Loading...
Minutes - 2024 - Planning & Zoning Commission - 01/22/2024 - SpecialTHE CITY OF EAGLE PLANNING AND ZONING COMMISSION January 22, 2024 Minutes 1. CALL TO ORDER: Meeting called to order at 6:02 p.m. 2. ROLL CALL: Present: GUERBER, MCAULEY, MCLAUGHLIN, SMITH. Absent: WRIGHT. A quorum is present. 3. CONSENT AGENDA: ALL CONSENT AGENDA ITEMS ARE CONSIDERED ACTION ITEMS. • Consent Agenda items are considered to be routine and are acted on with one motion. There will be no separate discussion on these items unless the Chairman, a Commissioner, member of City Staff, or a citizen requests an item to be removed from the Consent Agenda for discussion. Items removed from the Consent Agenda will be placed on the Regular Agenda in a sequence determined by the Rules of Order. • Any item on the Consent Agenda that contains written recommendations from the City of Eagle shall be adopted as part of the Planning & Zoning Commission's Consent Agenda approval motion unless specifically stated otherwise. A. Minutes of January 8, 2024. (ELL) McLaughlin moves to approve the consent agenda as presented. Seconded by McCauley ALL AYES... MOTION CARRIES. 4. UNFINISHED BUSINESS: None. 5. PUBLIC HEARINGS: ALL PUBLIC HEARING ITEMS ARE CONSIDERED ACTION ITEMS. A. RZ-11-15 MOD — Development Agreement Modification for East End Marketplace — TPC Commercial, LLC: TPC Commercial, LLC, represented by Zach Turner with Rennison Design, is requesting a development agreement modification (development agreement in lieu of a conditional use permit) to modify the conditions of development and concept plan contained within the executed development agreement. The 15.55-acre site is generally located on the east side of South Edgewood Lane between East State Street and State Highway 44. (MJW) Debrah Nelson, 601 W. Bannock Street Boise, ID. Nelson provides an overview of the application. Nelson responds to questions from the Commission. Planner Williams responds to questions from the Commission. City Planner, Micheal Williams provides an overview of the application. Chairman Guerber opens the Public Hearing. Cynthia Horsford, 7431 W. Corinthia Street Eagle, ID opposes the application with concerns related to an increase in traffic. Tom Simmonds, 724 N. Spyglass Way Eagle, ID. Simmonds expresses concerns related to the egress of the proposed application. Nelson addresses concerns raised during the public hearing. Nelson responds to questions from the Commission. Chairman Guerber closes the Public Hearing. Discussion amongst the Commission. Page 1 of 3 K:\P&Z\M IN U TES\2024\PZ-01-22-24. d oc McCauley motions to approve RZ-11-15 MOD— Development Agreement Modification for East End Marketplace — TPC Commercial, LLC subject to staff recommendations outlined in the staff packet with the amendment of 3.7, 3.8, 3.10, and 3.19 as discussed. Seconded by McLaughlin. ALL AYES...MOTION CARRIES. B. PU-03-23 — Valnova Planning Unit Master Plan (PUMP) No. 4 — GWC Capital, LLC: GWC Capital, LLC, represented by Langvardt Design Group, is requesting approval of Planning Unit Master Plan (PUMP) No. 4 for the Valnova Planned Development (formerly known as Spring Valley). Planning Unit Master Plan No. 4 consists of 26.32-acres of land within the Southwestern Planning Area and includes one (1) 9.92-acre Estate Residential parcel and one (1) 14.28-acre Regional Open Space (ROS) lot, pursuant to Eagle City Code Title 11 A and in accordance with the amended and restated development agreement associated with the Valnova Development, designating the land for the future development of the City of Eagle regional sports park. The 26.32-acre site is generally located 2,800-feet northeast of State Highway 16 at Equest Lane. (DM) Eric Langvardt with Langvardt Design Group provides an overview of the application. City Planner, Daniel Miller provides an overview of the application. Planner Miller responds to questions from the Commission. Chairman Guerber opens the Public Hearing. Eric Schirmer, 4430 N. Double S Lane Eagle, ID. Schirmer expresses concerns with access to the property of the proposed application as well as the regional open space pathways to the farmers union ditch. Tom Kress, 5002 N. Highway 16 Eagle, ID. Kress expresses concerns in regard to the identification of the pipeline. Eric Schirmer, 4430 N. Double S Lane Eagle, ID. Schirmer expresses concerns related to the grading of the pathways. Lawrence Stubbs with Alliance Consulting, 533 E. Riverside Dr. Eagle, ID. Stubbs addresses concerns raised during the Public Hearing. Langvardt addresses concerns raised during the Public Hearing. Chairman Guerber closes the Public Hearing. Discussion amongst the Commission. Mclughlin motions to approve PU-03-23 — Valnova Planning Unit Master Plan (PUMP) No. 4 — GWC Capital, LLC with the sight specific conditions listed on page 5 and the standard conditions listed on page 34. Seconded by Smith. ALL AYE...MOTION CARRIES. 6. NEW BUSINESS: None. 7. REPORTS: A. Commission: None. B. City Attorney: None. C. Staff: Planner Williams gives an overview of upcoming applications. 8. ADJOURNMENT: McLaughlin moves to adjourn. Seconded by Guerber. ALL AYES... MOTION CARRIES. Hearing no further business, the Commission meeting adjourned at 7:30p.m. Page 2 of 3 K:\P&Z\M I N UT ES\2024\PZ-01-22-24.d oc SUBMITTED: rii/(9 EMILY I4' K , CLERK 120F E MEETING APPROVED: TRENT WRIGHT, CHAIRMAN AN AUDIO RECORDING OF THIS MEETING IS AVAILABLE FOR DOWNLOAD AT W W W. CITYOFEAGLE.ORG. Page 3 of 3 K:\PBZ\M IN U TES\2024\PZ-01-22-24.d oc 1/23/2024 VALNOVA PLANNED UNIT MASTER PLAN (PUMP) No. 4 PU-03-23 Eagle Planning & Zoning Public Hearing January 22, 2024 City Staff: Daniel Miller l Planner III Phone: 939-0227 E-Mail: dmiller@cityofeagle.org 1 Project History: Original Project Submittal — April 2006 (CPA, Annexation, Rezone with Development Agreement Conditional Use and PUD) • Project was no contiguous to the City Limits at the time of application • Land was not in the City's planning boundary/Comp Plan City -Wide Plan Amendment — Adopted February 2007 • Oppose to a stand alone amendment the Council directed the City to complete the Foothills Subarea Plan, north of Homer Road and between SH-16 & SH-55 • M3 (previous developer) was allowed to retain their CPA application through the City's planning process. Approved Application — November 2007 City Council Approved the Pre-Annexation/Development Agreement (Establishing a process for the future annexation & rezone). City denied the Comprehensive Plan Amendment designating the property as "Foothills Residential." "Clouded" Entitlement - Not approved to construct, additional work & Studies to be completed to pertect the application. 2 z 1 1/23/2024 Necessary Project Specific Approvals - • FEMA CLOMR approval — February 2009 • Hillside & Grading Standards — November 2009 • Annexation & Rezone — November 2009 • Habitat Mitigation Plan —January 2011 • ECC Title 11: Planned Developments Chapter A: Spring Valley — January 2014 • Included a Zoning Ordinance Amendment & Design Review Applications Development Agreement Modification — January 2014 • Recognized the master plan approvals • Recognized ECC 11A • Established the process for development 3 Planning Unit Master Plan (PUMP) "The guide to development of all or a portion of the Planning Unit and includes, individually and collectively: • Planning Unit Land Use Plan , • Planning Unit Master Drainage Plan, • Planning Unit Master Street & Circulation Plan, • Planning Unit Master Potable Water Plan, • Planning Unit Master Wastewater Plan, • Planning Unit Master Pressurized Irrigation Plan, • Planning Unit Master Parks, Trails, & Open Space Plan, • Planning Unit Master Public Facilities Plan, • Planning Unit Environmental Design Plan applicable to a particular Planning Unit or portion thereof, and which is developed based on, and consistent with the Project Master Plan" 4 3 4 2 1/23/2024 Whya PUMP? Recognizing the size and the extended build -out of the project, the PUMP is a check to ensure that each individual projects within the larger "Spring Valley Planned Community" has current engineering and studies that are consistent with the requirements of the Development Agreement, and Eagle City Code. Has the "cloud" been lifted? A PUMP is not... • A comprehensive plan review — that was completed with the development agreement approval in 2007. • A new entitlement - the development agreement clearly states the allowance and terms of development including density and uses. • A subdivision - The PUMP alone does not allow for the division of property. A preliminary plat is required. Project Summary: The applicant, GWC Capital, LLC, represented by Eric Langvardt, is requesting: • Approval of Planned Unit Master Plan No. 1 (PUMP) (PU-01-21) for Spring Valley. 6 5 6 3 1/23/2024 11A-7-5 Procedures for Approval: The following procedures shall be used for the review and approval of a PUMP application: A. Action By Planning And Zoning Commission: 1. ...The planning and zoning commission shall either recommend approval, approval with conditions, or continue for further review, the PUMP application ... If the PUMP is in substantial conformance with the PADA and applicable provisions of this title, the planning and zoning commission shall not unreasonably withhold a recommendation of approval. If the planning and zoning commission finds that the PUMP submitted does not reflect proportional progress of planning area requirements (such as density, open space, community and neighborhood centers, etc.) in comparison to the percentage of planning area already developed, the planning and zoning commission may still proceed with processing the PUMP if the commission finds that adequate conditions can be imposed on future PUMP applications to ensure reasonable progress toward completion of the planning area requirements. 7 7 11A-7-5 Procedures for Approval: The following procedures shall be used for the review and approval of a PUMP application: 2. Upon making a recommendation the commission shall specify in writing: a) The ordinances and standards used in evaluating the application; b) The facts submitted with the application and presented establishes that: 1. The PUMP substantially conforms with: the PADA and subsequent amendments; this Title; applicable master plans approved by the City; and/or other applicable information reasonably relied on by the City necessary to uphold the intent of the PADA and this Title: 2. Streets and thoroughfares proposed are suitable and adequate to carry anticipated traffic, and increased densities, if any, will not generate traffic is such amounts as to overload the street network, 3. The proposed commercial/non-residential development is justified at the locations proposed and is consistent with the PADA; 4. The information provided from the agencies having jurisdiction over public facilities needed for the site indicate that adequate public facilities exist, or are expected to be provided, to serve any and all uses allowed within the PUMP area. The Planning Unit will be served, or is conditioned to be served, by adequate public services. c) A summary of the current status of overall Planning Area density, Open Space, Community Centers, Neighborhood Centers, re -assignment of densities, and other adjustable factors as set forth in the PADA. s 8 4 1/23/2024 Paragraph 1.7 of the D.A. — Allocation; Density: (The] developer shall also have the right to allocate residential density and/or Non -Residential Use acreage ... from Planning Areas to other Planning Area or at any time and Developer may allocate any unused acreage originally allocated to a Planning Area or Planning Unit to another Planning Area ... provided such allocation: (i) Does not exceed the Maximum Planning Area Density; (ii) Does not exceed the Maximum Density for the Property; (iii) Does not exceed the Maximum Non -Residential Use Acreage allowed for the Property; (iv) Does Not allow a use otherwise prohibited; (v) Cause a material change to this Agreement... The allocation of residential density and/or Non -Residential Use acreage between Planning Areas is consistent with the City's planning efforts to encourage planning flexibility based on physical and market conditions while protecting private party rights. 9 Vicinity Map: VALNOVA • O \ PUMP #3 �_ t lc J PLANNING UNIT MASTER Er -r—AN k4 BONDARY '--"U A...._. ` �PUMP #2 HWY. 44 r HWY. 26 6 rc 0 z BEACON LIGHT RD. yh �*r 10 5 1/23/2024 OVERVIEW: - . \ litle•04 k .••••••••• F-1 -- - ----i :_, 7-1 I - _ • - r._ , 1 ) ' I-- --j '1.. ''' -- 11 OVERVIEW: ri Spring Valley: 6,017.00 acres 5 different planning areas A2 - PLANNING AREA VICINITY MAP ,• , 11 . .. .... ...... ... .. .... — -\. .7 i -------; j .-.._.._.._. ft7.54"46,\ I r - •- - Aci Spring Valley: 6,017.00 acres j • PUMP No. 4: 26.32 acres A2 - PLANNING AREA VICINITY MAP 12 12 6 1/23/2024 Comprehensive and Zoning Map Designations: Existing: Proposed: North of site: South of site: East of site: West of site: 13 Comprehensive Plan Designation: Foothills Residential Foothills Residential (No Change) Foothills Residential Foothills Residential Foothills Residential Zoning Designation: R-1-DA R-1-DA (No Change) PS (Public/Semi-Public) PS (Public/Semi-Public) PS (Public/Semi-Public) Foothills Residential RR (Rural Residential — Ada County Designation) Land Use Distribution: Planning Area: ECC 11A-2: Land Use District: Description: Southwestern Residential Planning Regional Open Space (ROS) 14.28 acres of Regional Open Space is proposed within PUMP No. 4 Area Southwestern Single family detached unit with a minimum lot size of 0.3D-acres. Residential Planning Estate Residential (ER) Area 1 Estate Residential unit (9.92 acres) is proposed within PUMP No. 4 14 13 14 7 1/23/2024 15 "NITKI6',ARY•, 16 CONSULTING (%) MOAN? CONSIM GWC PUMP No. 4: 26.32-acres • 9.92-acres ER Lot • 14.28-acres ROS Lot Total Proposed Unit: 1 PUMP density: .04 du/ac Valnova density: 0.37 du/ac D - LAND USE PLAN VALNOVA PLANNING UNIT MASTER PLAN $S4 H - PARKS, TRAILS AND OPEN SPACE PLAN GWC VALNOVA PLANNING UNIT MASTER PLAN#4 15 16 8 1/23/2024 DA Compliance: Overall Development Acreage I Pr oposed Total A cr rage I Pr o pas ed RasldenOal Acre age I RapeNd Men-McWntW Mn* Psspos_jOp.o/*we PUMP No 1 41 AC 11 AC SA•'. 117 AC PUMP Not 40 AC 11110 AC 1:111G AC PUMP No 3 AC AC .1 00 AC _ — � — � 1;11': W PUMP NOG AC AC il. il0 AC 14i0 at TOTAL: 1.714.331 AC 607.44 AC 344 AC L:O::N AC MAXIMUM TOTAL ACREAGE. PROPOSER TOTAL ACREAGE CONSUMED ITO 0ATE1: OVERALL ACREAGE REMAINING (TO DATE!. /.CONSUMED. MAX. RESIDENTIAL ACREAGE: PROPOSED RES. ACREAGE CONSUMED ITO DATEI: RESIDENTIAL ACREAGE REMAINING (TO DATEI'. I X CONSUMED: MAX. NON-IIESIOENTIAL ACREAGE: I PROPOSED NON-RES. ACREAGE CONSUMED ITO DATE): 11 NON-RESIDENTIAL ACREAGE REMAINING ITO DATE): '.CONSUMED: 1 17 6.017.00 1.714.33 4.302.67 26.49 I 5.77 �yI 4.061.11 29.64 245.00 3.44 24L56 1.41 AC AC AC AC AC AC AC AC AC DA Compliance: SWR Planning Area Acreage PUMP No 1 PUMP No 2 p PUMP No ti PUMP No 0 10041- ly MAXIMUM TOTAL ACREAGE. PROPOSED TOTAL ACREAGE CONSUMED ITO DATEI: (li OVERALL ACREAGE REMAINING ITO DATE): "ll] /.CONSUMED: - 51 MAX. RESIDENTIAL ACREAGE: e PROPOSED RES. ACREAGE CONSUMED ITO DATEI: RESIDENTIAL ACREAGE REMAINING (TO DATEI: z '.CONSUMED: D MAX. NON-RESIDENTIAL ACREAGE: 8I PROPOSED NON-RES. ACREAGE CONSUMED ITO DATE): ` NON-RESIDENTIAL ACREAGE REMAINING ITO DATE). X. CONSUMED: 18 Proposed Total Acreage AC AC AC AC 415.30 AC 419.00 AC 415.30 AC 3.70 AC 99.12 X. 902.00I AC 415.30 AC 113.3Q) AC 103. 17.00 17.00 AC AC AC I XI Proposed Residential Aowage 147.65 AC 0.00 AC 0 00 AC 12.04 AC f59.69 AC I r Proposed Noe-ResNxW Mee 000 SE o. SE 0 00 SF 0.06I SE 0.00 AC r i i AC 17 Peep0M wen Dpae. I 150.271 AC 0/.00 AC 000 14.20 255.111 18 AC AC ACI 9 1/23/2024 19 TOTAL REMAINING. USE DENSITY TOTAL NUMBER OF BASE UNITS. TOTAL NUMBER APPROVED TO DATE REMAINING UNITS TO DATE APPROVED BASE DENSITY DENSITY TO DATE DENSITY CONSIDERING 6017-AC WILD OUT 1. BASE UNITS CONSUMED MAXIMUM ALLOWABLE. DENSITY TOTAL NUMBER OF UNITS POSSIBLE TOTAL NUMBER OF BONUS UNITS PO551BLE TOTAL PO551BLE BONUS UNITS REMAINING TOTAL NUMBER APPROVE() TO DATE REMAINING UNITS TO DATE. APPROVED MAX DENSITY: DENSITY TO DATE: DENSITY CONSIDERING FULL BUILD OUT: 1, UNITS CONSUMED: 20 DA Compliance: Overall Residential Units and Density PUMP No 1 PUMP Nu 2 PUMP No 3 PUMP No 4 TOTAL APPROVED TOTAL ALLOWED: TOTAL REMAINING: CASE DENSITY TOTAL NUMBER OF 0A5E UNITS: TOTAL NUMBER APPROVED TO DATE REMAINING UNITS TO DATE APPROVED BASE DENSITY DENSITY TO DATE DENSITY CONSIDERING 6017-AC BUILD OUT % BASE UNITS CONSUMED MAXIMUM' ALLOWABLE DENSITY: TOTAL NUMBER OF UNITS POSSIBLE: TOTAL NUMBER OF BONUS UNITS POSSIBLE: TOTAL POSSIBLE °ONUS UNITS REMAINING: TOTAL NUMBER APPROVED TO DATE: REMAINING UNITS TO OATS: APPROVED MA%DENSITY: DENSITY TO DATE: DENSITY CONSIDERING FULL BUILD OUT: % MATS CON5UME0: Total Number of Iks:deneal Ulnas PUMP Area UNIT .. 2.200 UNIT, Uir'ITS LWITS UNITS 7,160 UNITS 4.960 UNITS 3,000 2, RP 0.5 1.28 UNITS (1NII s OUTAC AC MC At AC AC 1,714.33 AC PUMP Dans's, DWAC MAC MAC • DU.IAC 1.20 I DUAC 7.1601 UMTS UNITS UNITS 2,200 UNITS UNITS 1.19 040AC OUMC /CLRFfTIT APPROVE000I APPROVED AC MAC <FILL6.017-ACBA.000T 30. 73 DA Compliance: SWR Residential Units and Density PUMP No 1 PUMP No 2 PUMP No 3 PUMP No4 TOTAL APPROVED Vela' Number of Residential Units of TOTAL ALLOWED W 3 D L'I;I1G UNITS 1315 450 UNITS 450 UN(T5 0 UNI15 209 UNITS 450 FIFA R(f.5 FIFA 1.08 DU/AC 0.07 DU/AC 215.31 5 450 UNITS PUMP Area PUMP OMrA, AC I46 DUYAC AC rI r. a DUTAC AC :I:3,:.I' DUTAC AC 415.30 AC 1.011 DUAAC p1(AC 450 UNITS - UNITS 1.07 DU/AC • WMC , CURRE14TAPPA3VED DUI APPROVED AC W IAC .TCURP1NT APPROVEDDU 1413-AC PLAIEft3G AREAFl N OTT IT 1 • 19 20 10 1/23/2024 DA Compliance: Overall Open Space PUMP NO I PUMP Not PUMP No 3 PUMP No4 TOTAL 0.9. PROVIDED TO DATE: Gl 2 MN. REQ. FOR PLANNING AREA M6IMOMS=15i EA 4 TOTAL O.S. PROVIDED TO DATE: 0.5. NEEDED TO REACH 154' MIN : l PROVIDED RELATIVE TO 20% REQUIREMENT: I F MN. REQ. FOR PROJECT = 20Y. TOTAL O.S. PROVIDED 70 DATE: 0.5. NEEDED TO REACH 20% MN.: IC` 13 PROVIDED RELATIVE TO 2034 REQUIREMENT: GOAL FOR PROJECT - 40X TOTAL O.S. PROVIDED 70 DATE: 0.5 NEEDED TO REACH 40Y. GOAL. 34 PROVIDED RELATIVE TO 40X GOAL: 21 Tad Op«. SPao. AonMO. I Taal R.Oia..l Open Span. AC AC AC AC AC AC AC 1.203.45 AC 1.030.47 AC 342.67 AC < I REODFIED FOR 20X M#I. ITO DA DI 70.20 3: < % Of 0 3 PROVED ITO DATE) 665.73 AC <4FECATPE0 TOI4EET 407.. GOAL ITODATEI 1 AC AC AC 13334 1263.46 AC 1513 Ibl 2 406.80 21221.23 1114.55 95.66 DA Compliance: SWR Planning Area Open Space PUMP No 1 PUMP No 2 PUMP No 3 PUMP No 4 TOTAL 0.9. PROVIDED TO DATE: gyy Taal Open Span. Taa Raglan. OI.n Span. 126.810 AC 81.06 AC 0.00 AC 14.23 255.61 AC 222.14 62.30 AC < MIN REQUFEDTODATE115%:1 61.55 X < 4 PROVIDED IODATE lid. RED. PER PLANING AREA = 141 MIN. RED. FOR PL AIMING AREA MINIMUMS = 1533 EA $ I 63.00 AC 1 TOTAL O.S. PROVIDED TO DATE: f 1 61 AC 0.5. NEEDED TO REACH ISZ MN.: 2 6R AC PROVIDED RELATIVE TO 20Y. REQUIREMENT: 2I .13 33 22 AC AC AC AC AC Taal Camara, Open Span& I % a OP.n Span. AC r 172.36 AC Taal Canaanite Open Spao. 33.47 AC 000 AC 000 AC 0.00 AC 33.47 Sr I r d Open Spaap i 21 1011 0 22 11 1/23/2024 DA Compliance: Habitat Area of Special Concern (HASC) 6. PUMP No. 4 Constrained Lands (CL) and Habitat of Special Concern (HASC): (See 1 = "_)litigation " and Exhibit N in the Development Agreement) Total Pre Mitigation Acreage in Valnova: 1,160 acres Total Post -Mitigation acreage Required: 580 acres (580 acres 1,160 acres) 50% Total Pre -Mitigation Acreage within Prior PUMPS: Total Post -Mitigation Acreage within Prior PUMPS: Current Preservation' Mitigation o'o: Total Current Preservation Mitigation ? o Total Pre Mitigation Acreage in PU2dP No. 4: Total Post -Mitigation Acreage ut PUMP No. 4: (14.91 acres 25.12 acres) 23 732A1 acres 339.75 acres 46.39% 66.15% 25.12 acres 14.91 acres 59.4°,o of PUMP No. 4 1' 7 SITE SPECIFIC CONDITIONS OF APPROVAL: 8. The applicant shall be required to place a deed restriction and/or plat note on the Native/Undisturbed areas within the Habitat of Special Concern (HASC) areas identified to be preserved in Exhibit M — Habitat Area of Special Concern Plan (dated September 2023) at the time of the final plat submittal associated with the lots within PUMP No. 4. These preserved areas shall be identified to be managed and maintained as native and undisturbed areas and there shall be no alterations or modifications to these areas including, but not limited to, grading, drainage, landscaping, conventional maintenance. The specific wording shall be reviewed by the City Engineer and the City Attorney prior to approval of each final plat. 24 23 24 12 1/23/2024 SITE SPECIFIC CONDITIONS OF APPROVAL: 12. The "natural trail" (red dashed line on Exhibit H, dated September 2023), shall be required to connect with the natural trail that was approved in the previously approved PUMP No. 1 application (PU-01-21). 13. The proposed "community pathway", shown as a ten -foot (10') wide Regional Trail (purple dashed line on Exhibit H, dated September 2023), shall be required to connect with the approved ten -foot (10') wide Regional Trail approved in the adjacent PUMP No. 1 application (PU-01-21). 25 25 TRENDING TOWARDS COMPLIANCE: The proposed PUMP No. 4, as submitted (dated September 2023) and described in the written narrative (dated October 30, 2023), is trending towards compliance per the following: • They are in substantial conformance with the development agreement and Title 11A; • They are in substantial conformance with Title 11A; • They are in substantial conformance with master plans approved by the City; • The proposed Streets and thoroughfares have been reviewed and applicable comments and reports were issued by ACHD and ITD, as required; • No proposed commercial and non-residential development is proposed within this PUMP; • Unit totals and density, neighborhood centers„ open space requirements, open space adjacencies, essential infrastructure and utilities, and habitat preservation and rehabilitation are consistent with the development agreement. 26 26 13 1/23/2024 Planning Commission Recommendation: If the Planning Unit Master Plan (PUMP) No. 4 is recommended for approval, staff recommends the Site Specific Conditions of Approval found on page 5 and the Standard Conditions of Approval on page 34 of the Staff Report. 27 End of Presentation 28 27 28 14 CITY OF EAGLE - PLANNING & ZONING COMMISSION PUBLIC HEARING SIGN -IN SHEET PU-03-23 - Valnova Planning Unit Master Plan (PUMP) No. 4 — GWC Capital, LLC: GWC Capital, LLC, represented by Langvardt Design Group, is requesting approval of Planning Unit Master Plan (PUMP) No. 4 for the Valnova Planned Development (formerly known as Spring Valley). Planning Unit Master Plan No. 4 consists of 26.32-acres of land within the Southwestern Planning Area and includes one (1) 9.92-acre Estate Residential parcel and one (1) 14.28-acre Regional Open Space (ROS) lot, pursuant to Eagle City Code Title 11A and in accordance with the amended and restated development agreement associated with the Valnova Development, designating the land for the future development of the City of Eagle regional sports park. The 26.32-acre site is generally located 2,800- feet northeast of State Highway 16 at Equest Lane. (DM) January 22, 2024 NAME (PLEASE PRINT) ADDRESS TESTIFY? (Y/N) PRO/CON `,c liY rnzY `i L130 I`l !.low k\C S Los t. LJ 1/23/2024 DEVELOPMENT AGREEMENT MODIFICATION RZ-11-15 MOD Eagle Planning and Zoning Commission Public Hearing January 22, 2024 City Staff: Michael Williams, CFM, Planner III Phone: 939-0227 E-Mail: Mwilliams@cityofeagle.org 1 Project Summary • TPC Commercial, LLC, represented by Zach Turner with Rennison Design, is requesting a development agreement modification (development agreement in lieu of a conditional use permit) to modify the conditions of development and concept plan contained within the executed development agreement. • The 15.55-acre site is generally located on the east side of South Edgewood Lane between East State Street and State Highway 44. 2 1 1/23/2024 Vicinity Map 3 Aerial Map 4 ur4v10..:2,4 116.1918J41,,..1 . . I , .: Mr ' 4„. . ' ",.., ' .11: • ., l'94' : '''''''".4 01%:*•••• 4143 • '; il•'' " 1' ' '-e4 - i •.11....--... •: i-v4. • i? gar ,......., / 0 • -... , .,..‹.:-.. • - i', ., . I , . r•••="""t;Az. ,t2t7Q.,,, : • ,-.4.-- - elt.•., . A '' s --. 2 1/23/2024 Concept Plan contained within the executed development agreement, Ada County instrument #2016-035523 EAST END MARKETPLACE CONCCPTUAL SITE PLAN 5 Propose Concept Plan 6 3 1/23/2024 Issues of Special Concern • Styles of Architecture • Proposed office use • Allocation of proposed uses • Location of restaurant (with drive -through) uses • Buffer area located adjacent to State Highway 44 • Loading facilities 7 Styles of Architecture • The executed development agreement contains exhibits identifying the style of architecture. The development agreement does not specifically identify a style of architecture associated with the development. • The applicant is proposing style of architecture be limited to Italianate, Craftsman, and/or Mediterranean style of architecture as shown on Exhibit "E.' • To ensure the proposed architecture is in conformance with Eagle City Code, if the development agreement modification is approved, Condition of Development #3.7 should be amended to read as follows: 8 3.7 The multi -family building shall be constructed utilizing a "Craftsman" style of architecture similar, but not limited to, the architecture shown on Exhibit D. The commercial/retail buildings shall be constructed utilizing "Italianate, Craftsman, and/or Mediterranean," style architecture and as shown on Exhibit E. The multi -family building and commercial buildings shall be designed in conf rrpance with the Eagle Architecture an Site Design Book utilizing tour -sided archi ecture. Eagle Design Review Board and City Council approval of the detailed architectural plans for the development is required prior to the issuance of buildin permits for the multi commercial/retail buildings. 4 1/23/2024 Proposed office use • An office use was not previously identified within Condition of Development #3.8 as one of the allowed uses. An office use is a permitted use within the C-2 (General Business District) zoning designation. If the development agreement modification is approved, Condition of Development #3.8 should be amended to read as follows: 3.8 The commercial area of the Property as depicted on the Concept Plan is to be developed with a combination of retail, restaurant, office, and bank uses allowed within Eagle City Code Section 8-2-3 "Official Schedule of District Regulations" under the C-2 zoning designation. The commercial area shall be limited to a maximum of 80,000-square feet of enclosed area (i.e., enclosed with walls and roof). No commercial building footprint shall exceed 30,000-square feet of enclosed area (i.e., enclosed with walls and roof). Allocation of proposed uses • The applicant is proposing 17-tenant spaces which is a reduction from the 21-tenant spaces originally approved. The applicant is not proposing to reduce the number of restaurant (with drive -through) uses within the development. Also, the screening of the drive -through lanes should be addressed. If the development agreement modification is approved, Condition of Development #3.10 should be amended to state as follows: 10 5 1/23/2024 3.10 The Restaurants (with drive through) shall be limited to Pads 1, 2, 3a, and 5a. Additionally, the development may include a bank with drive through, which is an allowed use in the C-2 zone. Owner shall provide a minimum forty -eight -inch (48") buffer (berm, decorative block wall, cultured stone, decorative rock, or similarly designed concrete wall) between the restaurant drive through lanes and the adjacent roadway to reduce the impact of the vehicles utilizing the drive through lanes (i.e. vehicle headlights and vehicle cueing) 11 Buffer area located adjacent to State Highway 44 • The owner was previously required to install a three foot (3') high landscaped berm (measured from the centerline of State Highway 44), or alternative method of compliance within a common lot. The applicant is not proposing to subdivide the area located adjacent to State Highway 44 in its entirety. The applicant is requesting to allow the berm to be placed within an easement versus a common lot. Since it is commercial development the property owners or business association will be responsible for the maintenance of the landscaped area. If the development agreement modification is approved, Condition of Development #3.17 should be amended to read as follows: 12 6 1/23/2024 3.17 Owner shall install a three foot (3') high landscaped berm (measured from the centerline of State Highway 44), or alternative method, within a 30-foot-wide easement located adjacent to State Highway 44. The berm area shall be landscaped with the following plants per one hundred (100) linear feet of right of way: two (2) shade trees, three (3) evergreen trees, and twenty-four (24) shrubs. Each required shade tree may be substituted with one (1) flowering/ornamental tree, provided that not more than fifty percent (50%) of the shade trees are substituted. The total number of trees shall be twenty-five (25) and the total number of shrubs shall be four hundred and seventy-five (475) as depicted in the plan provided on December 15, 2015 (Exhibit F 1-4). The landscape plan shall be reviewed and approved by the Design Review Board prior to submittal of a final plat application. 13 Loading facilities • The Concept Plan contained within the executed development agreement identifies an anchor tenant located at the southwest corner of the development. The anchor tenant was proposed with a loading dock located adjacent to the north elevation of the building. As proposed, the development will not contain uses requiring a loading dock. If the development agreement modification is approved, Condition of Development #3.19 should be amended to read as follows: 14 7 1/23/2024 3.19 Loading facilities or docks shall not be located on the south side of structures, where visible from State Highway 44; however, deliveries may be received on the south side of the building. 15 Planning Commission Recommendation On November 20, 2023, the Eagle Planning and Zoning Commission voted (4 to 0, So & So absent) to recommend approval of this application with the conditions of development provided on page 15 of the Planning and Zoning Commission Findings of Fact and Conclusions of Law. 16 8 1/23/2024 End of Presentation 17 9 1/23/2024 VALNOVA PLANNED UNIT MASTER PLAN (PUMP) No. 4 PU-03-23 Eagle Planning & Zoning Public Hearing January 22, 2024 City Staff: Daniel Miller Planner III Phone: 939-0227 E-Mail: dmiller@cityofeagle.org 1 Project History: Original Project Submittal — April 2006 (CPA, Annexation, Rezone with Development Agreement Conditional Use and PUD) • Project was no contiguous to the City Limits at the time of application • Land was not in the City's planning boundary/Comp Plan City -Wide Plan Amendment — Adopted February 2007 • Oppose to a stand alone amendment the Council directed the City to complete the Foothills Subarea Plan, north of Homer Road and between SH-16 & SH-55 • M3 (previous developer) was allowed to retain their CPA application through the City's planning process. Approved Application — November 2007 City Council Approved the Pre-Annexation/Development Agreement (Establishing a process for the future annexation & rezone). City denied the Comprehensive Plan Amendment designating the property as "Foothills Residential" "Clouded" Entitlement - Not approved to construct, additional work & Studies to be completed to pertect the application. 2 2 1 1/23/2024 Necessary Project Specific Approvals - • FEMA CLOMR approval — February 2009 • Hillside & Grading Standards — November 2009 • Annexation & Rezone — November 2009 • Habitat Mitigation Plan —January 2011 • ECC Title 11: Planned Developments Chapter A: Spring Valley —January 2014 • Included a Zoning Ordinance Amendment & Design Review Applications Development Agreement Modification — January 2014 • Recognized the master plan approvals • Recognized ECC 11A • Established the process for development 3 Planning Unit Master Plan (PUMP) "The guide to development of all or a portion of the Planning Unit and includes, individually and collectively: • Planning Unit Land Use Plan , • Planning Unit Master Drainage Plan, • Planning Unit Master Street & Circulation Plan, • Planning Unit Master Potable Water Plan, • Planning Unit Master Wastewater Plan, • Planning Unit Master Pressurized Irrigation Plan, • Planning Unit Master Parks, Trails, & Open Space Plan, • Planning Unit Master Public Facilities Plan, • Planning Unit Environmental Design Plan applicable to a particular Planning Unit or portion thereof, and which is developed based on, and consistent with the Project Master Plan" 4 3 4 2 1/23/2024 Why a PUMP? Recognizing the size and the extended build -out of the project, the PUMP is a check to ensure that each individual projects within the larger "Spring Valley Planned Community" has current engineering and studies that are consistent with the requirements of the Development Agreement, and Eagle City Code. Has the "cloud" been lifted? A PUMP is not... • A comprehensive plan review — that was completed with the development agreement approval in 2007. • A new entitlement - the development agreement clearly states the allowance and terms of development including density and uses. • A subdivision - The PUMP alone does not allow for the division of property. A preliminary plat is required. Project Summary: The applicant, GWC Capital, LLC, represented by Eric Langvardt, is requesting: • Approval of Planned Unit Master Plan No. 1 (PUMP) (PU-01-21) for Spring Valley. 6 5 6 3 1/23/2024 11A-7-5 Procedures for Approval: The following procedures shall be used for the review and approval of a PUMP application: A. Action By Planning And Zoning Commission: 1. ...The planning and zoning commission shall either recommend approval, approval with conditions, or continue for further review, the PUMP application ... If the PUMP is in substantial conformance with the PADA and applicable provisions of this title, the planning and zoning commission shall not unreasonably withhold a recommendation of approval. If the planning and zoning commission finds that the PUMP submitted does not reflect proportional progress of planning area requirements (such as density, open space, community and neighborhood centers, etc.) in comparison to the percentage of planning area already developed, the planning and zoning commission may still proceed with processing the PUMP if the commission finds that adequate conditions can be imposed on future PUMP applications to ensure reasonable progress toward completion of the planning area requirements. 7 11A-7-5 Procedures for Approval: The following procedures shall be used for the review and approval of a PUMP application: 2. Upon making a recommendation the commission shall specify in writing: a) The ordinances and standards used in evaluating the application; b) The facts submitted with the application and presented establishes that: 1. The PUMP substantially conforms with: the PADA and subsequent amendments; this Title; applicable master plans approved by the City; and/or other applicable information reasonably relied on by the City necessary to uphold the intent of the PADA and this Title: 2. Streets and thoroughfares proposed are suitable and adequate to carry anticipated traffic, and increased densities, if any, will not generate traffic is such amounts as to overload the street network, 3. The proposed commercial/non-residential development is justified at the locations proposed and is consistent with the PADA; 4. The information provided from the agencies having jurisdiction over public facilities needed for the site indicate that adequate public facilities exist, or are expected to be provided, to serve any and all uses allowed within the PUMP area. The Planning Unit will be served, or is conditioned to be served, by adequate public services. c) A summary of the current status of overall Planning Area density, Open Space, Community Centers, Neighborhood Centers, re -assignment of densities, and other adjustable factors as set forth in the PADA. 8 8 4 1/23/2024 Paragraph 1.7 of the D.A. — Allocation; Density: [The] developer shall also have the right to allocate residential density and/or Non -Residential Use acreage ... from Planning Areas to other Planning Area or at any time and Developer may allocate any unused acreage originally allocated to a Planning Area or Planning Unit to another Planning Area ... provided such allocation: (i) Does not exceed the Maximum Planning Area Density; (ii) Does not exceed the Maximum Density for the Property; (iii) Does not exceed the Maximum Non -Residential Use Acreage allowed for the Property; (iv) Does Not allow a use otherwise prohibited; (v) Cause a material change to this Agreement... The allocation of residential density and/or Non -Residential Use acreage between Planning Areas is consistent with the City's planning efforts to encourage planning flexibility based on physical and market conditions while protecting private party rights. 9 • Vicinity Map: PUMP #3 I ' PLANNING UNIT MASTER PLAN #4 BOUNDARY `— J w PUMP #2 • HWY. 44 .- 1 -.. HWY.26 • •y k' VP ■ k • v f 10 4 VALNOVA - o tam BEACON LIGHT RO. "4.,V7P„'' 4tk- 10 5 1/23/2024 OVERVIEW: 11 OVERVIEW: i 12 J Spring Valley: 6,017.00 acres 5 different planning areas A2 - PLANNING AREA VICINITY MAP „„ 11 Spring Valley: 6,017.00 acres PUMP No. 4: 26.32 acres A2 - PLANNING AREA VICINITY MAP 12 6 1/23/2024 Comprehensive and Zoning Map Designations: Existing: Proposed: North of site: South of site: East of site: West of site: 13 Comprehensive Plan Designation: Foothills Residential Foothills Residential (No Change) Foothills Residential Foothills Residential Foothills Residential Zoning Designation: R-1-DA R-1-DA (No Change) PS (Public/Semi-Public) PS (Public/Semi-Public) PS (Public/Semi-Public) Foothills Residential RR (Rural Residential — Ada County Designation) Land Use Distribution: Planning Area: ECC 11A-2: Land Use District: Description: Southwestern Residential Planning Regional Open Space (ROS) 14.28 acres of Regional Open Space is proposed within PUMP No. 4 Area Southwestern Single family detached unit with a minimum lot size of 0.30-acres. Residential Planning Estate Residential (ER) Area 1 Estate Residential unit (9.92 acres) is proposed within PUMP No. 4 14 13 14 7 1/23/2024 15 16 /X7 Al HANCE Cr.11:511111V I 1ft PUMP No. 4: •It ' ........___...--)' I PUMP PI G WC 26.32-acres • 9.92-acres ER Lot • 14.28-acres ROS Lot Total Proposed Unit: 1 PUMP density: .04 du/ac Valnova density: 0.37 du/ac D - LAND USE PLAN VALNOVA PLANNING UNIT MASTER PLAN K4 PUMP PI - • Ti* H - PARKS, TRAILS AND OPEN SPACE PLAN GWC VALNOVA PLANNING UNIT MASTER PLAN #4 . , 15 16 8 1/23/2024 DA Compliance: Overall Development Acreage PUMP No 1 PUMP Not PUMP No 3 PUMP No 4 TOM - MAXIMUM TOTAL ACREAGE: PROPOSED TO1Al. ACREAGE CONSUMED ITO DATE): OVERALL ACREAGE REMAINING ITO DATE). CONSUMED: MAX. RESOENTIAL ACREAGE. PROPOSED RES. ACREAGE CONSUMED (TO DATE'. RESIDENTIAL ACREAGE REMAINING ITO DATE): X CONSUMED: MAX NON-RESCIENTIAL ACREAGE: PROPOSED NON-RES. ACREAGE CONSUMED ITO DATEI: NON-RESIDENTIAL ACREAGE REMAINING (TO DATE): X CONSUMED: 17 Dp 8 Proposed Taal Acreage I Ptoposed Resmdenoal Acreage Proposed Non -Residential Area Proposed Open Space AC AC AC AC AC AC 1,714.33 AC 6,017.00 AC 1.714. 33 AC 4,3E12.67 AC 26.43 X 5,772.00 AC 1.7 .69 AC 4 '1.11 AC .64 X 245.00 AC 3.44 AC 241.56 AC 1.41 X DA Compliance: SWR Planning Area Acreage AC 507.41 AC 1 011 3.44 AC 12113.411 r 1 AC AC AC AC 17 Proposed Total Acreage Proposed Residential Acreage Proposed Non-Residemial Area Ptoposed Open Space PUMP No 1 I AC. 147 G5 4C 0 001 SF 160.27 AC PUMP Not p 1 AC 000 AC 0001 SF 01.06 AC PUMP No 3 Cy _... AC 0001 AC 0001 SF 000 AC PUMP No4 t AC 12: .04 AC 0p0I SF M.26 AC TOTAL: I,415.30 AC 159.69 AC 0.00 AC 255.61 AC I MAXIMUM TOTAL ACREAGE g.a1 PROPOSED TOTAL ACREAGE CONSUMER (TO DATE): LCR OVERALL ACREAGE REMAINING ITO DATEI: iy X CONSUMED: b1 MAX. RESIDENTIAL ACREAGE: g I PROPOSED RES. ACREAGE CONSUMED ITO DATE). la RESIDENTIAL ACREAGE REMAINING ITO DATE): Z X CONSUMED: DI MAX. NON-RESIDENTIAL ACREAGE: 8I PROPOSED NON-RES. ACREAGE CONSUMED ITO DATEI: i" NON-RESIDENTIAL ACREAGE REMAINING ITO DATE): 1 X CONSUMED: I 18 419.00 415.30 3.70 99.12 AC 1 AC I AC I 402.00 I AC I 415.30 AC I i 0.30 AC 103.31 X I 17.00 17.00 AC AC AC X� r 1 18 9 1/23/2024 DA Compliance: Overall Residential Units and Density PUMP No 1 PUMP No 2 PUMP No 3 PUMP No 9 TOTAL APPROVED TOTAL ALLOWED. I TOTAL REMAINING: BASE DENSITY: D TOTAL NUMBER OF BASE UNITS. 2 TOTAL NUMBER APPROVED TO DATE: Q REMAINING UNITS TO DATE D APPROVED BASE DENSITY: E9 DENSITY TO BATE: SI DENSITY CONSIDERING 6017-AC BUILD OUT % BASF. UNITS CONSUMED: MAXIMUM ALLOWABLE DENSITY: TOTAL NUMBER OF UNITS P0551BLE. TOTAL NUMBER OF BONUS UNITS POSSIBLE: TOTAL POSSIBLE BONUS UNITS REMAINING: TOTAL NUMBER APPROVED TO BATE: REMAINING UNITS TO DATE: APPROVED MAX DENSITY: DENSITY TO DATE: DENSITY CONSIDERING FULL BUILD OUT: % UNITS CONSUMED: 19 Total !Jumbo. of Residential Units PUMP Mora cn3ic I i<rs uNIT; 2.200 UNITS 7.160 UNIr5 1 9.360 UNITS 3,0q00 UNITS I P. 51 0.51 OUTAC I 113I ql/ACT TAT 7,1601 UNITS UNITS 2,2001 UNITS UNITS 1.19 DU1AC I DUIAC ,CIA ENTAPPROVEDDU IAPPROVED AC IIUTAC IFULL6.017-ACBUILDOUT 1,714.33 PUMP AC I'I i DUAL AC DUTAC AC mac AC t211 01NAC 30.73 DA Compliance: SWR Residential Units and Density 1 Total Numbm 6 of Reside al Units PUMP Waa PUMP Bowie, PUMP Not lT:1TS AC 4AA OJIAC PUMP Not .4111 .• 11.1111 MAC PUMP No3 L;T:ITS AC I100110 DU! AC PUMP Nod 1.1175_AC ll I)'• DNAC TOTAL APPROVED: p 450 UNITS 415.30 AC t8! GNAC TOTAL ALLOWED: X 050 UNITS TOTAL REMAINING W I 0 I UNITS BASE DENSITY: i TOTAL NUMBER Of BASE UNITS 2 203 UNITS TOTAL NUMBER APPROVED TO DATE: I^q{ 1 450 UNITS REMAINING UNITS TO DATE: gt1 (2C11 t(NJJj APPROVED GAGE DENSITY: F 0.5 ((II(lii/RC DENSITY TO DATE: J:I 1 J1� pll//J[ I DENSITY CONSIDERING 6D17-AC DUIL0 DUI: v I (i0i PEE 1 -/. BASE UNITS CONSUMED: �I 215.311 1 I i` MAXIMUM ALLOWABLE DENSITY: n TOTAL NUMBER OF UNITS POSSIBLE: y 450 UNITS I TOTAL NUMBER OF BONUS UNITS POSSIBLE_ 2 TOTAL POSSIBLE BONUS UNITS REMAINING. TOTAL NUMBER APPROVED TO GATE: 450 UNtt REMAINING UNITS TO DATE: UNITS4 1 APPROVED MAX DENSITY: 1.07 OUTAC I DENSITY 1O DATE: DUTAC sCURRENT APPROVED DU IAPPROVEDAC DENSITY CONSIDERING FULL WILD OUT: (UGC OCURRENT APPROVED DUli19-ACPLANTING AREA MILNJUT UNITS CONSUMED: _ n.. , ;I 20 r 1 r 1 19 20 10 1/23/2024 DA Compliance: Overall Open Space PUMP No 1 PUMP No 2 PUMP No 3 PUMP No 4 TOTAL 0.9. PROVIDED TO DATE: 2 MIN. REQ. FOR PLANNING AREA 111WMUM9 = 15X. EA F. TOTAL 0.5. PROVIDED TO DATE: 0.5. NEEDED TO REACH 1501 MAL CTs X PROVDEO RELATIVE TO 20X REQUIREMENT: I MN. REQ. FOR PROJECT =20X 1 TOTAL O.S. PROVIDED TO DATE: O.S. NEEDED TO REACH 20'X MN.: X. PROVIDED RELATIVE TO 20X REQUIREMENT: GOAL FOR PROJECT = 40X. TOTAL 0.5. PROVIDED 70 DATE: 0.5. NEEDED TO REACH 40X GOAL. X PROVIDED RELATIVE TO 40X GOAL: 21 Tad Open Space Ao.. g. Tad Regional Open Space I Tar Co....a.ay Op.. Space I X a Op.n SP.o. AC AC AC Ac AC 1.203.45 AC 1.030.47 AC 342.071,AC < 1RErtm1070R 20XMt1 1TUDA EI 70.201 L <'/. OF0.5 PROV0D (T0 DATE) 655.731 AC < ',REQUIRED TOI'EET 40% COAL ITO DATE? � 'r38�ACc AC 1 13334 '/. 1.203.40 1 AC 1 11.1' AI C 131311 I 2 406.00 AC 1 2`25 AC 104.55 1 AC 1 95 66 1 •r. 1 DA Compliance: SWR Planning Area Open Space PUMP No 1 PUMP No 2 PUMP No 3 PUMP No 4 TOTAL O.S. PROVIDED TO GATE: 1".' Total .. op.sP.e. AC 126.80 6106 T. ' AC 0.00 ill 14.20 Z' I 255.01 AC 222.14 I. 02.30 AC <Nk1PIEDJFEDTODATEI)S/.1 I61.55 X 1<):PPo]V40EDTO DATE MN. REO. PER PLANpN' AREA < 15i MIN. RED FOR PLANNING AREA MINIMUMS = 15X EA y I TOTALO.S. PROVIDED TO DATE: ZI 0.5. NEEDED TO REACH 15X MN., 2I X. PROVIDED RELATIVE 70 202.. REOUIREMENT: �. 22 63.00 ACl 05.51 N. I (1152.6 AC 405. I v.. 1 iad Ragland Op.n Sp.p. r AC 1 X 1 172.30 AC 1 Taal C..wei• Upon Spaea AC 33.47 AC AC 0.00 AC AC 0.Ctl1 AC AC 0031 AC AC 33.471 SF r i 1 21 X OOP.. Spam 1 570 X 010 0 RHNIW X 54 3 X l 1 • 22 11 1/23/2024 DA Compliance: Habitat Area of Special Concern (HASC) 6. PUMP No. 4 Constrained Lands (CL) and Habitat of Special Concern (HASC): (See 1.3 "Mitigation" " and Exhibit V in the Development Agreement) Total Pre -Mitigation Acreage in Valnova: 1,160 acres Total Post -Mitigation Acreage Required: 5$0 acres (580 acres 1.160 acres) 50% Total Pre -Mitigation .Acreage within Prior PL11Ps: Total Post \litigation Acreage tvithun Prior PLNPs: Current Preservation' Mitigation''o Total Current Preservation Mitigation % Total Pre -Mitigation Acreage in PU11P No. 4: Total Post -Mitigation Acreage in PUMP No. 4: (14.91 acres 25.12 acres) 23 732.41 acres 339.75 acres 46.39° o 66.15% 25.12 acres 14.91 acres 59.4%ofPU'oIPNo.4 r 7 SITE SPECIFIC CONDITIONS OF APPROVAL: 8. The applicant shall be required to place a deed restriction and/or plat note on the Native/Undisturbed areas within the Habitat of Special Concern (HASC) areas identified to be preserved in Exhibit M — Habitat Area of Special Concern Plan (dated September 2023) at the time of the final plat submittal associated with the lots within PUMP No. 4. These preserved areas shall be identified to be managed and maintained as native and undisturbed areas and there shall be no alterations or modifications to these areas including, but not limited to, grading, drainage, landscaping, conventional maintenance. The specific wording shall be reviewed by the City Engineer and the City Attorney prior to approval of each final plat. 24 23 24 12 1/23/2024 SITE SPECIFIC CONDITIONS OF APPROVAL: 12. The "natural trail" (red dashed line on Exhibit H, dated September 2023), shall be required to connect with the natural trail that was approved in the previously approved PUMP No. 1 application (PU-01-21). 13. The proposed "community pathway", shown as a ten -foot (10') wide Regional Trail (purple dashed line on Exhibit H, dated September 2023), shall be required to connect with the approved ten -foot (10') wide Regional Trail approved in the adjacent PUMP No. 1 application (PU-01-21). 25 25 TRENDING TOWARDS COMPLIANCE: The proposed PUMP No. 4, as submitted (dated September 2023) and described in the written narrative (dated October 30, 2023), is trending towards compliance per the following: • They are in substantial conformance with the development agreement and Title 11A; • They are in substantial conformance with Title 11A; • They are in substantial conformance with master plans approved by the City; • The proposed Streets and thoroughfares have been reviewed and applicable comments and reports were issued by ACHD and ITD, as required; • No proposed commercial and non-residential development is proposed within this PUMP; • Unit totals and density, neighborhood centers„ open space requirements, open space adjacencies, essential infrastructure and utilities, and habitat preservation and rehabilitation are consistent with the development agreement. 26 26 13 1/23/2024 Planning Commission Recommendation: If the Planning Unit Master Plan (PUMP) No. 4 is recommended for approval, staff recommends the Site Specific Conditions of Approval found on page 5 and the Standard Conditions of Approval on page 34 of the Staff Report. 27 End of Presentation 28 27 28 14 1/23/2024 East End Marketplace Eagle Planning and Zoning Commission January 22, 2024 1 Site History 2 1 1/23/2024 'r ITT{-37G 1m ILO I bni rrii ,,;leg}•,+6O}aiI:E Original Site Plan 3 4 all ass fr r ar a. Jlr a. _ v •MJ� r v � ilk �� s' Updated Site Plan 2 1/23/2024 5 6 3 1/23/2024 7 8 4 1/23/2024 9 10 5 1/23/2U24 11 12 6 1/23/2024 DA Text Changes 13 DA Text Changes 14 3.7 The multi -family building shall be constructed utilizing a "Craftsman" style of architecture similar, but not Limited to, the architecture shown on Exhibit D. The commercial/retail buildings shall be constructed utilizing a "Italianate, Craftsman. and/or Mediterranean." style architecture as shown on Exhibit E. The multi -family building and commercial buildings shall be designed utilizing four-sided architecture. Eagle Design Review Board approval of the detailed architectural plans for the development is required prior to the issuance of building permits for the multi -family building and commercial/retail buildings. 3.8 The commercial area of the Property as depicted on the Concept Plan is to be developed with a combination of retail, restaurant, office. and bank uses allowed within Eagle City Code Section 8-2-3 "Official Schedule of District Regulations" under the C-2 zoning designation. The commercial area shall be limited to a maximum of 80,000-square feet of enclosed area (i.e., enclosed with walls and roof). No commercial building footprint shall exceed 30,000-square feet of enclosed area (i.e., enclosed with walls and roof). 3.10 The Restaurants (with drive through) shall be limited to Pads B, C, K, and N. four (4) pads or parcels. Additionally, the development may include a bank with drive through, which is an allowed use in the C-2 zone. Pad I is allocated one (1) of the four (4) restaurant drive throughs. Owner shall provide a minimum forty-eight inch (48") buffer (berm, decorative block wall, cultured stone, decorative rock, or similarly designed concrete wall) between the restaurant drive through lanes and the adjacent roadway to reduce the impact of the vehicles utilizing the drive through lanes (i.e. vehicle headlights and vehicle cueing), 7 1/23/2024 DA Text Changes 15 I EXHIBIT B-1 16 3.17 Owner shall install a three foot (3') high landscaped berm (measured from the centerline of State Highway 44), or alternative method, within a 30-foot wide common -lot -easement located adjacent to State Highway 44. The berm area shall be landscaped with the following plants per one hundred (100) linear feet of right of way: two (2) shade trees, three (3) evergreen trees, and twenty four (24) shrubs. Each required shade tree may be substituted with one (1) flowering/ornamental tree, provided that not more than fifty percent (50%) of the shade trees are substituted. The total number of trees shall be twenty-five (25) and the total number of shrubs shall be four hundred and seventy-five (475) as depicted in the plan provided on December 15, 2015 (Exhibit F 1-4). The landscape plan shall be reviewed and approved by the Design Review Board prior to submittal of a final plat application. 3.19 Loading facilities or docks shall not be located on the south side of structures, where visible from State Highway 44; however, deliveries may be received on the south side of the building. East End Marketplace I Conceptual Site Plan • HIGHWAY 44 1 •YPAI• H¢c ay Oy 2 G+y d E �'rt l.srnxvy ] 103e 1 PACIFIC OPIF AD Ill• .. 8 1/23/2024 East End Marketplace Thank you 17 Supplemental Slides 18 9 1/23/2024 Er,M0611' 8: I i' • E. mil( 'M1 } 1 • gni 19 East End Marketplace 1 Conceptual Site Plan EAGLE i0AH0 �..,o. .0 Pece�rea � IN Cay of Eapb 9'IE.tA.. _-. twv'NtlM__M!Y.1v'ed T[ALIWLM.T ITATI HIGHWAY 44 1 iAGLG GYFA$i- Original Development Agreement, from Section 3.1 The intent of this Agreement is to allow sufficient flexibility at the time of detailed planning and platting while still maintaining the general intent of the Conceptual Plan with the requirements set forth in this Development Agreement. Specific design elements shall be clarified during the platting and design review application processes. 20 10 1/23/2024 seik. IandproDATA 01110, 2071 • 4-410.C.14 CO, S[al, "1^ t/111,111 • AO 'Pr 21 East End Market Place Vicinity Map r cvt A mg- fc Cp1,,J.€1 ilf,oAcin:772101 R-2-0A-P f 22 r A • , 434110.22N w 1 The nutlet ion available al this wobsite are tor informational purposes only and do not constitute a leo& document. Zoning • R.15 R.12 CPO R-3 R_2_p R'4DA-P RI5'DA1' (-1 .ceoloA MI. 's C. R1 mu • *1110) r - • — . R-4 -DA C-11DA IP I REDAP , R-2-P •• \ 11 1/23/2024 23 Rc7 24 Zoning A (Agricultural) A-R (Agricultural- Residential) BP (Business Parb) C-1(Neighborhood Business) C-2 (General Business) C-3(Highway Business) CBD (Central Business) L-O (Limited Office) 1.10 M-I(Light Industrial) MU (Mixed Use) PI (Publicsfemipublic) R-1(Residentiol) R-2 (Residential) R-3 (Residential) R-4 (Residential) R-S (Residential) E> R-9 (Residential) R-to (Residential) R-12 (Residential) R-iS (Residential) R-E (Residential -Estates) Future Land Use c c a c ,fl glace Rd E BeassnI Rd �E.EIQa EcaU)celi>i � a /41' 12 1/23/2024 Q -• • 5J-• 1 - T • • • • •e • • • • • • •^wit3 7 • .116 • • • I �' • • • • • • • 1 • • • • • • . - • • • REGIONAL OPENSPACE OVERLAY TRANSITION OVERLAY COMMUNITY CENTER SCENIC CORRIDOR FLOODWAY PROFESSIONAL OFFICE/BUSINESS PARK FOOTHILLS RESIDENTIAL AGRICULTURE/RURAL ESTATE RESIDENTIAL LARGE LOT NEIGHBORHOOD COMPACT INFILLIHIGH DENSITY MIXED USE DOWNTOWN VILLAGE/COMMUNITY CENTER III COMMERCIAL INDUSTRIAL PUBLIC/SEMI-PUBLIC BLM PARK EAGLE ISLAND SPECIAL USE AREA ® FUTURE LA\ D USE 25 tl41111jIll [] J L Original Site Plan 26 MAP 6.1 i i 1.1.1 E Updated Site Plan 13 1/33/2O24 37 IO 14 1/23/2024 29 15 CITY OF EAGLE - PLANNING & ZONING COMMISSION PUBLIC HEARING SIGN -IN SHEET RZ-11-15 MOD — Development Agreement Modification for East End Marketplace — TPC Commercial, LLC: TPC Commercial, LLC, represented by Zach Turner with Rennison Design, is requesting a development agreement modification (development agreement in lieu of a conditional use permit) to modify the conditions of development and concept plan contained within the executed development agreement. The 15.55-acre site is generally located on the east side of South Edgewood Lane between East State Street and State Highway 44. (MJW) January 22, 2024 NAME (PLEASE PRINT) ADDRESS TESTIFY? (Y/N) PRO/CON