Electrical - 240182 - 112 S Eagles Roost Way - 01/16/2024 City of Eagle
Electrical Permit
New Home- Single Family Residential
660 E. Civic Lane, Eagle, ID 83616
(208) 489-8760 -- Contractor's Portal: portal.iworq.net/eagle/permits/600
Permit Number 240182 Issue Date 01/16/2024 Issue Receipt Paula Gratiot
ELECTRICIAN
Better Homes Electric Inc/Energy Smart Wiring
1809 N Wildwood St
Boise,ID 83713
208-375-8200 Registration#: ELE-C-3418
PERMIT ADDRESS
Property Owner: WPG BEP LLC
Subdivision: BALD EAGLE POINTE SUB NO 02
Lot 21 Block 03
Address 112 S EAGLES ROOST WAY
RESIDENTIAL PERMIT FEES
Electrical-New Home $260.00
Total Fee: $260.00
Job Scope/Notes
Contractor's Printed Name einailed
Contractor's Signature
City Clerk/Authorized Personnel
CITY OF EAGLE—BUILDING DEPARTMENT Permit#(office use only)
660 E Civic Ln
Eagle, ID 83616
Phone: 208-489-8760
Email: bOldinglpfcitvofeagte.iarg _ 26/V
Contractor Portal:httotioortahworonet/EAuLidoermits/600
ELECTRICAL PERMIT APPLICATION-COMMERCIAL& RESIDENTIAL For emionv 20230513
I Electrical Contractor:Better Homes Electric Inc dba Enel Pbone:2083758200 I Emailienergysmartwitingrdigmail.com
I State Cont.Lic#:ELE-C-3418 I Exp Date:10-31-24 __ I
Builder or Property Owner:Woodbridge Pacific Group 1 Site Subdivision:Bald Eagle Point
Site Street Address:112 S Eagles Roost Way Lot:21 1 Block:3 Project Sq Ft:2694
DiesciiptiOo of WorkfrOp) :ji — i Permit ..,Type: '
Residential new construction of single family dwelling „V ! New Residential I I Commercial
I Remodel I I Commercial TI
„
Wing Space++Space siOlitnin ai,iflaieftingunit irrtended fir human POOltOPPO:,00:0#Iitir*O0adOililfiftpatilfzackI'i3Or ,,ieeptrig,,g0irt,:coOking;
who*washiewreleatiolln ,„'".0#16,11,010,*$,Ati:0101140ed, 441 H4*,..* OnfidritOjd:parpfjOe'llyi," '
Up to 1,500 sq ft ! $130.00 Duplex Only $260.00 Enter
Section
k_ 1,501 sq ft to 2,500 sq ft I $195.00 I Three or more multi-family units Total
1 x 2,501 sq ft to 3,500 sq ft $260.00 ! Enter 1 #of buildings x$130
Section
3,501 sq ft to 4,500 sq ft $325.00 Total
#of units x$65
I Over 4,500 sq ft$325 plus$65 per additional 1000 sq ft
I Base Fee $325.00 I Maddlitin.MatariactiateditirMeMileitiomerg ,
, I o of Additional 1000 sq ft x$65 rAct).00 $65 basic fee for each electrical connection+$10 for each addT.
circuit.
- -- Enter
$65 basic fee,200 amp or less,one location $65.00 Basic Fee $65.00 I Section
Total
ExIs
7_,... LIiiiitvvIREEt',vv, vvr,,Vvl „, ' '" '' „ v ] #of Electrical Connections x$65
$65 basic fee plus$10 for each additional branch circuit up,to the il Ai of Additional Circuits x$10
, sectionI maximum of the corresponding square footage of the residential
buildlng. 1 216004"nr , seEnte
::''ii;i''''.iiitL't.iitithiggiL
Basic Fee I $65.00 Enter $65 basic fee plus$1.0 for each ride,concession,or generator. Total
V #of Additional Branch Circuits x$10 I '
Section
Total V Basic Fee I $65.00
Floor Heat Basic Fee I $65.00 I #of Rides,Concessions,Generators x$10 ,I
..... „-.--!
#of Additional Branch Circuits x$10 I Enter
Section
enter ' Total 1
I Signs-$65 for each sign
$65 basic fee plus$65 grounding grid where applicable. Total I #of Signs x$65 , I
Each additional trip will be charged the$65 basic fee. 1 Outline Lighting-$65 per occupancy'
Basic Fee $65.00 PiedirkettietateItitirit: ,, IIPIeratitig)0O4101)1COOlittk ' Section
Grounding Grid I $65.00 bb5 eisic tee—Wften NOT part o a new $65.00 Total
,--r„,,,v,„,„vw ii residential permit,or HVAC permit,and no
041111: EIPICiOlk , , , „
additional wiring. i
. — .
I $195 Basic fee(this covers the 3 required I $195.00 „:Re idiatO IIIPO III ' - 'iiiNateriII' ,I:r4(ippIIII ');; (.,I,OI " seth
ction
inspections). Up to 25 HP I $65.00 , Total
CP'10.1rkt''":".11;,,,,,,, v v vvVvv'vV'''r,'ll''''"' '' v 26—200 HP I $95.00 I
Over 200 HP lnter
_$130.00
Total
to
$65 for center pivot plus 510 per tower or drive motor.
equiPIINOIC "
' "0(10)1(:') #of Pivots x$65 I
#of Towers or drive motors x$10 I
i,Vp to$10,000 multiply by 2%(-02)otos$60.00Enter
.....i
Section I
$10,001-$100,000 subtract 510,000 multiply by 1% $65 minimum plus 65 per hour or portion thereof in - Total
1 iV,03.)plus$260,00 Enter excess of one hour including travel time to and from job
Section location.
Over$100,001 subtract$100,000 multiply by.5% Total
' Minimum fee 1 565.00 II
(.005)plus$1160.00
For all owner-supplied,factory assembFeid I #of additional hours x$65 I
equipment installed inspection will be based on
.5%(.005)of total cost of equipment or hourly rate
of$130 for 1 hour and$65 for each additional
hour. ..*A copy of the bid is required.***
Total Cost of Labor and Materials
If mailing payment,please remit payment to
City of Eagle Building Department-Permitting X I Pay Online(Link on ttomepage)
PO Box 1500,Eagle,ID 83616 Check/Cash
Signature: Glenda Nelson Date: 1-16-24
l' , 10101M,T,004,1001be#1,404,1040.''7'114#11f,!# Vii011/1740,440,6lV'e*Itiii4CalleilLv I Total Fees Due: 1260.00 ,