Loading...
Electrical - 233995 - 489 S Rivershore Ln - 12/22/2023 City of Eagle Electrical Per it Tenant Improvement 660 E. Civic Lane, Eagle, ID 83616 (208) 489-8760 -- Contractor's Portal: portal.ivi,orq gliLf 601) Permit Number 233995 Issue Date 12/22/2023 Issue Receipt Dean Gernaat ELECTRIC DG Electric LLC 2907 Inglewood Rd Boise, ID 208-908-2242 Registration#: 021891 I PERMIT AD RESS BETTER BUSINESS BUREAU OF LA& Property Owner: SILICON VALLEY I C Subdivision: LOYA CONDO Lot Block !Address 489 S RIVERSHORE LN RESIDENTIAL PERMIT FEES Electrical-Commercial/Industrial/Other Installations $143.90 Total Fee: $143.90 Job Scope/Notes electric for TI Contractor's Printed Name email Contractor's Signature City Clerk/Authorized Personnel Amanda Nadeau From: Idaho <NoReplyOTC@egov.com> Sent: Friday, December 22, 2023 11:36 AM To: julia@dgelectricllc.com Subject: Idaho - Receipt PURCHASE RECEIPT City of Eagle 660 East Civic Lane Eagle ID 83616 (208)939-6813 OTC Local Ref ID: 90421166 12/22/2023 11:36 AM Your credit card or bank statement will show this charge as City Payment. Status: APPROVED Customer Name: Julia Gernaat Type: AmericanExpress Credit Card Number: **** **** **** 1011 Items Quantity TPE Order ID Total Amount Electrical Permit 1 61303242 $143.90 Contractor Business Name: DG Electric Customer Name: Dean Gernaat Contact Phone Number: 2089082242 Project Street Address: 489 S Rivershore Ln Total remitted to the City of Eagle $143.90 Access Idaho Fee 1 61303242 $5.32 Total Amount Charged $149.22 To offer the convenience of using your bank card, a service fee of 3% plus $1.00 has been added to your transaction. This fee goes to our third-party provider, Access Idaho. The City does not keep any portion of this fee. 1 Brian McCoy Straight Line Building Solutions Bodyology 489 S Rivershore Ln, Eagle, ID 83616 Prepared By DG Electric 4-27-2023 Bid Includes: • Provide/install up to 9 new outlets in new walls for offices and hallway • Provide/install up to 4 new data drops to crawl for new offices • Provide/install 4 new switch locations in new offices • Re-locate any necessary 2X4 lights in new offices o Includes demising lights to work with new switch • Demo one 3 recess cans and 4 speakers in dropdown • Provide/install 3 new exit signs with emergency lights • Demo 2 floor outlets • Includes permit and inspection fees Materials and Labor: $4,195.00 CITY OF EAGLE-BUILDING DEPART ENT Permit#(office use only) 4. 660 E Civic Ln Eagle,ID 83616 208-489-8760 Contract Portal: (2/,?) q. ii •-- ELECTRICAL PERMIT APPLICATION-COMMERCIAL&RESIDENTIAL Form Version:20230513 electrical Contrecton cl.. cliectii,.... Phone:„I/1)4- /..-;,/,g_.0.. I Email: - — de state Cont.Lic a: 47„:"Zi if,/ Exp Date: ,e-,2 5 - Builder or Property Owner: 27- 41/1, 1.,,fit, ;01,011,141,,,jot I Site Subdivision: Site Street Address: Li v cs-, g.,;tier(i t_ri Lot: I Block: I Project Sq Ft: .i Desciiption of Work(required): I Permit Type: I New Residential I I Commercial ..,1 ),,,,‘I, _...- , ,, .' “ or c'f,..' Jo' 6 f'I .> C 4 Z ' Ise e 4-1 I Remodel . martian! 11 living Space-Space within a dwelling unit intended for human habitation which may reasonably be utilized for sleeping,eating,cooking, 1, bathing,washinir recreation,and sanitation purposes. An unfinished basement is consicleredpart of the living space. New Residential-Single Family Dwei E I New Residential-Multi-Family Dwelling(Contractors MN): -----1'lip to 1,500 so ft $130.00 I Duplex Only I $260.00 i Enter Section 1,501 sq ft to 2,500 sq ft $195.00 I Three or more m lid-family units Total I 2,501 sq ft to 3,500 sq ft $260.00 Enter 1 #•11 • iklings x$130 I I 3,501 sq ft to 4,500 sq ft Section $325.00 Total #of un,x sa Over4,500 sq ft$325 plus$65per additional 1000 sq ft 1 I Base Fee I $325.00 I Modular.Manufactured or Moyle liplees: I #of Additional 1000 sq ft x$65 I I $65 basic fee for each electrical connection+$10 for each add Ternjs Only Ea"..T."1 circuit. Enter I $65 basic fee,200 amp or less,one location I $65.00 I Basic Fee $65.00 saction Total 11 Existing Residential: #of Electrical Connections x$65 -, 1 $65 basic fee plus$10 'reach additional branch circuit up to the #of Additional Circuits x$10 1 max urn . Vie corresponding square footage of the residential I building. ...Le.iri orary Amusement-Industry Section Total Basic Fee $65.00 Enter 1 $65 basic fee plus$10 for each ride,concession,or generator. #of Additional Branch Circuits x$10 I Total I Basic Fee $65.00 Floor Heat Basic Fee $65.00 #of Rides,Concessions,Generators x$10 Erster I #of Additional Branch Circuits x$10 Signs and Outline lighting,;.: Section Total Residential Spas.Hot Tubs&Hvdro Massa. . Tubs: srecia;, , I Signs-$65 for each sign $65 basic fee plus$65 grounding grid where applicable. Total I #of Signs x$65 Each additional trip will be charged the$65 basic fee. I Outline Lighting-$65 per occupancy Basic Fee $65.00 Residential Central Systems Heating andior Cooling Enter Section Grounding Grid $65.00 ISob .-z, c .-,-WrielrillOi_part or a new $65.00 Tata' Eatieratel residential permit, .r HVAC permit,and no Swimming Pools: additional wiring. $195 Basic fee(this covers the 3 required $195.00 Residential Pumas(Domestic Water.Irrig .1. .Sewage] Entefn inspections). Up to 25 HP $65.00 Total Other Installation-Cornmerdeliindustdel-Solarilteriews. ,, 26-200 HP $95.00 Energy Over 200 HP $130.00 work not specifically cowered by ony other fee schedule.Fees based on Fitnt Irrigation Machine felectricallv drivenl: Enter RKET PROJECT VAltiE which means total tabor;Materials and F Section Equipment for a complete working system. This ware Is not reducible due to owner supplied and for donated materials,labor and/or $65 for center pi Total vot plus$10 per tower or drive motor. equipment Overhead and Profit must be included in value(These It of Pivots x$65 Values WILL NOT include the Base Admin Fee). It of Towers or drive motors x$10 Up to$10,000 multiply by 2%(.02)plus$60.00 i 43,CID Requested inspections-Reinsitection-Technical Service °tern 1 1-- $io,003.-$100,000 subtract$10,000 multiply by 1% $65 minimum plus65 per hour or portion thereof in Total (.01)plus$260.00 Enter excess of one hour including travel time to and from job Section location. Over$100,001 subtract$100,I.i multiply by_5% Total Minimum fee $65.00 , 1 (.005)plus$1160.00 For all owner-su..lied,factory assembled #of additional hours x$65 equipment installed inspection will be based on .5%(A05)of total cost of equipment or hourly rate of$130 for 1 hour and$65 for each a..itional 1 hour. •••A cow of the bid is required.•** Total Cost of La..rt and Materials I • If mailing payment,please remit payment to: Method of Payment City of Eagle Bull. rig Department-Permitting ,„/. Pay Online(link on Homepage) PO 1:.x 1500,Eagle,ID 83616 Check/Cash — Sign.1.1 re: Permits will be Issued when paid In full via Check,Cash or Credit Card. I Total Fees Due: I it74,5,1 o_j .._.