Loading...
Minutes - 2025 - Design Review Board - 05/08/2025 - RegularDESIGN REVIEW BOARD MINUTES The Design Review Board met in regular session on May 8, 2025. Norton presiding. 1. CALL TO ORDER: Meeting called to order at 6:07 p.m. 2. ROLL CALL: MIHAN, NORTON, SAYER. Milian attending via telephone. Absent: LINDGREN, GREER, GRUBB, MURPHY. A quorum is present. 3. CONSENT AGENDA: ALL CONSENT AGENDA ITEMS ARE CONSIDERED ACTION ITEMS. Consent Agenda items are considered to be routine and are acted on with one motion. There will be no separate discussion on these items unless a Design Review Board member or City Staff requests an item to be removed from the Consent Agenda for discussion. Items removed from the Consent Agenda will be placed on the Regular Agenda in a sequence determined by the Rules of Order. Any item on the Consent Agenda that contains written recommendations from the City of Eagle shall be adopted as part of the Design Review's Consent Agenda approval motion unless specifically stated otherwise. A. Minutes of April 24, 2025. (HC) B. Findings of Fact and Conclusions of Law for the Approval of DR-2025-17 - Childcare Facility for Avimor Academy - Dillon Ludlow: Dillon Ludlow, represented by Erik Knudsen with Hillside Architecture, is requesting design review approval of a 9,900-square foot daycare facility for Avimor Academy. The 0.67-acre site is located on the southwest corner of North McLeod Way and West Avimor Drive at 18551 North McLeod Way (Lot 1, Block 11, Avimor Subdivision No. 1). (BAW) C. Findings of Fact and Conclusions of Law for the Approval of DR-2024-14-MOD2 - Common Area Landscaping within Torrente Secco Subdivision (Phases 3-6) - Toll Brothers: Toll Brothers, represented by Brian Garrett with Brian Garrett Architecture and Design, PLLC, is requesting design review approval of the common area landscaping within Torrente Secco Subdivision (Phases 3-6). The 65.52-acre site is located at the southeast corner of West Beacon Light Road and North Palmer Lane between West Beacon Light Road and West Floating Feather Road at 6397 West Beacon Light Road and 6868 West Floating Feather Road. (ERF) Sayer moves to approve the Consent Agenda. Seconded by Mihan. ALL AYES ... MOTION CARRIES. 4. UNFINISHED BUSINESS: None. 5. NEW BUSINESS: A. ACTIONITEM.• DR-2025-19 - One Townhome Building (3-units) within Valnova Subdivision No. 1, Lots 30-32, Block 4 - Hallmark Homes: Hallmark Homes, represented by Austin Wilkes, is requesting design review approval for one townhome building (3-units). The 0.20-acre site is located on the southeast corner of West Satinwood Lane and North Birch Run Lane at 5681, 5693, and 5701 West Satinwood Lane within Valnova Subdivision No. 1 (Lots 30-32, Block 4). (BAW) Norton introduces the item. Austin Wilkes, 4692 North Brody Avenue, Meridian, Idaho, provides an overview of the application and responds to questions from the Board. City Planner, Barb Williams, provides an overview of the application and responds to questions from the Board. Norton moves to make a motion to approve DR-2025-19 - One Townhome Building (3-units) within Valnova Subdivision No. 1, Lots 30-32, Block 4 - Hallmark Homes. Seconded by Sayer. ALL AYES ... MOTION CARRIES. B. ACTIONITEM.• DR-2025-20 - One Townhome Building (3-units) within Valnova Subdivision No. 1, Lots 44-46, Block I - Hallmark Homes: Hallmark Homes, represented by Austin Wilkes, is requesting design review approval for one townhome building (3-units). The 0.20-acre site is located on the northeast corner of West Rediva Drive and North Holly Springs Lane at 6276, 6294, and 6302 North Holly Springs Lane within Valnova Subdivision No. I (Lots 44-46, Block 1). (BAW) Norton introduces the item. Austin Wilkes, 4962 North Brody Avenue, Meridian, Idaho, provides an overview of the application and responds to questions from the Board. City Planner, Williams, provides an overview of the application and responds to questions from the Board. Norton moves to make a motion to approve DR-2025-20 - One Townhome Building (3-units) within Valnova Subdivision No. 1, Lots 44-46, Block 1 - Hallmark Homes Seconded by Sayer. ALL AYES ... MOTION CARRIES. 6. REPORTS: A. Design Review Board: None. B. Staff. City Planner, Barb Williams provides an update of pending applications for the next Design Review Board. 7. ADJOURNMENT: Norton makes a motion for adjournment. Seconded by Sayer. ALL AYES ... MOTION CARRIES. Hearing no further business, the Board meVlin,adjourned at 6:23 p.m. RE PE TFULLY SUBMITTFk%,t OF •EA•C<�va't, OQ,QOliq% '4 H 0 IV N. NCSITS, id T SE p+�' CLERK OF THE MEETING y�oR����' •'0�.•J •••`rl'�rE OV APPROVED: TOBY NORTON, BOARD MEMBER AN AUDIO RECORDING OF THIS MEETING IS AVAILABLE FOR DOWNLOAD AT W W W.CITYOFEAGLE.ORG. i ��� �r •. i!�� ♦ � • + • • .i • air u ,j�{ • � .. � C, .1$ f'+ r f � .{n��� ;:w i, �� `�► 5/23/2025 • Lighting 1-••_�� Valnova No. 1: Phase Townhomes ------ \rChitcaural Stdc At oll a III T !6 lhn­ Igo Lighting Landscape .'Iliank wu ONE TOWNHOME BUILDING (3-UNITS) WITHIN VALNOVA SUBDIVISION NO. 1 (Lars 30-32, BLOCK 4) DR-2025-19 Eagle Design Review Board Meeting May 8, 2025 Site Plan Vicinity Map Landscape plan Site Plan 3-unit Townhome - Floor Plan 3-unit Townhome — Building Elevations Issues of Special Concern Metal roofing conrealed fa:tenet: - SSCa2 light future - 55CN3 3-unit Townhome — Building Elevations ,i IIIIII I 111►JNI�) riiYi AII: }IYM ��II rEil an Ban --- ---- --- Architecture — deferred to the Board Ada■ � ��■ "' Y�ii 1. Belie III ,Eeeieeeeill 9��iei3e=:AM Issues of Special Concern Architecture and landuaping deferred to the Board Memel roofing concealed fasteners-SSC92 Light fixture - SSCg3 Landscaping — deferred to the Board Issues of Special Concern Arc hitecture and landscaping deferred to the Board Light f,.ture - 5SCg3 Light Fixture Cutsheets — SSC#3 Metal roof concealed fasteners — SSC#2 Issues of Special Concern • Architecture and landscaping deferred to the Board • Metal roofing concealed fasteners-SSCg2 • Light fixture -SSCp3 Issues of Special Concern Architecture and landscaping deferred to the Board Metal roofing concealed fasteners - SSCg2 End of Presentation (D] Site Plan ONE TOWNHOME BUILDING (3-UNITS) WITHIN VALNOVASUBDIVIs1ON No. 1 (LOTS 44-46, BLOCK 1) DR-2025-20 Eagle Design Review Board Meeting May 8, 2025 dfv$Wr-. 6aeDaa S. waWms. Plamn III xcenfu:v f-Ma1: Vicinity Map Landscape plan Site Plan 3-unit Townhome - Floor Plan 3-unit Townhome — Building Elevations Q. Architecture — deferred to the Board Issues of Special Concern Metal roofing concealed fasteners- SSC#2 Issues of Special Concern • Architecture and landuaping deferred to the Board • Metal roofing concealed fasteners-SSC#2 Landscaping — deferred to the Board Metal roof concealed fasteners — SSC#2 Issues of Special Concern m m Issues of Special Concern Architecture and landscaping deferred to the Board End of Presentation Architecture and landscaping deferred to the Board Metal roofing concealed fasteners — SSC42