Loading...
Service Solicited - 2025 - ESI-Express - Clerk/Treasurer Office Remodel - Change Order No. 2CHANGE ORDER NO.2 TO CITY OF EAGLE CONSTRUCTION CONTRACT FOR CLERK/TREASURER DEPARTMENT REMODEL This Change Order No. 2 to City of Eagle Construction Contract for Clerk -Treasurer Department Remodel ("Change Order No. 2") is entered into this day of April 2025, by and between the City of Eagle, an Idaho municipal corporation ("City") and Engineered Structures Inc. dba: ESI-Express ("Contractor"). The City and Contractor are sometimes collectively referred to herein as the "Parties." RECITALS WHEREAS, the City entered into a City of Eagle Construction Contract for Clerk/Treasurer Department Remodel (the "Construction Contract") on November 12, 2024 for the provision of construction services including labor and materials associated with an interior remodel of the Eagle City Hall building located at 660 E. Civic Ln. Eagle, Idaho; WHEREAS, Section 3B of the Contract provides that charges for additional work must be approved by the Eagle City Council through mutual execution of a Change Order setting forth the additional work, price and other terms agreed upon by the parties; and WHEREAS, during the course of the remodel unforeseen expenses have arisen, causing the Contractor to bring forward a Change Order which identifies additional costs associated with the project; and WHEREAS, all conditions contained within the November 12, 2024 agreement shall remain in full force, unless changes are noted herein; NOW THEREFORE, and in consideration of the mutual promises contained herein, the Parties agree to the following: 1. Incorporation of Recitals: The above Recitals are a material part of this Agreement and are incorporated into the Services of this Agreement by reference as though they were fully set forth herein. 2. Chan2e Order Request: The additional work associated with this Change Order No. 2 to be performed by Contractor and/or its subcontractors is identified in Exhibit 1 attached hereto and incorporated herein. 3. Compensation: The Contractor shall be paid for services associated with Change Order No. 2 in an amount not to exceed three thousand six hundred dollars and no cents. ($3,600.00) for the work performed. 4. Approval: The City and Contractor each acknowledge that this Agreement, even though agreed upon by the City's representatives, is not binding upon the City until such time as the Eagle City Council approves this Agreement and authorizes the Mayor to execute this Agreement on behalf of the City. Page 1 of 3 IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the date first above written. C/ DATED this day of April, 2025. CITY OF EAGLE: CONTRACTOR: f Dalton Gates, Service Manager Engineered Structures, Inc. •��'`` CIT y '''��� CORD, •;fit+ �. 3 • r Tracy E. orn, City Clerk ^ > 'PAHO Page 2 of 3 EXHIBIT A Change Order No. 2 Electrical work TOTAL $3,600.00 Including: encountered additional low voltage work was required than originally anticipated; retrofit hallway lighting for EM use, adding ceiling mounted occupancy sensors in hallway, lighting for closet, purchase and installation of exit signs. Page 3 of 3 Oa � SERVICE DIVISION Owner: CITY OF EAGLE 660 E CIVIC LN EAGLE, ID 83616 GENERAL CONTRACTORS / CONSTRUCTION MANAGERS 2200 S. Cobalt Point Way, Meridian, Idaho 83642 1208.362.3040 CHANGE ORDER REQUEST #2 Project: Eagle City Hall Clerk/Treasurer Department Remodel 660 E. Civic Lane Eagle, ID 83616 ADDITIONAL ELECTRICAL 1 ADDITIONAL ELECTRICAL Date: 4/16/2025 ESI Project No.: 24002- Reference : ADDITIONAL ELECTRICAL Total Estimated Cost of Included items Total CHANGE ORDER REQUEST 3 : • Following approval of this CHANGE ORDER REQUEST, a Change Order will be submitted to amend the Contract Sum and/or Contract Time as approved. • Schedule Impact (0) Days " For breakdown on subcontract items, see attached proposals. • Additional Building Permit Fees are not included. Acknowledged By: CONTRACTOR By: r)AZft"e Title: Service Manager Date:: 4/16/2025 Date:: z r.I ESI Express, a division of Engineered Structures, Inc. 1 3330 E Louise Dr Ste 300 1 Meridian, ID 83642 (877) 374-4697 Office 1 (208) 362-3113 Fax I www.esi-express.com <http://www.esi-exexpress.com> 3,600.00 3,600.00 3,600.00