Electrical - 240166 - 1334 E Rockhurst Ln - 01/16/2024 City of Eagle
Electrical Permit
New Hone- Single Family Residential
660 E. Civic Lane, Eagle, ID 83616
(208) 489-8760 -- Contractor's Portal: portal.iworq,Det/eagle/permits/600
Permit Number 240166 Issue Date 01/16/2024 Issue Receipt 29.000996
ELECTRICIAN
Vanzandt Electric Inc
PC)Box 1183
Meridian, ID 83680
208-941-5464 Registration #: ELE-C-21404
PERMIT ADDRESS
Property Owner: BLACKROCK HOMES LLC
ESTRAI)A VILLAGE SUB NO OI House
Subdivision:
Image
Lot 47 Block V
Address 1334 E ROCKIRJRST LN
RESIDENTIAL PERMIT FEES
Electrical-New Home S195.00
Total Fee: $195.00
Job Scope Notes
Contractor's Printed Name /1"
7/4<74:
Contractor's Signature
/4/7/
e
City Clerk/Authorized Personnel
CITY OF EAGLE—BUILDING DEPARTMENT Permit#(office use only)
660 E Civic Ln
Eagle, ID 83616
Phone: 208-489-8760
Email: INH!Illtligel.c.1.1:.11c1.4f.ilitlt;'..9!„,,e,
Contractor Portal: tItiKi;;122131RLiA2tInglitifoCEInern:4511;l Zet,i0)C,67
ELECTRICAL PERMIT APPLICATION -COMMERCIAL& RESIDENTIAL r '' Form Version: 20-5017/3,
Electrical Contractor:Llit70-&/?4.fr--c,/7°. •.•,e..../t; I Phone: Z.,9 g,-, $16/( -,,,,!.5-" /(4,:-,y 1 Email: ii4,-; ied1 .1./fe':-74/ _ 6.2 ,41,4•,,--
State Cont.Licit: l.1., ?../(.,/,.,,.i y Exp Date: 5...-.:75/— ,..1/ ' I
Builder or Property Owner: /3 (izt_c_g f„, K.,.. 1 Site Subdivision:
Site Street Address://)5 c7i i t-,, , iL,‘, L..b,,.,-.:5,i:.. /,..,,,, Lot: 77, 7 Block: / 1 Project Sq Ft:
Description of Work(required): Permit Type:
-
/,Ll, . - „, /.-7 6',l(.;" `I, New Residential 1 Commercial
1 , Remodel 1 Commercial Ti
Living Space-Space within a dwelling unit intended for human habitation which may reasonably be utilized for sleeping,eating,cooking,
bathing,washing,recreation,and sanitation purposes. An unfinished basement is considered part of the living space.
New Residential-Singje Family Dwelling,;_ 11 New Residential-Multi-Family Dwelling(Contractors IOnlyjt
Up to 1,500 sq ft $130.00 1 Duplex Only I $260.00 Enter
Section
7 1,501 sq ft to 2,500 so ft $195.00 Three or more multi-family units Total
2,501 sq ft to 3,500 sq ft $260,00 Enter #of buildings x$130
V 3,501 sq ft to 4,500 sq ft $325.00 , STIT
#of units x$65
Over 4,500 sq ft$325 plus$65 per additional 1000 sq ft
Base Fee $325,00 . Modular,Manufactured or Mobile Homes:
#of Additional 1.000 sq ft x$65 , $65 basic fee for each electrical connection+$10 for each add
Temporary Construction Services Only 1 E.,.'10th' I circuit.
,.. •—•--- Enter
$65 basic fee,200 amp or less,one location $65.00 /'1'05, Basic Fee $65.00 Section
Total
.__
Existing Residential: #of Electrical Connections x$65
.
$65 basic fee plus$10 for each additional branch circuit up to the #of Additional Circuits x$10
maximum of the corresponding square footage of the residential •
building, Temporary Amusement-Industry Enter
Section
' Basic Fee $65.00 Enter $65 basic fee plus$10 for each ride,concession,or generator. Total
Section
#of Additional Branch Circuits x$10 Total ' Basic Fee I $65.00 V
Floor Heat Basic Fee $65.00 #of Rides,Concessions,Generators x$10
Enter
#of Additional Branch Circuits x$10 ins and Outline Lighting; Section
Enter Total
Residential Seas,Hot Tubs&Hydro Massage Tubs: Section Signs-$65 for each sign
$65 basic fee plus$65 grounding grid where applicable. Total #of Signs x$65,
Each additional trip will be charged the$65 basic fee. Outline Lighting•$65 per occupancy
Basic Fee $65.00 Residential Central Systems Heating and/or Cooling Enter
Section
Grounding Grid l $65.00 ,•ti5 basic tee—When NO I part ot a new $65.00 Total
residential permit,or HVAC permit,and no
Swimming Pools: COW TOtoll 1
additional wiring.
I I $195Residential Pum s,(Domestic Water irri ation Sewa.e
I Section
I inspections).Basic fee(this covers the 3 required $195.00 Up to 2.5 HIP $65,00 0 Total
1 Other Installation-Commerclal/Industriai-Solar/Renewable I 26-200 HP' ' $95,001
Energy I Over 200 HP $130,00
I Work not,specijkolly covered by any other fee schedule.Fees based on FAIR Irrigation Machine(electrically driven):
section
MARKET PROJECT VALUE which means total tabor,Material's anti Total
Equipment for a complete working system. This value is not reducible' ,
' due to owner supplied and/or donated materials,labor and/or $65 for center pivot plus$10 per tower or drive motor.
' equipment. Overhead and Profit must be included In value(These 1 #of Pivots x$65, 0
Values WILL NOT include the Base Admin Fee), '-
' #of Towers or drive motors x$10
Up to 510,000 multiply by 2%(.02)plus$60.00 Requested Inspections-Reinsgection—Technical Service Sectionrer
'$10,001-5100,000 subtract 510,000 multiply by 1% , 36' minimum plus$65 per16:17-6i.portion thereof in Total
(.01)plus$260.00 Enter excess of one hour including travel time to and from job
Section location„
Over$.100,01 subtract.5100,000 multiply by.5% Total
I Minimum fee $65.00
(.005)plus$1160.00
For ail owner-supplied,factory assembled l tr,of additional hours x$65 I
equipment installed inspection will be based on
,
.5%(.005)of total cost of equipment or hourly rate inspection requests must 4,,e called into the inspection request
of$130 for 1 hour and$65 for each additional line at ,:',6',:j:,g,!"1-,939-,,01'.,,062 before 41:,il(1),:,0a4 to schedule an inspection
hour. "IA copy of the bid is required.*** for the next Or, Another rettl,ests will be scheduled the next
'Total Cost of Labor and Materials business sitar
lf mailing payment,please remit payment to: Method of Payment
Mt Credit Cord paymel,Tts ore subject to a non-
City of Eagle Building Department-Permitting ' Pay Online(Link on Homepage)
refundable Portal AfirMin Fee of 3%plus$1
PO Box 1500,Eglle,10/83616 Check/Cash
,7 , , , 1 7
Signature: „pil /4 ''''? -4 6---- I Date: i .. >
/ --)( -
f '. —
A.../ "O4i13 will be issued when paid in full via Check,Cash or Credit Card. Total Fees Due: i,y.