Service Solicited - 2023 - Idaho Power - Idaho Power Equest Lane Road Trench Cost Quote CUSTOMER COST QUOTE FOR
An IDACORPCompanV IDAHO POWER FACILITIES
Customer or Project Name: CITY OF EAGLE -8285 W EQUEST LN - ROAD TRENCH
Construction Costs
Line Installation Costs
1. Line Installation/Upgrade Charge APPROVED: A lid $127,191
{{tom
2. Customer Credits (Betterment,Metering,Salvage) AMOUNT PAID: Ca a. $0
3. Customer Performed Construction Work Credit ACCOUNT': IC •t !IA.0 $0
CHECK#: $127,191
4. Net Line Installation Cost
DATE:
Unusual Conditions
5. Unusual Conditions $11,064
6. Unusual Conditions Bank Letter of Credit (Only for over$10,000) $0
7. Net Unusual Conditions $11,064
Terminal Facilities Costs
8. Terminal Facilities $0
9. Terminal Facilities Allowances $0
10.Terminal Facilities Salvage $0
11. Net Terminal Facilities Cost $0
12. Underground Service and Attachment Charges $0
13. Engineering Charge $0
14. Permits $0
15. Relocation or Removal $0
16. Miscellaneous Charges/Adjustments $0
17. Net Construction Costs , (Line Items 4,7, 11, 12, 13, 14, 15, 16) $138,255
18. Prepaid Charges (Engineering, Permits&Right-of-Way) $0
19. Vested Interest Charge $0
20. Customer Payment Due Prior to Construction Scheduling $138,255
This cost may not include all construction costs, see page 3 if additional service charges apply.
Notes: Due to labor shortages and pandemic-related supply chain issues, Idaho Power anticipates a possible
shortage of certain materials and equipment necessary to complete the Work (as defined below)which may delay
completion of the Work.
Customer understands that charges for relocation, transfer or removal of non-Idaho Power equipment attached to Idahc
Power facilities are not included in this Customer Cost Quote. It is the customer's responsibility to coordinate this work
with the affected utility. All charges associated with this work are the responsibility of the Customer. For utility contact
information, please call 208-388-2886.
Notice: This Customer Cost Quote shall be binding on both Idaho Power Company("Idaho Power")and Customer for a period of 60
days from the quoted date indicated below, subject to changes in information provided by the Customer or changes in Idaho
Power's ability to obtain satisfactory rights-of-way or to comply with governmental regulations, including but not limited to the rules,
regulations, and tariffs of the Idaho Public Utilities Commission ("IPUC")and the Public Utility Commission of Oregon ("OPUC").
Customer must make payment of the quoted amount not less than (30)days prior to the start of the construction work set forth in this
agreement("Work"). However, Idaho Power does not represent or warrant that the Work will commence within 30 days of receipt of
payment.The start of the Work is subject to Idaho Power's ability to obtain the necessary labor, materials and equipment.
Internal use Page 1 of 3
Service Request Number: Customer Account Number: Work Order Number: Design Number: Version:
00511646 2270979616 27638199 0000166340 001
By Initialing below, Customer acknowledges and agrees to the following:
The Customer has received the Underground Residential Conduit Installation brochure/packet or will access
cus er the information available online at
initials https://dots.idahopower.com/pdfs/ServiceBilling/customerservice/newConstruction/UGResConduitlnstall.pdf
-� Final Grade: Customer understands that as of the above-named project will
mer be ready for facilities to be installed by Idaho Power. All roadways and cable routes must have all grading and
initials sub grading completed by this date. The project must be properly referenced and have grade stakes installed
at all Idaho Power device locations and as might be necessary to establish proper elevations and burial depths
Idaho Power facilities. The Customer will be responsible for the total cost of damage to Idaho Power
facilities resulting from any subsequent changes in property, any needed relocation, repair, or lines, lot lines,
elevations, grades, excavations, or profiles causing improper locations or burial depths of above-ground
equipment, below-ground equipment, cable, or conduit.
Unusual Conditions: As defined in Idaho Power's line installation tariff, Rule H, Unusual Conditions are
r construction conditions not normally encountered, but which Idaho Power may encounter during construction
Is which impose additional, project-specific costs. These conditions include, but are not limited to: frost,
landscape replacement, road compaction, pavement replacement, chip-sealing, rock digging/trenching,
boring, nonstandard facilities or construction practices, and other than available voltage requirements. The
total cost for all Unusual Conditions, in connection with the work as set forth on this Customer Cost Quote will
be based on the actual costs incurred by Idaho Power related to the conditions encountered during
performance of the Work. Upon completion of all Work, Idaho Power will refund to Customer any Unusual
Conditions amount set forth on this Customer Cost Quote sheet but, not incurred by Idaho Power.
Prior to commencement of the work, Customer shall identify for Idaho Power the location of all underground pipes, lines,
and other facilities (collectively, the"Underground Lines")that may be on Customer's property where Idaho Power is
working. Customer agrees to be responsible for identification and location of all Underground Lines and shall indemnify,
defend, reimburse and hold harmless Idaho Power and its successors and their respective directors, officers, members,
employees, representatives and agents for, from, and against any and all claims, liabilities, losses, damages, expenses,
suits, actions, proceedings,judgement and costs of any kind (collectively, "Damages"), whether actual or merely alleged
and whether directly incurred or from a third party, arising out of or relating to Customer's failure to properly or adequately
identify and locate the Underground Lines, except to the extent finally determined by a court of law that such Damages
resulted from the gross negligence or willful misconduct of Idaho Power, its agents, subcontractors, employees, officers
or directors.
Internal use Page 2 of 3
Service Request Number: Customer Account Number: Work Order Number: Design Number: Version:
00511646 2270979616 27638199 0000166340 001
The Customer acknowledges Idaho Power's Rule C (Service and Limitations), Section 7 (Right of Way)on file with the IPUC
OPUC: "The Customer shall, without cost to Idaho Power, grant Idaho Power a right-of-way for Idaho Power's lines and
apparatus across and upon the property owned or controlled by the Customer, necessary or incidental to the supplying of
Electric Service and shall permit access thereto by Idaho Power's employees at all reasonable hours." By signing this
Customer Cost Quote, Customer grants to Idaho Power a perpetual right-of-way over the Customer's property for the
installation, operation, replacement and maintenance of power facilities to provide electrical service to the Customer and any
future owners of the Customer's property.
Construction Costs available for refund
(Vested Interest limited to 5 years or 4 additional applicants) $0
Customer Payment Due Prior to Scheduling Construction $138,255
Underground Service Attachment Charges to be billed separately
The Customer understands that Underground Service Attachment Charges will be billed separately on the
c -tdmer first month's power bill after service installation has been completed. In addition, the Customer has
initials reviewed and acknowledges their responsibility for these costs. Idaho and Oregon cost information are
available online at:
ID: https://docs.idahopower.com/pdfs/ServiceBilling/customerservice/newConstruction/IdahoCostlnfo.pdf
OR: https://docs.idahopower.com/pdfs/ServiceBilling/customerservice/newConstruction/OregonCostlnfo.pdf
Please sign and return all relevant forms along with the amount stated on the Customer
Cost Quote to:
IDAHO POWER COMPANY
1221 W Idaho
Boise, ID 83702
Customer Signature C � Date /1/27/a 3
Idaho Power Representative Za v�e S%w�w�Ov 5 Quote Date 09/19/2023
Internal use Page 3 of 3
Service Request Number: Customer Account Number: Work Order Number: Design Number: Version:
00511646 2270979616 27638199 0000166340 001
ADDENDUM TO CUSTOMER COST QUOTE
FOR IDAHO POWER FACILITIES
This Addendum hereby becomes part of the Customer Cost Quote For Idaho Power
Facilities between City of Eagle and Idaho Power Company dated September 19, 2023.
Statutory Certifications. In accordance with Idaho Code Section 67-2359, Idaho Power
Company hereby certifies that it is not owned or operated by the Government of China, as
defined in said code section, and that during the Term of this Agreement it will not be owned or
operated by the Government of China. In accordance with Idaho Code Section 67-2346 Idaho
Power Company hereby certifies that it is not currently engaged in, and during the Term of this
Agreement will not engage in,a boycott of goods and services from Israel or territories under its
control as defined in said code section.
Idaho Power Representative Date: October 26, 2023
is Hil n
VP and General Counsel
Idaho Power Company
1 \ %
cv
§! O \ 7 \ e
� \ § �� / N \ \ \
z 2 , ! , , , , _
eA
! ! !
) . � � 8 a |
o
$
om
\ 15 ° | i
oxa ® - _ . a . - . - . a ,
b� _ ° d | | $
�\ : f>" | „ 8E8888 I ' I CO
@
z\ § � 0 | § !
0 > I.
} _- ! , .
� j\ \ { } )) � k
§h \ew&» 2 Cr
z,°® _
P I'm _ , % §
a J -z®z® / §2 o
z�®k� M»
z= w §_ n- |w
2| � ] „ §
{ k
6
/k � § § ! £ 222 § § \j }( o
� ilog„ I
z k
\ § ! l2222222 G � E
a �iR °
. _ - � , a , a . � - § aw /
| o
/ !§
\
aAa
I
! ■
\ i \ \
|§
\ |g §
co
k
C Iag
%.
�1
ell . ii
m i
O I 0 N
0
CD
U) OO n N
>—W m S h O N
O
On
6
O N mg z° F. y
rN O 0 4 e
3�
Q 9
`y a m
a 0 2 w
(n O Wk 2
as I
a N z Q Z 11
E a
0 x Oj�F
wcr azmui, I J
zw ��„o� I
w V) aaami s m
o m co
O W 2 a ree $ $
? _ \ ce¢m8a e o" 2 0
Z 2
N p N OO m "
Qw (n m:mom C CL
m �- w 1-0 0 0 2
: LcJ N O m z to
Y Z u Z J JEt
X W
a I—azQF fhiit
WCZ Et02 O!
onA Q m U O `C
CC W
, 2 ZDW3
_20� WW
s3 w U0
mm
Z Qo^lO
9 � o
mix_
u.a €o
1. g
ao I. LL O NI
I
V
H IN y
- Z
\\ w•
Z
.. p
ww =
U
W W
Z ce
J
1- o
• ' Q
re
H
u)
W
n
a
W
0
0
N
Co
W
C9 p\‘‘ .\\,\ ....g.
O Q i
iU3 ( 3
..akii,16"1111311110 Idaho Power Company Page: 1
ULM POWER* Service Request Date: 9/19/2023
An IDACORP company
Service Request Number: 00511646
CITY OF EAGLE-8285 W EQUEST LN-ROAD TRENCH
Work Order Number: 27638199 Eng Hours: 00020
Request Type: CS Eng Fee Amount(Att98): 1,740.00
Rate Sch.: N/A Eng Fee Amount(Att16):
Reply By: Eng Fee Service Agreement No:
Eng Fee Service Agreement Date:
Customer No: 2270979616
Feeder: B N LT 11 A
Service Location: 8285 W EQUEST LN EAGLE, ID 83616
Required in Service Date: 8/21/2023
Planning Center/Team: EAGLE
Contact Detail:
CUST CITY OF EAGLE
IPCO ZANE SIMMONS 208-388-2329 ZSimmons@idahopower.com
1221 W Idaho,BOISE ID 83702
IPCO ZEKE VANHOOSER 208-388-5229 ZVanHooser@idahopower.com
10790 W Franklin Rd,BOISE ID 83702
RFND CITY OF EAGLE
Attribute Information
RES/COM
Service Voltage 0 No.Of Meters 0
Number of Phases 0 Meter Location
KW Motor Load: 0 Ct Loc
Largest Motor 0 Primary OH/UG UG
1 Phase KW Demand 0 Service OH/UG N/A
3 Phase KW Demand 0 Sry Owner N/A
Vested Int.Connected Load 0 Panel Amp Size N/A
Commercial Deposit Amount Service Pole Riser N/A
SIC Number
Description
1/11"414IIHO Idaho Power Company Page: 2
POWER Service Request Date: 9/19/2023
An 4DACORP ComWny
Service Request Number: 00511646
CITY OF EAGLE-8285 W EQUEST LN-ROAD TRENCH
CITY OF EAGLE HAS A PLANNED SPORTS PARK.CUSTOMER HAS REQUESTED TO INSTALL
CONDUITS AND VAULTS,UNDER JOINT TRENCH,WHILE PERFORMING ROADWORK TO ALLOW
FOR FUTURE UNDERGROUNDING OF EXISTING OVERHEAD FACILITIES.THIS SERVICE DOES
NOT CONTAIN ANY UNDERGROUND CABLE OR TIES TO THE EXISTING OVERHEAD.CUSTOMER
WILL BE REQUIRED TO REQUEST AN ADDITIONAL SERVICE REQUEST AT A LATER DATE TO
RELOCATE EXISITNG FACILITIES UNDERGROUND.
IDAHO POWER WILL UTILIZE THE PROVIDED EASEMENT DESCRIPTION(CITY OF EAGLE)
TO DEVELOP AND PROVIDE THE CITY OF EAGLE WITH A UTILITY SPECIFIC EASEMENT.
CITY OF EAGLE WILL NEED TO PROVIDE PRELIMINARY AND FINAL CONSTRUCTION PRINTS.
FINAL SCOPE OF WORK:
INSTALL 3 5115 VAULTS.INSTALL 1 4"& 1 6"CONDUIT(S).TIE 6"CONDUIT TO
DUCT AT CANAL BRIDGE.
•
Any changes to the project including but not limited to increases in load,timing of load schedule,location of service,and requested
voltage may result in additional charges and/or delay of service.It is necessary to communicate changes as soon as possible.
.Z,a Si,wt vikovts 19 Sep 2023
Client Sig 15 Date Idaho Power Representative Signature Date