Service Solicited - 2023 - Idaho Power - Idaho Power 850 E Fishing Creek Drive Pump Station Quote �� CUSTOMER COST QUOTE FOR
IDAHO POWER FACILITIES _
Customer or Project Name: CITY OF EAGLE-850 E FISHING CREEK DR-PUMP STATION — KWV
Construction Costs
Line Installation Costs
1. Line Installation/Upgrade Charge $6,338
2. Customer Credits (Betterment,Metering,Salvage) $0
3. Customer Performed Construction Work Credit $0
4. Net Line Installation Cost $6,338
Unusual Conditions
5. Unusual Conditions $5,458
6. Unusual Conditions Bank Letter of Credit (Only for over$10,000) $0
7. Net Unusual Conditions $5,458
Terminal Facilities Costs
8. Terminal Facilities $11,540
9 Terminal Facilities Allowances $(6,890)
10.Terminal Facilities Savage $0
11. Net Terminal Facilities Cost $4,650
12. Underground Service and Attachment Charges $745
13. Engineering Charge $1,131
14. Permits $100
15. Relocation or Removal $0
16. Miscellaneous ChargestAdjustments $0
17. Net Construction Costs (Line Items 4,7,11,12,13,14,15,16) $18,422
18 Prepaid Charges (Engineering,Permits&Right-of-Way) $0
19. Vested Interest Charge $0
20. Customer Payment Due Prior to Construction Scheduling $18,422
This cost may not include all construction costs, see page 3 if additional service charges apply
Notes: Due to labor shortages and pandemic-related supply chain issues, Idaho Power anticipates a possible
shortage of certain materials and equipment necessary to complete the Work (as defined below)which may dell
completion of the Work. APPROVED:
AMOUNT PAll7: R-
ACCC U NT#: _'
CHECK#-
Customer understands that charges for relocation,transfer or removal of non-Idaho PoWtTgju''F,......t.(,Lail Lu ;6o;,u
Power facilities are not included in this Customer Cost Quote. It is the customer's responsibility to coordinate this work
with the affected utility.All charges associated with this work are the responsibility of the Customer. For utility contact s t
information, please call 208-388-2886.
Notice:This Customer Cost Quote shall be binding on both Idaho Power Company("Idaho Power")and Customer for a period of 60
days from the quoted date indicated below, subject to changes in information provided by the Customer or changes in Idaho
Power's ability to obtain satisfactory rights-of-way or to comply with governmental regulations, including but not limited to the rules,
regulations, and tariffs of the Idaho Public Utilities Commission ("IPUC")and the Public Utility Commission of Oregon("OPUC").
Customer must make payment of the quoted amount not less than(30)days prior to the start of the construction work set forth in this
agreement("Work"). However, Idaho Power does not represent or warrant that the Work will commence within 30 days of receipt of
payment The start of the Work is subject to Idaho Power's ability to obtain the necessary labor, materials and equipment.
Internal use Page 1 of 3
Service Request Number. Customer Account Nusi ber: Work Order Number. Design Number- Version:
00510144 27640011 0000166762 001
By Initialing below, Customer acknowledges and agrees to the following:
The Customer has received the Underground Residential Conduit Installation br®chure/packet or will access
Customer the information available online at
initials https://docs.idahopower.com/pdfs/ServiceBilling/ccuustomerservice/newConstruction/UGResConduitinstall.pdf
Final Grade: Customer understands that as of X the above-named project will
Cus o J r be ready for facilities to be installed by Idaho Power.All roadways and cable routes must have all grading and
initia s sub grading completed by this date.The project must be properly referenced and have grade stakes installed
at all Idaho Power device locations and as might be necessary to establish proper elevations and burial depths
Idaho Power facilities. The Customer will be responsible for the total cost of damage to Idaho Power
facilities resulting from any subsequent changes in property,any needed relocation, repair, or lines, lot lines,
elevations, grades, excavations, or profiles causing improper locations or burial depths of above-ground
equipment, below-ground equipment, cable, or conduit.
Unusual Conditions: As defined in Idaho Power's line installation tariff, Rule W, Unusual Conditions are
Cusio 'er
construction conditions not normally encountered,but which Idaho Power may encounter during construction
inita(s which impose additional, project-specific costs.These conditions include, but are not limited to:frost,
landscape replacement, road compaction, pavement replacement,chip-sealing, rock digging/trenching,
boring, nonstandard facilities or construction practices,and other than available voltage requirements.The
total cost for all Unusual Conditions, in connection with the work as set forth on this Customer Cost Quote will
be based on the actual costs incurred by Idaho Power related to the conditions encountered during
performance of the Work. Upon completion of all Work, Idaho Power will refund to Customer any Unusual
Conditions amount set forth on this Customer Cost Quote sheet but, not incurred by Idaho Power.
Prior to commencement of the work, Customer shall identify for Idaho Power the location of all underground pipes, lines,
and other facilities(collectively, the"Underground Lines")that may be on Customer's property where Idaho Power is
working. Customer agrees to be responsible for identification and location of all Underground Lines and shall indemnify,
defend, reimburse and hold harmless Idaho Power and its successors and their respective directors, officers, members,
employees, representatives and agents for,from,and against any and all claims, liabilities, losses, damages, expenses,
suits, actions, proceedings,judgement and costs of any kind(collectively,"Damages"),whether actual or merely alleged
and whether directly incurred or from a third party, arising out of or relating to Customer's failure to properly or adequately
identify and locate the Underground Lines, except to the extent finally determined by a court of law that such Damages
resulted from the gross negligence or willful misconduct of Idaho Power,its agents,subcontractors, employees, officers
or directors.
Internal use Page 2 of 3
Service Request Number. Customer Account Number: Work Order Number. Design Number Version:
00510144 27640011 0000166762 001
The Customer acknowledges Idaho Power's Rule C (Service and Limitations), Section 7(Right of Way) on file with the IPUC
OPUC: "The Customer shall,without cost to Idaho Power, grant Idaho Power a right-of-way for Idaho Power's lines and
apparatus across and upon the property owned or controlled by the Customer, necessary or incidental to the supplying of
Electric Service and shall permit access thereto by Idaho Power's employees at all reasonable hours."By signing this
Customer Cost Quote, Customer grants to Idaho Power a perpetual right-of-way over the Customer's property for the
installation, operation, replacement and maintenance of power facilities to provide electrical service to the Customer and any
future owners of the Customer's property.
Construction Costs available for refund
(Vested Interest limited to 5 years or additional applicants) $10,528
Customer Payment Due Prior to Scheduling Construction $18,422
N/A Underground Service Attachment Charges to be billed separately
The Customer understands that Underground Service Attachment Charges will be billed separately on the
Customer first month's power bill after service installation has been completed. In addition, the Customer has
initials reviewed and acknowledges their responsibility for these costs. Idaho and Oregon cost information are
available online at:
ID: https:/idocs.idahopower.comipdfslSe�-viceSilling/customerservicelnewConstructiorV]dahoCostlnfo.pd`
OR: https'rldocs_idahocower.comJpctfs/ServiceBillinglcustomerservicelnewConEtruciionlOregonCostl.r)fo. df
Please sign and return all relevant forms along with the amount stated on the Customer
Cost Quote to:
IDAHO POWER COMPANY
10790 Franklin Rd
Boise, ID 83709
�fCustomer Signature X +�� —� Date X 2 {
Idaho Power Representative I f r. r� / `� Quote Date 09/I 5/2023
Internal use Page 3 of 3
Service Reauest Number. Customer Account Number Work Order Number. Design Number. Version:
00510144 27640011 0000166762 001
�Imm Idaho Power Company Page: I
�
D� Service Request ate: 9/15/2023
Service Request Number. 00510144
CITY OF EAGLE-850 E FISHING CREEK DR-PUMP STATION
Work Order Number: 27640011 Eng Hours: 00013
Request Type: CS Eng Fee Amount(Att98): 1,131.00
Rate Sch.: 07 Eng Fee Amount(Attl6):
Reply By: Eng Fee Service Agreement No:
Eng Fee Service Agreement Date:
Customer No:
Feeder. JPLN41 A
Service Location: 850 E FISHING CREEK DR EAGLE, ID 83616
Required in Service Date: 7/21/2023
Planning Center/Team: EAGLE
Contact Detail:
CUST CITY OF EAGLE
IPCO EARL BEATTIE 208-388-2513 ABeattie@idahopower.com
10790 Franklin Rd,BOISE ID 83709
RFND CITY OF EAGLE 208-949-4390 eziegenfuss@citvofeagle.org
660 E CIVIC LANE,PO BOX 1520,EAGLE
Attribute information
RESICO-M
Service Voltage 2771480 No.Of Meters 1
Number of Phases 3 Meter Location
KW Motor Load: 20KW Ct Loc
Largest Motor 10KW Primary OH/UG UG
1 Phase KW Demand Service OH/UG UG
3 Phase KW Demand Sry Owner IPCO
Vested Int.Connected Load 20KW Panel Amp Size 100
Commercial Deposit Amount Service Pole Riser
SIC Number
Descrivtion
INSTALL PRIMARY LINE EXTENSION FROM JC30 TO JC72,INSTALL 75 KVA 277/480
TRANSFORMER AND(2)3"SERVICE STUBS AND A PRIMARY STUB FOR(2) 10HP PUMPS.
2ND SERVICE STUB AND PRIMARY STUB FOR FUTURE USE
Any changes to the project including but not limited to increases in load,timing of load schedule,location of service,and requested
pottage may result in additional charges and/or delay of service.It is necessary to communicate changes as soon as possible.
X C���� �� 9-15-23
Client Sig,
i Date Idaho Power Representative Signature Date
Council Approval: y��