Loading...
Service Solicited - 2023 - Idaho Power - Idaho Power 850 E Fishing Creek Drive Pump Station Quote �� CUSTOMER COST QUOTE FOR IDAHO POWER FACILITIES _ Customer or Project Name: CITY OF EAGLE-850 E FISHING CREEK DR-PUMP STATION — KWV Construction Costs Line Installation Costs 1. Line Installation/Upgrade Charge $6,338 2. Customer Credits (Betterment,Metering,Salvage) $0 3. Customer Performed Construction Work Credit $0 4. Net Line Installation Cost $6,338 Unusual Conditions 5. Unusual Conditions $5,458 6. Unusual Conditions Bank Letter of Credit (Only for over$10,000) $0 7. Net Unusual Conditions $5,458 Terminal Facilities Costs 8. Terminal Facilities $11,540 9 Terminal Facilities Allowances $(6,890) 10.Terminal Facilities Savage $0 11. Net Terminal Facilities Cost $4,650 12. Underground Service and Attachment Charges $745 13. Engineering Charge $1,131 14. Permits $100 15. Relocation or Removal $0 16. Miscellaneous ChargestAdjustments $0 17. Net Construction Costs (Line Items 4,7,11,12,13,14,15,16) $18,422 18 Prepaid Charges (Engineering,Permits&Right-of-Way) $0 19. Vested Interest Charge $0 20. Customer Payment Due Prior to Construction Scheduling $18,422 This cost may not include all construction costs, see page 3 if additional service charges apply Notes: Due to labor shortages and pandemic-related supply chain issues, Idaho Power anticipates a possible shortage of certain materials and equipment necessary to complete the Work (as defined below)which may dell completion of the Work. APPROVED: AMOUNT PAll7: R- ACCC U NT#: _' CHECK#- Customer understands that charges for relocation,transfer or removal of non-Idaho PoWtTgju''F,......t.(,Lail Lu ;6o;,u Power facilities are not included in this Customer Cost Quote. It is the customer's responsibility to coordinate this work with the affected utility.All charges associated with this work are the responsibility of the Customer. For utility contact s t information, please call 208-388-2886. Notice:This Customer Cost Quote shall be binding on both Idaho Power Company("Idaho Power")and Customer for a period of 60 days from the quoted date indicated below, subject to changes in information provided by the Customer or changes in Idaho Power's ability to obtain satisfactory rights-of-way or to comply with governmental regulations, including but not limited to the rules, regulations, and tariffs of the Idaho Public Utilities Commission ("IPUC")and the Public Utility Commission of Oregon("OPUC"). Customer must make payment of the quoted amount not less than(30)days prior to the start of the construction work set forth in this agreement("Work"). However, Idaho Power does not represent or warrant that the Work will commence within 30 days of receipt of payment The start of the Work is subject to Idaho Power's ability to obtain the necessary labor, materials and equipment. Internal use Page 1 of 3 Service Request Number. Customer Account Nusi ber: Work Order Number. Design Number- Version: 00510144 27640011 0000166762 001 By Initialing below, Customer acknowledges and agrees to the following: The Customer has received the Underground Residential Conduit Installation br®chure/packet or will access Customer the information available online at initials https://docs.idahopower.com/pdfs/ServiceBilling/ccuustomerservice/newConstruction/UGResConduitinstall.pdf Final Grade: Customer understands that as of X the above-named project will Cus o J r be ready for facilities to be installed by Idaho Power.All roadways and cable routes must have all grading and initia s sub grading completed by this date.The project must be properly referenced and have grade stakes installed at all Idaho Power device locations and as might be necessary to establish proper elevations and burial depths Idaho Power facilities. The Customer will be responsible for the total cost of damage to Idaho Power facilities resulting from any subsequent changes in property,any needed relocation, repair, or lines, lot lines, elevations, grades, excavations, or profiles causing improper locations or burial depths of above-ground equipment, below-ground equipment, cable, or conduit. Unusual Conditions: As defined in Idaho Power's line installation tariff, Rule W, Unusual Conditions are Cusio 'er construction conditions not normally encountered,but which Idaho Power may encounter during construction inita(s which impose additional, project-specific costs.These conditions include, but are not limited to:frost, landscape replacement, road compaction, pavement replacement,chip-sealing, rock digging/trenching, boring, nonstandard facilities or construction practices,and other than available voltage requirements.The total cost for all Unusual Conditions, in connection with the work as set forth on this Customer Cost Quote will be based on the actual costs incurred by Idaho Power related to the conditions encountered during performance of the Work. Upon completion of all Work, Idaho Power will refund to Customer any Unusual Conditions amount set forth on this Customer Cost Quote sheet but, not incurred by Idaho Power. Prior to commencement of the work, Customer shall identify for Idaho Power the location of all underground pipes, lines, and other facilities(collectively, the"Underground Lines")that may be on Customer's property where Idaho Power is working. Customer agrees to be responsible for identification and location of all Underground Lines and shall indemnify, defend, reimburse and hold harmless Idaho Power and its successors and their respective directors, officers, members, employees, representatives and agents for,from,and against any and all claims, liabilities, losses, damages, expenses, suits, actions, proceedings,judgement and costs of any kind(collectively,"Damages"),whether actual or merely alleged and whether directly incurred or from a third party, arising out of or relating to Customer's failure to properly or adequately identify and locate the Underground Lines, except to the extent finally determined by a court of law that such Damages resulted from the gross negligence or willful misconduct of Idaho Power,its agents,subcontractors, employees, officers or directors. Internal use Page 2 of 3 Service Request Number. Customer Account Number: Work Order Number. Design Number Version: 00510144 27640011 0000166762 001 The Customer acknowledges Idaho Power's Rule C (Service and Limitations), Section 7(Right of Way) on file with the IPUC OPUC: "The Customer shall,without cost to Idaho Power, grant Idaho Power a right-of-way for Idaho Power's lines and apparatus across and upon the property owned or controlled by the Customer, necessary or incidental to the supplying of Electric Service and shall permit access thereto by Idaho Power's employees at all reasonable hours."By signing this Customer Cost Quote, Customer grants to Idaho Power a perpetual right-of-way over the Customer's property for the installation, operation, replacement and maintenance of power facilities to provide electrical service to the Customer and any future owners of the Customer's property. Construction Costs available for refund (Vested Interest limited to 5 years or additional applicants) $10,528 Customer Payment Due Prior to Scheduling Construction $18,422 N/A Underground Service Attachment Charges to be billed separately The Customer understands that Underground Service Attachment Charges will be billed separately on the Customer first month's power bill after service installation has been completed. In addition, the Customer has initials reviewed and acknowledges their responsibility for these costs. Idaho and Oregon cost information are available online at: ID: https:/idocs.idahopower.comipdfslSe�-viceSilling/customerservicelnewConstructiorV]dahoCostlnfo.pd` OR: https'rldocs_idahocower.comJpctfs/ServiceBillinglcustomerservicelnewConEtruciionlOregonCostl.r)fo. df Please sign and return all relevant forms along with the amount stated on the Customer Cost Quote to: IDAHO POWER COMPANY 10790 Franklin Rd Boise, ID 83709 �fCustomer Signature X +�� —� Date X 2 { Idaho Power Representative I f r. r� / `� Quote Date 09/I 5/2023 Internal use Page 3 of 3 Service Reauest Number. Customer Account Number Work Order Number. Design Number. Version: 00510144 27640011 0000166762 001 �Imm Idaho Power Company Page: I � D� Service Request ate: 9/15/2023 Service Request Number. 00510144 CITY OF EAGLE-850 E FISHING CREEK DR-PUMP STATION Work Order Number: 27640011 Eng Hours: 00013 Request Type: CS Eng Fee Amount(Att98): 1,131.00 Rate Sch.: 07 Eng Fee Amount(Attl6): Reply By: Eng Fee Service Agreement No: Eng Fee Service Agreement Date: Customer No: Feeder. JPLN41 A Service Location: 850 E FISHING CREEK DR EAGLE, ID 83616 Required in Service Date: 7/21/2023 Planning Center/Team: EAGLE Contact Detail: CUST CITY OF EAGLE IPCO EARL BEATTIE 208-388-2513 ABeattie@idahopower.com 10790 Franklin Rd,BOISE ID 83709 RFND CITY OF EAGLE 208-949-4390 eziegenfuss@citvofeagle.org 660 E CIVIC LANE,PO BOX 1520,EAGLE Attribute information RESICO-M Service Voltage 2771480 No.Of Meters 1 Number of Phases 3 Meter Location KW Motor Load: 20KW Ct Loc Largest Motor 10KW Primary OH/UG UG 1 Phase KW Demand Service OH/UG UG 3 Phase KW Demand Sry Owner IPCO Vested Int.Connected Load 20KW Panel Amp Size 100 Commercial Deposit Amount Service Pole Riser SIC Number Descrivtion INSTALL PRIMARY LINE EXTENSION FROM JC30 TO JC72,INSTALL 75 KVA 277/480 TRANSFORMER AND(2)3"SERVICE STUBS AND A PRIMARY STUB FOR(2) 10HP PUMPS. 2ND SERVICE STUB AND PRIMARY STUB FOR FUTURE USE Any changes to the project including but not limited to increases in load,timing of load schedule,location of service,and requested pottage may result in additional charges and/or delay of service.It is necessary to communicate changes as soon as possible. X C���� �� 9-15-23 Client Sig, i Date Idaho Power Representative Signature Date Council Approval: y��