; Mu sti ca.uaQ EaV'... trsxt' ESTWATEOTOTAL I �jLF��j� PROJECT COST i _ LG u00 EAAC & $10,000 City of Eagle Contribution IN R 10/30/2026 THANK YOU Meg Glasgow GLASGOW GROUP rneg@finerframes.com 13 7 10/30/2026 Wellspring Eagle City Council October 13, 2026 1 Wellspring: Items for Re-evaluation 1. Elevation of building pads & Finished Floor Elevations 2. Density / # of Lots 3. Snow removal and snow storage 4. Pathway easement along the Boise River 2 1 10/30/2026 _ __ _ . r=:^ ocaf A Wellspring Subdivision 5 3. Snow removal and Snow Storage Not aware of any city codes or standards, but we have a plan: 1. use ACHD Best Management Practices to ensure storm water (including snow melt) is treated prior to WOTUS 2. storm water swales + new common lot for snow storage area • Rob's expertise in Alaska 3. Snow maintenance plan included in a master 0&M Manual for streets & storm water mgt in the CC&Rs yCondition: Include snow maintenance plan in O&M Manual / CC&Rs 0 3 10/30/2026 4. Pathway Easement along Boise River • Agree to add pathway easement along Boise River • Added a common lot for dedicated area ➢ New Condition: Provide 25-foot access easement for future public pathway adjacent to Boise River on Common Lot 30 Block 1 "1 New Common lot for Pathway Easement �1Lfi• !; -- ti 10 5 10/30/2026 Conclusion • Thank you for re-evaluating • Thank you for your comments, it has made a better development • Excited to bring this quality development to Eagle with noted benefits • Agree with the staff report • Request approval Si. L—H.. Map 13 Thank You 14 10/30/2026 WELLSPRING SUBDIVISION L2-:111 _j 7 7!r, rill o o IEGEND- . ....... . . PP1.0 17 Site on July 8, 2026 4.1 0 10/30/2026 No Net Loss Grade Elevations - ° o ° o 0 _ s Cic EX1.0 21 Conveyance Channel • FXI9TWU ,S CULVERT • —.. �— (61LTEC IN) p o Existing pond head gate � ✓Remove small culvert /dam �\ �j ✓ Clean out pond head gate © `\�� . ® ---- - --.., _._ ✓ Create channel i EM.0 22 11 10/30/2026 25 Agency letters with comments / approvals: ✓ Ada County ✓ ACHD ✓ Central District Heath Dept ✓ Idaho DEQ ✓ ITD ✓ Eagle Fire Department ✓ Eagle Sewer District (pending plan approval) ✓ Eagle City Engineer and Water (pending plan approval) ✓ Flood Control District 10 Pz1 13 10/30/2026 Pathways and Trails: Eagle PPRC discussion ✓ Providing sidewalks, trail, & frontage pathway ✓ Idaho Parks and Rec comments: • Very clear: Do not want uncontrolled access pathway installed to the park, especially to the back of the park. • Discussed an easement • They don't know where the pathway MIGHT connect IF there is path in future • PPRC: agreed to not require pathway due to uncertainty • Solution... we evaluated the site: • Installing 10' multi -use path at Hatchery Rd. frontage • Installing fence on east border to restrict access to park land • Determined adequate land available on State land for future pathway if State decides to install path on State Park land. • Emergency access for Flood control approved • Existing public access to river (Linder Road and State Park) 29 15 HICRMP Member Incident/Potential Claim Form MEMBER NAME: For Notification Use Only. To Be Completed by Risk Manager and Sent to ICRMP when Tort/Claim HAS NOT been Filed by Claimant. (PLEASE PRINT) 1. Mailing Address: 2. City/State/Zip: 3. Risk Manager/Contact: 4. Phone: 5. Fax: Email: 6. Date of Incident: Department Involved: 7. Who reported the incident to you? 8. Time of Incident: a.m./p.m. (circle one) 9. DESCRIBE IN DETAIL WHAT DAMAGE OR INJURY OCCURRED: (Attach additional documentation if necessary) Employee(s) / Persons Involved: If this incident could have been avoided describe how: Signature: Date: Per Idaho Statute Title 41, Chapter 13: 41-1331-Any person who knowingly, and with intent to defraud or deceive any insurance company, files a statement of claim containing any false, incomplete, or misleading information is guilty of a felony. "Statement' includes, but is not limited to, any notice, statement, proof of loss, bill of lading, receipt for payment, invoice, account, estimate of property damages, bill for services, diagnosis, 11 /20/2026 SHEKINAH SUBDIVISION Aspen Creek at Banbury Meadows Eagle City Council September 22, 2026 1 Property • SWC Colchester and Eagle Rd. •�� uCI.L G:{ • 6.08Acres-3 parcels 1e' - CRnHE Ia[ J • 2 existing access points on Eagle Road. • Adjacent to Banbury Golf Course and Lake More Commercial. y Y 3 Rezone • Current Zoning:R-2 • Requested Zoning C-2-DA • FLUM: Commercial • Compatible with Comprehensive Plan • Compatible with Surrounding Uses • Prohibited C-2 Uses o storage o Automot— eody shop o Au[omot- vehicle vinyl wrap shop o Cemetery Kann.1 Pawnshops o Tatroo parlor and body piercing establishments o storage o Truck stop o Terminal yard, trucking Truck and equipment repair and sales (heavy) Public Utilfty Yard a Railroad yard or shop Gas Station o Convenience Store 5 Future Land Use Map 4 3 REQUESTED APPROVALS 1. Rezone: R-2 (Residential) to C-2-DA (General Business District with a Development Agreement) 2. Preliminary Plat Project Community Commercial Center Office • Restaurants • Neighborhood Services Rezone - Neighborhood Compatibility Through Banbury Meadows Easement Agreement Voted on by households: • "Yes"-187 "No" -10 Easement Agreement Imposed Restrictions: • Prohibits national -chain fast food and drive -through coffee users • Prohibits gas station, car wash, liquor store, tobacco, vape stores or any other adult uses • Caps building square footage to59,700SF E 11 /20/2026 Rezone -Approved Drive Through • 2 Requested Drive-Throughs • No National Chain Coffee or Restaurant users allowed • No" Drive-t h rough Only" users • Additional Landscape Screening • Design Guidelines including canopies, detailed and pedestrian -friendly windows and massing. Rezone -Architectural Guidelines . ' • • 4' .f t YOGA 4� Controlled Accesses • Colchester Drive o Right in o LeftI n o Right Out • Eagle Road right-in/right-out • Future cross -access for southern properties 11 Drive -Through M. I l� I Preliminary Plat • 6.08 acres • '� • 9 total lots • 8commerciallots • 1 common/open- spacelot I. Conceptual Site Plan 50,275 SF Commercial - �1 Buildings _ • 243 Parking Spots (219 Required) ,mow: 10 Landscape Plan r = ;r L Fin 1 t: ^ 1 1 7a;.:t, 12 2 11 /20/2026 SUPPLEMENTAL MATERIALS 13 11 /20/2026 1 3 STATEMENTS 71 Mission T Vision ^ Value Proposition Build athletes and Build the model for One d.stinctbn for strengthen the complete athlete training, leagues, community through development, strength, simulations ,..ovary, and stondardsdriven training, power, speed, agility, and hospitality, so athletes, competition, and endurance, backed by families, and the broad., recovery, delivered in a confidence, discipline, and community can came, premium, tech -enabled decision -making under together to foster better pavilion that runs like a pressure. health, aduccitional, and pro organization. social devalopmarrt. 5 2 4 6 �a,wa,.a.aae, C--d BrEw Dbw- t4gd 1.4wW keetpae Gersid livnpr ObcmrdapeGb+ bind biwbn iap+q vsv �tki.m „arq i.. ae +wm .Wm. ry a...wp..•. ,�,.. e. ...i.wa.o.ae.m..,. ep.R.. LLs ,., e. ass. SITE LAYOUT Building Size 21,717 SF Canopy Size 87,700 SF Land Size 6.25 Acm Porking 216 Stalls Zoning Mired -Use Building Height 43.5 F7 Canopy Height 40FT 1 11 /20/2026 SITE LAYOUT �,y' i � Access will ba taken from State _..^ Highway U with a dedicated Right-H.r Deceleration Lana 7 AIRNASIUM COMPETITION COMPLEX ,Lacrosse, dl) sal, Volleyball) eating iing I 11 Interior Training Facility 8 10 12 Gym • Batting Cages • Batting Simulators • Golf Simulators • Saunas/Cold Plunges Cafe • Sports Bar • Media Studio 1 1 /20/2026 13 SECOND - FLOOR 15 WEST SIDE PARKING LOT 17 FIRST FLOOR 14 16 ROADSIDE MATCHING ST. LUKENS 6 lecrwHY 18 3 11 /20/2026 19 TRAFFIC STUDY y Study Am AM and PM Pack Hoar Cond''W— S q 1. E State Street/ SH 44 at SH 55""" f 2. E State Street/ SH-44 at Horseshoe Bend 0 Road 3. E State Street/ SH-44 at Site Access 21 TRAFFIC DATA 23 TRAFFIC DATA ��. IW!.7 . aw. aow, i ® .. ssoio aaoio 22 24 0 ATHLETIC TRAINING & GYM SNAP COURTS FIFAPofessional Size- Futsal Courts FF� r AhilitytoCovert Basketball Courts(4Courts) •.• £ na �y. e.aao uo y 2 1138FT x 84FT 5re Fi?IAt •.f �J ,,e ,� a _ JILµ, Y REHAB We provide resources for athletes to rehab mom site. In our locker rooms, we want to provide saunas and I then a cold plunge in a separate room to facilitate all aspects of rehab. ti CAFE JUST WALK OUT r Inside our building will be a mixed -use cafe and small, tech -efficient market for sports drinks, chip, snack, and other food goods. along with branded merchandise. --• r" !i[Trax BATTING SIMULATORS Aw 11 /20/2026 ADVANCED ROLF SNBUTATOR BOILT FOR RFAl1SM 31.