Findings - DR - 2025 - DR-2025-08 - Valnova Subdivision - Valnova Sub. Common Area Landscaping No. 3 - Lot 24.BEFORE THE EAGLE DESIGN REVIEW BOARD
IN THE MATTER OF AN APPLICATION
FOR A DESIGN REVIEW FOR THE COMMON
AREA LANDSCAPING WITHIN VALNOVA
SUBDIVISION NO. 3 — LOT 24
FOR CLYDE CAPITAL GROUP
FINDINGS OF FACT AND CONCLUSIONS OF LAW
CASE NUMBER DR-2025-08
The above -entitled design review application came before the Eagle Design Review Board for their action
on March 27, 2025. The Eagle Design Review Board having heard and taken oral and written testimony,
and having duly considered the matter, makes the following Findings of Fact and Conclusions of Law;
FINDINGS OF FACT:
A. PROJECT SUMMARY:
Clyde Capital Group, represented by Eric Langvardt with Langvardt Design Group, is requesting design
review approval of the common area landscaping within Valnova. Subdivision No. 3 — Lot 24 (Spring
Valley PUMP No. 1). The 48.1-acre site is located approximately 650-feet west of the intersection of
Aerie Way and Linder Road (approximately 1.3-miles east of State Highway 16)(Ada County Parcel #
R8954702850).
B. APPLICATION SUBMITTAL:
The City of Eagle received the application for this item on February 11, 2025.
C. NOTICE OF AGENCIES' REVIEW:
Requests for agencies' reviews were transmitted on February 20, 2025, in accordance with the
requirements of the Eagle City Code.
D. HISTORY OF RELEVANT PREVIOUS ACTIONS:
On December 11, 2007, the City Council approved an annexation and rezone application with a
development agreement from RP (Rural Preservation — Ada County designation) and RR (Rural
Residential — Ada County designation) to R-1-DA (Residential One with a development agreement) for
M3 Eagle (A-14-06 & RZ-19-06).
On November 24, 2009, the City Council approved a development agreement modification to adopt the
M3 Hillside and Grading Standards on November 24, 2009 (RZ-19-06 MOD1).
M3 received a Conditional Letter of Map Revision (CLOMR) from FEMA on February 17, 2009. An
amendment was submitted in March of 2013 and was approved by FEMA on November 8, 2013.
On January 11, 2011, the City Council approved the overall project -wide Habitat Mitigation Plan.
On January 14, 2014, the City Council approved an amended and restated development agreement for
M3/Spring Valley (RZ-19-06 MOD2).
On January 14, 2014, the City Council approved the M3/Spring Valley Development Standards and by
the adoption of Ordinance 710, established Eagle City Code Title 11— Planned Developments, Chapter
A — Spring Valley.
On March 18, 2022, the City of Eagle Floodplain Administrator approved a Floodplain Development
Page 1 of 12
K:\Planning Dept\Eagle Applications\Spring Valley \Applications\01-Planning Unit No 1\04-DR\Valnova Lot 24 LS - DR-2025-08\03-Working Files\02-DRB\03-DRB Findings\Valnova Lot 24
Findings DR.docz
Permit for Alliance Consulting (FPDP-06-21).
On May 24, 2022, the City Council approved a Planned Unit Master Plan (PUMP) No. 1 for Spring
Valley for GWC Capital, LLC, (PU-01-21).
On May 24, 2022, the City Council approved a design review for the common area landscaping along
Aerie Way within Spring Valley PUMP No. 1 for GWC Capital, LLC, (DR-22-22).
On May 24, 2022, the City Council approved a design review for the common area landscaping along
Big Gulch Parkway, Linder Road, and Aerie Way (East) within Spring Valley PUMP No. 1 for GWC
Capital, LLC, (DR-23-22).
On May 24, 2022, the City Council approved a two (2) community entry monument signs for Spring
Valley Subdivision for GWC Capital, LLC (DR-24-22).
On August 24, 2022, the City approved a Mass Grading Permit associated with the Spring Valley
PUMP No. 1 for Western Construction, Inc.
On October 25, 2022, the City approved Spring Valley Subdivision No. 1, a large lot preliminary plat,
associated with the Spring Valley PUMP No. 1 for GWC Capital, LLC, (PP-17-21).
On January 10, 2023, the City Council approved a preliminary plat for Valnova Lot 17 Subdivision (a
re -subdivision of Spring Valley Subdivision No. 1), a 201-lot (188-buildable, 13-common [7-
community open space, 1-regional open space, 5-private alleys]) subdivision (PP-12-22).
On December 19, 2024, the City Engineer issued mass grading approval for Valnova Subdivision
No. 4 (GP-2024-05).
On February 25, 2025, the City Council approved a preliminary plat approval for Valnova Subdivision
No. 3, a 128-lot (117-residential, 11-common) subdivision (PP-2024-04).
E. COMPANION APPLICATIONS: None.
F. COMPREHENSIVE PLAN LAND USE MAP AND ZONING MAP DESIGNATIONS:
COMP PLAN
DESIGNATION
ZONING
DESIGNATION
LAND USE
Existing
Foothills Residential
R-1-DA (Residential with a
development agreement)
Vacant Land (Designated
for Future Re -Subdivision)
Proposed
No Change
No Change
Single Family Residential
Subdivision and
Community Open Space
North of site
Foothills Residential
R-1-DA (Residential with a
development agreement)
Vacant Land (Designated
for Future Re -Subdivision)
South of site
Foothills Residential
PS (Public/Semi-Public)
Vacant Land and Public
Land (Bureau of Land
Management)
East of site
Foothills Residential
PS (Public/Semi-Public)
Vacant Land (Designated
for Future Re -Subdivision)
West of site
Foothills Residential
R-1-DA (Residential with a
development agreement)
Vacant Land (Designated
for Future Re -Subdivision)
Page 2 of 12
K:\Planning Dept\Eagle Applications \Spring Valley \Applications\01-Planning Unit No I\04-DR\Valnova Lot 24 LS - DR-2025-08\03-Working Files\02-DRB\03-DRB Findings\Valnova Lot 24
Findings DR.docx
G. DESIGN REVIEW OVERLAY DISTRICT:
The site is not located within the DDA, TDA, CEDA, or DSDA overlay districts.
H. URBAN RENEWAL DISTRICT:
The site is not located within the Urban Renewal District.
I. EXISTING SITE CHARACTERISTICS:
The site is currently undeveloped and range or BLM land.
J. SITE DATA:
Total Acreage of Site — 41.18-acres
Total Number of Lots —128
Buildable —117
Commercial — 0
Industrial — 0
Common — 11 (10-community open space, 1-regional open space)
Total Number of Units — Single-family — 117 (58-SF2, 59-SF3)
Duplex — 0
Multi -family - 0
Total Acreage of Any Out -Parcels — 0-acres
ADDITIONAL SITE DATA
PROPOSED
REQUIRED
Dwelling Units per Gross
Acre
SF2: 4.17 du/ac
SF3: 5.10 du/ac
Total: 2.43 du/ac
SF2: 7 du/ac max.
SF3: 10 du/ac max.
Total: 3.15 du/ac max.+
Northern PA Total: 1.53 du/ac
Big Gulch PA Total: 4.24 du/ac
Total PUMP No. 1: 2.19/du/ac max+
Total Spring Valley: 1.19 du/ac max ++
Minimum Lot Area
SF2: 8,618 square feet
SF3: 5,950 square feet
SF2: 6,000 square feet
SF3: 4,000 square feet
Total Acreage of Common
Area Open Space
15.71 acres
1.76-acres*
Percent of Site as Common
Area Open Space
38%
4.2% (minimum)*
Total Residential Units
SF2: 58-dwelling units
SF3: 59-dwelling units
SF2: 65 dwelling units+
SF3: 64 dwelling units+
+ Based on the approved PUMP No. 1.
++ Based on the requirements of the amended and re -instated development agreement, the overall
project has a 20% open space requirement and 40% goal. Each Planning Area has a 15% minimum
requirement.
* Based on the Eagle City Code requirement that all subdivisions within the Spring Valley development
are required to have 600 square feet of open space per lot.
Page 3 of 12
K:\Planning Dept\Eagle Applications\Spring Valley \Applications\01-Planning Unit No I\04-DR\Valnova Lot 24 LS - DR-2025-08\03-Working Files\02-DRB\03-DRB Findings\Valnova Lot 24
Findings DR.docx
K. PARKING ANALYSIS: N/A
L. GENERAL SITE DESIGN FEATURES:
Landscape Screening:
Lot 19, Block 1 requires a minimum landscape buffer of 50-feet (50'W) in width along Aerie Way,
which is designated as a Foothills Principal Arterial Street in the Master Streets and Circulation Plan,
when adjacent to single-family residential uses. If there are no adjacent single-family uses, the required
buffer width may be reduced to 30-feet wide (30'W).
Open Space:
The revised preliminary plat, received by the City on December 10, 2024, shows eleven (11) open space
common lots (15.71-acres) consisting of ten (10) Community Open Space lots (4.07-acres) and one (1)
Regional Open Space lot (11.64-acres). The total open space accounts for 38% of the total area
associated with the preliminary plat.
Storm Drainage and Flood Control:
Specific drainage system plans are to be submitted to the City Engineer for review and approval prior
to the City Engineer signing the final plat. The plans are to show how swales, or drain piping, will be
developed in the drainage easements. Also, the CC&Rs are to contain clauses to be reviewed and
approved by the City Engineer and City Attorney, requiring that lots be so graded that all runoff runs
either over the curb, or to the drainage easement, and that no runoff shall cross any lot line onto another
lot except within a drainage easement.
Utility and Drainage Easements, and Underground Utilities:
Eagle City Code section 11A-13C-4 requires utility easements to be not less than 10-feet-wide.
Fire Hydrants and Water Mains:
Hydrants are to be located and installed as may be required by the Star Fire Protection District.
On -site Septic System — No
Preservation of Existing Natural Features:
As part of the Planned Unit Master Plan (PUMP) No. 1 for Spring Valley, the applicant is required to
comply with the Habitat of Special Concern Plan (dated February 2022) at the time of final plat
submittal.
Preservation of Existing Historical Assets:
Staff is not aware of any existing historical assets on the site. If any historical artifacts are discovered
during excavation or development of the site, state law requires immediate notification to the state.
M. BUILDING DESIGN FEATURES:
Proposed Mailbox Structure: Craftsman, 9' 6" tall
Roof: Metal (Endura-Coat Charcoal Gray)
Base: Stone Veneer (Table Rock Sandstone)
Columns: Steel (Iron Ore)
N. LANDSCAPING DESIGN:
Retention of Existing Trees and Preservation Methods: There are no existing trees.
Tree Replacement Calculations: N/A
Proposed Tree Mix (Species & Number): To be reviewed by the Design Review Board.
Page 4 of 12
K:\Planning Dept\Eagle Applications\Spring Valley \Applications\01-Planning Unit No 1\04-DR\Valnova Lot 24 LS - DR-2025-08\03-Working Files \02-DRB\03-DRB Findings\Valnova Lot 24
Findings DR.docx
Street Trees: Street trees are proposed along all internal roads within this phase.
Maintenance Provisions and Proposed Irrigation Methods: Automatic irrigation required.
Transition Zones: N/A
Parking Lot Landscaping: N/A
O. TRASH ENCLOSURES: N/A
P. MECHANICAL UNITS: N/A
Q. OUTDOOR LIGHTING:
A site and parking lot light plan showing location, height, and wattage is required to be reviewed and
approved by the Zoning Administrator prior to issuance of any building permits.
R. SIGNAGE:
No signs are proposed with this application. A separate design review application is required to be
reviewed and approved prior to any signs being constructed on this site.
S. PUBLIC SERVICES AVAILABLE:
No preliminary approval letter from Star Fire Protection has been received by the City to date. The site
is located within City of Eagle Water service area and within the boundaries of the Eagle Sewer District.
T. PUBLIC USES PROPOSED: None.
U. PUBLIC USES SHOWN ON FUTURE ACQUISITIONS MAP: No map currently exists.
V. SPECIAL ON -SITE FEATURES:
Areas of Critical Environmental Concern — Yes — As identified within the Habitat of Special Concern
Plan (dated February 2022)
Evidence of Erosion — No
Fish Habitat — No
Floodplain — No
Mature Trees — No
Riparian Vegetation — No
Steep Slopes — Yes — Natural slopes exceed 25% at various locations. Slopes have been evaluated
through the Mass Grading review and are addressed in the hillside and grading standards within the
Development Agreement associated with Spring Valley.
Stream/Creek — No
Unique Animal Life — unknown
Unique Plant Life — unknown
Unstable Soils — unknown
Wildlife Habitat — Yes — Habitat of Special Concern Plan (refer to approved PUMP No. 1 (PU-01-21),
dated February 2022)
W. SUMMARY OF REVIEW OF ENVIRONMENTAL ASSESSMENT PLAN (IF REQUIRED): Not
required.
X. AGENCY RESPONSES:
The following agencies have responded and their correspondence is attached to the staff report.
Department of Environmental Quality
Eagle Sewer District
Idaho Transportation Department
Y. LETTERS FROM THE PUBLIC: None received to date.
Page 5 of 12
K:\Planning Dept\Eagle Applications \Spring Valley\ Applications\0I-Planning Unit No I\04-DR\Valnova Lot 24 LS - DR-2025-08\03-Working Files \02-DRB\03-DRB Findings\Valnova Lot 24
Findings DR.docx
Z. EAGLE CITY CODE 11A-13(B)(1)&(2): Required Findings for Design Review:
1. City Findings: The City shall make findings which address the following:
a. The ordinance and standards used in evaluating the application;
b. The reasons for the approval or denial;
c. The actions, if any, that the applicant could take to obtain approval.
2. General Standards For Design Review: The Zoning Administrator, Design Review Board, or City
Council, whichever is applicable, shall review the particular facts and circumstances of each
proposed design review in terms of the following standards and shall find adequate evidence
showing that such design review at the proposed location:
a. Will function in conformance with the applicable strategies of the Eagle Comprehensive Plan
and is in accordance with the regulations of this Code;
b. Is of a scale, intensity, and character that is in harmony with existing conforming and planned
development in the vicinity of the site;
c. Is designed with adequate off street parking facilities in such a way as to not interfere with
ingress/egress to the site and will serve the intended use so as to not cause conflict with adjacent
uses as anticipated within the zoning district;
d. Will not interfere with the visual character, quality, or appearance of the surrounding area and
the City, and where possible, enhance the continuity of thematically common architectural
features;
e. Will have facades, features, and other physical improvements that are designed as a whole,
when viewed alone as well as in relationship to surrounding buildings and settings;
f. Will not obstruct views and vistas as they pertain to the urban environment and in relation to
artistic considerations;
Will provide safe and convenient access to the property for both vehicles and pedestrians
through patterned traffic circulation and connectivity to abutting development;
h. Is in the interest of public health, safety, and general welfare promoting a pedestrian friendly
and walkable environment in balance with protecting a viable commercial center in the area;
g•
and
i. Will have signs, if proposed, that are harmonious with the architectural design of the building
and the adjacent buildings, and will not cover or detract from desirable architectural features.
THE DESIGN REVIEW BOARD RECEIVED AND REVIEWED THE FOLLOWING STAFF
ANALYSIS PROVIDED WITHIN THE STAFF REPORT AND ADOPTS THE STAFF REPORT
AS PART OF THE DESIGN REVIEW BOARD'S FINDINGS OF FACT:
A. COMPREHENSIVE PLAN PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING
THIS PROPOSAL:
Chapter 6 — Land Use
6.3 Land Use Designations
The Comprehensive Plan designates this site as:
Foothills Residential
A unique combination of land uses within the Eagle Foothills that strives to balance residential,
non-residential, and open space (developed and natural) use to create unique hamlets of
Page 6 of 12
K:\Planning Dept\Eagle Applications\Spring Valley \Applications\01-Planning Unit No l\04-DR\Valnova Lot 24 LS - DR-2025-08\03-Working Files\02-DRB\03-DRB Findings\Valnova Lot 24
Findings DR.docx
development that place urban development within the natural environment without overcrowding
or significantly altering the natural features found on the site.
The overall density in the foothills should be approximately 1 unit per two acres. Residential
densities should be calculated to be commensurate with the existing land conditions. Priorities
for open space areas should be lands with slopes of 25% or greater and important habitat areas.
No residential density should be granted for areas located within the Floodway. Units should be
arranged in accordance with the transect plan as described in the Foothills planning area.
6.14 Land Use Sub Area:
The Comprehensive Plan designates this site to be located within the North Eagle Foothills
Planning Area.
B. PRELIMINARY PLAT PROVISIONS WHICH HARE OF SPECIAL CONCERN REGARDING
THIS PROPOSAL:
10. Any fencing located adjacent to common area open spaces and on the street side of all corner lots
shall be an open fencing style such as wrought iron or other similar decorative style, durable
fencing material. Specific buffer area fences and decorative walls may be allowed as otherwise
required in ECC Section 11A-13C-8. All fencing shall comply with the requirements of the
Habitat Mitigation Plan.
C. ZONING CODE PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS
PROPOSAL:
• Eagle City Code Section 11A-3-1: GENERAL APPLICABILITY:
This title applies to all proposed development located within Spring Valley and requires the
submittal of a design review application pursuant to this title and fee as prescribed from time to
time by the city council.
An individual single-family detached dwelling on a single parcel is specifically excluded from the
requirements of design review.
D. DISCUSSION:
• The applicant is requesting design review approval of the common area landscaping within Valnova
Subdivision No. 3, a 128-lot (117-residential, 11-common) subdivision. Street trees are proposed
along the lot frontages. Amenities include benches, pathways, mailbox structure, litter receptacle,
and pet waste stations within the common open space. Staff defers comment regarding the common
area landscaping, amenities, and mailbox structure to the Design Review Board.
STAFF RECOMMENDATION PROVIDED WITHIN THE STAFF REPORT:
Based upon the information provided to staff to date, if the requested design review application is approved,
staff recommends the site specific conditions of approval and standard conditions of approval provided
within the staff report.
PUBLIC MEETING OF THE BOARD:
A. A meeting to consider the application was held before the Design Review Board on March 27, 2025, at
which time the Board made their decision.
BOARD DELIBERATION:
Upon completion of the applicant's and staff's presentations, the Board discussed during deliberation that:
• The Board is in favor of the landscaping and amenities as submitted.
Page 7of12
K:\Planning Dept\Eagle Applications\Spring Valley \Applications\01-Planning Unit No 1\04-DR\Valnova Lot 24 LS - DR-2025MD-Working Files\02-DRB\03-DRB Findings\Valnova Lot 24
Findings DR.docx
BOARD DECISION:
The Board voted 6 to 0 (Lindgren absent) to recommend approval of DR-2025-08 for a design review
application for the common area landscaping within Valnova Subdivision No. 3 — Lot 24, with the
following staff recommended site specific conditions of approval and standard conditions of approval.
SITE SPECIFIC CONDITIONS OF APPROVAL:
1. Comply with all applicable conditions of PP-2024-04.
2. All ground mounted transformers, cable, and phone boxes shall be screened by landscaping per Eagle
City Code.
3. Submit payment to the City for the Planning and Zoning plan review at the time of building permit
submittal.
4. No ground mounted mechanical units are proposed with this application and none are approved.
5. Paint all electrical meters, phone boxes, etc. located on the building to match the color of the building.
6. No signs are proposed with this application and none are approved.
NOTE: In the event a Standard Condition of Approval conflicts with a Site Specific Condition of
Approval contained herein the Site Specific Condition of Approval shall control.
STANDARD CONDITIONS OF APPROVAL:
1. The applicant shall comply with all requirements of the Ada County Highway District and/or the Idaho
Transportation Department, including but not limited to approval of the drainage system, curbs, gutters,
streets and sidewalks. A letter of approval from the highway district having jurisdiction shall be
submitted to the City prior to issuance of a Zoning Certificate for this site.
2. Idaho Department of Health & Welfare approval of the sewer and water facilities is required prior
issuance of any building permits or Certificate of Occupancy, whichever occurs first.
3. All permits from Central District Health, Eagle Sewer District & Eagle Fire District shall be secured
prior to issuance of building permit or Certificate of Occupancy, whichever occurs first.
4. Written approval of all well water for any shared or commercial well shall be obtained from the Idaho
Department of Water Resources and shall be submitted to the City prior to issuance of any building
permits or Certificate of Occupancy, whichever occurs first.
5. Unless septic tanks are permitted, wet line sewers will be required and the applicant will be required to
furnish the City Engineer with a letter from the sewer entity serving the property, accepting the project
for service, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs
first.
6. The applicant shall submit a letter from the appropriate drainage entity approving the drainage system
and/or accepting said drainage; or submit a letter from a registered professional engineer certifying that
all drainage shall be retained on -site prior to issuance of any building permits or Certificate of
Occupancy, whichever occurs first. A copy of the construction drawing(s) shall be submitted with the
letter.
7. The applicant shall submit plans and calculations prepared by a registered professional engineer to
handle the satisfactory disposal of all storm drainage on the applicant's site. Drainage system plans shall
be submitted to the City Engineer for review and approval prior to issuance of any building permits or
Certificate of Occupancy, whichever occurs first.
The plans shall show how swales, or drain piping, will be developed in the drainage easements. The
approved drainage system shall be constructed, or a performance bond shall be submitted to the City
Clerk, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first.
Page 8 of 12
K:\Planning Dept\Eagle Applications\Spring Valley \Applications\01-Planning Unit No I \ 04-DR \Valnova Lot 24 LS - DR-2025-08\03-Working Files \02-DRB\03-DRB Findings\Valnova Lot 24
Findings DR.docx
The lot shall be so graded that all runoff runs either over the curb, or to the drainage easement and no
runoff shall cross any lot line onto another lot except within a drainage easement.
All design and calculations shall meet the requirements of Ada County Highway District. Construction
of the storm drain disposal system shall be complete before an occupancy permit is issued.
8. No ditch, pipe or other structure or canal, for irrigation water or irrigation waste water owned by an
organized irrigation district, canal company, ditch association, or other irrigation entity, shall be
obstructed, routed, covered or changed in any way unless such obstruction, rerouting, covering or
changing has first been approved in writing by the entity. A Registered Engineer shall certify that any
ditch rerouting, piping, covering or otherwise changing the existing irrigation or waste ditch (1) has
been made in such a manner that the flow of water will not be impeded or increased beyond carrying
capacity of the downstream ditch; (2) will not otherwise injure any person or persons using or interested
in such ditch or their property; and (3) satisfied the Idaho Standards for Public Works Construction. A
copy of such written approval and certification shall be filed with the construction drawing and
submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever
occurs first.
9. Encroachments including, but not limited to, landscaping, fencing, lighting, and/or pathways shall not
be located within any easement or right-of-way for any ditch, pipe or other structure, or canal used for
irrigation water or irrigation waste water without the express written approval of the organized
irrigation district, canal company, ditch association, or other irrigation entity associated with such ditch,
pipe or other structure, or canal. The applicant shall submit a copy of the written approval from the
irrigation entity prior to the City Clerk signing the final plat.
10. Street light plans shall be submitted and approved as to the location, height and wattage to the City
Engineer (if applicable) prior to issuance of any building permits or Certificate of Occupancy,
whichever occurs first. All construction shall comply with the City's specifications and standards.
The applicant shall provide a recorded easement, acceptable to the City Engineer, for the purpose of
installing and maintaining street light fixtures, conduit and wiring lying outside any dedicated public
right-of-way, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs
first.
The applicant shall pay applicable street light inspection fees prior to issuance of any Certificate of
Occupancy.
11. Parking lot light plan shall be submitted and approved as to the location, height and wattage by the City
Engineer. All construction shall comply with the City's specifications and standards.
Lighting is required in the parking area and shall be properly illuminated to avoid accidents. Any lights
used to illuminate the parking lot shall be so arranged as to reflect the light away from the adjoining
property.
12. The parking area shall be paved and shall be maintained in good condition without holes and free of all
dust, trash, weeds and other debris.
13. One set of building plans, for any non single-family residential use, shall be submitted to the Eagle Fire
Department for approval. An approval letter from the Eagle Fire Department shall be submitted to the
City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The
letter shall include the following comments and minimum requirements, and any other items of concern
as may be determined by the Eagle Fire Department officials:
a. "The applicant has made arrangements to comply with all requirements of the Fire Department."
b. The fire hydrant locations shall be reviewed and be approved in writing by the Eagle Fire
Department prior to the City Engineer signing the final plat.
c. Minimum flow per hydrant shall be 1,000 gallons per minute for one and two family dwellings,
Page 9of12
K:\Planning Dept\Eagle Applications\Spring Valley \Applications\01-Planning Unit No I \ 04-DR \Valnova Lot 24 LS - DR-2025-08\03-Working Files \02-DRB\03-DRB Findings\Valnova Lot 24
Findings DR.docz
1,500 gallons per minute for dwellings having a fire area in excess of 3,600-square feet, and 1,500
gallons per minute for non-residential uses (i.e.; Commercial, Industrial, Schools, etc.). Flow rates
shall be inspected in accordance with all agencies having jurisdiction, and shall be verified in
writing by the Eagle Fire Department prior to issuance of any building permits or Certificate of
Occupancy, whichever occurs first.
d. The proposed fire protection system shall be reviewed and approved by the Eagle Fire Department
prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first.
14. Any recreation area, greenbelt area or pathway area along the Boise River, Dry Creek or any other area
designated by the City Council or Eagle City Park and Pathway Development Committee for a path or
walkway shall be approved in writing by the Eagle City Park and Pathway Development Committee
prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first.
15. Conservation, recreation and river access easements (if applicable) shall be approved by the Eagle City
Park and Pathway Development Committee and shall be shown on the final plat prior to issuance of a
building permit or Certificate of Occupancy, whichever occurs first.
16. The applicant shall comply with the provisions of the Eagle City Code, pertaining to floodplain and
river protection regulations (if applicable) prior to issuance of a building permit or Certificate of
Occupancy, whichever occurs first.
17. The applicant shall obtain written approval of the development relative to the effects of the Boise River
Flood Plain (if applicable) from the Corps. of Engineers prior to issuance of a building permit or
Certificate of Occupancy, whichever occurs first.
18. The applicant shall obtain approval of the development relative to its effects on wetlands or other
natural waterways (if applicable) from the Corps. of Engineers and the Idaho Department of Water
Resources and/or any other agency having jurisdiction prior to issuance of a building permit or
Certificate of Occupancy, whichever occurs first.
19. Basements in the flood plain are prohibited.
20. The Americans with Disabilities Act, Uniform Building Code, Eagle City Code, and all applicable
County, State and Federal Codes and Regulations shall be complied with. All design and construction
shall be in accordance with all applicable City of Eagle Codes unless specifically approved by the City
Council.
21. New plans, which incorporate any required changes, shall be submitted for staff approval. Staff may
elect to take those plans to the Design Review Board and the City Council for review and approval.
22. Any changes to the plans and specifications upon which this approval is based, other than those required
by the above conditions, will require submittal of an application for modification and approval of that
application prior to commencing any change.
23. Any modification of the approved design review plans, including, but not limited to building design,
location and details, landscaping, parking, and circulation, must be approved prior to construction/
installation of such changes. Failure to do so may result in the requirement to modify the project to
comply with the approved design review and/or result in the inability to issue a final approval for
occupancy of this project.
24. Use, or each use for multi-use/multi-tenant projects, shall be as defined within Eagle City Code 8-2-3,
"Schedule of District Use Regulations", and any use and subsequent change by the applicant in the
planned use of the property which is the subject of this application, shall require the applicant to submit
a Zoning Permit application to the City and comply with all rules, regulations, ordinances, plans, or
other regulatory and legal restrictions in force at the time the applicant or its successors in interest
advises the City of Eagle of its intent to changes the planned use of the subject property unless a
waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the
Page 10 of 12
K:\Planning Dept\Eagle Applications\Spring Valley \Applications\0I-Planning Unit No I\04-DR\Valnova Lot 24 LS - DR-2025-08\03-Working Files\02-DRB\03-DRB Findings\Valnova Lot 24
Findings DR.docx
time the change in use is sought.
25. Approval of any Design Review shall expire without notice to the applicant on the date of expiration
of the Design Review if construction has not started prior to that date, as stipulated in Eagle City Code
(one year from approval date).
26. All ground -mounted accent lighting fixtures and monument sign lighting fixtures shall be screened
from view with the use of landscaping (top of the fixture shall be no higher than the surrounding
landscaping). The light source itself shall otherwise be screened as provided for within Eagle City
Code.
27. The City's actions on the application does not grant the applicant any appropriation of water or
interference with existing water rights. The applicant indemnifies and holds the City harmless for any
and all water rights, claims in any way associated with this application.
CONCLUSIONS OF LAW:
1. The Board reviewed the particular facts and circumstances of this proposed design review application
(DR-2025-08) with regard to the Eagle City Code Title 11A, Chapter 3, DR Design Review, and based
upon the information provided with the conditions required herein, concludes that the proposed design
review application is in accordance with the Eagle City Code and the Eagle Comprehensive Plan.
2. The Board reviewed the particular facts and circumstances of the proposed design review in terms of
Eagle City Code 11A-3-13, "General Standards For Design Review" and has concluded that the
proposed design review:
A. Will function in conformance with the applicable strategies of the Eagle Comprehensive Plan and
is in accordance with the regulations of this code since there are no inconsistencies with the
comprehensive plan and subdivision landscaping is permitted with the approval of a design review
application within the R-1-DA (Residential one with a development agreement) zoning district;
B. Is of a scale, intensity, and character that is in harmony with existing conforming and planned
development in the vicinity of the site since the proposed landscaping is designed to complement
the general vicinity;
C. Is designed with adequate off street parking facilities in such a way as to not interfere with
ingress/egress to the site and will serve the intended use so as to not cause conflict with adjacent
uses as anticipated within the zoning district — Not applicable for a landscape plan;
D. Will not interfere with the visual character, quality, or appearance of the surrounding area and city,
and where possible, enhance the continuity of thematically common architectural features since the
community structures have been designed to complement the area;
E. Will have facades, features, and other physical improvements that are designed as a whole, when
viewed alone as well as in relationship to surrounding buildings and settings since the community
structures are in conformance with the Eagle Architecture and Site Design Book and will enhance
the proposed buildings in the vicinity;
F. Will not obstruct views and vistas as they pertain to the urban environment and in relation to artistic
considerations since the community structures do not exceed 35-feet permitted within Eagle City
Code;
G. Will provide safe and convenient access to the property for both vehicles and pedestrians through
patterned traffic circulation and connectivity to abutting development since the development has
been designed with public streets connecting to future roadways and pathways have been provided
throughout the development;
H. Is in the interest of public health, safety, and general welfare promoting a pedestrian friendly and
walkable environment in balance with protecting a viable residential center in the area; and
Page 11 of 12
K:\Planning Dept\Eagle Applications\Spring Valley\ Applications\01-Planning Unit No I\04-DR\Valnova Lot 24 LS - DR-2025-08\03-Working Files\02-DRB\03-DRB Findings\Valnova Lot 24
Findings DR.docx
I. No signs are proposed with this application. All signs, if proposed, will be required to be
harmonious with the architectural design of the subdivision, and will not cover nor detract from
desirable architectural features.
DATED this loth day of April 2025.
DESIGN REVIEW BOARD
OF THE CITY OF EAGLE
Ada County, Idaho
ATT ST:
cy E. , Eagle City Clerk
Page 12 of 12
K:\Planning Dept\Eagle Applications\Spring Valley \Applications\01-Planning Unit No 1\04-DR\Vainova Lot 24 LS - DR-2025-08\03-Working Files\02-DRB\03-DRB Findings\Valnova Lot 24
Findings DR.docz