Loading...
Findings - 2026 - PU-2021-01-MOD1 - Valnova - Planned unit master plan (pump) No. 1 modification for ValnovaBEFORE THE EAGLE PLANNING AND ZONING COMMISSION IN THE MATTER OF AN APPLICATION FOR A PLANNED UNIT MASTER PLAN (PUMP) NO. 1 MODIFICATION FOR VALNOVA FOR CLYDE CAPITAL GROUP FINDINGS OF FACT AND CONCLUSIONS OF LAW CASE NUMBER PU-2021-01-MOD1 The above -entitled Planned Unit Master Plan (PUMP) modification application came before the Eagle Planning and Zoning Commission for their recommendation on October 19, 2026, at which time public testimony was taken and the public hearing was closed. The Eagle Planning and Zoning Commission, having heard and taken oral and written testimony, and having duly considered the matter, makes the following Findings of Fact and Conclusions of Law: FINDINGS OF FACT: A. PROJECT SUMMARY: Clyde Capital Group, represented by Eric Langvardt with Langvardt Design Group, is requesting approval for modifications to the approved Spring Valley Planning Unit Master Plan (PUMP) No. 1. The proposed modifications include amendments to the land use designations and residential densities, roadway configurations, roadway types, open space adjacency, and allocated open spaces within Lot 6 and Lot 8, Block 1, of the Spring Valley Subdivision No. 1 large lot plat. The 1,005.91- acre site is generally located 3,000-feet northeast of the intersection of State Highway 16 and Equest Lane, approximately 1 mile north of the Beacon Light Road and Linder Road intersection. B. APPLICATION SUBMITTAL: This application was originally submitted to the City on July 6, 2026. C. NOTICE OF PUBLIC HEARING: Notice of Public Hearing on the application for the Eagle Planning and Zoning Commission was published in accordance with the requirements of Title 67, Chapter 65, Idaho Code and the Eagle City Code on October 4, 2026. Notice of this public hearing was mailed to property owners within three -hundred feet (300-feet) of the subject property in accordance with the requirements of Title 67, Chapter 65, Idaho Code and Eagle City Code on October 2, 2026. Requests for agencies' reviews were transmitted on September 17, 2021, in accordance with the requirements of the Eagle City Code. The site was posted on October 7, 2026. D. HISTORY OF RELEVANT PREVIOUS ACTIONS: This development received original entitlements and approvals under the working name "M3 Eagle ", which was later changed to "Spring Valley" when the property came under new ownership. This was later changed to "Valnova. " • On December 11, 2007, the City Council approved an annexation and rezone application with a development agreement from RP (Rural Preservation — Ada County designation) and RR (Rural Residential — Ada County designation) to R-1-DA (Residential One with a development agreement) for M3 Eagle (A-14-06 & RZ-19-06). • On November 24, 2009, the City Council approved a development agreement modification to adopt the M3 Hillside and Grading Standards on November 24, 2009 (RZ-19-06 MOD1). Page 1 of 27 Spring Valley PUMP No I MOD Findings PZ • M3 received a Conditional Letter of Map Revision (CLOMR) from FEMA on February 17, 2009. An amendment was submitted in March of 2013 and was approved by FEMA on November 8, 2013. • On January 11, 2011, the City Council approved the overall project -wide Habitat Mitigation Plan. • On January 14, 2014, the City Council approved an amended and restated development agreement for M3/Spring Valley (RZ-19-06 MOD2). • On January 14, 2014, the City Council approved the M3/Spring Valley Development Standards and by the adoption of Ordinance 710, established Eagle City Code Title 11 — Planned Developments, Chapter A — Spring Valley. • On May 24, 2022, the City Council approved Planning Unit Master Plan (PUMP) No. 1 for Valnova which consists of 1,005.9 1 -acres (503-acres of open space), 2,199 residential units, and 150,000-square feet of non-residential uses (PU-01-21). • On July 11, 2023, the City Council approved Planning Unit Master Plan (PUMP) No. 2 for Valnova which consists of 81.06-acres of land designated as Regional Open Space (PU-01-23). • On July 11, 2023, the City Council approved Planning Unit Master Plan (PUMP) No. 3 for Valnova which consists of 603.04-acres of land designated as Regional Open Space (PU-02-23). • On March 12, 2024, the City Council approved Planning Unit Master Plan (PUMP) No. 4 for Valnova which consists of 24.2-acres of land; (1) Estate Residential lot (9.92-acres) and (14.28-acres designated as Regional Open Space (PU-03-23). • On December 10, 2024, the City Council approved Planning Unit Master Plan (PUMP) No. 5 for Valnova which consists of 1,936.82-acres (824.96-acres of open space), 1,674 residential units, and 300,000 square feet of non-residential Neighborhood Center uses. E. COMPANION APPLICATIONS: The applicant has submitted a preliminary plat (PP-2026-07) for Valnova Holmbrook, a re -subdivision of Lots 6 & 8 of the Spring Valley Large Lot Plat No. 1 Page 2 of 27 Spring Valley PUMP No 1 MOD Findings PZ COMPREHENSIVE PLAN LAND USE MAP AND ZONING MAP DESIGNATIONS: Comprehensive Plan Designation: Zoning Designation: Land Use: Existing Foothills Residential R-1-DA Approved in PUMP No. 1: SFA (Single Family Attached) SFSL (Single Family Special Lot) SF3 (Single Family 3) SF2 (Single Family 2) ROS (Regional Open Space) COS (Community Open Space) Proposed Foothills Residential R-1-DA (No Change) Proposed in PUMP No. 1 MOD: (No Change) SF3 (Single Family 3) SF2 (Single Family 2) ROS (Regional Open Space) COS (Community Open Space) North of site Foothills Residential R-1-DA SFA (Single Family Attached) (Ada County S173 (Single Family 3) Designation) SF2 (Single Family 2) No Change ROS (Regional Open Space) COS (Community Open Space) South of site BLM Land PS (Public/Semi-Public) Native Foothills East of site BLM Land PS (Public/Semi-Public) Native Foothills West of site Rural Residential R-1-DA SF3 (Single Family 3) (Ada County SF2 (Single Family 2) Designation) ROS (Regional Open Space) COS (Community Open Space) Page 3 of 27 Spring Valley PUMP No 1 MOD Findings PZ G DESIGN REVIEW: Subject to ECC 11A-3 - Spring Valley Design Review GENERAL PUMP No. 1 DATA/DESIGN: Items shown with strike-thru text reflects development data approved in the original PUMP No. I application that is proposed to be amended through this PUMP No. I MOD, which is shown with underline text. 1. PUMP No. 1 Overall — Acreage*: (See 1.4 "Planning Concept" and Table 1: Project Summary in the Development Agreement) Total Acreage of Spring Valley: 6,017.00 acres Proposed Total Acreage in PUMP No. 1: 1,005.91 acres Proposed Residential Acreage in PUMP No. 1: 500.84 ae;-es 502.61 acres Proposed Non -Residential Area in PUMP No. 1: 150,000 square feet Proposed Open Space in PUMP No. 1: 505.0es 503.30 acres a. Southwestern Residential PA Acreage*: Total Acreage of PA in Spring Valley: 419.00 acres Total Acreage of PA in PUMP No .1: 307.92 acres Residential Acreage in PA: 147�er-es 149.42 acres Non -Residential Area in PA: 0 square feet Open Space Acreage in PA: ' 60.'�er-es 158.50 acres b. Southern Residential PA Acreage*: Total Acreage of PA in Spring Valley: 2,114.00 acres Total Acreage of PA in PUMP No. 1: 153.55 acres Residential Acreage in PA: 38.65 acres Non -Residential Area in PA: 0 square feet Open Space: 114.90 acres c. Northern Residential PA Acreage*: Total Acreage of PA in Spring Valley: 2,76.000 acres Total Acreage of PA in PUMP No .1: 276.49 acres Residential Acreage in PA: 152.08 acres Non -Residential Area in PA: 0 square feet Open Space: 124.41 acres d. Big Gulch PA Acreage*: Total Acreage of PA in Spring Valley: 636.00 acres Total Acreage of PA in PUMP No .1: 267.95 acres Residential Acreage in PA: 151.00 acres Non -Residential Area in PA: 150,000 square feet Open Space: 105.49 acres e. Highway Mixed Use PA Acreage*: Total Acreage of PA in Spring Valley: 88.00 acres Total Acreage of PA in PUMP No .1: 0 acres Residential Acreage in PA: 0 acres Non -Residential Area in PA: 0 square feet Open Space: 0 acres *Current as proposed within the PUMP No. 1 MOD application — dated July 2026 Page 4 of 27 Spring Valley PUMP No I MOD Findings PZ 2. PUMP No. 1 Overall Residential Units: (See 1.4 "Planning Concept" and Table 1: Project Summary in the Development Agreement) Maximum Allowable Units in Spring Valley: Number of Units in PUMP No. 1: Remaining Units in Spring Valley: Current Total Development Density: Current PUMP No. 1 Density: Maximum Density Spring Valley: 7,160 units max., total' 2,199 units 4,960 units, max. 0.3 7 du/ac 2.19 units per acre 1.19 du/ac, max. 'Including all applicable bonus densities or if developed per the D.A. a. Southwestern Residential PA Residential Units*: Maximum Allowable Units in PA: 449 units Proposed Units in PA in PUMP No. 1: 449 units** Remaining Units in PA: 0 units Maximum Allowable PA Density: 1.07 du/ac, max. Current Total PA Density: 1.07 du/ac Current PUMP No.1 PA Density: 1.46 du/ac ** The applicant is proposing a net reduction of (17) buildable lots within the focus area of this application from the original PUMP No 1 approval but desires to retain the total number of proposed buildable lots of 449 within the Southwestern Residential Planning Area for potential distribution throughout the remainder of the Southwestern Residential PA in PUMP No. 1. b. Southern Residential PA Residential Units*: Maximum Allowable Units in PA: 2,109 units Proposed Units in PA in PUMP No. 1: 192 units Maximum Remaining Units in PA: 1,917 units, max. Maximum Allowable PA Density: 0.96 du/ac, max. Current Total PA Density: 0.09 du/ac Current PUMP No.1 PA Density: 1.25 du/ac c. Northern Residential PA Residential Units*: Maximum Allowable Units in PA: 5,917 units Proposed Units in PA in PUMP No. 1: 422 units Maximum Remaining Units in PA: 5,495 units, max. Maximum Allowable PA Density: 2.14 du/ac, max. Current Total PA Density: 0.15 du/ac Current PUMP No.1 PA Density: 1.53 du/ac d. Big Gulch PA Residential Units*: Maximum Allowable Units in PA: 3,335 units Proposed Units in PA in PUMP No. 1: 1,136 units Maximum Remaining Units in PA: 2,199 units, max. Maximum PA Density: 5.24 du/ac, max. Current Total PA Density: 1.79 du/ac Current PUMP No.1 PA Density: 4.24 du/ac Page 5 of 27 Spring Valley PUMP No 1 MOD Findings PZ e. Highway Mixed Use PA Residential Units*: Maximum Allowable Units in PA: 500 units Proposed Units in PA in PUMP No. 1: 0 units Remaining Units in Spring Valley: 500 units, max. Maximum PA Density: 4.68 du/ac, max. Current Total PA Density 0.00 du/ac Proposed PUMP No.1 PA Density: 0.00 du/ac • The number of dwelling units shall not exceed 7,160 dwelling units for the entire Project unless Additional Property is annexed into the City and made subject to the approved development agreement. • At no time shall the buildable lot total in any planning area exceed the allowable maximums as allowed through the development agreement. (See 1.4 "Planning Concept" and Table 1: Project Summary in the Development Agreement) Upon approval of PUMP No. 1, the Southwestern Residential Planning Area will have consumed 99.8% of the units (449 of 450 max. total) allowed within the Planning Area, but will only have consumed 73.5% of the acres (307.92 of 419 max. total) of the Planning Area. Additionally, PUMP No. 4 consumed the last remaining buildable lot within the Southwestern Residential Planning ArNo further residential development shall occur within the Southwestern Residential Planning Area. *As proposed within the PUMP No. I MOD application — dated July 2026 3. PUMP No. 1 Bonus Density Allocation: (See 1.4 "Planning Concept " and Table 1: Project Summary in the Development Agreement) a. Spring Valley Totals*: Maximum Allowable Units in Spring Valley: 7,160 units max., total' Total Units Consumed in PUMP No. 1: 2,199 units Maximum Remaining Units in Spring Valley: 4,960 units, max. 'Including all applicable bonus densities or if developed per the D.A. b. Base Density*: Maximum Base Density Units in Spring Valley: 3,008 units Base Density Units Consumed in PUMP No. 1: 1,141 units Remaining Base Density Units in Spring Valley: 1,867 units, max. c. Community Open Space (COS)*: Total COS Bonus Units Allowed in Spring Valley: 161 units COS Bonus Units Earned in PUMP No. 1: 0 units COS Bonus Units Consumed in PUMP No. l: 0 units Remaining COS Units in Spring Valley: 161 units, max. d. Regional Open Space (ROS)*: Total ROS Bonus Units Allowed in Spring Valley: 880 units ROS Bonus Units Earned in Pump No. 1: 0 units ROS Bonus Units Consumed in PUMP No. 1: 0 units Remaining ROS Units in Spring Valley: 880 units, max. Page 6 of 27 Spring Valley PUMP No 1 MOD Findings PZ e. Community Center (CC)*: Total CC Bonus Units Allowed in Spring Valley: 220 units CC Bonus Units Earned in PUMP No. 1: 0 units CC Bonus Units Consumed in PUMP No. 1: 0 units Remaining CC Units in Spring Valley: 220 units, max. f. Neighborhood Center (NC)*: Total NC Bonus Units Allowed in Spring Valley: 2,240 units NC Bonus Units Earned in PUMP No. 1: 1,448 units NC Bonus Units Consumed in PUMP No. 1: 1,059 units Remaining NC Units in Spring Valley: 1,181 units, max. g. Open Space Funding (OSF)*: Total OSF Bonus Units Allowed in Spring Valley: 651 units OSF Bonus Units Earned in PUMP No. 1: 0 units OSF Bonus Units Consumed in PUMP No. 1: 0 units Remaining OSF Units in Spring Valley: 651 units, max. 144.80-acres of Neighborhood Center area have been consumed for the property. Upon approval of PUMP No. 1, 95.2-acres of Neighborhood Center area remain for future use. • 1,141 Base Units and 1,059 Bonus Units (associated with the implementation of a Neighborhood Center) have been consumed for the property upon approval of PUMP. No. 1. • 389 Bonus Units (associated with the implementation of Neighborhood Centers) are unused in PUMP No. 1. These units shall carry over into future PUMP applications for future use. *As proposed within the PUMP No. I MOD application — dated July 2026 4. PUMP No. 1 Open Space Overall*: (See 2.6(a) "Master Parks, Trails, and Open Space Plan " in the Development Agreement) Total Open Space: Regional Open Space: Community Open Space: % Open Space: Required Minimum Open Space: Total Open Space Goal: a. Southwestern Residential PA Open Space*: Total Open Space: Regional Open Space: Community Open Space: % of Developable Acres: Required Minimum PA O.S.: b. Southern Residential PA Open Space*: Total Open Space: Regional Open Space: Community Open Space: % of Developable Acres: Required Minimum PA Open Space: 505.07 —aer-es 503.30 acres 332.^09 avid 332.84 acres "'.9tee; 170.46 acres 3&2% 50.0% of 1,005.91 acres) 20% (201.18-acres) 40% (402.36-acres) 60.'rvv s7nvres 158.50-acres "`.° es127.55 acres 33.47 aoies 30.95 acres 52.0% 51.5% (of 307.92 acres) 15% (46.19 acres) 114.90 acres 99.41 acres 15.49 acres 74.8% (of 153.55 acres) 15% (23.03 acres) Page 7 of 27 Spring Valley PUMP No 1 MOD Findings PZ c. Northern Residential PA Open Space*: Total Open Space: 124.41 acres Regional Open Space: 42.60 acres Community Open Space: 81.81 acres % of Developable Acres: 45.0% (of 276.49 acres) Required Minimum PA Open Space: 15% (41.47 acres) d. Big Gulch PA Open Space*: Total Open Space: 105.49 acres Regional Open Space: 63.28 acres Community Open Space: 42.21 acres % of Developable Acres: 39.4% (of 267.95 acres) Required Minimum PA Open Space: 15% (40.19 acres) e. Highway Mixed Use PA Open Space*: Total Open Space: 0 acres Regional Open Space: 0 acres Community Open Space: 0 acres % of Developable Acres: 0% (of 0 acres) Required Minimum PA Open Space: 0% (0 acres) *As proposed within the PUMP No. 1 MOD application — dated July 2026 5. PUMP No. 1 Total Units Adjacent to Open Space (O.S.)*: (See 1.4 "Planning Concept" in the Development Agreement) Total Number of Dwelling Units in PUMP No. 1: Required Dwelling Units Adjacent to Open Space: Proposed Dwelling Units Adjacent to Open Space: 2,199 lots 1,100 units (50%) 1,618 tinits (73 coi) 1,597 units (72.6%) a. Detached Units Less than 5,000 square feet*: Total Number of <5K SF Units in PUMP No. 1: 264 lots 243 lots Required Number of <5K SF Units Adjacent to O.S: ""'mots (65144 158 lots (65%) Proposed Number of <5K SF Units Adjacent to O.S.: 1 °""*" (68.9 ) 161 lots (66.2%1 b. Detached Units Less than 8,000 square feet*: Total Number of <8K SF Units in PUMP No. 1: 918 lots 944 lots Required Number of <8K SF Units Adjacent to O.S: 459 lots (50,10 472 lots (50%) Proposed Number of <8K SF Units Adjacent to O.S.: . ° 618 lots (65.5%) *As proposed within the PUMP No. I MOD application — dated July 2026 6. PUMP No. 1 Constrained Lands and Habitat of Special Concern (HASC): (See 1.3 "Mitigation" in the Development Agreement) Total Pre -Mitigation Acreage in Spring Valley: 1,160 acres Total Post -Mitigation Acreage Required for Spring Valley: 580 acres (580 acres / 1,160 acres) 50% Total Pre -Mitigation Acreage in PUMP No. 1: Total Post -Mitigation Acreage in PUMP No. 1: (194.62 acres / 453.36 acres) (901.26 acres / 1,160.00 acres) Total Pre -Mitigation Floodplain Area: Total Post -Mitigation Floodplain Area: Total Pre -Mitigation Slopes >30%: 453.36 acres 194.62 acres 42.9% of PUMP No. 1 HASC 77.7% of SV HASC 147.01 acres 33.12 acres 67.85 acres Page 8 of 27 Spring Valley PUMP No 1 MOD Findings PZ Total Post -Mitigation Slopes >30%: 10.48 acres Total Existing HASC Area: 453.36 acres Total Preserved HASC Area: 143.07 acres Total Riparian HASC Rehabilitation: 11.16 acres Total Upland HASC Rehabilitation: 40.29 acres a. Southwestern Residential PA Constrained Lands and HASC*: Pre -Mitigation Floodplain Area: 90.02 acres Post -Mitigation Floodplain Area: 16.25 acres Pre -Mitigation Slopes >30%: 9.16 acres Post -Mitigation Slopes >30: 1.05 acres Existing HASC Area: 307.77 acres Preserved HASC Area: 93.97 acres Riparian HASC Rehabilitation: 16.25 acres Upland HASC Rehabilitation: 24.90 acres b. Southern Residential PA Constrained Lands and HASC*: Pre -Mitigation Floodplain Area: 7.61 acres Post -Mitigation Floodplain Area: 5.94 acres Pre -Mitigation Slopes >30%: 17.79 acres Post -Mitigation Slopes >30: 0.66 acres Existing HASC Area: 73.22 acres Preserved HASC Area: 27.83 acres Riparian HASC Rehabilitation: 5.94 acres Upland HASC Rehabilitation: 2.86 acres c. Northern Residential PA Constrained Lands and HASC*: Pre -Mitigation Floodplain Area: 0.00 acres Post -Mitigation Floodplain Area: 0.00 acres Pre -Mitigation Slopes >30%: 28.92 acres Post -Mitigation Slopes >30: 6.63 acres Existing HASC Area: 1.68 acres Preserved HASC Area: 1.29 acres Riparian HASC Rehabilitation: 0.00 acres Upland HASC Rehabilitation: 0.00 acres d. Big Gulch PA Constrained Lands and HASC*: Pre -Mitigation Floodplain Area: 49.38 acres Post -Mitigation Floodplain Area: 10.93 acres Pre -Mitigation Slopes >30%: 11.98 acres Post -Mitigation Slopes >30: 2.14 acres Existing HASC Area: 71.01 acres Preserved HASC Area: 19.98 acres Riparian HASC Rehabilitation: 0.00 acres Upland HASC Rehabilitation: 1.60 acres e. Highway Mixed Use PA Constrained Lands and HASC*: Pre -Mitigation Floodplain Area: 0.00 acres Post -Mitigation Floodplain Area: 0.00 acres Pre -Mitigation Slopes >30%: 0.00 acres Post -Mitigation Slopes >30: 0.00 acres Page 9 of 27 Spring Valley PUMP No 1 MOD Findings PZ I. K. L. M. N ❑c Existing HASC Area: 0.00 acres Preserved HASC Area: 0.00 acres Riparian HASC Rehabilitation: 0.00 acres Upland HASC Rehabilitation: 0.00 acres *As proposed within the PUMP No. 1 application — Exhibits S, T and U, dated February 2022 ECONOMIC ANALYSIS: The City contracted with independent economic consulting firm TischlerBise who provided an economic analysis of the proposed development. Their report was received and dated stamped by the City on May 11, 2021. In conjunction with the analysis provided by TischlerBise, the applicant provided an independent report completed by Zion's Bank Public Finance, whose report was received by the City on April 6, 2021, and later revised including the City's approved land values and Fiscal Impact Tool absorption category classification table was submitted to the City on July 21, 2022, as Exhibit A6 and Exhibit A7. The economic analysis was incorporated within the PUMP No. 1 approvals. LAND USE MASTER PLAN: The applicant's justification of the PUMP's compliance with the requirements of the Land Use Master Plan was addressed in the applicant's narrative received by the City on March 14, 2022, and the applicants Planning Unit Master Plan No. 1 Exhibit D1 — Overall Land Use Plan, in addition to Exhibits D2-D5, each dated February 2022, respectively, along with the revised narrative and Exhibit D — Southwestern Planning Area Land Use Plan, each date stamped by the City on July 7, 2026, as part of the PUMP No.1 Modification. PHASING PLAN: The Phasing Plan for Planning Unit Master Plan No. 1 was approved by the City Council on May 24, 2022. The Phasing Plan within PUMP No. 1 has not changed since that approval and is not proposed to be amended as part of this application. STREETS AND CIRCULATION MASTER PLAN: The Streets and Circulation Master Plan for Planning Unit Master Plan No. 1 was approved by the City Council on May 24, 2022. The Streets and Circulation Master Plan within PUMP No. 1 has not changed since that approval and is not proposed to be amended as part of this application. POTABLE WATER MASTER PLAN: The Potable Water Master Plan for Planning Unit Master Plan No. 1 was approved by the City Council on May 24, 2022. The Potable Water Master Plan within PUMP No. 1 has not changed since that approval and is not proposed to be amended as part of this application. WASTEWATER MASTER PLAN: The Wastewater Master Plan for Planning Unit Master Plan No. 1 was approved by the City Council on May 24, 2022. The Wastewater Master Plan within PUMP No. 1 has not changed since that approval and is not proposed to be amended as part of this application. DRAINAGE MASTER PLAN: The Drainage Master Plan for Planning Unit Master Plan No. 1 was approved by the City Council on May 24, 2022. The Drainage Master Plan within PUMP No. 1 has not changed since that approval and is not proposed to be amended as part of this application. Page 10 of 27 Spring Valley PUMP No 1 MOD Findings PZ P �i R. S T U V W 04 PRESSURIZED IRRIGATION MASTER PLAN: The Pressure Irrigation Master for Planning Unit Master Plan No. 1 was approved by the City Council on May 24, 2022. The Pressurized Irrigation Master Plan within PUMP No. 1 has not changed since that approval and is not proposed to be amended as part of this application. POWER & GAS MASTER PLAN: The Power & Gas Master Plan for Planning Unit Master Plan No. 1 was approved by the City Council on May 24, 2022. The Power & Gas Master Plan within PUMP No. 1 has not changed since that approval and is not proposed to be amended as part of this application. PARKS, TRAILS, AND OPEN SPACE PLAN: The Parks, Trails, and Open Space Plan for Planning Unit Master Plan No. 1 was approved by the City Council on May 24, 2022. The applicant's proposed amendments to this plan within the Southwestern Residential Planning Area are reflected in the applicant's proposed Exhibit P — Parks, Trails, and Open Space, date stamped by the City on July 7, 2026. LOT OPEN SPACE ADJACENCY PLAN: The Lot Open Space Adjacency Plan for Planning Unit Master Plan No. 1 was approved by the City Council on May 24, 2022. The applicant's proposed amendments to this plan within the Southwestern Residential Planning Area are reflected in the applicant's proposed Exhibit Q — Lot Open Space Adjacency Plan, date stamped by the City on July 7, 2026. ENVIRONMENTAL DESIGN MASTER PLAN: The Environmental Design Plan for Planning Unit Master Plan No. 1 was approved by the City Council on May 24, 2022. The applicant's proposed amendments to this plan within the Southwestern Residential Planning Area are reflected in the applicant's proposed Exhibit R — Environmental Design Plan, date stamped by the City on July 7, 2026. CONSTRAINED LANDS PLAN: The Constrained Lands Plan for Planning Unit Master Plan No. 1 was approved by the City Council on May 24, 2022. The Power & Gas Master Plan within PUMP No. 1 has not changed since that approval and is not proposed to be amended as part of this application. HABITAT AREA OF SPECIAL CONCERN PLAN: The Habitat Area of Special Concern (HASC) Plan for Planning Unit Master Plan No. 1 was approved by the City Council on May 24, 2022. The Power & Gas Master Plan within PUMP No. 1 has not changed since that approval and is not proposed to be amended as part of this application. SUPER PAD/LARGE PARCEL MASTER PLAN: The Super Pad/Large Parcel Master Plan for Planning Unit Master Plan No. 1 was approved by the City Council on May 24, 2022. The Power & Gas Master Plan within PUMP No. 1 has not changed since that approval and is not proposed to be amended as part of this application. PUBLIC FACILITIES MASTER PLAN: The Public Facilities Master Plan for Planning Unit Master Plan No. 1 was approved by the City Council on May 24, 2022. The Power & Gas Master Plan within PUMP No. 1 has not changed since that approval and is not proposed to be amended as part of this application. Page 11 of 27 Spring Valley PUMP No 1 MOD Findings PZ Y. AGENCY RESPONSES: The following agencies have responded and their correspondence is attached: • Ada County Highway District • Department of Environmental Quality • Idaho Transportation Department (letter dated January 24, 2022) Z. LETTERS FROM THE PUBLIC: None received to date. AA. PROPOSED TIME SCHEDULE FOR THE DEVELOPMENT OF THE SITE: The PUMP NO. 1 Phasing Plan, approved by the City Council on May 24, 2022, reflected the developer's anticipated progression of development within PUMP No. 1 at the time of approval. BB. REQUIRED FINDINGS FOR A PLANNING UNIT MASTER PLAN: I IA-7-5A-2 - ACTION BY PLANNING & ZONING COMMISSION: Upon making a recommendation the Commission shall specify in writing: a. The ordinances and standards used in evaluating the application; b. The facts submitted with the application and presented establishes that: 1) The PUMP substantially conforms with: the PADA and subsequent amendments; this Title; applicable master plans approved by the City; and/or other applicable information reasonably relied on by the City necessary to uphold the intent of the PADA and this Title: 2) Streets and thoroughfares proposed are suitable and adequate to carry anticipated traffic, and increased densities, if any, will not generate traffic is such amounts as to overload the street network, 3) The proposed commercial/non-residential development is justified at the locations proposed and is consistent with the PADA; 4) The information provided from the agencies having jurisdiction over public facilities needed for the site indicate that adequate public facilities exist, or are expected to be provided, to serve any and all uses allowed within the PUMP area. The Planning Unit will be served, or is conditioned to be served, by adequate public services. c) A summary of the current status of overall Planning Area density, Open Space, Community Centers, Neighborhood Centers, re -assignment of densities, and other adjustable factors as set forth in the PADA. STAFF ANALYSIS: A. COMPREHENSIVE PLAN PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: See the Eagle Foothills Subarea Plan and the Findings of Fact and Conclusions of law for RZ-19-06, including MOD 1 and MOD 2. These documents are incorporated herein by reference. Page 12 of 27 Spring Valley PUMP No I MOD Findings PZ B. DEVELOPMENT AGREEMENT CONDITIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: 1.2 Planned Development: 2nd Paragraph: City hereby authorizes Developer to include in Planning Unit Master Plans the types of uses that are the same as or similar to (as reasonably determined by City's Zoning Administrator), and densities and intensities of uses equal to or less than, those set forth in this Agreement and/or Title 11. Development of the Property may include, without limitation, the planning, design, engineering, construction, acquisition, installation, and/or provision of improvements of any sort or nature, including private infrastructure and Public Infrastructure related to development of the Property, whether located within or outside the Property. City, having exercised City's discretion in approving this Agreement, shall cooperate reasonably in administratively -processing the approval or issuance of such permits, plans, specifications, plats and/or other development approvals of or for the Property as may be requested by Developer in order to implement the Project, and which are reasonably consistent with this Agreement. 1.4 Planning Concept: Starting at 2nd Paragraph: The Project is planned for a Base Project Density of 0.5 units per gross acre, or 3,008 dwelling units, and 245 acres for Non -Residential Use. Through the application of the Bonus Density provisions, the Maximum Density may be increased up to 1.19 units per gross acre, not to exceed 7,160 dwelling units, and 245 acres for Non -Residential Use. In the event that any of the Non -Residential Use lands within a Planning Area are developed as residential, Developer may allocate any unused acres for Non -Residential Use to another Planning Area as provided in this section 1. In the event Additional Property is annexed the process is set forth in this section 1. Bonus Density is achieved at the time of City's approval of any PUMP as follows: ■ 2.5 units for each acre of a Community Center shown on such City -approved PUMP. ■ 10 units for each acre of a Neighborhood Center shown on such City -approved PUMP. ■ 1 unit for each acre of Regional Open Space shown on each City -approved PUMP and cumulatively for all prior City -approved PUMPS over and above the 20% Open Space minimum requirement not to exceed 1,250 units. ■ 0.5 units for each acre of Community Open Space shown on each City -approved PUMP and cumulatively for all prior City -approved PUMPS over and above the 20% Open Space minimum requirement. ■ 10% of the total units for a Regional Open Space funding mechanism as described further in Section 2.6(f) herein. To achieve Bonus Density in a PUMP, there must be a minimum Open Space of 20% in such PUMP, which Open Space shall be first calculated using Community Open Space. Bonus Density shall be re -calculated upon the submittal of each PUMP and/or plat. Spring Valley is being planned as five different Planning Areas, as set forth in Exhibit B and Exhibit(s) D, D1, D2, D3, D4 and D5; the density allocation planned for each Planning Area is summarized in Table 1 below. Each Planning Area represents a unique design based upon: (i) topography; (ii) location within the Development Plan; (iii) existing and planned transportation corridors; (iv) a balance of commercial, employment and residential uses to promote trip capture within the Project; (v) a wide array of housing and employment options to create a live/work environment; (vi) regional and community Open Space; and (vii) dedication or donation of public facility sites for schools, police and fire, library, parks, public and civic uses. Within all Planning Areas a minimum of 50% of all dwelling units, and 65% of all single-family detached lots less than Page 13 of 27 Spring Valley PUMP No 1 MOD Findings PZ 5,000 square feet, and 50% of all single-family detached lots less than 8,000 square feet shall abut some form of Open Space. 1.6 Planning Unit Master Plan (PUMP): Each Planning Unit Master Plan shall be based on the Planning Area plans set forth in Exhibit(s) D, D1, D2, D3, D4 and D5 and the Conceptual Development Plan set forth in Exhibit E. The Conceptual Development Plan will be updated when necessary to reflect modifications or to refine phasing within the respective Planning Unit Master Plans. It is not necessary for Planning Unit Master Plans to encompass the same geographical area as a Planning Area. A Planning Unit Master Plan should reflect the area within the Project that the Planning Unit Developer is proposing to subdivide. The Planning Unit Master Plan may address a portion of one or more Planning Area(s) or Planning Unit(s), a complete Planning Area or Planning Unit, and/or more than one Planning Area or Planning Unit. The Planning Unit Master Plan shall be filed with the Zoning Administrator for review as to completeness and compliance with the application requirements of Title 11 of Eagle City Code and this Agreement. Thereafter, the Planning Unit Master Plan shall be reviewed by the Planning & Zoning Commission for recommendation to City Council in accordance with the notice and hearing procedures of Title 11 of Eagle City Code. If the Planning Unit Master Plan is substantially in conformance with this Agreement and Title 11 of Eagle City Code, the Planning & Zoning Commission and City Council shall not unreasonably withhold approval. 1.7 Allocation; Density: This Agreement provides for a Maximum Density of 1.19 units/acre, or 7,160 dwelling units, as provided in section 1.4 of this Agreement, and a maximum of 245 acres of Non -Residential Uses within the Property. The number of dwelling units shall not exceed 7,160 dwelling units for the entire Project unless Additional Property is annexed into City and made subject to this Agreement. Developer shall also have the right to allocate residential density and/or Non -Residential Use acreage, and the Development Rights associated with such residential density and/or Non - Residential Use acreage, from Planning Area(s) or Planning Unit(s) to other Planning Area(s) or Planning Unit(s) at any time, and Developer may allocate any unused residential density or Non - Residential Use acreage originally allocated to a Planning Area or Planning Unit to another Planning Area or Planning Unit in the event that the preliminary or final platting of a Planning Area or Planning Unit results in unused residential density and/or unused Non -Residential Use acreage, provided such allocation: (i) does not exceed the Maximum Planning Area Density; (ii) does not exceed the Maximum Density for the Property; (iii) does not exceed the maximum Non -Residential Use acreage allowed for the Property; (iv) does not allow a use otherwise prohibited; or (v) cause a material change to this Agreement without prior amendment to this Agreement and compliance with the notice and hearing requirements of Title 11 of Eagle City Code. The allocation of residential density and/or Non -Residential Use acreage between Planning Areas and Planning Units is consistent with City's planning efforts to encourage planning flexibility based on physical and market conditions while protecting private property rights. Developer shall deliver notice to City that an allocation of residential density or Non -Residential Use acreage shall be made from one Planning Area or Planning Unit to another Planning Area or Planning Unit and shall provide City with a statement of the number of residential units per gross acre and/or Non -Residential Use acreage being allocated. Any such allocation shall not necessitate a formal amendment to this Agreement, but shall be retained in City's official file for the Property. 2.1 Traffic and Circulation: (a) Ada County Hijzhway District,• Idaho Transportation Department Improvements to the ACHD and/or ITD Traffic System, as applicable, within the Project shall be provided at the direction of ACHD, ITD or some other legally -constituted entity with jurisdiction over the ACHD Traffic System and/or the ITD Traffic System. Unless City has such jurisdiction, City Page 14 of 27 Spring Valley PUMP No 1 MOD Findings PZ shall not be responsible for any approvals or access permits required or construction or maintenance costs associated with the ACHD Traffic System and/or the ITD Traffic System, within the Project. (c) ACHD Traffic S, sum: Developer, with consultation with ACHD, will design, engineer, construct, acquire, install, permit and dedicate the ACHD Traffic System within and/or proportional to the Project's impacts in accordance with the Master Streets & Circulation Plan, Planning Unit Master Streets & Circulation Plans and the Phasing Plan and all planning and study documents of ACHD. (d) ITD Traffic System: Developer, with consultation with ITD, will design, engineer, construct, acquire, install, permit and dedicate the ITD System within and/or adjacent and/or proportional to the Project's impacts in accordance with the Master Streets & Circulation Plan, Planning Unit Master Streets & Circulation Plans and Phasing Plan and all planning and study documents of ITD. City and Developer shall cooperate in pursuit of funding from or authorized by the State of Idaho for the construction of Developer's proportionate share of necessary improvements to the ITD System (which improvements may include, without limitation, interchanges, roundabouts, traffic signals, turning lanes and frontage roads) required to implement this Plan. (e) Planning Unit Master Streets & Circulation Plan: A detailed analysis of the ACHD Traffic System within the Project and the ITD Traffic System within and/or adjacent to the Project and the ultimate design and locations of streets and circulation improvements shall be consistent with the Master Streets & Circulation Plan and further defined in each Planning Unit Master Streets & Circulation Plan, which analysis shall be submitted and approved by ACHD and/or ITD, as appropriate. Each Planning Unit Master Streets & Circulation Plan shall be prepared by Developer and approved by City taking into account the Master Streets & Circulation Plan, and any amendments thereto and the recommendations of ACHD and/or ITD, as applicable. Each Planning Unit Master Streets & Circulation Plan shall address any increase or decrease in traffic volumes from other Planning Unit Master Plans and the particular Planning Unit being planned that may occur as development progresses and densities and intensities are rearranged. 2.2 Water: (a) Municipal Water Right. Monitoring Plan: Pursuant to that certain Assignment of Application and Permit dated and filed with IDWR on June 13, 2011, which remains in effect and is applicable to this Agreement, Developer has conveyed to City ground water right no. 63-32573 (the "Municipal Water Right"), which is to be used to provide municipal water service to the Project for all of its municipal uses, including without limitation irrigation, storage, residential, commercial, industrial, and other municipal uses. The Municipal Water Right requires ground water monitoring in accordance with its Attachment B, which is a March 17, 2011 Technical Memorandum setting forth a water level/water production monitoring and reporting plan (the "Monitoring Plan"). Developer has been implementing the Monitoring Plan and is responsible for all costs of implementing the Monitoring Plan until a Completed Portion is conveyed to City. As Completed Portions are conveyed to City, City shall be responsible to pay its proportionate share of the total Monitoring Plan costs, its share being calculated as follows: total Monitoring Plan costs (A); multiplied by the results of the number of connections to the Water System by a "customer(s)" or "user(s)" as defined by Eagle City Code Title 6 Chapter 5 (B); divided by the total Project residential density of 7,160 dwelling units (C). (A x (B _ Q. Nothing in this Agreement, or action taken pursuant to this Agreement, shall be deemed to convey or grant any interest in the Municipal Water Right to Developer. (b) Irrigation and Related Uses: The Irrigation System shall be effluent (including reuse) or other systems used for storage, delivery and the use of treated effluent on site, any water right or Page 15 of 27 Spring Valley PUMP No 1 MOD Findings PZ entitlement associated with ditch company shares, any surface water or ground water (excluding Permit # 63-32573 or any existing or future water rights held by the City) or any additional water right or permits that may be associated with irrigation, aesthetics, amenities, or open space purposes. Connection to the water system shall be consistent with paragraph 2.2(a) of this Agreement. Developer may provide additional water rights or entitlements for use on the Project, through Developer's own system or otherwise, for irrigation, aesthetic, amenity and/or open space use not served by the Water System within the Project, and shall make best efforts to provide for these uses with surface water, such as Farmers Union Canal Company or Re -Use Water or existing irrigation wells on the Property that are not part of the Water System. The method of providing water for irrigation uses shall be at the discretion, and under the control, of Developer so long as an adequate system and source of supply is provided, including a source of supply consistent with Sections 2.2(a) and 2.3 below. Any irrigation system shall meet the requirements of Eagle City Code Title 11. If Developer so requests, City will give good faith consideration to establishing a city irrigation system pursuant to Title 50, Chapter 18, Idaho Code, or otherwise, to deliver irrigation water to the Project. If City decides not to establish a city irrigation system, Developer may establish or contract with an irrigation or other special district, a canal company, or similar entity to serve the Project's irrigation needs consistent with the provisions of this Section. Nothing in this section shall limit water delivery from City to Developer at a wholesale rate during those times when such water is available under the Municipal Water Right if it is not needed to serve other municipal water needs in the Project, and Developer has not yet constructed the facilities or generated the re -use or other irrigation water necessary to serve such needs. 2.3 Wastewater Treatment and Disposal: (a) Eagle Sewer District: Sanitary sewer collection, treatment and disposal shall be provided by Sewer District or some other legally constituted public or private provider allowed to operate in City. Developer agrees to annex to Eagle Sewer District and further agrees not to seek other sewer treatment services unless or until Eagle Sewer District refuses to serve the Project. City shall not be responsible for any treatment, maintenance or costs associated with sanitary sewer collection, treatment and disposal in connection with the Project. (b) Master Wastewater Study; Master Wastewater Plan: Developer has completed the Master Wastewater Study and Master Wastewater Plan which has been submitted to Eagle Sewer District for approval. The Master Wastewater Plan, to be developed based on the Master Wastewater Study provides general locations of the major wastewater infrastructure needed to provide service for the Property. 2.4 Storm Water Drainage: (a) Ada County Highway District: Post -development storm water management includes drainage collection, diversion, detention, retention, dispersal, use and discharge, which shall be provided by ACHD or some other legally -constituted public or private provider allowed to operate in City and having jurisdiction over the Drainage System. Unless City has such jurisdiction, City shall not be responsible for any approval, construction, collection, conveyance or maintenance costs associated with the Drainage System within the Project. (b) Master Drainage Study,• Master Drainage Plan: Developer shall complete the Master Drainage Plan, based on the Master Drainage Study to describe pre -development drainage characteristics of the Property and a conceptual hydrologic and hydraulic analysis of the Property's existing and proposed Drainage System. In connection with such Master Drainage Plan, Developer determined the applicable 100-year floodway elevations for the Property and shall obtain from FEMA a Conditional Letter of Map Revision ("CLOMR") that adjusts the floodway boundaries. City shall use all good faith efforts to cooperate with Developer in Page 16 of 27 Spring Valley PUMP No 1 MOD Findings PZ connection with any of Developer's applications to FEMA to modify relevant flood maps to reflect actual conditions. 2.5 Public Facilities: a Police: City shall provide police protection services to the Property as developed on the same basis as is provided to other residents and businesses within City. Developer shall contribute 1 site (not to exceed 1 acre) for the construction of a police station in accordance with the Master Parks, Trails and Public Facilities Plan, attached as Exhibit I, which defines a general location. Police. City shall provide police protection services to the Property as developed on the same basis as is provided to other residents and businesses within City. Developer shall contribute 1 site (not to exceed 1 acre) for the construction of a police station in accordance with the Master Parks, Trails and Public Facilities Plan, attached as Exhibit 1, which defines a general location. b Fire: Fire services are now provided to City by Eagle Fire District and Star Fire District (individually, the "Fire District" and collectively, the "Fire Districts"). Unless City becomes the entity responsible, City shall not be obligated to provide fire services to the Property. Fire water flows shall be provided by the Water System and all fire protection infrastructure will be designed and constructed in conjunction with each Fire District and in accord with all applicable governmental regulations and adopted uniform fire codes. Hydrant locations will be determined following consideration of, without limitation, accessibility, obstructions, building proximity, driveway entrances, signs and light poles. Developer, in consultation with the Fire Districts, has developed a wildfire management plan for implementation within such Fire Districts. Unless otherwise agreed between Developer and Fire District, Developer shall contribute 1 site (not to exceed 1 acre of land per site and in addition to the fire station site combined with the police station site referenced in section 2.5(a) above) for construction of the fire station in accordance with the Master Parks, Trails and Public Facilities Plan, attached as Exhibit I, which defines a general location. The final location is subject to Developer, applicable Fire District and City approval. Such fire station shall be identified in connection with the applicable Planning Unit Master Plan or portion thereof. c Schools: Public education is provided by the School District. City shall not be obligated to provide public education service to the Property. Developer has, and shall continue to work diligently with School District to ensure that the educational needs of Property residents are met. In furtherance of meeting educational needs, Developer may participate with School District in enhancing the technology in one or more schools constructed by School District on the Property. Developer generally has identified potential school sites within the Project, as depicted on the Master Parks, Trails and Public Facilities Plan, attached as Exhibit I, to accommodate the needs of students generated as a result of the development of the Property using School District's student generation rates to determine the probable number of sites. The specific location, specific number of school sites and types of schools (i.e., elementary, middle and high schools) will be subject to approval by Developer and School District. The school sites will be shown as being dedicated to School District on an applicable Planning Unit Master Plan by Planning Unit Master Plan basis. The final number of school sites, the type of schools and their locations shall be identified in the appropriate Planning Unit Master Plan. (d) Library and Other Municipal Services: City shall provide library and such other municipal services to the Property on the same basis as is provided to other residents and businesses within City. Developer shall offer to City up to a four -acre site (subject to actual needs and based upon an approved site plan) for donation to City, with utilities stubbed, or to be stubbed, to such site to accommodate the development of the type of library and other municipal services necessary to serve the community at a location to be mutually agreed upon between City and Developer. If Page 17 of 27 Spring Valley PUMP No 1 MOD Findings PZ mutually agreed upon between City and Developer, Developer shall have the right to incorporate the space necessary to accommodate these uses into buildings built by Developer within the Property. It is planned that such site would be located within the Big Gulch Planning Area. Design of any library shall be consistent with the EASD and/or Title 11 of Eagle City Code and shall be reviewed for approval by Developer. 2.6 Parks, Trail and Open Space: (a) Master Parks, Trails and Open Space Plan: The Project will contain Open Space, totaling a gross minimum acreage of 20% of the Project area with an overall goal of providing 40% or more of the Project area as Open Space in exchange for Bonus Density described in section 1.4, above. Each Planning Area shall contain a minimum of 15% of its total gross acres as Open Space. A Master Parks, Trails and Open Space Plan for the Project is shown on Exhibit I, which depicts the intent to link neighborhoods and Planning Areas to various common areas and recreational uses. The pathways and trails will be within and through Planning Areas and may be located along Open Space corridors and near or adjacent to community streets and roads. Pathways and trails may also utilize drainage ways and dry gulches between common areas and neighborhoods or may be combined with the drainage system for the Project. The parks, trails and Open Space Plan shown on Exhibit I will be either owned by the Owners' Association City, or another entity, or a combination of all three. Developer will submit to City a more detailed Master Parks, Trails and Open Space Plan concurrently with the submittal of the first Planning Unit Master Plan or portion thereof. (b) A Planning Unit Master Parks, Trails and Open Space Plan: A Planning Unit Master Parks, Trails and Open Space Plan shall be submitted as part of the Planning Unit Master Plan that generally conforms to the Master Parks, Trails and Open Space Plan and will address roadway crossings, habitat, trails within the Eagle Regional Park, ownership or intent to dedicate park facilities if known at the time of submittal. (f) Maintenance of Regional Open Space: Developer acknowledges the significance of the public Regional Open Space being created in the foothills and agrees to cooperate with City to establish an ongoing funding mechanism which is applicable to all residential and Non - Residential Use lands, homes or buildings within the North Eagle Foothills Planning Area and/or City limits. This funding mechanism shall be solely for the Regional Open Space associated with this Project and identified in Exhibit I of this Agreement. The funding mechanism requirement shall be met when Developer provides for funding of maintenance of Regional Open Space through an Owners' Association's CC&Rs and such funding mechanism is an obligation of all owners governed by such CC&Rs to fund the maintenance of Regional Open Space within that area of Spring Valley governed by such CC&Rs. In no event does the Density Bonus provision, in section 1.4 of this Agreement, apply until the funding mechanism is established by Developer in accordance with this Agreement. 2.7 Planning Unit Master Environmental Design Plan: (a) Landscape; Signage; Lighting: All development of the Property shall comply with the landscape, signage and lighting standards of Eagle City Code Title 11. (b) Habitat Mitigation Plan: A Habitat Mitigation Plan that addresses development within Constrained Lands, as generally identified on Exhibit J as Habitat Areas of Special Concern, has been prepared by Developer in cooperation with City. The City -approved Habitat Mitigation Plan, attached hereto as Exhibit N, identifies areas where Mitigation is required, the type of Mitigation actions, if any, required, and the rationale for such actions. City and Developer may coordinate, cooperate, and consult with other agencies in the application of the Habitat Mitigation Plan, but approval authority for the application of the Habitat Mitigation Plan Page 18 of 27 Spring Valley PUMP No I MOD Findings PZ shall rest solely with City based on standards commensurate with such Habitat Mitigation Plan(s) and based on findings that demonstrate a rational nexus Nothing in the Habitat Mitigation Plan may be construed as either incorporating state and/or federal standards and/or regulations that are not applicable to the Property or otherwise conferring any approval authority for the Habitat Mitigation Plan to any state or federal agency. Implementation and compliance with the Habitat Mitigation Plan shall be on a Planning Unit by Planning Unit basis. A PUMP shall not be approved if development is proposed and compliance with the Habitat Mitigation Plan has not been approved or conditionally approved in accordance with Eagle City Code Title 11. 3.1 Regulation of Development: (a) Applicable Rules: The ordinances, rules, regulations, permit requirements, development fees, other infrastructure fees, exactions, other requirements, and/or official policies however denominated, applicable to and governing the development of the Property shall be those that are existing and in force as of the Date of Application, as may be mutually amended by amendment to this Agreement; provided, however, notwithstanding anything to the contrary herein, Titles 8 and 9 of Eagle City Code are not applicable to Spring Valley and have been replaced by Title 11 of Eagle City Code. 3.2 Amendments: 2" paragraph: No moratorium, future ordinance, resolution or other land use rule or regulation imposing a limitation on the development or the rate, timing or sequencing of the development, of the Property or any portion thereof shall apply to or govern the development of the Property whether affecting land use permits, subdivision plats, building permits, occupancy permits or other entitlements to use issued or granted by City, except as otherwise provided in this Agreement. Nothing in this section shall prohibit City from withholding the issuance of Certificates of Occupancy for a structure to be occupied if the Public Infrastructure improvements set forth in this Agreement and Planning Unit Master Plans required to serve the applicable portion of the Property on which a structure to be occupied is to be located are not in place prior to occupation of such structure. C. PLANNED DEVELOPMENTS CODE PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: I IA-7-1: PURPOSE, GOALS, AND OBJECTIVES: A. The purpose of the Planning Unit Master Plan is to ensure that the land uses and densities prescribe for development are consistent with the PADA and this Title 11A prior to subdivision; B. A Planning Unit Master Plan should reflect an area within Spring Valley that the Planning Unit developer is proposing to subdivide in the future; C. The Planning Unit Master Plan may address a portion of a Planning Area, a complete Planning Area, or more than one Planning Area. I IA-7-2: PUMP COMPLIANCE WITH PADA: The PUMP process is intended to demonstrate substantial conformance with the land use and infrastructure requirements found within the approved PADA dated January 15, 2014. The PUMP does not provide or constitute approval(s) to construct or develop the site. Page 19 of 27 Spring Valley PUMP No I MOD Findings PZ An application for approval of a PUMP may be filed by a property owner or a person having an existing interest in the property to be included in the PUMP. I IA-7-3: OWNERSHIP REQUIREMENTS: The PUMP application shall be filed in the name or names of the recorded owner or owners of property included in the development. However, the application may be filed by the holder(s) of an equitable interest in such property. Documentation showing the approval by the Master Developer shall be presented at the time of application submittal. I IA-7-4: PLANNING UNIT MASTER PLAN (PUMP) APPLICATION REQUIREMENTS A. A PUMP shall be prepared for each Planning Area as defined in the PADA, or a portion of a Planning Area, detailing substantial conformance with Exhibits D, D1, D2, D3, D4, D5 and E of the PADA which includes but is not limited to the general location and size of development parcels; uses and density ranges for each parcel compared to the maximum allowed density and units with the planning area; circulation system by road classification and the use of private roads; backbone water, wastewater, drainage and irrigation facilities; locations for public facilities; amenities, trails and acres of open space and habitat area; and landscape character. A PUMP application shall be submitted to the Administrator for review and approval by the City. The applicant shall meet with the Administrator prior to the submission of the PUMP. The purpose of this meeting is to discuss informally the proposed PUMP and to inform the applicant of the applicable regulations. B. The Zoning Administrator shall refer the PUMP application to as many governmental agencies as deemed necessary. The Zoning Administrator shall provide that any transmittal will be returned within fifteen (15) days. Such agencies may include the following: 1. Other governing bodies having joint jurisdiction; 2. The appropriate utility companies, irrigation companies or districts and drainage districts; 3. The superintendent of the school district; and 4. Other agencies having an interest in the proposed subdivision. C. A PUMP application shall include the following information, on forms or in a format deemed appropriate by the Zoning Administrator: 1. Project Narrative a) Name, address, phone number and email address of the applicant, engineer and/or planner. b) Proof of ownership and, if appropriate, identification of the contract -purchaser along with vesting deed, current Title insurance policy or commitment and legal description. If the PUMP application is submitted by an applicant other than the Master Developer, a letter from the Master Developer approving the submission of the application. c) A submittal letter including a brief description of the project that also briefly describes a history of previous project applications. Page 20 of 27 Spring Valley PUMP No I MOD Findings PZ d) Description of how the PUMP is consistent with the existing and planned uses outlined in the PADA and the Spring Valley Master Plan. If the PUMP is not in substantial conformance with any component of the Spring Valley Master Plan, an amendment of the nonconforming component of the Master Plan shall be submitted contemporaneously with the PUMP application. e) A tabulation of proposed residential units and non-residential acres in the Planning Unit compared to the number of units and non-residential acres allowed in the Spring Valley Master Plan and the applicable Planning Area in which the PUMP is located, including cumulative totals approved in connection with previous PUMPS. Such tabulation shall show the trend toward achieving the Planning Area requirement that fifty percent (50%) of all dwelling units in the Planning Area, sixty-five percent (65%) of all single-family detached lots less than five thousand (5,000) square feet in the Planning Area, and fifty percent (50%) of all single-family detached lots less than eight thousand (8,000) square feet in the Planning Area, will abut some form of Open Space. fl A tabulation of the constrained (pre -mitigation) and unconstrained (post -mitigation) acreage for the PUMP and the Planning Area. g) A vicinity map at a scale approved by the Administrator showing the relationship of the PUMP to the Spring Valley Master Plan and Eagle Comprehensive Plan. 2. Economic Impact Analysis An Economic Impact Analysis & Demographic Forecast, dated October 25, 2006, and revised July 2007, by Idaho Economics was provided to the City in connection with the 2007 approval of Spring Valley. An update to the Economic Impact Analysis shall be provided to City in connection with the first Planning Unit Master Plan application. Thereafter, an update to the Economic Impact Analysis shall only be required with a PUMP application if a substantial change is proposed for the Spring Valley Master Plan such as an increase in the maximum density in Spring Valley. 3. Planning Unit Master Land Use Plan A land use plan on a minimum sheet size of 11" x 17" but not greater than 24" x 36" at a scale appropriate to the sheet and legible enough to read all details and containing the following: a) The Title block should be located in the lower right hand corner along with the date of preparation, owner's name, address and phone number, and the name, address and phone number of the person(s) or firm(s) preparing the land use plan. b) The name of the proposed Planning Unit. c) North arrow and the scale of the drawing. d) Location and acreage for each development parcel within the Planning Unit. Land use districts will be identified with different colors. Superpads/large parcels may be identified on the land use plan. e) A summary table describing the land use, number of acres and/or units for each development parcel. f) Existing and proposed arterial and collector streets. g) Topography at 2-foot or other appropriate intervals referenced to a U.S.G.S. standard. This information could be shown on a separate exhibit. Page 21 of 27 Spring Valley PUMP No 1 MOD Findings PZ h) Existing topographic characteristics showing slopes over 25% and the location and acres for development to be graded pursuant to the Grading Guidelines and Hillside Development Standards. This information may be shown on a separate exhibit and may be combined with the submittal listed immediately above. 4. Planning? Unit Master Streets & Circulation Plan a) A plan showing the arterial and collector roadway network. b) A streets and circulation phasing plan. c) A traffic impact study (TIS) of the ACHD traffic system within the PUMP and ITD traffic system adjacent to the PUMP for compliance with the Master Traffic Study and the ACHD Northwest Foothills Transportation Study will be provided to ACHD and/or ITD. Such TIS may be submitted prior to the rest of the PUMP application. d) A narrative or evidence showing how this component of the PUMP complies with the Spring Valley Master Streets & Circulation Plan with reference to traffic volumes associated with previously approved PUMP(s). The narrative shall include a description of the location of private roads and the number of residential units served by such private roads. 5. Planning Unit Master Potable Water Plan a) An updated Spring Valley Water Facility Plan will be provided if the PUMP application requires modifications to the existing Spring Valley Water Facility Plan. If the municipal transmission potable water system complies with the existing Spring Valley Water Facility Plan, an update is not necessary. b) A plan showing the location and size of municipal transmission potable water system components, including both on- and off -site (that is, outside of the Planning Unit) municipal water mains (that is, not service lines), municipal wells, pump stations, pressure reducing stations and storage facilities needed to serve the Planning Unit. c) A phasing plan for the construction of the necessary municipal transmission potable water system. d) A narrative or evidence showing how this component of the PUMP complies with the Spring Valley Master Water Facility Plan and the Spring Valley RAFN water right. 6. Planning Unit Master Wastewater Plan e) A plan showing the location, size, type and capacity of the backbone wastewater collection, transmission and treatment system components, including effluent and/or re- use storage, transmission and/or disposal facilities needed to serve the Planning Unit. f) A phasing plan for the construction of the necessary wastewater collection and re -use systems. g) A narrative or evidence showing how this component of the PUMP complies with the Spring Valley Master Wastewater Facility Plan, including a discussion of re -use goals and feasibility. 7. Planning Unit Master Drainage Plan a) A plan showing the location and estimated size of major drainage channels and major retention/detention basins, and the location of existing major drainage ways and designated 100-year flood plains within the Planning Unit including background information and/or calculations. Page 22 of 27 Spring Valley PUMP No l MOD Findings PZ b) Location and acreage removed from the floodway pursuant to the FEMA-approved CLOMR. c) A narrative describing: proposed measures necessary to comply with the ACHD Storm Water Policy Manual for drainage located within ACHD rights -of -way; and the regional design of storm water management systems that mitigate flooding potential, including peak discharge reduction and storage facilities consistent with applicable ACHD or City requirements and the basis of design for flood protection for all structures. d) A narrative or evidence showing how this component of the PUMP complies with the Spring Valley Master Drainage Pla 8. Planning Unit Master Pressurized Irrigation Plan a) An updated Spring Valley Master Pressurized Irrigation Plan will be provided if the PUMP application requires modifications to the existing Spring Valley Master Pressurized Irrigation Plan. If the pressurized irrigation system complies with the existing Spring Valley Master Pressurized Irrigation Plan, an update is not necessary. b) Description of the irrigation measures to be used for the PUMP including groundwater, potable water and reuse. Evidence of sufficient means/rights to provide irrigation. c) A narrative or evidence showing how this component of the PUMP complies with the Spring Valley Master Pressurized Irrigation Plan. 9. Planning Unit Master Public Facilities Plan a) A plan showing the locations of public facilities including schools, fire and police stations, a library and other civic facilities, and public utility easements and facilities. b) A narrative or evidence showing how this component of the PUMP complies with the Spring Valley Master Public Facilities Plan. c) Evidence from public facility providers to the effect such provider(s) will serve the Planning Unit. 10. Planning Unit Master Parks Trails & Open Space Plan a) A plan showing the locations and sizes of public and private common areas outside of a development parcel, which may include neighborhood, regional and community parks, lakes and ponds, floodways, drainage ways and dry gulches, natural open space, and other open space and recreation areas, including a description of what amenities are provided. b) A tabulation of Open Space acreage by Regional Open Space, Community Open Space (including Open Space within neighborhoods or parcels) and other Open Space (including on -lot Open Space) including cumulative totals in connection with previous PUMPS. c) Golf course locations. d) Location of vineyards and other agricultural areas. e) Location of regional and community pathway and trail facilities, including typical pathway and trail cross -sections, materials and trail signage. f) Identification of who will own and maintain the regional and community parks, trails and open space facilities. Page 23 of 27 Spring Valley PUMP No I MOD Findings PZ g) A phasing plan for the construction of the regional and community parks, trails and Open Spaces within the Planning Unit. h) A narrative or evidence showing how this component of the PUMP complies with the Spring Valley Master Parks, Trails & Open Space Plan. i) Discussion of the funding mechanism proposed in connection with the maintenance of Regional Open Space. j) A letter of recommendation from the Eagle Parks and Pathway Committee for all facilities to be dedicated, operated and/or maintained by and to the City. 11. Environmental Desi n Plan a) Landscape — An exhibit or exhibits showing landscape areas that will use upland or riparian landscape palettes included in Title 11A Chapter 3. The exhibit shall also include the location of formal versus informal street sections as defined in Title 11A Chapter 3. b) Signage - An exhibit showing the location of the proposed community signs for the PUMP identified in Title 11 A Chapter 3. Approval of the PUMP signage plan does not waive the requirement for all community signs to comply with the location, size and spacing standards of Title 11 A Chapter 3 and/or the Community Master Sign Plan once approved by the City, and, if the Community Master Sign Plan has not been approved by the City, then City Code. c) Habitat Mitigation Plan - Location of any Areas of Special Concern, and if present, a narrative or evidence of showing how the PUMP complies with the Spring Valley Habitat Mitigation Plan. 12. Super Pad/Large Parcel Plan a) A plan showing the conceptual locations and sizes of super pads/large parcels for sale and transfer for further development. The plan should include timing and phasing of platting. The conceptual location and sizes of super pads/large parcels may be identified on the land use plan. b) All platting of such super pads/large parcels shall be conducted in compliance with Title 11A Chapter 13 of Eagle City Code. c) Super pads/large parcels are not considered buildable lots until re -platted and reviewed for compliance with Title I lA Chapter 13 of Eagle City Code. D. DISCUSSION: Planning Unit Master Plan No. 1 was approved by the City Council on May 24, 2022. As development of the Valnova project has commenced and the project continues to be built into 2026, the developer has observed a change in market demands and is seeking to adjust the Planning Unit Master Plan No. 1 to accommodate a shift in the housing market by proposing to eliminate all Single Family Attached (SFA) and all Single Family Special Lot (SFSL) lots from this phase and, in return, replacing them with additional Single Family 2 (SF2) and Single Family 3 (SF3) lot typologies. The proposed change results in seventeen (17) fewer buildable lots within the PUMP No. 1 and Southwestern Residential Planning Area boundaries, but the applicant has requested that the total number of buildable lots within PUMP No. 1 does not decrease from 2,199 to 2,182 units or that the number of buildable lots within the Southwestern Planning Area) (as approved within PUMP No.l in 2022) does not decrease from 449 to 432. The applicant is unsure if they may proposed to distribute those seventeen (17) lots throughout other future subdivision plants within the PUMP No.I boundary, but given that no future PUMP Page 24 of 27 Spring Valley PUMP No 1 MOD Findings PZ applications will contain any portion of the Southwestern Residential Planning Area, the have requested that the number of approved buildable units remain banked for future consideration. Additionally, related changes to the PUMP No. 1 master plans through this application include minor revisions to in -tract local residential streets that would service this portion of the developer (to be evaluated by ACHD at the time of the submittal of future preliminary plat applications), and a reduction of 1.77-acres of open space. This proposed amendment in open space would reduce the total open space acreage within PUMP No. 1 from 505.07-acres to 503.30 and within the Southwestern Residential Planning Area from 160.27-acres to 158.50- acres. Both PUMP No. 1 and the Southwestern Residential Planning Area remain above the minimum required and open space goals for the project at 50% proposed (20% project required; 40% project goal) and 51.5% proposed (15% minimum required within a Planning Area), respectively. PUBLIC HEARING OF THE COMMISSION: A. A public hearing on the application was held before the Planning and Zoning Commission on October 19, 2026, at which time testimony was taken and the public hearing was closed. The Commission made their recommendation at that time. B. Oral testimony in favor of the application was presented to the Planning and Zoning Commission by no one (not including the applicant/ representative). C. Oral testimony in opposition to the application was presented to the Planning and Zoning Commission by no one. COMMISSION DELIBERATION: Upon closing the public hearing, the Commission made a motion based on the information provided by staff and the testimony provided. A summary of the deliberation can be found at the following link (Granicus time: 00:26:15): hfts://eagle-id.granicus.com/plgyer/clip/2313 COMMISSIONS DECISION: The Commission voted 3 to 0 (Guerber and Oland absent) to recommend approval of PU-2021-01-MOD1 for a Planned Unit Master Plan (PUMP) modification for Valnova with the following staff recommended site specific conditions of approval and standard conditions of approval: SITE SPECIFIC CONDITIONS OF APPROVAL: 1. All PUMP No. 1 Master plans, as approved or conditioned for approval, shall be used to evaluate and establish conditions of approval for any and all preliminary plat submittals within the Boundary of PUMP No. 1, except those that are approved herein for this specific phase of PUMP No. 1 shall supersede prior approvals. 2. The applicant shall submit payment to the City for all outstanding fees (planning, engineering, and legal) incurred for reviewing this PUMP, prior to approval of a preliminary plat for the area contained within PUMP No. 1 MOD. NOTE: In the event a Standard Condition of Approval conflicts with a Site Specific Condition of Approval contained herein the Site Specific Condition of Approval shall control. Page 25 of 27 Spring Valley PUMP No 1 MOD Findings PZ STANDARD CONDITIONS OF APPROVAL: All previous Standard Conditions of Approval approved as part of the PUMP No. 1 approval remain unchanged and in effect. CONCLUSIONS OF LAW: 1. The Commission reviewed the particular facts and circumstances of this proposed Planned Unit Master Plan (PUMP) Modification No. 1 (PU-2021-01-MOD1) and based upon the information provided concludes that the proposed PUMP application is in accordance with the City of Eagle Title 11A (Planned Developments): 1. The facts submitted with the application and presented establishes that: a. This Planning Unit Master Plan modification substantially conforms with the PADA and subsequent amendments; this Title; applicable master plans approved by the City; and/or other applicable information reasonably relied on by the City necessary to uphold the intent of the PADA and this Title because the proposed amendment to the PUMP does not deviate from any required maximum total residential unit counts within the Southwestern Residential Planning Area, PUMP No. 1, or the overall development. Additionally, all proposed local streets are public streets and will be developed consistent with the policies and standards of Ada County Highway District, and the minimum open space goals and requirements outlined within the development agreement are exceeded despite a slight reduction in the total amount of open space provided within this portion of the development; b. Streets and thoroughfares proposed are suitable and adequate to carry anticipated traffic, and increased densities, if any, will not generate traffic is such amounts as to overload the street network. ACHD previously reviewed PUMP No. 1 and, as been consistent with their policy, will evaluate the local streets that are developed as part of a subdivision at the time of the submittal of a preliminary plat; C. There are no proposed commercial/non-residential development within this portion of the PUMP No.1 masterplan; d. The information provided from the agencies having jurisdiction over public facilities needed for the site indicate that adequate public facilities exist, or are expected to be provided, to serve any and all uses allowed within the PUMP area. The development will be served with central water through the City of Eagle, central sewer by the Eagle Sewer District, City of Eagle Police Department, and this portion of the development will be served by the Star/Middleton Fire District. 2. A summary of the current status of overall Planning Area density, Open Space, Community Centers, Neighborhood Centers, re -assignment of densities, and other adjustable factors as set forth in the PADA is provided herein. Page 26 of 27 Spring Valley PUMP No I MOD Findings PZ DATED this 2nd day of November 2026. PLANNING AND ZONING COMMISSION OF THE CITY OF EAGLE Ada County, Idaho Trent Wright, Chairman AT EST: Tracy E orn, Eagle City Clerk .•'` C1T Y OF Op IDA"o Page 27 of 27 Spring Valley PUMP No I MOD Findings PZ