Loading...
Findings - CC - 2024 - CU-12-17 MOD/PPUD-06-17 MOD - Brookway Sub. No. 4 CUP & PPUD MOD RequestBEFORE THE EAGLE CITY COUNCIL IN THE MATTER OF AN APPLICATION FOR A CONDITIONAL USE PERMIT/ PRELIMINARY DEVELOPMENT PLAN MODIFICATION FOR BROOKWAY SUBDIVISION NO. 4 FOR BILTMORE COMPANY FINDINGS OF FACT AND CONCLUSIONS OF LAW CASE NUMBER CU-12-17 MOD/PPUD-06-17 MOD The above -entitled conditional use permit/preliminary development plan modification application came before the City Council for their action on May 14, 2024. The Council, having heard and taken oral and written testimony, and having duly considered the matter, makes the following Findings of Fact and Conclusions of Law; FINDINGS OF FACT: A. PROJECT SUMMARY: Biltmore Company is requesting a conditional use permit/preliminary development plan modification to permit a reduced side yard setback for a two-story structure located on Lot 16, Block 6, Brookway Subdivision No. 4. The request is to reduce the side yard setback of a two- story structure from 10-feet to 7.5-feet. The .39-acre site is located at 2805 North Synergy Avenue, Eagle ID 83616. B. APPLICATION SUBMITTAL: The application for this item were received by the City of Eagle on March 29, 2024. C. NOTICE OF PUBLIC HEARING: Notice of Public Hearing on this application for the Eagle City Council was published in accordance with the requirements of Title 67, Chapter 65, Idaho Code and the Eagle City Code on April 26, 2024. Notice of this public hearing was mailed to property owners of the subject property in accordance with the requirements of Title 67, Chapter 65, Idaho Code and Eagle City Code on April 26, 2024. The site was posted in accordance with the Eagle City Code on May 3, 2024. D. HISTORY OF RELEVANT PREVIOUS ACTIONS: On March 13, 2018, the City Council approved an annexation, rezone from RUT (Rural -Urban Transition — Ada County designation) to R-2-DA-P (Residential with a development agreement — PUD), conditional use permit, preliminary development plan, and preliminary plat for Brookway Subdivision(A-02-17/RZ-05-17/CU-12-17/PPUD-06-17/PP-06-17). On March 10, 2020, the City Council approved a final development plan and final plat for Brookway Subdivision No. 4 (FPUD-09-19 and FP-14-19). On January 26, 2024, the City of Eagle Building Department issued a permit for a new home on Lot 16, Block 6 Brookway Subdivision No. 4. (#234038). E. COMPANION APPLICATIONS: None Page 1 of 6 K:\Planning Dept\Eagle Applications\Preliminary Development Plans\2017\Brookway Sub PPUD MOD\Working Files\Brookway Sub PPUD MOD CCF.doc F. COMPREHENSIVE PLAN LAND USE MAP AND ZONING MAP DESIGNATIONS: COMP PLAN DESIGNATION ZONING DESIGNATION LAND USE Existing Residential Two R-2-DA-P (Residential with a development agreement) Single -Family Residential Subdivision (Brookway Subdivision) Proposed No Change No Change No Change North of site Residential Two R-2-DA-P (Residential with a development agreement) Agriculture South of site Residential Two R-3-DA-P (Residential with a development agreement — PUD) Single -Family Residential Subdivision (Lilac Springs Subdivision) East of site Residential Two R-2-DA-P and R-3-DA-P (Residential with a development agreement — PUD) Single -Family Residential Subdivisions (Beaconwood Subdivision and Lanewood Subdivision) West of site Residential Two R-2-DA-P (Residential with a development agreement) Single -Family Residential Subdivision (Stags Crossing Subdivision) G. DESIGN REVIEW OVERLAY DISTRICT: Not in the DDA, TDA, CEDA or DSDA. H. SITE DATA (for Brookway Subdivision): Total Acreage of Site — 61.34-acres Total Number of Lots — 122 Residential — 105 Commercial — 0 Industrial — 0 Common — 17 Total Number of Units - 105 Single-family — 105 Duplex — 0 Multi -family — 0 Total Acreage of Any Out -Parcels — 0 Page 2 of 6 K:\Planning Dept\Eagle Applications\Preliminary Development Plans \2017\Brookway Sub PPUD MOD\Working Files\Brookway Sub PPUD MOD CCF.doc ADDITIONAL SITE DATA PROPOSED REQUIRED Dwelling Units Per Gross Acre 1.71-dwelling units per acre 1.71-dwelling units per acre (as limited within the development agreement) Minimum Lot Size 16,838-square feet 17,000-square feet (minimum) Except that a decrease of minimum lot size in a subdivision may be allowed if there is an offsetting increase of the same percentage in open space and a planned unit development is applied for and approved) - per ECC Section 8-2-4 (G). An offsetting increase of the same percentage in open space has been provided. Minimum Lot Width 84-feet 75-feet Minimum Street Frontage 35.5-feet 35-feet Total Acreage of Common Area 12.66-acres (not inclusive of the planter strip area) 12.27-acres minimum Percent of Site as Common Area 20.6% 20% Except that, according to ECC Section 9-3-8 (C) the City may require additional public and/or private park or open space facilities in PUDs or in subdivisions with 50 or more lots. I. APPLICANT'S STATEMENT OF JUSTIFICATION FOR THE CONDITIONAL PERMIT/PRELIMIANRY DEVELOPMENT PLAN MODIFICATION: See applicant's justification letter, date stamped by the City on March 29, 2024 (attached to the staff report). J. PUBLIC USES SHOWN ON FUTURE ACQUISITIONS MAP: No map currently exists Page 3 of 6 K:\Planning Dept \Eagle Applications \Preliminary Development Plans \2017\Brookway Sub PPUD MOD\Working Files\Brookway Sub PPUD MOD CCF.doc K. AGENCY RESPONSES: The following agencies have previously responded with the original application (A-02-17/RZ-05- 17/CU-12-17/PPUD-06-17/PP-06-17) and their correspondence is attached to the staff report: Ada County Highway District Andeavor (formerly known as Tesoro NW Pipeline) Boise River Flood Control District #10 Central District Health Department Community Planning Association of Southwest Idaho (COMPASS) Eagle Fire Department Idaho Department of Environmental Quality Idaho Transportation Department New Dry Creek Ditch Company Republic Services L. LETTERS FROM THE PUBLIC (attached to the staff memo dated May 9, 2024): Email correspondence received from Becky Strand, dated May 7,2024 Email correspondence received from Bhushan and Laurie Taravade, dated May 7,2024 Email correspondence received from Bill and Carol Koran, dated May 7, 2024 Email correspondence received from Brian Dutchover, dated May 7, 2024 Email correspondence received from Gina Rogers, dated May 7, 2024 Email correspondence received from Jason and Stefani Payne, dated May 7, 2024 Email correspondence received from Liz Williams-Itterly and Brian Itterly, dated May 7, 2024 Email correspondence received from Martin and Maria Rios, dated May 7, 2024 Correspondence received from Mike and Marlee Fischnaller, date stamped by the City on May 7, 2024 Email correspondence received from Rodger Borge, dated May 7, 2024 Email correspondence received from Scott O'Briant, date stamped by the City on May 7, 2024 Email correspondence received from Timothy and Brianne Sullivan, dated May 7, 2024 Email received from Tracy and Kalima Moses, dated May 7, 2024 THE CITY COUNCIL RECEIVED AND REVIEWED THE FOLLOWING STAFF ANALYSIS PROVIDED WITHIN THE STAFF REPORT AND ADOPTS THE STAFF REPORT AS PART OF THE CITY COUNCIL'S FINDINGS OF FACT: A. ZONING CODE PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: • Eagle City Code Section 8-2-4 Schedule of Building Height and Lot Area Requirements for the required R-2 (Residential) zone: Zoning District Maximum Interior Height (Front Rear Side R-2 ; 35' 30' I30' 1 10' Street Side 20' Maximum Lot Covered F And J* 40% Minimum Lot Area (Acres Or Square Feet) H* Minimum Lot Width I* 17,000 j 75' Page 4 of 6 K:\Planning Dept\Eagle Applications \Preliminary Development Plans \2017\Brookway Sub PPUD MOD\Working Files\Brookway Sub PPUD MOD CCF.doc B. DISCUSSION: • The applicant is requesting approval to reduce the interior setback requirement of a constructed two-story structure located within Lot 16, Block 6, Brookway Subdivision No. 4. The request is to reduce the side yard setback from 10-feet to 7.5-feet. Approval of the modification would allow the framed home to remain at the current location within the property. Staff will defer to the Council regarding the applicant's request. PUBLIC HEARING OF THE COUNCIL (Public Hearing Audio/Video Record [Granicus time 00:51:15] https://eagle-id.granicus.com/player/clip/1877?meta_id=94970) : A. A public hearing on the application was held before the City Council on May 14, 2024, at which time public testimony was taken and the public hearing was closed. The Council made their decision at that time. B. Oral testimony in favor of the application was presented to the City Council by no one (other than the applicant/representative). C. Oral testimony in opposition of the application was presented to the City Council by five (5) individuals who indicated the following concerns: • Everyone should be required to conform to the previously approved setbacks. • Biltmore Company was aware that based on the location of the foundation the constructed dwelling would not be in conformance with the required setbacks; however, they proceeded with construction. • As constructed, the home is not harmonious with other homes located within the subdivision. • Biltmore Company should have known better since they constructed other homes within the development. • They are not pleased with the location of the constructed two-story home upon the subject property. • Biltmore Company should be required to conform to the required setbacks. • While the adjacent neighbor may not be affected due to no windows being located on the elevation located closest to the property line, the location of the home does impact all of those in the neighborhood since it is not harmonious with other two-story structures due to the proximity to the side property line. • The subject home is located too close to the sidewalk. • The applicant was aware the proposed home was too close to the side property line prior to pouring the foundation. STAFF RECOMMENDATION PROVIDED WITHIN THE STAFF REPORT: Based upon the information provided to date, if the requested conditional use permit/preliminary development plan modification is approved, staff recommends site specific condition of approval #8 be modified to read as shown within the staff report. COUNCIL DECISION: The Council voted 4 to 0 to deny CU-12-17 MOD/PPUD-06-17 MOD for a conditional use permit modification and preliminary development plan modification to reduce the interior setback requirement of a constructed two-story structure located on Lot 16, Block 6, Brookway Subdivision No. 4 for Biltmore Company. Page 5 of 6 K:\Planning Dept\Eagle Applications\Preliminary Development Plans \2017\Brookway Sub PPUD MOD\Working Files\Brookway Sub PPUD MOD CCF.doc CONCLUSIONS OF LAW: 1. The Council reviewed the particular facts and circumstances of this proposed conditional use permit/preliminary development plan modification (CU-12-17 MOD/PPUD-06-17 MOD) and based upon the public testimony and information provided the Council concludes that the proposed conditional use permit modification and preliminary planned unit development modification is not in accordance with Eagle City Code, Title 8 (Zoning) because the lot is less than 90-feet in width and the original application was approved with a reduction of side yard setbacks for single -story and two- story structures for lots less than 90-feet in width. As constructed, the two-story structure is not in conformance with the approved reduced setbacks. Also, the Council determined the lot has adequate depth which would have allowed for the dwelling to be constructed closer to the rear of the lot; therefore, the two-story structure could have been set back farther to allow for the structure to be constructed in conformance with the required setbacks. Furthermore, based on the proposed location of the dwelling, the Council determined the constructed two-story structure would not be harmonious with other residential dwellings located within the subdivision due to the setback being further reduced. DATED this 1 lth day of June 2024. CITY COUNCIL OF THE CITY OF EAGLE Ada County, Idaho Brad Pike, Mayor ATTES >..,.. •..,;9 c �gPORq •.fit '. . „: ,s-i3OF E. ,,, �: Tracy E. Osborn, le ity Clerk SEAL :* - •., • ::: • -9 •. .• , ''• OF lON,.,• Page 6 of 6 K:\Planning Dept\Eagle Applications\Preliminary Development Plans\2017\Brookway Sub PPUD MOD\Working Files\Brookway Sub PPUD MOD CCF.doc