Service Solicited - 2023 - Idaho Power - Idaho Power Equest Lane Road Trench Cost Quote CUSTOMER COST QUOTE FOR An IDACORPCompanV IDAHO POWER FACILITIES Customer or Project Name: CITY OF EAGLE -8285 W EQUEST LN - ROAD TRENCH Construction Costs Line Installation Costs 1. Line Installation/Upgrade Charge APPROVED: A lid $127,191 {{tom 2. Customer Credits (Betterment,Metering,Salvage) AMOUNT PAID: Ca a. $0 3. Customer Performed Construction Work Credit ACCOUNT': IC •t !IA.0 $0 CHECK#: $127,191 4. Net Line Installation Cost DATE: Unusual Conditions 5. Unusual Conditions $11,064 6. Unusual Conditions Bank Letter of Credit (Only for over$10,000) $0 7. Net Unusual Conditions $11,064 Terminal Facilities Costs 8. Terminal Facilities $0 9. Terminal Facilities Allowances $0 10.Terminal Facilities Salvage $0 11. Net Terminal Facilities Cost $0 12. Underground Service and Attachment Charges $0 13. Engineering Charge $0 14. Permits $0 15. Relocation or Removal $0 16. Miscellaneous Charges/Adjustments $0 17. Net Construction Costs , (Line Items 4,7, 11, 12, 13, 14, 15, 16) $138,255 18. Prepaid Charges (Engineering, Permits&Right-of-Way) $0 19. Vested Interest Charge $0 20. Customer Payment Due Prior to Construction Scheduling $138,255 This cost may not include all construction costs, see page 3 if additional service charges apply. Notes: Due to labor shortages and pandemic-related supply chain issues, Idaho Power anticipates a possible shortage of certain materials and equipment necessary to complete the Work (as defined below)which may delay completion of the Work. Customer understands that charges for relocation, transfer or removal of non-Idaho Power equipment attached to Idahc Power facilities are not included in this Customer Cost Quote. It is the customer's responsibility to coordinate this work with the affected utility. All charges associated with this work are the responsibility of the Customer. For utility contact information, please call 208-388-2886. Notice: This Customer Cost Quote shall be binding on both Idaho Power Company("Idaho Power")and Customer for a period of 60 days from the quoted date indicated below, subject to changes in information provided by the Customer or changes in Idaho Power's ability to obtain satisfactory rights-of-way or to comply with governmental regulations, including but not limited to the rules, regulations, and tariffs of the Idaho Public Utilities Commission ("IPUC")and the Public Utility Commission of Oregon ("OPUC"). Customer must make payment of the quoted amount not less than (30)days prior to the start of the construction work set forth in this agreement("Work"). However, Idaho Power does not represent or warrant that the Work will commence within 30 days of receipt of payment.The start of the Work is subject to Idaho Power's ability to obtain the necessary labor, materials and equipment. Internal use Page 1 of 3 Service Request Number: Customer Account Number: Work Order Number: Design Number: Version: 00511646 2270979616 27638199 0000166340 001 By Initialing below, Customer acknowledges and agrees to the following: The Customer has received the Underground Residential Conduit Installation brochure/packet or will access cus er the information available online at initials https://dots.idahopower.com/pdfs/ServiceBilling/customerservice/newConstruction/UGResConduitlnstall.pdf -� Final Grade: Customer understands that as of the above-named project will mer be ready for facilities to be installed by Idaho Power. All roadways and cable routes must have all grading and initials sub grading completed by this date. The project must be properly referenced and have grade stakes installed at all Idaho Power device locations and as might be necessary to establish proper elevations and burial depths Idaho Power facilities. The Customer will be responsible for the total cost of damage to Idaho Power facilities resulting from any subsequent changes in property, any needed relocation, repair, or lines, lot lines, elevations, grades, excavations, or profiles causing improper locations or burial depths of above-ground equipment, below-ground equipment, cable, or conduit. Unusual Conditions: As defined in Idaho Power's line installation tariff, Rule H, Unusual Conditions are r construction conditions not normally encountered, but which Idaho Power may encounter during construction Is which impose additional, project-specific costs. These conditions include, but are not limited to: frost, landscape replacement, road compaction, pavement replacement, chip-sealing, rock digging/trenching, boring, nonstandard facilities or construction practices, and other than available voltage requirements. The total cost for all Unusual Conditions, in connection with the work as set forth on this Customer Cost Quote will be based on the actual costs incurred by Idaho Power related to the conditions encountered during performance of the Work. Upon completion of all Work, Idaho Power will refund to Customer any Unusual Conditions amount set forth on this Customer Cost Quote sheet but, not incurred by Idaho Power. Prior to commencement of the work, Customer shall identify for Idaho Power the location of all underground pipes, lines, and other facilities (collectively, the"Underground Lines")that may be on Customer's property where Idaho Power is working. Customer agrees to be responsible for identification and location of all Underground Lines and shall indemnify, defend, reimburse and hold harmless Idaho Power and its successors and their respective directors, officers, members, employees, representatives and agents for, from, and against any and all claims, liabilities, losses, damages, expenses, suits, actions, proceedings,judgement and costs of any kind (collectively, "Damages"), whether actual or merely alleged and whether directly incurred or from a third party, arising out of or relating to Customer's failure to properly or adequately identify and locate the Underground Lines, except to the extent finally determined by a court of law that such Damages resulted from the gross negligence or willful misconduct of Idaho Power, its agents, subcontractors, employees, officers or directors. Internal use Page 2 of 3 Service Request Number: Customer Account Number: Work Order Number: Design Number: Version: 00511646 2270979616 27638199 0000166340 001 The Customer acknowledges Idaho Power's Rule C (Service and Limitations), Section 7 (Right of Way)on file with the IPUC OPUC: "The Customer shall, without cost to Idaho Power, grant Idaho Power a right-of-way for Idaho Power's lines and apparatus across and upon the property owned or controlled by the Customer, necessary or incidental to the supplying of Electric Service and shall permit access thereto by Idaho Power's employees at all reasonable hours." By signing this Customer Cost Quote, Customer grants to Idaho Power a perpetual right-of-way over the Customer's property for the installation, operation, replacement and maintenance of power facilities to provide electrical service to the Customer and any future owners of the Customer's property. Construction Costs available for refund (Vested Interest limited to 5 years or 4 additional applicants) $0 Customer Payment Due Prior to Scheduling Construction $138,255 Underground Service Attachment Charges to be billed separately The Customer understands that Underground Service Attachment Charges will be billed separately on the c -tdmer first month's power bill after service installation has been completed. In addition, the Customer has initials reviewed and acknowledges their responsibility for these costs. Idaho and Oregon cost information are available online at: ID: https://docs.idahopower.com/pdfs/ServiceBilling/customerservice/newConstruction/IdahoCostlnfo.pdf OR: https://docs.idahopower.com/pdfs/ServiceBilling/customerservice/newConstruction/OregonCostlnfo.pdf Please sign and return all relevant forms along with the amount stated on the Customer Cost Quote to: IDAHO POWER COMPANY 1221 W Idaho Boise, ID 83702 Customer Signature C � Date /1/27/a 3 Idaho Power Representative Za v�e S%w�w�Ov 5 Quote Date 09/19/2023 Internal use Page 3 of 3 Service Request Number: Customer Account Number: Work Order Number: Design Number: Version: 00511646 2270979616 27638199 0000166340 001 ADDENDUM TO CUSTOMER COST QUOTE FOR IDAHO POWER FACILITIES This Addendum hereby becomes part of the Customer Cost Quote For Idaho Power Facilities between City of Eagle and Idaho Power Company dated September 19, 2023. Statutory Certifications. In accordance with Idaho Code Section 67-2359, Idaho Power Company hereby certifies that it is not owned or operated by the Government of China, as defined in said code section, and that during the Term of this Agreement it will not be owned or operated by the Government of China. In accordance with Idaho Code Section 67-2346 Idaho Power Company hereby certifies that it is not currently engaged in, and during the Term of this Agreement will not engage in,a boycott of goods and services from Israel or territories under its control as defined in said code section. Idaho Power Representative Date: October 26, 2023 is Hil n VP and General Counsel Idaho Power Company 1 \ % cv §! O \ 7 \ e � \ § �� / N \ \ \ z 2 , ! , , , , _ eA ! ! ! ) . � � 8 a | o $ om \ 15 ° | i oxa ® - _ . a . - . - . a , b� _ ° d | | $ �\ : f>" | „ 8E8888 I ' I CO @ z\ § � 0 | § ! 0 > I. } _- ! , . � j\ \ { } )) � k §h \ew&» 2 Cr z,°® _ P I'm _ , % § a J -z®z® / §2 o z�®k� M» z= w §_ n- |w 2| � ] „ § { k 6 /k � § § ! £ 222 § § \j }( o � ilog„ I z k \ § ! l2222222 G � E a �iR ° . _ - � , a , a . � - § aw / | o / !§ \ aAa I ! ■ \ i \ \ |§ \ |g § co k C Iag %. �1 ell . ii m i O I 0 N 0 CD U) OO n N >—W m S h O N O On 6 O N mg z° F. y rN O 0 4 e 3� Q 9 `y a m a 0 2 w (n O Wk 2 as I a N z Q Z 11 E a 0 x Oj�F wcr azmui, I J zw ��„o� I w V) aaami s m o m co O W 2 a ree $ $ ? _ \ ce¢m8a e o" 2 0 Z 2 N p N OO m " Qw (n m:mom C CL m �- w 1-0 0 0 2 : LcJ N O m z to Y Z u Z J JEt X W a I—azQF fhiit WCZ Et02 O! onA Q m U O `C CC W , 2 ZDW3 _20� WW s3 w U0 mm Z Qo^lO 9 � o mix_ u.a €o 1. g ao I. LL O NI I V H IN y - Z \\ w• Z .. p ww = U W W Z ce J 1- o • ' Q re H u) W n a W 0 0 N Co W C9 p\‘‘ .\\,\ ....g. O Q i iU3 ( 3 ..akii,16"1111311110 Idaho Power Company Page: 1 ULM POWER* Service Request Date: 9/19/2023 An IDACORP company Service Request Number: 00511646 CITY OF EAGLE-8285 W EQUEST LN-ROAD TRENCH Work Order Number: 27638199 Eng Hours: 00020 Request Type: CS Eng Fee Amount(Att98): 1,740.00 Rate Sch.: N/A Eng Fee Amount(Att16): Reply By: Eng Fee Service Agreement No: Eng Fee Service Agreement Date: Customer No: 2270979616 Feeder: B N LT 11 A Service Location: 8285 W EQUEST LN EAGLE, ID 83616 Required in Service Date: 8/21/2023 Planning Center/Team: EAGLE Contact Detail: CUST CITY OF EAGLE IPCO ZANE SIMMONS 208-388-2329 ZSimmons@idahopower.com 1221 W Idaho,BOISE ID 83702 IPCO ZEKE VANHOOSER 208-388-5229 ZVanHooser@idahopower.com 10790 W Franklin Rd,BOISE ID 83702 RFND CITY OF EAGLE Attribute Information RES/COM Service Voltage 0 No.Of Meters 0 Number of Phases 0 Meter Location KW Motor Load: 0 Ct Loc Largest Motor 0 Primary OH/UG UG 1 Phase KW Demand 0 Service OH/UG N/A 3 Phase KW Demand 0 Sry Owner N/A Vested Int.Connected Load 0 Panel Amp Size N/A Commercial Deposit Amount Service Pole Riser N/A SIC Number Description 1/11"414IIHO Idaho Power Company Page: 2 POWER Service Request Date: 9/19/2023 An 4DACORP ComWny Service Request Number: 00511646 CITY OF EAGLE-8285 W EQUEST LN-ROAD TRENCH CITY OF EAGLE HAS A PLANNED SPORTS PARK.CUSTOMER HAS REQUESTED TO INSTALL CONDUITS AND VAULTS,UNDER JOINT TRENCH,WHILE PERFORMING ROADWORK TO ALLOW FOR FUTURE UNDERGROUNDING OF EXISTING OVERHEAD FACILITIES.THIS SERVICE DOES NOT CONTAIN ANY UNDERGROUND CABLE OR TIES TO THE EXISTING OVERHEAD.CUSTOMER WILL BE REQUIRED TO REQUEST AN ADDITIONAL SERVICE REQUEST AT A LATER DATE TO RELOCATE EXISITNG FACILITIES UNDERGROUND. IDAHO POWER WILL UTILIZE THE PROVIDED EASEMENT DESCRIPTION(CITY OF EAGLE) TO DEVELOP AND PROVIDE THE CITY OF EAGLE WITH A UTILITY SPECIFIC EASEMENT. CITY OF EAGLE WILL NEED TO PROVIDE PRELIMINARY AND FINAL CONSTRUCTION PRINTS. FINAL SCOPE OF WORK: INSTALL 3 5115 VAULTS.INSTALL 1 4"& 1 6"CONDUIT(S).TIE 6"CONDUIT TO DUCT AT CANAL BRIDGE. • Any changes to the project including but not limited to increases in load,timing of load schedule,location of service,and requested voltage may result in additional charges and/or delay of service.It is necessary to communicate changes as soon as possible. .Z,a Si,wt vikovts 19 Sep 2023 Client Sig 15 Date Idaho Power Representative Signature Date