Electrical - 233995 - 489 S Rivershore Ln - 12/22/2023 City of Eagle
Electrical Per it
Tenant Improvement
660 E. Civic Lane, Eagle, ID 83616
(208) 489-8760 -- Contractor's Portal: portal.ivi,orq gliLf 601)
Permit Number 233995 Issue Date 12/22/2023 Issue Receipt Dean Gernaat
ELECTRIC
DG Electric LLC
2907 Inglewood Rd
Boise, ID
208-908-2242 Registration#: 021891
I PERMIT AD RESS
BETTER BUSINESS BUREAU OF LA&
Property Owner:
SILICON VALLEY I C
Subdivision: LOYA CONDO
Lot Block
!Address 489 S RIVERSHORE LN
RESIDENTIAL PERMIT FEES
Electrical-Commercial/Industrial/Other Installations $143.90
Total Fee: $143.90
Job Scope/Notes
electric for TI
Contractor's Printed Name email
Contractor's Signature
City Clerk/Authorized Personnel
Amanda Nadeau
From: Idaho <NoReplyOTC@egov.com>
Sent: Friday, December 22, 2023 11:36 AM
To: julia@dgelectricllc.com
Subject: Idaho - Receipt
PURCHASE RECEIPT
City of Eagle
660 East Civic Lane
Eagle ID 83616
(208)939-6813
OTC Local Ref ID: 90421166
12/22/2023 11:36 AM
Your credit card or bank statement will show this charge as City Payment.
Status: APPROVED
Customer Name: Julia Gernaat
Type: AmericanExpress
Credit Card Number: **** **** **** 1011
Items Quantity TPE Order ID Total Amount
Electrical Permit 1 61303242 $143.90
Contractor Business Name: DG Electric
Customer Name: Dean Gernaat
Contact Phone Number: 2089082242
Project Street Address: 489 S Rivershore Ln
Total remitted to the City of Eagle $143.90
Access Idaho Fee 1 61303242 $5.32
Total Amount Charged $149.22
To offer the convenience of using your bank card, a service fee of 3% plus $1.00 has been added to your
transaction. This fee goes to our third-party provider, Access Idaho. The City does not keep any portion of
this fee.
1
Brian McCoy
Straight Line Building Solutions
Bodyology
489 S Rivershore Ln, Eagle, ID 83616
Prepared By DG Electric
4-27-2023
Bid Includes:
• Provide/install up to 9 new outlets in new walls for offices and hallway
• Provide/install up to 4 new data drops to crawl for new offices
• Provide/install 4 new switch locations in new offices
• Re-locate any necessary 2X4 lights in new offices
o Includes demising lights to work with new switch
• Demo one 3 recess cans and 4 speakers in dropdown
• Provide/install 3 new exit signs with emergency lights
• Demo 2 floor outlets
• Includes permit and inspection fees
Materials and Labor: $4,195.00
CITY OF EAGLE-BUILDING DEPART ENT Permit#(office use only)
4. 660 E Civic Ln
Eagle,ID 83616
208-489-8760
Contract Portal: (2/,?) q. ii •--
ELECTRICAL PERMIT APPLICATION-COMMERCIAL&RESIDENTIAL Form Version:20230513
electrical Contrecton cl.. cliectii,.... Phone:„I/1)4- /..-;,/,g_.0.. I Email: -
— de
state Cont.Lic a: 47„:"Zi if,/ Exp Date: ,e-,2 5 -
Builder or Property Owner: 27- 41/1, 1.,,fit, ;01,011,141,,,jot I Site Subdivision:
Site Street Address: Li v cs-, g.,;tier(i t_ri Lot: I Block: I Project Sq Ft:
.i
Desciiption of Work(required): I Permit Type:
I New Residential I I Commercial
..,1 ),,,,‘I, _...- , ,, .'
“ or c'f,..' Jo' 6 f'I .> C 4 Z ' Ise e 4-1 I Remodel . martian!
11 living Space-Space within a dwelling unit intended for human habitation which may reasonably be utilized for sleeping,eating,cooking,
1, bathing,washinir recreation,and sanitation purposes. An unfinished basement is consicleredpart of the living space.
New Residential-Single Family Dwei E I New Residential-Multi-Family Dwelling(Contractors MN):
-----1'lip to 1,500 so ft $130.00 I Duplex Only I $260.00 i Enter
Section
1,501 sq ft to 2,500 sq ft $195.00 I Three or more m lid-family units Total
I 2,501 sq ft to 3,500 sq ft $260.00 Enter 1 #•11 • iklings x$130 I
I 3,501 sq ft to 4,500 sq ft Section
$325.00 Total
#of un,x sa
Over4,500 sq ft$325 plus$65per additional 1000 sq ft 1
I Base Fee I $325.00 I Modular.Manufactured or Moyle liplees:
I #of Additional 1000 sq ft x$65 I I $65 basic fee for each electrical connection+$10 for each add
Ternjs Only Ea"..T."1 circuit.
Enter
I $65 basic fee,200 amp or less,one location I $65.00 I Basic Fee $65.00 saction
Total
11 Existing Residential: #of Electrical Connections x$65
-,
1 $65 basic fee plus$10 'reach additional branch circuit up to the #of Additional Circuits x$10
1 max urn . Vie corresponding square footage of the residential
I building. ...Le.iri orary Amusement-Industry Section
Total
Basic Fee $65.00 Enter 1 $65 basic fee plus$10 for each ride,concession,or generator.
#of Additional Branch Circuits x$10 I Total I Basic Fee $65.00
Floor Heat Basic Fee $65.00 #of Rides,Concessions,Generators x$10
Erster
I #of Additional Branch Circuits x$10 Signs and Outline lighting,;.: Section
Total
Residential Spas.Hot Tubs&Hvdro Massa. . Tubs: srecia;, , I Signs-$65 for each sign
$65 basic fee plus$65 grounding grid where applicable. Total I #of Signs x$65
Each additional trip will be charged the$65 basic fee. I Outline Lighting-$65 per occupancy
Basic Fee $65.00 Residential Central Systems Heating andior Cooling Enter
Section
Grounding Grid $65.00 ISob .-z, c .-,-WrielrillOi_part or a new $65.00 Tata'
Eatieratel residential permit, .r HVAC permit,and no
Swimming Pools: additional wiring.
$195 Basic fee(this covers the 3 required $195.00 Residential Pumas(Domestic Water.Irrig .1. .Sewage] Entefn
inspections). Up to 25 HP $65.00 Total
Other Installation-Cornmerdeliindustdel-Solarilteriews. ,, 26-200 HP $95.00
Energy Over 200 HP $130.00
work not specifically cowered by ony other fee schedule.Fees based on Fitnt Irrigation Machine felectricallv drivenl: Enter
RKET PROJECT VAltiE which means total tabor;Materials and F
Section
Equipment for a complete working system. This ware Is not reducible
due to owner supplied and for donated materials,labor and/or $65 for center pi Total
vot plus$10 per tower or drive motor.
equipment Overhead and Profit must be included in value(These It of Pivots x$65
Values WILL NOT include the Base Admin Fee). It of Towers or drive motors x$10
Up to$10,000 multiply by 2%(.02)plus$60.00 i 43,CID Requested inspections-Reinsitection-Technical Service °tern 1
1--
$io,003.-$100,000 subtract$10,000 multiply by 1% $65 minimum plus65 per hour or portion thereof in Total
(.01)plus$260.00 Enter excess of one hour including travel time to and from job
Section location.
Over$100,001 subtract$100,I.i multiply by_5% Total
Minimum fee $65.00 , 1
(.005)plus$1160.00
For all owner-su..lied,factory assembled #of additional hours x$65
equipment installed inspection will be based on
.5%(A05)of total cost of equipment or hourly rate
of$130 for 1 hour and$65 for each a..itional 1
hour. •••A cow of the bid is required.•**
Total Cost of La..rt and Materials I •
If mailing payment,please remit payment to: Method of Payment
City of Eagle Bull. rig Department-Permitting ,„/. Pay Online(link on Homepage)
PO 1:.x 1500,Eagle,ID 83616 Check/Cash
—
Sign.1.1 re:
Permits will be Issued when paid In full via Check,Cash or Credit Card. I Total Fees Due: I it74,5,1
o_j
.._.