Electrical - 240049 - 1352 E Rockhurst Ln - 01/05/2023 City of Eagle
Electrical Permit
New Home- Single Family Residential
660 E. Civic Lane, Eagle, ID 83616
(208) 489-8760 -- Contractor's Portal: portal.iworchnetleaaleigennits/600
Permit Number 240049 Issue Date 01/05/2023 Issue Receipt 29.000978
ELECTRICIAN
Vanzandt Electric Inc
PO Box 1183
Meridian, ID 83680
208-94 I-5464 Registration 4: ELE-C-21404
PERMIT ADDRESS
Property Owner: G20 LLC
Subdivision: ESTRADA VILLAGE I
Lot 46 Block
Address 1352 E ROCKHURST LN
RESIDENTIAL PERMIT FEES
Electrical- New Home $195.00
Total Fee: S195.90
Job Scope/Notes
Contractor's Printed Name '17-j
Contractor's Signature 4Q,4' -7,77HdZ
• • (' ;;(!;
ell
I
/14'lLeat,e,„„ Z14.7'71e.,Ncera,,
City ClerklAutborized Personnel
CITY OF EAGLE— BUILDING DEPARTMENT Permit#(office use only)
660 E Civic In
Eagle, ID 83616
Phone: 208-489-8760
Email: tiiIIg.!,1144vititi‘gittk:A4l;I ,
Contractor Portal: toIll?'!..,12,YP9'ilnil,i'voc,FS1,1”;11,FA()1,11.1gIllMatig! 1100111C1
ELECTRICAL PERMIT APPLICATION - COMMERCIAL& RESIDENTIAL Form Version: 20.1A51.3
Electrical Contractor:Vaiv Z.,„fri_j"../ ek,:&:t Phone: 77. ()")'- '!/`41/-,..;,(6, e.,/' 1 Email: I,:;!!Ii).,,!7, .,--g.i r?/!te,„rno;/ ,,,
State Cont.Lic it: c ;?,../y,,y Exp Date: 3 -,,."3 t - Z.,,t F.
Builder or Property Owner: ,!! .4.,„„„,e4.,. 0'")z, if„ 1 Site Subdivision: it,;,...,.,,,, !!!t! , ,,,11),,,,/
Site Street Address: 1 .3.;;),. k; ilLed""' j\,,,t,,,,,:,..1., 2,„,./,,, Lot: 4,,,,,, 4,,, Block: i Project Sq Ft: i'e!'
Description of Work(required): Permit Type:
74.,.. New Residential 1 Commercial
11 ! Remodel! 1 Commercial TI
' Living Space-Space within a dwelling unit intended for human habitation which may reasonably be utilized for sleeping,eating,cookin,g,
bathing,washing,recreation,and sanitation purposes. An unfinished basement is considered part of the Hying space.
New Residential::::: initle Family Dwellihriel New Residential-Multi-Family Dwelling(Contractors Onlvt,
_.........
Up to 1,.500 sq ft $1.30.00 1 Duplex Only I $260,0:0 Enter
Section
1,501 sq ft to 2,500 sq ft $195.00 Three or more multi-family units Total
2,501 sq ft to 3,500 sq ft $260.00 Enter #of buildings x$130
Section
3,501 sq ft to 4,500 sq ft $3.2.5.00 Total
—: #of units x$65
Over 4,500 sq ft$325 plus$65 per additional 1.000 sq ft
Base Fee ' $325.00 . ,, Modular.Manufactured or Mobile Homes:
#of Additional 1000 sq ft x$65 till'lc $65 basic fee for each electrical connection+$10 for each add
Temporary Construction Services Only "l,'T°,,l circuit,
Enter
$65 basic fee,200 amp or less,one location $65.00 Basic Fee $65.00 Section
Total
Existing Residential: #of Electrical Connections x$65
$65 basic fee plus$10 for each additional branch circuit up to the #of Additional Circuits x$10
maximum of the corresponding square footage of the residential
building. 1pri orary Amusement-Industry Enter
Section
Basic Fee $65.00 Enter $65 basic fee plus$10 for each ride,concession,or generator. Total
Section
#of Additional Branch Circuits x$10 Total l 1 Basic Fee $65.00
Floor Heat Basic Fee $65.00 1 #of Rides,Concessions,Generators x$10
Enter
#of Additional Branch Circuits x$10 Wis and Outline Lighting: Section
Total
Residential spalnLiilts&Hydro Massage Tubs: I Section Signs-$65 for each sign
$65 basic fee plus$65 grounding grid where applicable. Total #of Signs x$65 _
Each additional trip will be charged the$65 basic fee, 1 Outline Lighting-$65 per occupancy
Basic Fee I $65.00. Residential Central Systems Heating and/or Cooling Enter
Section
1 Grounding Grid $65.00 StiS basic tee- i%en Nth part.of a new $65.00 Total
Dner To.al residential permit,or HVAC permit,and no
Swimming Popls: additional wiring.
$195 Basic fee(this covers the 3 required $195.00 Residential Purrips,jDornestiWater,IrriRation„Sewage) Enter
Section
inspections). 1 Up to 25 HP $65.00 Total
Other Installation-Commercial/Industrial-Solar/Renewable I 26-200 HP $95,00
Energy I Over 200 HP $130.00
Work not specifically covered by any other fee scheeltili7aTbased on MIR Irrigation Machine lelectrically driven): Enter
Section
MARKET PROJECT VALUE which means total Labor,Materials and Total
Equipment.for a complete working system. This value is not reducible
due to owner supplied and/or donated materials,labor and/or $65 for center pivot plus$10 per tower or drive motor.
equipment. Overhead and Profit must be included in value(These. #of Pivots x$65 f
Values WILL NOT include the Bose Admin Fee). #of Towers or drive motors x$10
Up to$10,000 multiply by 2%(02)plus$60,00 Requested inspections-ReinsDection-Technical Service Section e n
Sto,00l.-$100,000 subtract$10,000 multiply by 1%
(.01)plus$260.00 Enter
Total $65 minimum plus$65 per hour or portion thereof in
excess of one hour including travel time to and from job
Section
location. Total
Over$100,001 subtract$100,000 multiply by.5% Minimum fee $65.00
(.0051 plus$11.6.0.00
For all owner-supplied,factory assembled #of additional hours x$65 i
equipment installed inspection will be based on
.5%(.005)of total cost of equipment or hourly rate inspection requests most be roiled into the inspection request
of$1.30 for 1 hour and$65 for each additional fine at 2 i..i,t-9394467 before.4.:,..0.,.6om to schedule on inspection
hour. ***A copy of the bid is required.*4* for the next day, .411 other requests will be scheduled the next
Total Cost of Labor and Materials I 'business day,
If mailing payment,please remit payment to: Method of Payment
All Credit Cord xi yinerds ore,Saifect to a non,
City of Eagle Building Department-Permitting ! Pay Online(Link on Homepage)
refundable Parini Admit,Fee of 38 plus$.1
PO Box 1500,Eagle,ID 83616, Check/Cash
Signature:. Date: f --,,,.5-.1 V
,E4rmits will be issued when paid in full via Check,Cash or Credit Card. 1 Total Fees Due: 1 / "2/