Service Solicited - 2024 - Idaho Power - Idaho Power Customer Cost Quote - Shooting Sports ParkIDAHO
POWER..
An IDACORP Company
CUSTOMER COST QUOTE FOR
IDAHO POWER FACILITIES
Customer or Project Name: CITY OF EAGLE - 7650 N WILLOW CREEK RD - SHOOTING PARK
Construction Costs
Line Installation Costs
1. Line Installation/Upgrade Charge $41,779
2. Customer Credits (Betterment, Metering, Salvage) $0
3. Customer Performed Construction Work Credit $0
4. Net Line Installation Cost
Unusual Conditions
5. Unusual Conditions $54,761
6. Unusual Conditions Bank Letter of Credit (Only for over $10,000) $0
7. Net Unusual Conditions $54,761
Terminal Facilities Costs
8. Terminal Facilities $4,853
9. Terminal Facilities Allowances $(3,813)
10. Terminal Facilities Salvage $0
$41,779
11. Net Terminal Facilities Cost $1,040
12. Underground Service and Attachment Charges $0
13. Engineering Charge $1,116
14. Permits $100
15. Relocation or Removal $32
16. Miscellaneous Charges/Adjustments $0
17. Net Construction Costs
18. Prepaid Charges
(Line Items 4, 7, 11, 12, 13, 14, 15, 16) $98,828
(Engineering, Permits & Right -of -Way) $0
19. Vested Interest Charge $0
20. Customer Payment Due Prior to Construction Scheduling
This cost may not include all construction costs. see page 3 if additional service charges apply.
Notes: Due to labor shortages and pandemic -related supply chain issues, Idaho Power anticipates a possible
shortage of certain materials and equipment necessary to complete the Work (as defined below) which may delay
completion of the Work.
$98,828
Customer understands that charges for relocation, transfer or removal of non -Idaho Power equipment attached to Idahc
Power facilities are not included in this Customer Cost Quote. It is the customer's responsibility to coordinate this work
with the affected utility. All charges associated with this work are the responsibility of the Customer. For utility contact
information, please call 208-388-2886.
Customer understands that Idaho Power determines the metering requirements at such time that Customer submits a
service request and requested electrical load during final design of the Project as contemplated herein.
Notice: This Customer Cost Quote shall be binding on both Idaho Power Company ("Idaho Power") and Customer for a period of 60
days from the quoted date indicated below, subject to changes in information provided by the Customer or changes in Idaho
Power's ability to obtain satisfactory rights -of -way or to comply with governmental regulations, including but not limited to the rules,
regulations, and tariffs of the Idaho Public Utilities Commission ("IPUC") and the Public Utility Commission of Oregon ("OPUC").
Customer must make payment of the quoted amount not less than (30) days prior to the start of the construction work set forth in this
agreement ("Work"). However, Idaho Power does not represent or warrant that the Work will commence within 30 days of receipt of
payment. The start of the Work is subject to Idaho Power's ability to obtain the necessary labor, materials and equipment.
Internal use Page 1 of 3
Service Request Number:
00526540
Customer Account Number: Work Order Number: Design Number: Version:
27661702 0000172370 001
By Initialing below, Customer acknowledges and agrees to the following:
Customer
initials
Customer
initials
Customer
initials
The Customer has received the Underground Residential Conduit Installation brochure/packet or will access
the information available online at
https://docs. idahopower.com/pdfs/ServiceBilling/customerservice/newConstruction/U GResConduitl nstall. pdf
Final Grade: Customer understands that as of the above -named project will
be ready for facilities to be installed by Idaho Power. All roadways and cable routes must have all grading and
sub grading completed by this date. The project must be properly referenced and have grade stakes installed
at all Idaho Power device locations and as might be necessary to establish proper elevations and burial depths
for Idaho Power facilities. The Customer will be responsible for the total cost of damage to Idaho Power
facilities resulting from any subsequent changes in property, any needed relocation, repair, or lines, lot lines,
elevations, grades, excavations, or profiles causing improper locations or burial depths of above -ground
equipment, below -ground equipment, cable, or conduit.
Unusual Conditions: As defined in Idaho Power's line installation tariff, Rule H, Unusual Conditions are
construction conditions not normally encountered, but which Idaho Power may encounter during construction
which impose additional, project -specific costs. These conditions include, but are not limited to: frost,
landscape replacement, road compaction, pavement replacement, chip -sealing, rock digging/trenching,
boring, nonstandard facilities or construction practices, and other than available voltage requirements. The
total cost for all Unusual Conditions, in connection with the work as set forth on this Customer Cost Quote will
be based on the actual costs incurred by Idaho Power related to the conditions encountered during
performance of the Work. Upon completion of all Work, Idaho Power will refund to Customer any Unusual
Conditions amount set forth on this Customer Cost Quote sheet but, not incurred by Idaho Power.
Prior to commencement of the work, Customer shall identify for Idaho Power the location of all underground pipes, lines,
and other facilities (collectively, the "Underground Lines") that may be on Customer's property where Idaho Power is
working. Customer agrees to be responsible for identification and location of all Underground Lines and shall indemnify,
defend, reimburse and hold harmless Idaho Power and its successors and their respective directors, officers, members,
employees, representatives and agents for, from, and against any and all claims, liabilities, losses, damages, expenses,
suits, actions, proceedings, judgement and costs of any kind (collectively, "Damages"), whether actual or merely alleged
and whether directly incurred or from a third party, arising out of or relating to Customer's failure to properly or adequately
identify and locate the Underground Lines, except to the extent finally determined by a court of law that such Damages
resulted from the gross negligence or willful misconduct of Idaho Power, its agents, subcontractors, employees, officers
or directors.
Public Entity Indemnity Limitation. Idaho Power acknowledges that Customer is a public entity and, as such, Customer's
liability is at all times limited as required by Idaho law, including Idaho Code Title 59, Chapter 10, the Idaho State
Constitution, and the Idaho Tort Claims Act, Idaho Code Sections 6-901 through 6-929 and any indemnification or hold
harmless provision shall be void to the extent such provision violates applicable laws. Nothing in the agreement shall be
deemed to constitute a waiver by Customer of any privilege, protection, or immunity otherwise afforded it under the Idaho
Constitution, Idaho Tort Claims Act, or any other applicable law or a waiver of its sovereign immunity, which is hereby
expressly retained.
Internal use Page 2 of 3
Service Request Number:
00526540
Customer Account Number:
Work Order Number: Design Number: Version:
27661702 0000172370 001
The Customer acknowledges Idaho Power's Rule C (Service and Limitations), Section 7 (Right of Way) on file with the IPUC
OPUC: "The Customer shall, without cost to Idaho Power, grant Idaho Power a right-of-way for Idaho Power's lines and
apparatus across and upon the property owned or controlled by the Customer, necessary or incidental to the supplying of
Electric Service and shall permit access thereto by Idaho Power's employees at all reasonable hours." By signing this
Customer Cost Quote, Customer grants to Idaho Power a perpetual right-of-way over the Customer's property for the
installation, operation, replacement and maintenance of power facilities to provide electrical service to the Customer and any
future owners of the Customer's property.
Construction Costs available for refund
(Vested Interest limited to 5 years or 4 additional applicants) $88,184
Customer Payment Due Prior to Scheduling Construction $98,828
Customer
initials
Underground Service Attachment Charges to be billed separately
The Customer understands that Underground Service Attachment Charges will be billed separately on the
first month's power bill after service installation has been completed. In addition, the Customer has
reviewed and acknowledges their responsibility for these costs. Idaho and Oregon cost information are
available online at:
ID: https://docs.idahopower.com/pdfs/ServiceBilling/customerservice/newConstruction/IdahoCostlnfo.pdf
OR: https://docs.idahopower.com/pdfs/ServiceBilling/customerservice/newConstruction/OregonCostlnfo.pdf
Statutory Certifications. In accordance with Idaho Code Section 67-2359, Idaho Power Company
hereby certifies that it is not currently, and for the duration of this Customer Cost Quote will not be,
owned or operated by the Government of China as defined in said code section. In accordance with
Idaho Code Section 67-2346, Idaho Power Company hereby certifies that it is not currently engaged
in, and for the duration of this Customer Cost Quote will not engage in, a boycott of goods and
services from Israel or territories under its control as defined in said code section.
Please sign and return all relevant forms along with the amount stated on the Customer
Cost Quote to:
Customer Signature
Idaho Power Representative
IDAHO POWER COMPANY
10790 Franklin Rd
Boise, ID 83709
Date
(6\-AvA
Quote Date 08/16/2024
Internal use Page 3 of 3
Service Request Number:
00526540
Customer Account Number:
Work Order Number: Design Number: Version:
27661702 0000172370 001
1•"411DAHO
WARMER.
Idaho Power Company
Service Request
Page: 1
Date: 8/16/2024
An IDACORP Company
Service Request Number: 00526540
CITY OF EAGLE - 7650 N WILLOW CREEK RD - SHOOTING PARK
Work Order Number: 27661702 Eng Hours: 00012
Request Type: RS Eng Fee Amount(Att98): 1,116.00
Rate Sch.: 07 Eng Fee Amount(Att16):
Reply By: Eng Fee Service Agreement No:
Eng Fee Service Agreement Date:
Customer No:
Feeder: S P VY 12A
Service Location: 7650 N WILLOW CREEK RD EAGLE, ID 83616
Required in Service Date: 7/30/2024
Planning Center/Team: EAGLE
Contact Detail:
CUST CITY OF EAGLE 208-939-6813
PO BOX 1520, EAGLE ID 83616
IPCO CASEY BELVOIR (208) 388-2910
10790 Franklin Rd, BOISE ID 83709
RFND CITY OF EAGLE 208-939-6813
PO BOX 1520, EAGLE ID 83616
Attribute Information
RES/COM
eziegenfuss@cityofeagle.org
CBelvoir@idahopower.com
Service Voltage 120/240 No. Of Meters 1
Number of Phases 1 Meter Location
KW Motor Load: Ct Loc
Largest Motor Primary OH/UG U G
1 Phase KW Demand 15 KW Service OH/UG UG
3 Phase KW Demand Sry Owner I P C O
Vested Int. Connected Load 15 KW Panel Amp Size 200
Commercial Deposit Amount Service Pole Riser
SIC Number
Description
INSTALL UNDERGROUND PRIMARY LINE EXTENSION TO SERVE NEW 25 KVA 120/240
PADMOUNT TRANSFORMER. BORE 1-2" CONDUIT ACROSS WILLOW CREEK RD. INSTALL 464
SPLICE VAULT WITH HILLSIDE BARRIER OUTSIDE OF R.O.W., CUSTOMER TO PROVIDE
TRENCH PATH ALONG EAST SIDE OF R.O.W. OTHERWISE COMPACTION WILL BE REQUIRED.
IF TRENCHING IS OUTSIDE OF R.O.W. THEN NO COMPACTION IS REQUIRED. CUSTOMER
RESPONSIBLE TO STAKE R.O.W ALONG WILLOWCREEK RD. AND AT ENTRANCE TO SHOOTING
PARK, ALSO NEED TO PROVIDE FINAL GRADE FOR TRANSFORMER LOCATION. 10'
EASEMENT ALONG R.O.W. MUST BE OBTAINED PRIOR TO CONSTRUCTION.
Any changes to the project including but not limited to increases in load, timing of load schedule, location of service, and requested
voltage may result in additional charge or delay of service. It is necessary to communicate changes as soon as possible.
Client Signature — Date
8/16/2024
Idaho Power Representative Signature Date
EASEMENT REQUIRED
a:slr,'
DATE OBTAINED:
TO BE OBTAINED:PRIOR TO CONSTRCTION
FROM CITY OF EAGLE
60' AVIAN CONSTRUCTION
N2 1 ♦
SCOPE OF WORK:
\ BORE 1-2" APPROX. PTg1 REMOVE PROTECTIVE CAP, INSTALL PRIMARY ELBOW
75' ACROSS ROAD PT#2 INSTALL 464 SPLICE VAULT & PAD, HILLSIDE BARRIER, BORE 1-2" ACROSS ROAD, d SPLICE
\ PTO3 TRENCH ALONG EAST SIDE OF ROADWAY, INSTALL 1-2" CONDUIT, INSTALL 25 KVA }i2
TRANSFORMER, CONCRETE PAD, 1-2" SERVICE STUB, 1-2" PRIMARY STUB TO EAST OF
TRANSFORMER.
CUSTOMER TO CLEAR SAGE BRUSH & MAKE PATH FOR TRENCHING OUTSIDE OF R.OW. OR
\ COMPACTION WILL BE REQUIRED.
ALL TRENCHING THAT IS INSIDE ROAD RIGHT OF WAY OR CROSSING ROADWAYS WILL REQUIRE 95%
', lyCOMPACTION
CONTACTS:
CUST: ERIC 208.949.4390 eziegenfussOcityofecgle.org
'' �+Q , IPCO: CASEY 208.388.2910
r
E—,
U '
z�
UNDERGROUND CABLE NOTES
POINT
NUMBER
FROM
TO
CONDUCTOR
CU
CABLE
SIZE
CABLE
LENGTH
TRENCH
LENGTH
CONDUIT
CU
CONDUIT
SIZE
CONDUIT
LENGTH
COMPACTION
LENGTH
BORE
LENGTH
2
HE3
PV1
DCP10
1/0-B
566
-
DDB2
2
-
-
75
3
PV1
WC136
DCP10
1/0-B
1925
1901
DDB2
2
1901
•-
-
B0
MI HE3 !
3
WC136
STUB
5
DDB2
2
5
-
Q0000Q
L_ tr) GO W LI_
L_ — CC L_
OL'i = .Q O
= V Il
0 3FrF0
z z
�
HE43 Lot: 43.758099 \
50 B Lon: —116.369084
GISO# 4463261
\
`
(1)
1 :1
DEVELOPER TO STAKE RUNNING LINE, FINAL HE3
GRADE AND DENCE LOCATIONS.
ALL TRENCH SPOILS TO BE LEFT ON SITE.
f 1
SWPP:—
. _ . COWIN r: Date:
Job Title:
CITY OF EAGLE - 7650 N WILLOW CREEK RD - NEW RESIDENTIAL
Feeder Map Fib Noma: EAGL1301
Surveyed or GPS: GPS
Joint Use Attachment: NO
Pre -Built Date: _
Suites Designed: —
Construction Date: —
Opero5ng Voltage: 7.2kV
T
FDR By: —
Designer: C LB 1221
Design No: 0000172370
Work Order No: 27661702
Dew' —
Additional Description:
INSTALL SINGLE PHASE PRIMARY UNDERGROUND LINE EXTENSION
Dos
1
Twn
05N
Rog
01E
Sec
20
BM
AcFMBy: —
Additlonel Description:State
— INCLUDES 2" BORE -- PERMIT REQUIRED --
ID
County
Ada
Date: —
IDAHO POWER Co. WORK ORDER MAP SCALE: 1" = 100 Sheet 1 of 3
MATCH SHEET 3 \\ EASEMENT REQUIRED
a^"®
DATE OBTAINED:
kJ)
d ".
\\
\ TO BE OBTAINED:PRIOR TO CONSTRCTION
\\
\ FROM CITY OF EAGLE
\
\ \
60" AVIANCONSTRUCTION
\,49\\\
� \ \
mod\ \
\ \\
\ \\
\ \
\ \\
\\
\\\
\ \
\\\
\
\
DEVELOPER TO STAKE RUNNING LINE. FINAL
GRADE AND DEVICE LOCATIONS.
ALL TRENCH SPOILS TO BE LEFT ON SITE.
MATCH SHEET 1
swap:—
Customer Date:
Job
CITY OF EAGLE - 7650 N WILLOW CREEK RD - NEW RESIDENTIAL
Feeder Map File Name: EAGL1301
Surveyed or CPS: GPS
JointSure Use or CPS:ent: S
Pre-BuBt Date:
Built as Designed: ---
Construction Date: --
Opemtingvoltage: 7.2kV
i
"
FOR By: —
1 1
Designer: CLB 1 22 1
I 7
Design No: OOOO 1 7Z3! O
WokOrderNO: 27661702
Date. _
Additional Description:
INSTALL SINGLE PHASE PRIMARY UNDERGROUND LINE EXTENSION
Qua
1
Twn
05N
Rng
01 E
Sec
20
BM
ArcFM By —
Additional Description:state
INCLUDES 2" BORE -- PERMIT REQUIRED --
ID
count'
Ada
Date: —
IDAHO POWER Co. WORK ORDER MAP SCALE: 1" = 100 Sheet 2 of 3
'THIS WORK ORDER DOES NOT INCLUDE YOUR UNDERGROUND SERVICE
CHARGES. YOUR ACCOUNT WILL BE BILLED SEPARATELY ACCORDING TO
THE "UNDERGROUND RESIDENTIAL CONDUR INSTALLATION
REQUIREMENTS" ONCE THE SERVICE WORK HAS BEEN COMPLETED.
/4
°icy''
Bh`
80" AVIAN CONSTRUCTION
FIRE-RESISTANT BARRIER
WHERE R IS NOT PRACTICAL ETWEETO OBTAIN THE
SPECEASEMENT REQUIRED i EW PI MI MANED ME`ECCOMBUSTIBLE THE
BUILDING
SURFACES OR OPENINGS, THE CUSTOMER MAY
PROVIDE FIRE-RESISTANT BARRIERS MADE OF
WC136 /
Z�S B ANLL APPLIBCABLE BUILDINUSTIBLE G CODS ES AND D MEETING
DATE OBTAINED. = N3 POWER REQUIREMENTS.
v NOTES:
HE
TO BE OBTAINED:PRIOR TO CONSTRCTION/ VARY • AT1 HEIGHT AND LENGTH OF THE
BARPoER TO FIT TXE NEEDS OF EACH
APPLICATION.
FROM CI TY OF EAGLE %J
FROM
• ALLOW SPACE FOR REASONABLE VARIATIONS
IN IT BE ESIZE OF REPLACED NETHE EQUIPMENT
FUTU E. SHOULD
[T] • THE 10' CLEARANCE IS MEASURED
M 'LINE -OF -SIGHT' BETWEEN THE NEAREST
7 POINT ON THE EQUIPMENT AND THE WALL
OR OPENING.
NON-COMRUSTIRI F WA IS WITH 0PFNING0
A 10' CLEARANCE IS REQUIRED IN FRONT. TO
EACH SIDE AND VERTICALLY OF ANY DOOR.
WINDOW THAT OPENS. AIR INTAKE VENT OR
FIRE ESCAPE ROUTE LOCATED ON A NON-
COMBUSTIBLE WALL OR SURFACE.
rDMPIISTIBI F WAI I (.
I\
A 10' CLEARANCE IS REQUIRED FOR
COMBUSTIBLE WALLS OR SURFACES.
NOTE:
• THESE DIMENSIONS MAY BE REDUCED IF
THE CUSTOMER PROVIDES A SURABLE FIRE
BARRIER.
DEVELOPER TO STAKE RUNNING LINE. FINAL
AAND DEVICE LOCATIONS.
ALLLL TRENCH SPOILS TTOO BEELEFT ON SITE.
SHEET 2
H
SWPP:__
- - - Customer Date:
Job TNIe:
CITY OF EAGLE - 7650 N WILLOW CREEK RD - NEW RESIDENTIAL
Feeder Map Fib Noma:
EAGL1301
Surveyed or GPS: Gp N
Joint Use AttachmentO
Pre -Built —
Buit es Designed: —
Construction Date: —
Operating voltage: 7.2kv
s
FOR By: —
esi
Dgner C L B 1221
Design No: 0000172370
wokQderNo: 27661702
Det"i —
Additional Description:
INSTALL SINGLE PHASE PRIMARY UNDERGROUND LINE EXTENSION
Oua
1
Twn
05N
Rng
01E
Sec
20
BM
AcFMBY _—
Additional Description:
— INCLUDES 2" BORE —PERMIT REQUIRED --
Stele
ID
Candy
Ada
Date: —
IDAHO POWER Co. WORK ORDER MAP SCALE: 1" = 100 Sheet 3 or 3