Loading...
Flood Control - Elevation Certificate - 2898 E Lakeland Lane - Lakeland Estates - 5/9/2024U.S. DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency National Flood Insurance Program ELEVATION CERTIFICATE AND INSTRUCTIONS OMB Control No. 1660-0008 Expiration Date: 06/30/2026 PAPERWORK REDUCTION ACT NOTICE Public reporting burden for this data collection is estimated to average 3.75 hours per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and submitting this form. You are not required to respond to this collection of information unless a valid OMB control number is displayed on this form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing the burden to: Information Collections Management, Department of Homeland Security, Federal Emergency Management Agency, 500 C Street SW, Washington, DC 20742, Paperwork Reduction Project (1660-0008). NOTE: Do not send your completed form to this address. PRIVACY ACT STATEMENT Authority: Title 44 CFR § 61.7 and 61.8. Principal Purpose(s): This information is being collected for the primary purpose of documenting compliance with National Flood Insurance Program (NFIP) floodplain management ordinances for new or substantially improved structures in designated Special Flood Hazard Areas. This form may also be used as an optional tool for a Letter of Map Amendment (LOMA), Conditional LOMA (CLOMA), Letter of Map Revision Based on Fill (LOMR-F), or Conditional LOMR-F (CLOMR-F), or for flood insurance rating purposes in any flood zone. Routine Use(s): The information on this form may be disclosed as generally permitted under 5 U.S.C. § 552a(b) of the Privacy Act of 1974, as amended. This includes using this information as necessary and authorized by the routine uses published in DHS/ FEMA-003 — National Flood Insurance Program Files System of Records Notice 79 Fed. Reg. 28747 (May 19, 2014) and upon written request, written consent, by agreement, or as required by law. Disclosure: The disclosure of information on this form is voluntary; however, failure to provide the information requested may impact the flood insurance premium through the NFIP. Information will only be released as permitted by law. PURPOSE OF THE ELEVATION CERTIFICATE The Elevation Certificate is an important administrative tool of the NFIP. It can be used to provide elevation information necessary to ensure compliance with community floodplain management ordinances, to inform the proper insurance premium, and to support a request for a LOMA, CLOMA, LOMR-F, or CLOMR-F. The Elevation Certificate is used to document floodplain management compliance for Post -Flood Insurance Rate Map (FIRM) buildings, which are buildings constructed after publication of the FIRM, located in flood Zones Al—A30, AE, AH, AO, A (with Base Flood Elevation (BFE)), VE, V1—V30, V (with BFE), AR, AR/A, AR/AE, AR/A1—A30, AR/AH, AR/AO, and A99. It may also be used to provide elevation information for Pre -FIRM buildings or buildings in any flood zone. As part of the agreement for making flood insurance available in a community, the NFIP requires the community to adopt floodplain management regulations that specify minimum requirements for reducing flood losses. One such requirement is for the community to obtain the elevation of the lowest floor (including basement) of all new and substantially improved buildings, and maintain a record of such information. The Elevation Certificate provides a way for a community to document compliance with the community's floodplain management ordinance. Use of this certificate does not provide a waiver of the flood insurance purchase requirement. Only a LOMA or LOMR-F from the Federal Emergency Management Agency (FEMA) can amend the FIRM and remove the federal mandate for a lending institution to require the purchase of flood insurance. However, the lending institution has the option of requiring flood insurance even if a LOMA/LOMR-F has been issued by FEMA. The Elevation Certificate may be used to support a LOMA, CLOMA, LOMR-F, or CLOMR-F request. Lowest Adjacent Grade (LAG) elevations certified by a land surveyor, engineer, or architect, as authorized by state law, will be required if the certificate is used to support a LOMA, CLOMA, LOMR-F, or CLOMR-F request. A LOMA, CLOMA, LOMR-F, or CLOMR-F request must be submitted with either a completed FEMA MT-EZ or MT-1 application package, whichever is appropriate. If the certificate will only be completed to support a LOMA, CLOMA, LOMR-F, or CLOMR-F request, there is an option to document the certified LAG elevation on the Elevation Form included in the MT-EZ and MT-1 application. This certificate is used only to certify building elevations. A separate certificate is required for floodproofing. Under the NFIP, non-residential buildings can be floodproofed up to or above the BFE. A floodproofed building is a building that has been designed and constructed to be watertight (substantially impermeable to floodwaters) below the BFE. Floodproofing of residential buildings is not permitted under the NFIP unless FEMA has granted the community an exception for residential floodproofed basements. The community must adopt standards for design and construction of floodproofed basements before FEMA will grant a basement exception. For both floodproofed non-residential buildings and residential floodproofed basements in communities that have been granted an exception by FEMA, a floodproofing certificate is required. The expiration date on the form herein does not apply to certified and completed Elevation Certificates, as a completed Elevation Certificate does not expire, unless there is a physical change to the building that invalidates information in Section A Items A8 orA9, Section C, Section E, or Section H. In addition, this form is intended for the specific building referenced in Section A and is not invalidated by the transfer of building ownership. Additional guidance can be found in FEMA Publication 467-1, Floodplain Management Bulletin: Elevation Certificate. FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (8/23) Form Page 1 of 8 U.S. DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency National Flood Insurance Program OMB Control No. 1660-0008 Expiration Date: 06/30/2026 ELEVATION CERTIFICATE IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON INSTRUCTION PAGES 1-11 Copy all pages of this Elevation Certificate and all attachments for (1) community official, (2) insurance agent/company, and (3) building owner. SECTION A - PROPERTY INFORMATION FOR INSURANCE COMPANY USE Al. Building Owner's Name: Chad & Megan McKibben Policy Number: A2. Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.: 2898 East Lakeland Lance Company NAIC Number: ZIP Code: 83616 City: Eagle State: ID A3. Property Description (e.g., Lot and Block Numbers or Legal Description) and/or Tax Parcel Number: Lot 11, Block 1 of Lakeland Estates Subdivision A4. Building Use (e.g., Residential, Non -Residential, Addition, Accessory, etc.): Addition to Residential Home A5. Latitude/Longitude: Lat. 43°40'51.79" N Long.116°19'06.16" W Horiz. Datum: ❑ NAD 1927 0 NAD 1983 ❑ WGS 84 (see Form pages 7 and 8). A6. Attach at least two and when possible four clear color photographs (one for each side) of the building A7. Building Diagram Number: 9 A8. For a building with a crawlspace or enclosure(s): a) Square footage of crawlspace or enclosure(s): 2800 sq. ft. b) Is there at least one permanent flood opening on two different sides of each enclosed area? c) Enter number of permanent flood openings in the crawlspace or enclosure(s) within 1.0 foot Non -engineered flood openings: 0 Engineered flood openings: 0 ❑ Yes 0 No ❑ N/A above adjacent grade: 0 sq. ft. d) Total net open area of non -engineered flood openings in A8.c: 0 sq. in. e) Total rated area of engineered flood openings in A8.c (attach documentation - see Instructions): f) Sum of A8.d and A8.e rated area (if applicable - see Instructions): 0 sq. ft. A9. For a building with an attached garage: a) Square footage of attached garage: 900 sq. ft. b) Is there at least one permanent flood opening on two different sides of the attached garage? c) Enter number of permanent flood openings in the attached garage within 1.0 foot above adjacent Non -engineered flood openings: 0 Engineered flood openings: 0 ❑ Yes 0 No ❑ N/A grade: 0 sq. ft. d) Total net open area of non -engineered flood openings in A9.c: 0 sq. in. e) Total rated area of engineered flood openings in A9.c (attach documentation - see Instructions): f) Sum of A9.d and A9.e rated area (if applicable - see Instructions): 0 sq. ft. SECTION B - FLOOD INSURANCE RATE MAP (FIRM) INFORMATION B1.a. NFIP Community Name: Eagle, City of B1.b. NFIP Community Identification Number: 160003 B2. County Name:Ada B3. State: ID B4. Map/Panel No.: 160001C0162 B5. Suffix: J B6. FIRM Index Date: 06/19/2020 B7. FIRM Panel Effective/Revised Date: 06/19/2020 B8. Flood Zone(s): AE B9. Base Flood Elevation(s) (BFE) (Zone AO, use Base Flood Depth): 2582.3 B10. Indicate the source of the BFE data or Base Flood Depth entered in Item B9: 0 FIS ❑ FIRM ❑ Community Determined ❑ Other: B11. Indicate elevation datum used for BFE in Item B9: ❑ NGVD 1929 0 NAVD 1988 ❑ Other/Source: B12. Is the building located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Designation Date: ❑ CBRS ❑ OPA Area (OPA)? ❑ Yes 0 No No B13. Is the building located seaward of the Limit of Moderate Wave Action (LiMWA)? ❑ Yes 0 FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (8/23) Form Page 2 of 8 ELEVATION CERTIFICATE IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON INSTRUCTION PAGES 1-11 Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.: 2898 East Lakeland Lance FOR INSURANCE COMPANY USE Policy Number: City: Eagle State: ID ZIP Code: 83616 Company NAIC Number: SECTION C — BUILDING ELEVATION INFORMATION (SURVEY REQUIRED) C1. Building elevations are based on: ❑ Construction Drawings* ❑ Building Under Construction* 0 *A new Elevation Certificate will be required when construction of the building is complete. C2. Elevations — Zones Al—A30, AE, AH, AO, A (with BFE), VE, V1—V30, V (with BFE), AR, AR/A, AR/AE, A99. Complete Items C2.a—h below according to the Building Diagram specified in Item A7. In Puerto Rico Benchmark Utilized: OPUS Derived Vertical Datum: NAVD 88 Finished Construction AR/A1—A30, AR/AH, AR/AO, only, enter meters. Indicate elevation datum ❑ NGVD 1929 /1 used for the elevations in items a) through h) below. NAVD 1988 ❑ Other: Datum used for building elevations must be the same as that used for the BFE. Conversion factor used? If Yes, describe the source of the conversion factor in the Section D Comments area. a) Top of bottom floor (including basement, crawlspace, or enclosure floor): 2583.0 ❑ Check 0 Yes the feet 0 measurement ❑ No used: meters b) Top of the next higher floor (see Instructions): 2585.9 0 feet ❑ meters c) Bottom of the lowest horizontal structural member (see Instructions): N/A ❑ feet ❑ meters d) Attached garage (top of slab): N/A ❑ feet ❑ meters e) Lowest elevation of Machinery and Equipment (M&E) servicing the building (describe type of M&E and location in Section D Comments area): 2585.3 0 feet ❑ meters f) Lowest Adjacent Grade (LAG) next to building: ❑ Natural a Finished 2584.4 0 feet ❑ meters g) Highest Adjacent Grade (HAG) next to building: ❑ Natural C. Finished 2585.3 0 feet ❑ meters h) Finished LAG at lowest elevation of attached deck or stairs, including structural support: N/A ❑ feet ❑ meters SECTION D — SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION This certification is to be signed and sealed by a land surveyor, engineer, or architect information. I certify that the information on this Certificate represents my best efforts false statement may be punishable by fine or imprisonment under 18 U.S. Code, Were latitude and longitude in Section A provided by a licensed land surveyor? ❑ Check here if attachments and describe in the Comments area. Section 0 authorized by state law to certify elevation to interpret the data available. I understand that any 1001. Yes ❑ No Certifiers Name: Aaron Rush License Number: L-12464 N1\t- L AND Title: Land Surveyor �� Company Name: LR Geo o m Address: 690 S. Industry Way, Suite 55 12464 O 0 o City: Meridian State: ID ZIP Code: 83642 -9` \oP of Telephone: (208) 519-5900 Ext.: 1 Email: aaron@Ir-geo.com IRON P. RVS Aaron Rush Digitally signed by Aaron Rush Signature: Date: 2024.05.09 15:48:07-06'00' Date: 05/09/2024 Place Seal Here Copy all pages of this Elevation Certificate and all attachments for (1) community official, (2) insurance agent/company, and (3) building owner. Comments (including source of conversion factor in C2; type of equipment and location per C2.e; and description of any attachments): FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (8/23) Form Page 3 of 8 ELEVATION CERTIFICATE IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON INSTRUCTION PAGES 1-11 Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.: 2898 East Lakeland Lance FOR INSURANCE COMPANY USE Policy Number: City: Eagle State: ID ZIP Code: 83616 Company NAIC Number: SECTION E — BUILDING MEASUREMENT INFORMATION (SURVEY NOT REQUIRED) FOR ZONE AO, ZONE AR/AO, AND ZONE A (WITHOUT BFE) For Zones AO, AR/AO, and A (without BFE), complete Items El—E5. For Items El—E4, use natural intended to support a Letter of Map Change request, complete Sections A, B, and C. Check the measurement enter meters. Building measurements are based on: ❑ Construction Drawings* ❑ Building Under Construction* *A new Elevation Certificate will be required when construction of the building is complete. El. Provide measurements (C.2.a in applicable Building Diagram) for the following and check the appropriate measurement is above or below the natural HAG and the LAG. a) Top of bottom floor (including basement, crawlspace, or enclosure) is: ❑ feet ❑ meters grade, if available. If the Certificate is used. In Puerto Rico only, ❑ Finished Construction boxes to show whether the ❑ above or ❑ below the HAG. ❑ above or ❑ below the LAG. 9 (see pages 1-2 of Instructions), the ❑ above or ❑ below the HAG. ❑ above or ❑ below the HAG. ❑ above or ❑ below the HAG. with the community's certify this information in Section G. b) Top of bottom floor (including basement, crawlspace, or enclosure) is: ❑ feet ❑ meters E2. For Building Diagrams 6-9 with permanent flood openings provided in Section A Items 8 and/or next higher floor (C2.b in applicable Building Diagram) of the building is: ❑ feet ❑ meters E3. Attached garage (top of slab) is: ❑ feet ❑ meters E4. Top of platform of machinery and/or equipment servicing the building is: ❑ feet ❑ meters E5. Zone AO only: If no flood depth number is available, is the top of the bottom floor elevated in accordance floodplain management ordinance? ❑ Yes ❑ No ❑ Unknown The local official must SECTION F — PROPERTY OWNER (OR OWNER'S AUTHORIZED REPRESENTATIVE) CERTIFICATION The property owner or owner's authorized representative who completes Sections A, B, and E for Zone A (without BFE) or Zone AO must sign here. The statements in Sections A, B, and E are correct to the best of my knowledge ❑ Check here if attachments and describe in the Comments area. Property Owner or Owner's Authorized Representative Name: Address: City: State: ZIP Code: Telephone: Ext.: Email: Signature: Date: Comments: FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (8/23) Form Page 4 of 8 ELEVATION CERTIFICATE IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON INSTRUCTION PAGES 1-11 Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.: 2898 East Lakeland Lance FOR INSURANCE COMPANY USE Policy Number: City: Eagle State: ID ZIP Code: 83616 Company NAIC Number: SECTION G — COMMUNITY INFORMATION (RECOMMENDED FOR COMMUNITY OFFICIAL COMPLETION) The local official who is authorized by law or ordinance to administer the community's floodplain management ordinance can complete Section A, B, C, E, G, or H of this Elevation Certificate. Complete the applicable item(s) and sign below when: G1. ❑ The information in Section C was taken from other documentation that has been signed and sealed by a licensed surveyor, engineer, or architect who is authorized by state law to certify elevation information. (Indicate the source and date of the elevation data in the Comments area below.) G2.a. ❑ A local official completed Section E for a building located in Zone A (without a BFE), Zone AO, or Zone AR/AO, or when item E5 is completed for a building located in Zone AO. G2.b. ❑ A local official completed Section H for insurance purposes. G3. ❑ In the Comments area of Section G, the local official describes specific corrections to the information in Sections A, B, E and H. G4. ❑ The following information (Items G5—G11) is provided for community floodplain management purposes. G5. Permit Number: G6. Date Permit Issued: G7. Date Certificate of Compliance/Occupancy Issued: ❑ meters Datum: G8. This permit has been issued for: ❑ New Construction ❑ Substantial Improvement G9.a. Elevation of as -built lowest floor (including basement) of the building: ❑ feet G9.b. Elevation of bottom of as -built lowest horizontal structural member: ❑ feet ❑ meters Datum: G10.a. BFE (or depth in Zone AO) of flooding at the building site: ❑ feet ❑ meters Datum: G10.b. Community's minimum elevation (or depth in Zone AO) requirement for the lowest floor or lowest horizontal structural member: ❑ feet ❑ meters Datum: G11. Variance issued? ❑ Yes ❑ No If yes, attach documentation and describe in the Comments area. The local official who provides information in Section G must sign here. / have completed the information in Section G and certify that it is correct to the best of my knowledge. If applicable, I have also provided specific corrections in the Comments area of this section. Local Official's Name: Title: NFIP Community Name: Telephone: Ext.: Email: Address: City: State: ZIP Code: Signature: Date: Comments (including type of equipment and location, per C2.e; description of any attachments; and corrections to specific information in Sections A, B, D, E, or H): FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (8/23) Form Page 5 of 8 ELEVATION CERTIFICATE IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON INSTRUCTION PAGES 1-11 Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.: 2898 East Lakeland Lance FOR INSURANCE COMPANY USE Policy Number: City: Eagle State: ID ZIP Code: 83616 Company NAIC Number: SECTION H — BUILDING'S FIRST FLOOR HEIGHT INFORMATION FOR ALL ZONES (SURVEY NOT REQUIRED) (FOR INSURANCE PURPOSES ONLY) The property owner, owners authorized representative, or local floodplain management official may to determine the building's first floor height for insurance purposes. Sections A, B, and I must also be nearest tenth of a foot (nearest tenth of a meter in Puerto Rico). Reference the Foundation Type Instructions) and the appropriate Building Diagrams (at the end of Section / Instructions) to complete H1. Provide the height of the top of the floor (as indicated in Foundation Type Diagrams) above the a) For Building Diagrams 1A, 1B, 3, and 5-8. Top of bottom ❑ feet ❑ complete Section H for all flood zones completed. Enter heights to the Diagrams (at the end of Section H this section. Lowest Adjacent Grade (LAG): meters ❑ above the LAG meters ❑ above the LAG to or above the floor indicated by the Building Diagram? floor (include above -grade floors only for buildings with crawlspaces or enclosure floors) is: b) For Building Diagrams 2A, 2B, 4, and 6-9. Top of next ❑ feet ❑ higher floor (i.e., the floor above basement, crawlspace, or enclosure floor) is: H2. Is all Machinery and Equipment servicing the building (as listed in Item H2 instructions) elevated H2 arrow (shown in the Foundation Type Diagrams at end of Section H instructions) for the appropriate ❑ Yes ❑ No SECTION I — PROPERTY OWNER (OR OWNER'S AUTHORIZED REPRESENTATIVE) CERTIFICATION The property owner or owner's authorized representative who completes Sections A, B, and H must sign here. The statements in Sections A, B, and H are correct to the best of my knowledge. Note: If the local floodplain management official completed Section H, they should indicate in Item G2.b and sign Section G. ❑ Check here if attachments are provided (including required photos) and describe each attachment in the Comments area. Property Owner or Owner's Authorized Representative Name: Address: City: State: ZIP Code: Telephone: Ext.: Email: Signature: Date: Comments: FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (8/23) Form Page 6 of 8 ELEVATION CERTIFICATE IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON INSTRUCTION PAGES 1-11 BUILDING PHOTOGRAPHS See Instructions for Item A6. Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.: 2898 East Lakeland Lance City: Eagle State: ID ZIP Code: 83616 FOR INSURANCE COMPANY USE Policy Number: Company NAIC Number: Instructions: Insert below at least two and when possible four photographs showing each side of the building (for example, may only be able to take front and back pictures of townhouses/rowhouses). Identify all photographs with the date taken and "Front View," "Rear View," "Right Side View," or "Left Side View." Photographs must show the foundation. When flood openings are present, include at least one close-up photograph of representative flood openings or vents, as indicated in Sections A8 and A9. Photo One Photo One Caption: FACING SOUTH (05-03-24) Photo Two Clear Photo One Photo Two Caption: FACING NORTH (05-03-24) Clear Photo Two FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (8/23) Form Page 7 of 8 ELEVATION CERTIFICATE IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON INSTRUCTION PAGES 1-11 BUILDING PHOTOGRAPHS Continuation Page Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.: 2898 East Lakeland Lance City: Eagle State: ID ZIP Code: 83616 FOR INSURANCE COMPANY USE Policy Number: Company NAIC Number: Insert the third and fourth photographs below. Identify all photographs with the date taken and "Front View," "Rear View," "Right Side View," or "Left Side View." When flood openings are present, include at least one close-up photograph of representative flood openings or vents, as indicated in Sections A8 and A9. Photo Three Photo Three Caption: FACING NORTHEAST (05-03-24) Photo Four Clear Photo Three Photo Four Caption: FACING SOUTHEAST (05-03-24) Clear Photo Four FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (8/23) Form Page 8 of 8