IN THE MATTER OF AN APPLICATION FOR A )
DESIGN REVIEW FOR A CHANGE OF USE, )
INCLUDING MODIFICATION TO THE HOME )
DEPOT SITE LOCATED WITHIN THE EAGLE )
PROMENADE SHOPPING CENTER FOR )
THE HOME DEPOT )
FINDINGS OF FACT AND CONCLUSIONS OF LAW
CASE NUMBER DR-03-03 MOD2
The above-entitled design review application came before the Eagle Design Review Board for their action
on February 8,2024. The Eagle Design Review Board having heard and taken oral and written testimony,
and having duly considered the matter,makes the following Findings of Fact and Conclusions of Law;
FINDINGS OF FACT:
A. PROJECT SUMMARY:
The Home Depot, represented by Cassandra Permenter with Scott A. Mommer Consulting, is
requesting design review approval to change the use of the site to include"equipment rental and sales
yard" to accommodate the rental of moving trucks, including a modification to the parking area to
designate areas for product storage,outdoor sales,and equipment rentals. The 12.5-acre site is located
on the northeast corner of State Highway 55 and State Highway 44 at 2808 East State Street within the
Eagle Promenade Shopping Center.
B. APPLICATION SUBMITTAL:
The City of Eagle received the application for this item on January 19, 2024. Revised information
(justification letter, site plan)was received January 26,2024.
C. NOTICE OF AGENCIES' REVIEW:N/A
D. HISTORY OF RELEVANT PREVIOUS ACTIONS:
On March 13, 2001, the Eagle City Council approved a preliminary plat application and conditional
use application for Eagle Towne and Country Centre(PP-18-00/CU-18-00).
On April 24, 2001,the Eagle City Council approved a design review application for the common area
landscaping within Eagle Towne and Country Centre including a building design for WinCo Foods
(DR-6-01).
On February 12, 2002,the Eagle City Council approved a preliminary plat extension time application
for Eagle Towne and Country Centre(PP-18-00)for one year until March 13,2003.
On February 26,2002,the Eagle City Council approved a design review extension of time application
for Eagle Towne and Country Centre including the building design for WinCo Foods (DR-6-01) for
one year until April 24, 2003.
On March 11, 2003,the Eagle City Council approved a design review application to construct a home
improvement store with a garden center(DR-03-03).
On September 9,2003,the Eagle City Council approved a design review application for building wall
signs for The Home Depot(DR-30-03).
Page 1 of 11
K:\Planning Dept\Eagle Applications\Dr\2003\Home Depot Site Mod to incl.Equipment Rental DR-03-03 MOD2\Home Depot Site Mod Findings DR.docx
On March 9, 2017, the Design Review Board approved a design review application to modify site
specific condition of approval#3 established with the approval of DR-03-03 to permit product storage
and outdoor sales within the parking lot(DR-03-03 MOD).
E. COMPANION APPLICATIONS:None.
F. COMPREHENSIVE PLAN LAND USE MAP AND ZONING MAP DESIGNATIONS:
COMP PLAN ZONING LAND USE
DESIGNATION DESIGNATION
Existing Commercial C-3 (Highway Business The Home Depot Store and
District) Garden Center
Proposed No Change No Change The Home Depot Store,
Garden Center including
equipment rental
North of site Business Park BP(Business Park District) Mini-Storage
South of site Commercial C-3 (Highway Business Epic Shine Car Wash/
District) Freddy's Frozen Custard
East of site Commercial C-3 (Highway Business Petco/Winco
District)
West of site Residential Four R-4(Residential) State Highway 55/Great
Sky Estates Subdivision
G. DESIGN REVIEW OVERLAY DISTRICT:Not in the DDA, TDA, CEDA, or DSDA.
H. URBAN RENEWAL DISTRICT:No.
I. EXISTING SITE CHARACTERISTICS:
The site is developed with The Home Depot Store and garden center, landscaping, and parking.
Page 2 of 11
K:\Planning DeptiEagle Applications\Dr\2003\Home Depot Site Mod to incl.Equipment Rental DR-03-03 MOD2\Home Depot Site Mod Findings DR.docx
J. SITE DATA:
SITE DATA PROPOSED REQUIRED
Total Acreage of Site 12.5-acres(544,500-square feet) 1,300-square feet(minimum)
Percentage of Site Devoted 23%(approximately) 92%(maximum)
to Building Coverage
Percentage of Site Devoted 25%(approximately) 10%(minimum)
to Landscaping
Number of Parking Spaces 513-parking spaces 507-parking spaces(Home
Improvement Building with
Garden Center-minimum)
Front Setback 30-feet(Northeast) 30-feet(minimum)*
Rear Setback 60-feet(South) 0-feet(minimum)*
Side Setback 30-feet(Northwest) 30-feet(minimum)*
Side Setback 40-feet(Southeast) 30-feet(minimum)*
*Setbacks are approved through CU-18-00
K. GENERAL SITE DESIGN FEATURES:
Number and Uses of Proposed Buildings:No change
Height and Number of Stories of Proposed Buildings:No change
Gross Floor Area of Proposed Buildings:No change
L. BUILDING DESIGN FEATURES:N/A
M. LANDSCAPING DESIGN:N/A
N. TRASH ENCLOSURES:N/A
O. MECHANICAL UNITS:N/A
P. OUTDOOR LIGHTING:N/A
Q. SIGNAGE:No signs are proposed with this application.
R. PUBLIC SERVICES AVAILABLE:No Change.
S. PUBLIC USES PROPOSED:None.
T. PUBLIC USES SHOWN ON FUTURE ACQUISITIONS MAP:No map currently exists.
U. SPECIAL ON-SITE FEATURES:
Areas of Critical Environmental Concern-none
Evidence of Erosion-no
Fish Habitat-no
Floodplain—yes—500 year
Mature Trees-yes
Riparian Vegetation-no
Page 3 of 11
K:\Planning Dept\Eagle Applications\Dr\2003\Home Depot Site Mod to incl.Equipment Rental DR-03-03 MOD2\Home Depot Site Mod Findings DR.docx
Steep Slopes-no
Stream/Creek—canal—Drainage District#2
Unique Animal Life-no
Unique Plant Life-no
Unstable Soils-unknown
Wildlife Habitat-no
V. SUMMARY OF REVIEW OF ENVIRONMENTAL ASSESSMENT PLAN(IF REQUIRED):Not
required.
W. AGENCY RESPONSES:N/A
X. LETTERS FROM THE PUBLIC:None received to date.
Y. EAGLE CITY CODE 8-2A-13(B)(1)&(2): Required Findings for Design Review:
1. City Findings: The City shall make findings which address the following:
a. The ordinance and standards used in evaluating the application;
b. The reasons for the approval or denial;
c. The actions, if any,that the applicant could take to obtain approval.
2. General Standards For Design Review: The Zoning Administrator, Design Review Board, or City
Council, whichever is applicable, shall review the particular facts and circumstances of each
proposed design review in terms of the following standards and shall find adequate evidence
showing that such design review at the proposed location:
a. Will function in conformance with the applicable strategies of the Eagle Comprehensive Plan
and is in accordance with the regulations of this Code;
b. Is of a scale, intensity,and character that is in harmony with existing conforming and planned
development in the vicinity of the site;
c. Is designed with adequate off street parking facilities in such a way as to not interfere with
ingress/egress to the site and will serve the intended use so as to not cause conflict with adjacent
uses as anticipated within the zoning district;
d. Will not interfere with the visual character, quality, or appearance of the surrounding area and
the City, and where possible, enhance the continuity of thematically common architectural
features;
e. Will have facades, features, and other physical improvements that are designed as a whole,
when viewed alone as well as in relationship to surrounding buildings and settings;
f. Will not obstruct views and vistas as they pertain to the urban environment and in relation to
artistic considerations;
g. Will provide safe and convenient access to the property for both vehicles and pedestrians
through patterned traffic circulation and connectivity to abutting development;
h. Is in the interest of public health, safety, and general welfare promoting a pedestrian friendly
and walkable environment in balance with protecting a viable commercial center in the area;
and
i. Will have signs, if proposed,that are harmonious with the architectural design of the building
and the adjacent buildings,and will not cover or detract from desirable architectural features.
Page 4 of 11
K:\Planning Dept\Eagle Applications\Dr\2003\Home Depot Site Mod to incl.Equipment Rental DR-03-03 MOD2\Home Depot Site Mod Findings DR.docx
THE DESIGN REVIEW BOARD RECEIVED AND REVIEWED THE FOLLOWING STAFF
ANALYSIS PROVIDED WITHIN THE STAFF REPORT AND ADOPTS THE STAFF REPORT
AS PART OF THE DESIGN REVIEW BOARD'S FINDINGS OF FACT:
A. COMPREHENSIVE PLAN PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING
THIS PROPOSAL:
The Comprehensive Plan Land Use Map (adopted November 15, 2017), designates this site as the
following:
Commercial
Suitable primarily for the development of a wide range of commercial activities including offices,
retail and service establishments.Uses should complement uses within Downtown Eagle.
B. ZONING CODE PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS
PROPOSAL:
• Eagle City Code Section 8-2-3: SCHEDULE OF DISTRICT USE REGULATIONS:
Land Uses Districts
�•�: R L-O C-A C. C-3
'Equipment renla and sales
• Eagle City Code Section 8-2A-1: GENERAL APPLICABILITY:
This article applies to all proposed development located within the design review overlay district
which shall include the entire city limits, and any land annexed into the city after the date of
adoption hereof. Such development includes, but is not limited to, new commercial, industrial,
institutional, office, multi-family residential projects, signs, common areas, subdivision signage,
proposed conversions, proposed changes in land use and/or building use, exterior remodeling or
repainting with a color different than what is existing, exterior restoration, and enlargement or
expansion of existing buildings, signs or sites, and requires the submittal of a design review
application pursuant to this article and fee as prescribed from time to time by the city council.
C. DISCUSSION:
• On March 9,2017,the Design Review Board approved a design review application DR-03-03
MOD)to modify site specific condition of approval#3 established with the approval of DR-03-03
to permit product storage and outdoor sales within the parking lot. This application supersedes the
approval of DR-03-03 MOD and DR-03-03 MOD is considered void. However,this modification
does not supersede the original design review approval for this site(DR-03-03)and all conditions
of approval contained therein remain applicable unless specifically modified herein.
• The applicant is requesting design review approval to change the use to include"equipment rental
and sales yard"to accommodate the rental of moving trucks and modify the parking area to
designate areas for product storage,outdoor sales and displays,and equipment rentals. The
applicant's justification letter, date stamped by the City on January 26,2024, identifies the
following parking spaces and locations for product storage,outdoor sales,and equipment rentals:
• 12-parking spaces for a garden shed display area(located on the south side of the building
centered in the parking lot).
Page 5 of 11
K:\Planning Dept\Eagle Applications\Dr\2003\Home Depot Site Mod to incl.Equipment Rental DR-03-03 MOD2\Home Depot Site Mod Findings DR.docx
• 2-parking spaces for a sod hut(located on the south side of the building and the closest
location to the front of the Garden Center).
• 10-parking spaces for live goods shipping crates(located on the north side of the building).
• 20-parking spaces for garden product storage(located on the west side of the building).
• 6-parking spaces for equipment rental [moving trucks] (located on the north side of the
building).
• Outdoor sales and display and compact power equipment rental areas(located at the southeast
corner of the building on the south side of the building).
The applicant is not proposing any other modifications to the site. Staff defers comment regarding
the product storage,outdoor sales area, and equipment rental areas to the Design Review Board.
• The equipment rental of compact power tools, owned and maintained by Home Depot, is separate
from the equipment rental of moving trucks(Penske)and is permitted to be displayed in the
location as noted on the site plan adjacent to the building near the southeast corner of the
building.
• The Home Depot site is required to have 507-parking spaces. Currently the site has 563-parking
spaces. The applicant is proposing to designate 50-parking spaces for product storage and outdoor
sales. This reduction will leave the site with 513-parking spaces which exceeds the minimum
507-spaces required for the site.
STAFF RECOMMENDATION PROVIDED WITHIN THE STAFF REPORT:
Based upon the information provided to staff to date,if the requested design review application is approved,
staff recommends the site specific conditions of approval and standard conditions of approval provided
within the staff report.
PUBLIC MEETING OF THE BOARD:
A. A meeting to consider the application was held before the Design Review Board on February 8, 2024,
at which time the Board made their decision.
BOARD DELIBERATION:
Upon completion of the applicant's and staff's presentations,the Board discussed during deliberation that:
• The Board is in favor of the change of use to include"equipment rental and sales yard"to accommodate
the rental of moving trucks with the specific parking areas identified.
• The Board is in favor of the revised site plan identifying parking areas designated garden display area,
sod hut, live goods shipping crates, garden product storage, equipment rentals, and location of the
outdoor sales and display area and compact power equipment rental area located in front of the building.
The Board recommended the sod hut be screened from State Highway 55 or relocated so that it is not
in view of the highway as noted in site specific condition of approval no. 7. The Board recommended
the sheds be relocated further west on the site as noted in site specific condition of approval no. 8
BOARD DECISION:
The Board voted 4 to 0(Grubb, Merrill,and Mihan absent)to recommend approval of DR-03-03 MOD2
for a design review application for a change of use of the site to include"equipment rental and sales yard"
to accommodate the rental of moving trucks, including a modification to the parking area to designate
areas for product storage,outdoor sales, and equipment rental,with the following staff recommended site
specific conditions of approval and standard conditions of approval with text shown with underline to be
added by the Board.
Page 6 of 11
K:\Planning Dept\Eagle Applications\Dr\2003\Home Depot Site Mod to incl.Equipment Rental DR-03-03 MOD2\Home Depot Site Mod Findings DR.docx
SITE SPECIFIC CONDITIONS OF APPROVAL:
1. Comply with all applicable conditions of CU-18-00 and DR-03-03.
2. Product storage, outdoor sale and displays,and equipment rentals shall be limited to the areas as
shown on the site plan, date stamped by the City on January 26,2024.
3. Provide a landscape plan showing all existing landscaping on the site. The landscape plan shall be
reviewed and approved by staff prior to issuance of a zoning certificate.
4. The use of the property as"Equipment rental and sales yard"shall be limited to the rental of moving
trucks. The moving trucks shall be placed/stored/kept/displayed on the north side of the building only
within the designated six parking spaces. The rental trucks shall not be placed/kept/displayed/nor
dropped off on the south side of the building.
5. Maximum rental truck length shall be 26-feet.
6. Provide a revised site plan showing the directional arrow for the existing compact power rental
locations pointing to the area adjacent to the building.Add a note to the site plan identifying the six
parking spaces located north of the building and east of the garden center staging area as truck rental
parking. The revised site plan shall be reviewed and approved by staff prior to the issuance of a
zoning certificate authorizing the change of use.
7. Provide a revised site plan showing the sod hut(located along the westernmost parking area)
relocated two parking aisles east or provide a revised landscape plan showing additional evergreen
plant material to screen the sod hut from State Highway 55. The revised site/landscape plan shall be
reviewed and approved by staff prior to the issuance of a zoning certificate.
8. Provide a revised site plan showing the garden sheds(12 parking spaces)relocated to the west side of
the site(second drive aisle from the westernmost parking area)and displayed back-to-back versus a
single line. The revised site plan shall be reviewed and approved by staff prior to the issuance of a
zoning certificate.
NOTE: In the event a Standard Condition of Approval conflicts with a Site Specific Condition of
Approval contained herein the Site Specific Condition of Approval shall control.
STANDARD CONDITIONS OF APPROVAL:
1. The applicant shall comply with all requirements of the Ada County Highway District and/or the
Idaho Transportation Department, including but not limited to approval of the drainage system, curbs,
gutters, streets and sidewalks. A letter of approval from the highway district having jurisdiction shall
be submitted to the City prior to issuance of a Zoning Certificate for this site.
2. Idaho Department of Health& Welfare approval of the sewer and water facilities is required prior
issuance of any building permits or Certificate of Occupancy,whichever occurs first.
3. All permits from Central District Health,Eagle Sewer District&Eagle Fire District shall be secured
prior to issuance of building permit or Certificate of Occupancy,whichever occurs first.
4. Written approval of all well water for any shared or commercial well shall be obtained from the Idaho
Department of Water Resources and shall be submitted to the City prior to issuance of any building
permits or Certificate of Occupancy,whichever occurs first.
5. Unless septic tanks are permitted,wet line sewers will be required and the applicant will be required
to furnish the City Engineer with a letter from the sewer entity serving the property,accepting the
project for service,prior to issuance of any building permits or Certificate of Occupancy,whichever
occurs first.
Page 7 of 11
K:\Planning Dept\Eagle Applications\Dr\2003\Home Depot Site Mod to incl.Equipment Rental DR-03-03 MOD2Uiome Depot Site Mod Findings DR.docx
6. The applicant shall submit a letter from the appropriate drainage entity approving the drainage system
and/or accepting said drainage;or submit a letter from a registered professional engineer certifying
that all drainage shall be retained on-site prior to issuance of any building permits or Certificate of
Occupancy,whichever occurs first. A copy of the construction drawing(s)shall be submitted with the
letter.
7. The applicant shall submit plans and calculations prepared by a registered professional engineer to
handle the satisfactory disposal of all storm drainage on the applicant's site.Drainage system plans
shall be submitted to the City Engineer for review and approval prior to issuance of any building
permits or Certificate of Occupancy,whichever occurs first.
The plans shall show how swales,or drain piping,will be developed in the drainage easements. The
approved drainage system shall be constructed, or a performance bond shall be submitted to the City
Clerk,prior to issuance of any building permits or Certificate of Occupancy,whichever occurs first.
The lot shall be so graded that all runoff runs either over the curb, or to the drainage easement and no
runoff shall cross any lot line onto another lot except within a drainage easement.
All design and calculations shall meet the requirements of Ada County Highway District.
Construction of the storm drain disposal system shall be complete before an occupancy permit is
issued.
8. No ditch,pipe or other structure or canal, for irrigation water or irrigation waste water owned by an
organized irrigation district, canal company,ditch association,or other irrigation entity, shall be
obstructed,routed,covered or changed in any way unless such obstruction,rerouting, covering or
changing has first been approved in writing by the entity. A Registered Engineer shall certify that
any ditch rerouting,piping,covering or otherwise changing the existing irrigation or waste ditch(1)
has been made in such a manner that the flow of water will not be impeded or increased beyond
carrying capacity of the downstream ditch; (2)will not otherwise injure any person or persons using
or interested in such ditch or their property; and(3) satisfied the Idaho Standards for Public Works
Construction. A copy of such written approval and certification shall be filed with the construction
drawing and submitted to the City prior to issuance of any building permits or Certificate of
Occupancy,whichever occurs first.
9. Encroachments including,but not limited to, landscaping, fencing, lighting,and/or pathways shall not
be located within any easement or right-of-way for any ditch,pipe or other structure,or canal used for
irrigation water or irrigation waste water without the express written approval of the organized
irrigation district,canal company,ditch association, or other irrigation entity associated with such
ditch,pipe or other structure,or canal. The applicant shall submit a copy of the written approval from
the irrigation entity prior to the City Clerk signing the final plat.
10. Street light plans shall be submitted and approved as to the location,height and wattage to the City
Engineer(if applicable)prior to issuance of any building permits or Certificate of Occupancy,
whichever occurs first. All construction shall comply with the City's specifications and standards.
The applicant shall provide a recorded easement,acceptable to the City Engineer, for the purpose of
installing and maintaining street light fixtures,conduit and wiring lying outside any dedicated public
right-of-way,prior to issuance of any building permits or Certificate of Occupancy,whichever occurs
first.
The applicant shall pay applicable street light inspection fees prior to issuance of any Certificate of
Occupancy.
11. Parking lot light plan shall be submitted and approved as to the location,height and wattage by the
City Engineer. All construction shall comply with the City's specifications and standards.
Page 8 of 11
K:\Planning Dept\Eagle Applications\Dr\2003\Home Depot Site Mod to incl.Equipment Rental DR-03-03 MOD2\Home Depot Site Mod Findings DR.docx
Lighting is required in the parking area and shall be properly illuminated to avoid accidents. Any
lights used to illuminate the parking lot shall be so arranged as to reflect the light away from the
adjoining property.
12. The parking area shall be paved and shall be maintained in good condition without holes and free of
all dust,trash,weeds and other debris.
13. One set of building plans,for any non single-family residential use, shall be submitted to the Eagle
Fire Department for approval. An approval letter from the Eagle Fire Department shall be submitted
to the City prior to issuance of any building permits or Certificate of Occupancy,whichever occurs
first. The letter shall include the following comments and minimum requirements,and any other
items of concern as may be determined by the Eagle Fire Department officials:
a. "The applicant has made arrangements to comply with all requirements of the Fire Department."
b. The fire hydrant locations shall be reviewed and be approved in writing by the Eagle Fire
Department prior to the City Engineer signing the final plat.
c. Minimum flow per hydrant shall be 1,000 gallons per minute for one and two family dwellings,
1,500 gallons per minute for dwellings having a fire area in excess of 3,600-square feet,and 1,500
gallons per minute for non-residential uses(i.e.;Commercial,Industrial, Schools,etc.). Flow rates
shall be inspected in accordance with all agencies having jurisdiction, and shall be verified in
writing by the Eagle Fire Department prior to issuance of any building permits or Certificate of
Occupancy,whichever occurs first.
d. The proposed fire protection system shall be reviewed and approved by the Eagle Fire Department
prior to issuance of a building permit or Certificate of Occupancy,whichever occurs first.
14. Any recreation area,greenbelt area or pathway area along the Boise River,Dry Creek or any other
area designated by the City Council or Eagle City Park and Pathway Development Committee for a
path or walkway shall be approved in writing by the Eagle City Park and Pathway Development
Committee prior to issuance of a building permit or Certificate of Occupancy,whichever occurs first.
15. Conservation,recreation and river access easements(if applicable)shall be approved by the Eagle
City Park and Pathway Development Committee and shall be shown on the final plat prior to issuance
of a building permit or Certificate of Occupancy,whichever occurs first.
16. The applicant shall comply with the provisions of the Eagle City Code,pertaining to floodplain and
river protection regulations(if applicable)prior to issuance of a building permit or Certificate of
Occupancy,whichever occurs first.
17. The applicant shall obtain written approval of the development relative to the effects of the Boise
River Flood Plain(if applicable)from the Corps. of Engineers prior to issuance of a building permit
or Certificate of Occupancy,whichever occurs first.
18. The applicant shall obtain approval of the development relative to its effects on wetlands or other
natural waterways(if applicable)from the Corps. of Engineers and the Idaho Department of Water
Resources and/or any other agency having jurisdiction prior to issuance of a building permit or
Certificate of Occupancy,whichever occurs first.
19. Basements in the flood plain are prohibited.
20. The Americans with Disabilities Act,Uniform Building Code,Eagle City Code, and all applicable
County, State and Federal Codes and Regulations shall be complied with. All design and
construction shall be in accordance with all applicable City of Eagle Codes unless specifically
approved by the City Council.
21. New plans,which incorporate any required changes, shall be submitted for staff approval. Staff may
elect to take those plans to the Design Review Board and the City Council for review and approval.
Page 9 of 11
K:\Planning Dept\Eagle Applications\Dr\2003\Home Depot Site Mod to Incl.Equipment Rental DR-03-03 MOD2\Home Depot Site Mod Findings DR.docx
22. Any changes to the plans and specifications upon which this approval is based,other than those
required by the above conditions,will require submittal of an application for modification and
approval of that application prior to commencing any change.
23. Any modification of the approved design review plans, including, but not limited to building design,
location and details, landscaping,parking, and circulation,must be approved prior to construction/
installation of such changes. Failure to do so may result in the requirement to modify the project to
comply with the approved design review and/or result in the inability to issue a final approval for
occupancy of this project.
24. Use,or each use for multi-use/multi-tenant projects, shall be as defined within Eagle City Code 8-2-3,
"Schedule of District Use Regulations",and any use and subsequent change by the applicant in the
planned use of the property which is the subject of this application, shall require the applicant to
submit a Zoning Permit application to the City and comply with all rules,regulations,ordinances,
plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in
interest advises the City of Eagle of its intent to changes the planned use of the subject property
unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in
effect at the time the change in use is sought.
25. Approval of any Design Review shall expire without notice to the applicant on the date of expiration
of the Design Review if construction has not started prior to that date, as stipulated in Eagle City
Code(one year from approval date).
26. All ground-mounted accent lighting fixtures and monument sign lighting fixtures shall be screened
from view with the use of landscaping(top of the fixture shall be no higher than the surrounding
landscaping). The light source itself shall otherwise be screened as provided for within Eagle City
Code.
27. The City's actions on the application does not grant the applicant any appropriation of water or
interference with existing water rights. The applicant indemnifies and holds the City harmless for any
and all water rights, claims in any way associated with this application.
CONCLUSIONS OF LAW:
1. The Board reviewed the particular facts and circumstances of this proposed design review application
(DR-03-03 MOD)with regard to the Eagle City Code Title 8,Chapter 2,Article A,DR Design Review
Overlay District, and based upon the information provided with the conditions required herein,
concludes that the proposed design review application is in accordance with the Eagle City Code and
the Eagle Comprehensive Plan.
2. The Board reviewed the particular facts and circumstances of the proposed design review in terms of
Eagle City Code 8-2A-13, "General Standards For Design Review" and has concluded that the
proposed design review:
A. Will function in conformance with the applicable strategies of the Eagle Comprehensive Plan and
is in accordance with the regulations of this code since there are no inconsistencies with the
comprehensive plan and equipment rental and sales yard is permitted with the approval of a design
review application within the C-3 (Highway Business District)zoning district;
B. Is of a scale, intensity, and character that is in harmony with existing conforming and planned
development in the vicinity of the site since the rental trucks will be located behind the building in
approved designated parking areas and the overall look of the building and site remain unchanged.
C. the proposed common area landscaping is designed to complement the general vicinity — Not
applicable for this application;
D. Is designed with adequate off street parking facilities in such a way as to not interfere with
ingress/egress to the site and will serve the intended use so as to not cause conflict with adjacent
Page 10 of 11
K:\Planning Dept\Eagle Applications\Dr\2003\Home Depot Site Mod to incl.Equipment Rental DR-03-03 MOD2\Home Depot Site Mod Findings DR.docx
uses as anticipated within the zoning district since the site meets the minimum parking requirement
and all product storage,outdoor sales,and equipment rentals will be located in approved designated
areas;
E. Will not interfere with the visual character,quality,or appearance of the surrounding area and city,
and where possible,enhance the continuity of thematically common architectural features since all
product storage,outdoor sales, and equipment rentals will be located in approved designated areas
including on the south side of the building out of view;
F. Will have facades, features, and other physical improvements that are designed as a whole, when
viewed alone as well as in relationship to surrounding buildings and settings—Not applicable for
this application;
G. Will not obstruct views and vistas as they pertain to the urban environment and in relation to artistic
considerations;
H. Will provide safe and convenient access to the property for both vehicles and pedestrians through
patterned traffic circulation and connectivity to abutting development since the site has parking
areas and pedestrian walkways;
I. Is in the interest of public health, safety, and general welfare promoting a pedestrian friendly and
walkable environment in balance with protecting a viable residential center in the area; and
J. No signs are proposed with this application. All signs, if proposed, will be required to be
harmonious with the architectural design of the building, and will not cover nor detract from
desirable architectural features.
DATED this 8th day of February 2024.
DESIGN REVIEW BOARD
OF THE CITY OF EAGLE
Ada County,Idaho
Waler L • ren, Chairman
ATTEST: ��•••uu,,,,,,,,,
a140
• -was
racy E. o ,Eagle City Clerk : * S —•— ; ''F
•v. o
s. 11//�b el 0 a�.0�7 .�
,,,bg,d O,,`osR,.,,,,,
Page 11 of 11
K:\Planning Dept\Eagle Applications\Dr\2003\FIome Depot Site Mod to Incl.Equipment Rental DR-03-03 MOD2\Home Depot Site Mod Findings DR.docx