Loading...
Findings - PZ - 2023 - PP-04-23 - Ambrosia Gardens - Preliminary Plat for Ambrosia Garden Subdivision BEFORE THE EAGLE PLANNING AND ZONING COMMISSION IN THE MATTER OF AN APPLICATION ) FOR A PRELIMINARY PLAT FOR ) AMBROSIA GARDEN SUBDIVISION FOR ) STEVEN RICKS AND SUSANNE RICKS ) FAMILY TRUST ) FINDINGS OF FACT AND CONCLUSIONS OF LAW CASE NUMBER PP-04-23 The above-entitled Preliminary Plat application came before the Eagle Planning and Zoning Commission for their recommendation on August 21, 2023, at which time public testimony was taken and the public hearing was closed. The Eagle Planning and Zoning Commission, having heard and taken oral and written testimony, and having duly considered the matter, makes the following Findings of Fact and Conclusions of Law: FINDINGS OF FACT: A. PROJECT SUMMARY: Steven Ricks and Susanne Ricks Family Trust, represented by Anna B. Canning with Centurion Engineers, Inc., is requesting preliminary plat approval for Ambrosia Garden Subdivision, a 6-lot (6-buildable) commercial subdivision. The 3.45-acre site is located at the northwest corner of State Highway 44 and North Park Lane at 101 North Park Lane. B. APPLICATION SUBMITTAL: A Neighborhood Meeting was held at the Eagle High School Social Center/Cafeteria at 574 North Park Lane from 7:30 — 8:00 PM, on Thursday, February 16, 2023, in compliance with the application submittal requirement of Eagle City Code. The application for this item was received by the City of Eagle on April 26, 2023. A revised preliminary plat was submitted to the City on June 12,2023. C. NOTICE OF PUBLIC HEARING: Requests for agencies' reviews were transmitted on May 15, 2023, in accordance with the requirements of the Eagle City Code. Notice of Public Hearing on the application for the Eagle Planning and Zoning Commission was published in accordance with the requirements of Title 67, Chapter 65, Idaho Code and the Eagle City Code on August 3, 2023. Notice of this public hearing was mailed to property owners in accordance with the requirements of Title 67, Chapter 65, Idaho Code and Eagle City Code on August 4, 2023. The site was posted in accordance with the Eagle City Code on July 28,2023. D. HISTORY OF REVELANT PREVIOUS ACTIONS: On June 16, 2015, the Director of Ada County Development Services approved a One Time Division (OTD) for D. Keith and Ona L. Ricks Revocable Trust represented by Kristi Watkins with J-U-B Engineers, Inc. (Project No.201500866 OTD) On February 17, 2022,the City Council approved an annexation, rezone from RUT(Rural-Urban Transition—Ada County designation) to R-9-DA (Residential with a development agreement [in lieu of a PUD]) and MU-DA (Mixed Use with a development agreement [in lieu of a PUD]), and preliminary plat approvals for Skyview Subdivision(A-05-21/RZ-06-21/PP-08-21). Pagel of 16 K:\Planning Dept\Eagle Applications\SUBS\2023\Ambrosia Garden Sub\Working Files\Ambrosia Gardens PZF.doc On June 14, 2022, the City Council approved a design review application for the common area landscaping, pool house, pool, and 23 townhome buildings (124-units) within Skyview Subdivision for Lennar Homes of Idaho, Inc. (DR-29-22). E. COMPANION APPLICATIONS: All applications inclusive herein. F. COMPREHENSIVE PLAN LAND USE MAP AND ZONING MAP DESIGNATIONS: COMP PLAN ZONING LAND USE DESIGNATION DESIGNATION Existing Mixed Use MU-DA(Mixed Use with Vacant Development Agreement [in Lieu of a PUD]) Proposed No Change No Change Commercial Subdivision North of site Mixed Use R-9-DA(Residential with a Single-Family Attached development agreement [in Residential(Proposed lieu of a PUD]) Skyview Subdivision) South of site Mixed Use M-U(Mixed Use) State Highway 44 East of site Mixed Use MU-DA(Mixed Use with Residential Subdivision Development Agreement[in (Warrior Park Lieu of a PUD]) Subdivision), Convenience store with fuel service West of site Neighborhood R-9-DA(Residential with a Single-Family Attached Residential development agreement [in Residential(Proposed lieu of a PUD]) Skyview Subdivision) G. DESIGN REVIEW OVERLAY DISTRICT: Not located within the DDA, TDA, CEDA, or DSDA. H. SITE DATA: Total Acreage of Site—3.45-acres Total Number of Lots—6 Residential—0 Commercial—6 Industrial—0 Common—0 Total Number of Units—0 Single-family—0 Single-family attached—0 Two-family—0 Multi-family—0 Total Acreage of Any Out-Parcels—0 Page 2 of 16 K:\Planning Dept\Eagle Applications\SUBS\2023\Ambrosia Garden Sub\Working Files\Ambrosia Gardens PZF.doc I. GENERAL SITE DESIGN FEATURES: Greenbelt Areas: See Trails and Pathways Superintendent's memo dated October 22, 2021, (attached to the staff report). Open Space: There are no common lots dedicated to open space. As part of the design review process, the applicant will be required to comply with landscaping requirements (associated with individual lots)pursuant to Eagle City Code Section 8-2A-7(B)(2). Storm Drainage and Flood Control: Specific drainage system plans are to be submitted to the City Engineer for review and approval prior to the City Engineer signing the final plat. The plans are to show how swales, or drain piping, will be developed in the drainage easements. Also, the CC&R's are to contain clauses to be reviewed and approved by the City Engineer and City Attorney, requiring that lots be so graded that all runoff runs either over the curb, or to the drainage easement, and that no runoff shall cross any lot line onto another lot except within a drainage easement. Utility and Drainage Easements, and Underground Utilities: The preliminary plat notes the lots include a blanket public utility, pressure irrigation, and drainage easements. Fire Hydrants and Water Mains: Hydrants are to be located and installed as may be required by the Eagle Fire District. On-site Septic System: The existing home was demolished and the septic system was abandoned. Preservation of Existing Natural Features: The site contains existing mature trees along the Middleton Mill Canal. Eagle City Code Sections 8-7-3-3 and 9-3-8 (B) states that existing natural features which add value to residential development and enhance the attractiveness of the community (such as trees, watercourses, historic spots,and similar irreplaceable assets)shall be preserved in the design of the subdivision. Preservation of Existing Historical Assets: Staff is not aware of any existing historical assets on the site. If any historical artifacts are discovered during excavation or development of the site, state law requires immediate notification to the state. J. STREET DESIGN: Public Streets: See ACHD staff report,date stamped by the City on May 31,2023 (attached to the staff report). Private Streets:None proposed. Blocks Less Than 500':None proposed. Cul-de-sac Design:None proposed. Page 3 of 16 K-\Planning Dept\Eagle Applications\SUBS\2023\Ambrosia Garden Sub\Working Files\Ambrosia Gardens PZF.doc Sidewalks: The preliminary plat, date stamped by the City on June 12, 2023, shows five-foot (5') wide sidewalks located between the proposed buildings and the parking areas. Also, the ACHD site specific conditions of approval associated with Skyview Subdivision apply to the required sidewalks located adjacent to North Park Lane, West Flint Drive,and North Pincushion Avenue. Curbs and Gutters: Curbs and gutters, which meet Ada County Highway District standards, are proposed for the streets located adjacent to the site. Lighting: Location and lighting specifications shall be reviewed and approved by the Design Review Board and City Council prior to the submittal of the final plat. Any modifications made to the lighting shall be completed before the final plat approval. Street Names: Street names should be approved by the Ada County Street Naming Committee prior to submittal of a final plat application. K. ON AND OFF-SITE PEDESTRIANBICYCLE CIRCULATION: Pedestrian Walkways: The preliminary plat, date stamped by the City on June 12, 2023, shows a ten-foot (10') wide regional pathway located in proximity and parallel to the southern property line. L. PUBLIC USES PROPOSED: All sidewalks and pathways within the development are open to the public. M. PUBLIC USES SHOWN ON FUTURE ACQUISITIONS MAP:No map currently exists. N. AVAILABILITY AND ADEQUACY OF UTILITIES AND SERVICES: The property will receive potable water from Veolia Water of Idaho. Eagle Sewer District will provide central sewer. The property will receive fire protection from the Eagle Fire Department and police protection from the Eagle Police Department. O. SPECIAL ON-SITE FEATURES: Areas of Critical Environmental Concern—Yes—adjacent to Middleton Mill Canal Evidence of Erosion—No Fish Habit—No Floodplain—No Mature Trees—Yes—Adjacent to the Middleton Mill Canal Riparian Vegetation—Yes—along the Middleton Mill Canal Steep Slopes—No Stream/Creek—Yes—Middleton Mill Canal Unique Animal Life—Unknown Unique Plant Life—Yes—Riparian area along the Middleton Mill Canal Unstable Soils—No Wildlife Habitat—Yes—Within the existing trees located within the site P. SUMMARY OF REVIEW OF ENVIRONMENTAL ASSESSMENT PLAN: Preliminary Wetland Evaluation — Skyview Subdivision, date stamped by the City on April 28, 2021 (attached to the staff report). Page 4 of 16 K:\Planning Dept\Eagle Applications\SUBS\2023\Ambrosia Garden Sub\Working Files\Ambrosia Gardens PZF dos Geotechnical Evaluation For "Rick's Property" — A 15.5 + Acre Multi-Family Townhome Residential Development Located To The North Of Highway 44 And West Of North Park Lane, Eagle,Idaho, date stamped by the City on April 28, 2021 (attached to the staff report). Q. AGENCY RESPONSES: The following agencies have responded, and their correspondence is attached to the staff report. Comments which appear to be special concern are noted below: Ada County Highway District Ballantyne Ditch Company Central District Health Department Department of Environmental Quality Eagle Fire Department Eagle Sewer District Idaho Transportation Department City Engineer: All comments within the engineer's letter dated July 18, 2023, are of special concern. R. RESPONSE FROM THE EAGLE PARKS, PATHWAYS, AND RECREATION COMMISSION: City Trails and Pathways Superintendent: All comments within the Trails and Pathways Superintendent's memo dated October 22,2021,are of special concern. S. FISCAL IMPACT ANALYSIS: See Developer Data Table, date stamped by the City on November 9, 2021, along with analysis table(attached to the staff report). T. PROPOSED TIME SCHEDULE FOR THE DEVELOPMENT OF THE SITE: The site will be constructed in a single phase. U. LETTERS FROM THE PUBLIC:None received to date THE PLANNING AND ZONING COMMISSION RECEIVED AND REVIEWED THE FOLLOWING STAFF ANALYSIS PROVIDED WITHIN THE STAFF REPORT AND ADOPTS THE STAFF REPORT AS PART OF THE PLANNING AND ZONING COMMISSION'S FINDINGS OF FACT: A. COMPREHENSIVE PLAN PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: 6.3 Land Use Designations: The Comprehensive Land Use Map(adopted November 15, 2017), designates this site as the following: Mixed Use Suitable for a mixture of uses including limited office, limited commercial and residential. Residential densities within the designation is up to 20 units per acre but density will be determined on a site by site basis. Uses should complement and not take away from downtown Eagle. Development within this land use designation should be required to proceed through the PUD and/or development agreement process. See the planning area text for a complete description of site-specific uses. Page 5of16 K.\Planning Dept\Eagle Applications\SUBS\2023\Ambrosia Garden Sub\Working Files\Ambrosia Gardens PZF.doc Scenic Corridor An overlay designation that is intended to provide significant setbacks from major corridors and natural features through the city. These areas may require berming, enhanced landscaping, detached meandering pathways and appropriate signage controls. This designation includes the Willow Creek Scenic Corridor that is to provide increased setbacks and buffering of development including natural vegetation and restoration,regional trails and connectivity. 6.4.2 General Land Use Objectives A. Encourage the conservation and preservation of open spaces (sensitive habitat for plant, wildlife, and species and unique areas)based on diverse values within the City of Eagle. 6.4.3 General Land Use Implementation Strategies A. Conserve the natural features and resources that make Eagle unique. K. Protect gravity flow irrigation systems including canals, laterals, and ditches to assure continued delivery of irrigation water to all land serviced by such systems. Protect these systems as a long-range economical method for water delivery and drainage. 6.5 Park Lane Planning Area 6.5.1 Park Lane Uses C. All properties within the Park Lane Planning Area abutting State Street should designed to promote trip capture by including a mix of residential uses, commercial uses(limited to lease spaces no larger than 30,000 square feet) and office uses. The properties abutting State Street should be reviewed and conditioned by the City through the use of a development agreement at the time of rezone. F. The area located on the northwest corner of State Highway 44 and Park Lane is designated Mixed Use for the southern 17-acres, transitioning to neighborhood residential, up to 3 units per acre, for the northern portion of the property. The transition area between the mixed use and the residential area shall be reviewed and conditioned by the City through the use of a development agreement at the time of rezone. 6.5.3 Park Lane Access/Connectivity C. Cross-access agreements and shared service roads should be encouraged throughout the area and should be a requirement for all non-residential development. B. ZONING CODE PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: • Eagle City Code Section 8-2-1: Districts Established, Purposes and Restrictions: MU MIXED USE DISTRICT: To provide for a variety and mixture of uses such as limited office, limited commercial, and residential. This district is intended to ensure compatibility of new development with existing and future development. It is also intended to ensure assemblage of properties in a unified plan with coordinated and harmonious development which shall promote outstanding design without unsightly and unsafe strip commercial development. Uses should complement the uses allowed within the CBD zoning district. All development requiring a conditional use permit in the MU zoning district, as shown in section 8-2-3 of this chapter, shall occur under the PUD and/or development agreement process in accordance with chapter 6 or 10 of this title unless the proposed development does not meet Page 6 of 16 K:\Planning Dept\Eagle Applications\SUBS\2023\Ambrosia Garden Sub\Working Files\Ambrosia Gardens PZF.doc the area requirements as set forth in section 8-6-5-1 of this title. In that case a cooperative development, in conjunction with adjacent parcels (to meet the minimum area requirements), shall be encouraged. Otherwise a conditional use permit shall be required unless the proposed use is shown as a permitted use in the MU zoning district within section 8-2-3 of this chapter. Residential densities shall not exceed twenty (20) dwelling units per gross acre. When a property is being proposed for rezone to the MU zoning district, a development agreement may be utilized in lieu of the PUD and/or conditional use process if approved by the city council, provided the development agreement includes conditions of development that are required during the PUD and conditional use process. DA DEVELOPMENT AGREEMENT: This designation, following any zoning designation noted on the official zoning map of the city (i.e., C-2-DA), indicates that the zoning was approved by the city with a development agreement. Specific provisions, as may have been incorporated within the development agreement, are applicable to development within this zoning designation. • Eagle City Code Section 8-3-3: Supplemental Yard and Height Regulations: In addition to all yard regulations in Section 8-2-4 of this title, and in other sections of this title,the following provisions should be adhered to: D. Side And Rear Yards For Nonresidential Uses Abutting Residential Districts: Nonresidential buildings or uses shall not be located nor conducted closer than forty feet (40') to any lot line of a Residential District; except that the minimum yard requirements may be reduced to fifty percent (50%) of the requirement if acceptable landscaping or screening approved by the Council is provided. Such screening shall be a masonry or solid fence between four feet (4') and eight feet (8') in height, maintained in good condition and free of all advertising or other signs. Landscaping provided in lieu of such wall or fence shall consist of a strip of land not less than twenty feet (20') in width planted with an evergreen hedge or dense planting of evergreen shrubs not less than four feet(4')in height at the time of planting. C. SUBDIVISION CODE PROVISIONS WHICH OF SPECIAL CONCERN REGARDING THIS PROPOSAL: • Eagle City Code Section 9-4-1-6: Trail and Pathway Regulations: E. Trail and Pathway Classifications: 1. Regional Trails and Pathways: are specified where a continuation of a major trail route is required, anticipated or possible. They must be built to withstand loads from maintenance, emergency and other vehicles that require access to locations along or near the pathway. Therefore, the trails or adjacent lands must be designed to accommodate the turning radius of such vehicles. The following requirements shall be used for planning and implementation purposes. Exceptions may be granted by the city if a subdivision has developed a suitable alternative to the city's pathway process and associated requirements. f. A twenty-five foot (25') wide non-revocable public access easement is required unless otherwise approved by the city Page 7 of 16 K:\Planning Dept\Eagle Applications\SUBS\2023\Ambrosia Garden Sub\Working Files\Ambrosia Gardens PZF doc D. DEVELOPMENT AGREEMENT PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: 3.5 The commercial area of the Property as depicted on the Concept Plan is to be developed with a combination of retail, office, and bank/financial uses allowed within Eagle City Code Section 8-2-3 "Official Schedule of District Regulations" under the MU (Mixed Use) zoning designation(except as limited in Section 3.6, below). Buildings shall not exceed 7,000-square feet in size. The total of the commercial buildings shall not exceed 23,000-square feet. E. DISCUSSION (based on the preliminary plat, date stamped by the City on June 12, 2023, and the narrative, date stamped by the City on April 26, 2023): • The parcel associated with the proposed subdivision was originally shown as a single-lot(Lot 64, Block 3) on the approved Skyview Subdivision preliminary plat (PP-08-21). The applicant is requesting to further subdivide the parcel to create additional commercial lots. • The preliminary plat shows a 10-foot regional pathway traversing the southern portion of the property from east to west. It appears there is an easement line delineated as well; however, the easement line is not identified in the preliminary plat legend. Pursuant to Eagle City Code Section 9-4-1-6 (E)(1)(f), regional pathways are required to be located within a 25-foot wide non-revocable public access easement. The applicant should be required to provide a revised preliminary plat showing the 10-foot wide regional pathway located within a 25-foot wide public access easement in favor of the City of Eagle. The revised preliminary plat should be provided prior to submittal of a final plat application. The applicant should be required to record the 25-foot wide public pathway easement associated with the 10-foot-wide regional pathway and reference the recorded easement on the face of the final plat. • Plat note #19 of the preliminary plat references that all lots within the subdivision provide perpetual reciprocal cross-parking and cross-access for vehicular, pedestrian ingress-egress to the public right-of-way. The note also references the development is subject to the Ambrosia Garden CC&Rs. The applicant should provide a copy of the CC&Rs which contain language addressing the reciprocal cross-parking and cross-access for vehicle and pedestrian ingress- egress to the public right-of-way. The CC&Rs should be submitted with the final plat application for review and approval by the City Attorney prior to the City Clerk signing the final plat. • The subdivision will contain pressurized irrigation, parking lots, landscaping, and amenities (i.e. bike racks, benches, ect.) within the individual lots which will need to be maintained. The applicant should be required to provide a copy of the CC&Rs which contains the following provisions: (a) An allocation of responsibility for maintenance of all community and privately owned pressurized irrigation facilities, parking lots and amenities. The repair and maintenance requirement shall run with the land and that the requirement cannot be modified and that the Agreement cannot be dissolved without the express consent of the city. (b) A requirement that all common landscaped areas are to be privately owned but shall be described in and subject to a reciprocal easement allowing for common use by all property owners within the development. The Agreement shall provide that a designated property owner or group (i.e. business owner's association) shall have the duty to maintain and operate all the landscaped areas in a competent and attractive manner, including watering, mowing, fertilizing and caring for shrubs and trees in accordance with Eagle City Code, in perpetuity. Page 8 of 16 K:\Planning Dept\Eagle Applications\SUBS\2023\Ambrosia Garden Sub\Working Files\Ambrosia Gardens PZF.doc (c) A requirement that all parking areas shall be shared within the subdivision. The CC&Rs should be submitted with the final plat application for review and approval by the City Attorney prior to the City Clerk signing the final plat. PUBLIC HEARING OF THE COMMISSION: A. A public hearing on the application was held before the Planning and Zoning Commission on August 21, 2023, at which time testimony was taken and the public hearing was closed. The Commission made their recommendation at that time. B. Oral testimony in favor of the application was presented to the Planning and Zoning Commission by no one(not including the applicant/representative). C. Oral testimony in opposition to the application was presented to the Planning and Zoning Commission by three (3) individuals who have concerns regarding the allowance of a drive-through restaurant located within the development and the traffic associated with a drive-through use. Students leaving the high school will utilize the re D. Oral testimony neither in opposition to nor in favor of the application was presented to the Planning and Zoning Commission by one (1) individual who discussed school release times and the school district will not enforce a closed campus; therefore, allowing students to leave the campus to access the drive-through restaurant for lunch. COMMISSION DELIBERATION: Upon closing the public hearing,the Commission made a motion based upon the information provided by staff and the testimony provided. A summary of the deliberation can be found at the following link (Granicus time: 03:18:36): https://eagle-id.granicus.com/player/clip/1777?meta id=86638 COMMISSIONS DECISION: The Commission voted 4 to 1 (McLaughlin against) to recommend approval of PP-04-23 for a preliminary plat for Ambrosia Garden Subdivision (Exhibit "A") with the following staff recommended site specific conditions of approval and standard conditions of approval with text shown with underline to be added by the Commission and text shown with strikethrough to be deleted by the Commission. SITE SPECIFIC CONDITIONS OF APPROVAL: 1. Comply with all conditions within the development agreement for rezone application RZ-06-21. 2. Comply with all requirements of the City Engineer. 3. The applicant shall submit payment to the City for all engineering and legal fees incurred for reviewing this project, prior to the City Clerk signing the final plat and/or upon receipt of an invoice by the City,whichever occurs first. 4. Provide a revised preliminary plat showing the 10-foot wide regional pathway located within a 25- foot wide public access easement in favor of the City of Eagle. The revised preliminary plat shall be provided prior to submittal of a final plat application. The applicant shall record the 25-foot wide public pathway easement associated with the 10-foot-wide regional pathway and reference the recorded easement on the face of the final plat. 5. The applicant shall provide a copy of the CC&Rs which contain language addressing the reciprocal cross-parking and cross-access for vehicle and pedestrian ingress-egress to the public right-of-way. The CC&Rs shall be submitted with the final plat application for review and approval by the City Attorney prior to the City Clerk signing the final plat. Page 9 of 16 K:\Planning Dept\P.agle Applications\SUBS\2023\Ambrosia Garden Sub\Working Files\Ambrosia Gardens PZF.doc 6. The developer shall provide shade-class trees (landscape plan to be reviewed and approved by the Design Review Board) along both sides of all service drives streets within this development. Trees shall be placed at the front of each lot generally at each side property line, or as approved by the Design Review Board. The trees shall be located within an 8-foot wide landscape strip between the 5-foot wide concrete sidewalk and the curb. Any and all drainage swales and/or seepage beds shall be placed so as to not interfere with the required placement of street trees. Prior to the City Clerk signing the final plat the applicant shall either install the required trees, sod, and irrigation or provide the City with a letter of credit for 150% of the cost of the installation of all landscape and irrigation improvements. Trees shall be installed prior to obtaining any occupancy permits for the buildings homes. A temporary occupancy may be issued if weather does not permit landscaping. Partial reduction of the surety may be permitted for any portion of the development that is completed, including service drives street trees that have been installed. On-going surety for service drive street trees for all undeveloped portions of the development will be required through project completion. 7. Board. The trees shall be located within-aft 8 feet wide lansseapc strip between the 5 foot wide ed placement of street trees. Prier to the City Clerk signing the final letter of cre`it f r '`00' of t` --st of the installation of all landscape and irrigation improvements. be pe=rmitted for any `ti f the development that is completed, including street trees that have be required through project completion. (ECC 8 2A 7[E] and ECC 8 2A 18) 8. The applicant shall provide a license agreement from ACHD approving the landscaping located within the public rights-of-way abutting and within this site prior to approval of a final plat. (ECC 9- 4-1-2) 9. Any fencing located adjacent to common area open spaces and on the street side of all corner lots shall be an open fencing style such as wrought iron or other similar decorative style, durable fencing material. Specific buffer area fences and decorative walls may be allowed as otherwise required in ECC Section 8-2A-7(J). 10. The Ambrosia Garden Subdivision shall remain under the control of one (1) business owner's association. 11. The applicant shall place a note on the final plat that the pressurized irrigation system is to be owned and maintained by the Ambrosia Garden Business Owner's Association. 12. The applicant shall be required to provide a copy of the CC&Rs which contains the following provisions: (a) An allocation of responsibility for maintenance of all community and privately owned pressurized irrigation facilities, service drive aisles, parking lots, and amenities. The repair and maintenance requirement shall run with the land and that the requirement cannot be modified and that the Agreement cannot be dissolved without the express consent of the city. (b) A requirement that all landscaped areas are to be privately owned but shall be described in and subject to a reciprocal easement allowing for common use by all property owners within the development. The Agreement shall provide that a designated property owner or group (i.e. business owner's association) shall have the duty to maintain and operate all the landscaped areas Page 10 of 16 K:\Planning Dept\Eagle Applications\SUBS\2023\Ambrosia Garden Sub\Working Files\Ambrosia Gardens PZF.doc in a competent and attractive manner, including watering, mowing, fertilizing and caring for shrubs and trees in accordance with Eagle City Code, in perpetuity. (c) A requirement that all parking areas shall be shared within the subdivision. The CC&Rs shall be submitted with the final plat application for review and approval by the City Attorney prior to the City Clerk signing the final plat. 13. Owner shall work with the City to establish a Conservation and Education Program (CEP) Funding Plan associated with Ambrosia Garden Subdivision. The CEP Funding Plan shall be executed by the Owner and City prior to the City Clerk signing the final plat. (ECC 8-6-7[B]) 14. To allow for the future installation of municipal fiber-optic cable, the applicant shall be required to install fiber-optic conduit lines along all streets in accordance with the City's Fiber Master Plan. Upon completion of the installation of the municipal fiber-optic conduit lines, the applicant shall provide GIS coordinates of the locations of the municipal fiber-optic conduit lines. The municipal fiber-optic conduit lines shall be installed, GIS coordinates provided, and the fiber-optic conduit lines shall be dedicated to the City prior to the City Clerk signing the final plat. 15. All plat notes that are required on the preliminary plat shall be transferred to the final plat prior to submittal of a final plat application. NOTE: In the event a Standard Condition of Approval conflicts with a Site Specific Condition of Approval contained herein the Site Specific Condition of Approval shall control. STANDARD CONDITIONS OF APPROVAL: 1. The applicant shall comply with all requirements of the Ada County Highway District and/or the Idaho Transportation Department, including but not limited to approval of the drainage system, curbs, gutters, streets and sidewalks. 2. Correct street names, as approved by the Ada County Street Name Committee, shall be placed on the plat prior to the City Engineer signing the final plat. 3. Complete water and sewer system construction plans shall be reviewed and approved by the City Engineer. Required improvements shall include, but not be limited to, extending all utilities to the platted property. The developer may submit a letter in lieu of plans explaining why plans may not be necessary. 4. Idaho Department of Health& Welfare approval of the sewer and water facilities is required prior to the City Engineer signing the final plat(I.C. Title 50,Chapter 13 and I.C. 39-118). 5. Written approval of all well water for any shared or commercial well shall be obtained from the Idaho Department of Water Resources prior to the City Engineer signing the final plat. 6. Unless septic tanks are permitted, wet line sewers will be required and the applicant will be required to furnish the City Engineer with a letter from the sewer entity serving the property, accepting the project for service,prior to the City Engineer signing the final plat. 7. All homes being constructed with individual septic systems shall have the septic systems placed on the street side of the home or shall have their sewer drainage system designed with a stub at the house front to allow for future connection to a public sewer system. 8. Per Idaho Code, Section 31-3805, concerning irrigation rights, transfer and disclosure, the water rights appurtenant to the lands in said subdivision which are within the irrigation entity will be transferred from said lands by the owner thereof; or the subdivider shall provide for underground tile or other like satisfactory underground conduit to permit the delivery of water to those landowners within the subdivision who are also within the irrigation entity. Page 11of16 K:\Planning Dept\Eagle Applications\SUBS\2023\Ambrosia Garden Sub\Working Files\Ambrosia Gardens PZF.doc See Eagle City Code Section 9-4-1-9(C), which provides overriding and additional specific criteria for pressurized irrigation facilities. Plans showing the delivery system must be approved by a registered professional engineer and shall be approved by the City Engineer prior to the City Engineer signing the final plat. 9. The applicant shall submit a letter from the appropriate drainage entity approving the drainage system and/or accepting said drainage; or submit a letter from a registered professional engineer certifying that all drainage shall be retained on-site prior to the City Engineer signing the final plat. A copy of the construction drawing(s)shall be submitted with the letter. 10. Drainage system plans shall be submitted to the City Engineer for review and approval prior to the City Engineer signing the final plat. The plans shall show how swales, or drain piping, will be developed in the drainage easements. The approved drainage system shall be constructed, or a surety shall be submitted to the City Clerk, prior to the City Engineer signing the final plat. The CC&R's shall contain clauses to be reviewed and approved by the City Engineer and City Attorney, prior to the City Engineer signing the final plat, requiring that lots be so graded that all runoff runs either over the curb, or to the drainage easement, and that no runoff shall cross any lot line onto another lot except within a drainage easement. 11. No ditch, pipe or other structure, or canal, or drain, for irrigation water or irrigation waste water owned by an organized irrigation district, canal company, ditch association, drainage district, drainage entity, or other irrigation entity, shall be obstructed, routed, covered or changed in any way unless such obstruction, rerouting, covering or changing has first been approved in writing by the entity. A Registered Engineer shall certify that any ditch rerouting, piping, covering or otherwise changing the existing irrigation or waste ditch(1)has been made in such a manner that the flow of water will not be impeded or increased beyond carrying capacity of the downstream ditch; (2)will not otherwise injure any person or persons using or interested in such ditch or their property; and (3) satisfied the Idaho Standards for Public Works Construction. A copy of such written approval and certification shall be filed with the construction drawing and submitted to the City Engineer prior to the City Engineer signing the final plat. 12. Encroachments including,but not limited to, landscaping, fencing, lighting,and/or pathways shall not be located within any easement or right-of-way for any ditch,pipe or other structure, or canal, or drain, used for irrigation water or irrigation waste water without the express written approval of the organized irrigation district, canal company, ditch association, drainage district, drainage entity or other irrigation entity associated with such ditch, pipe or other structure, drainage or canal. The applicant shall submit a copy of the written approval from the irrigation entity, drainage district,or drainage entity prior to the City Clerk signing the final plat. 13. Street light plans shall be submitted and approved as to the location, height and wattage to the City Engineer prior to the City Engineer signing the final plat. All construction shall comply with the City's specifications and standards. The applicant shall delineate on the face of the final plat an easement, acceptable to the City Engineer, for the purpose of installing and maintaining street light fixtures, conduit and wiring lying outside any dedicated public right-of-way, prior to the City Engineer signing the final plat. Whether located inside or outside of the public right-of-way the perpetual maintenance of the street lights shall be the responsibility of the applicant, subdivider, business owner, homeowner, or homeowner's/business owner's association,whichever the case may be. The applicant shall pay applicable street light inspection fees on the proposed subdivision prior to signing of the final plat by the Eagle City Engineer. Page 12 of 16 K:\Planning Dept\Eagle Applications\SUBS\2023\Ambrosia Garden Sub\Working Files\Ambrosia Gardens PZF.doc 14. The applicant shall submit cut sheets showing street lighting details for review and approval by the Zoning Administrator prior to the submittal of the final plat. The plans shall show how the streetlights will facilitate the"Dark Sky"concept of lighting. 15. The applicant shall provide utility easements as required by the public utility providing service, and as may be required by the Eagle City Code,prior to the City Engineer signing the final plat. 16. An approval letter from the Eagle Fire Department shall be submitted to the City prior to the City Engineer signing the final plat. The letter shall include the following comments and minimum requirements, and any other items of concern as may be determined by the Eagle Fire Department officials: a. The applicant has made arrangements to comply with all requirements of the Fire Department. b. The proposed fire hydrant locations shall be reviewed and be approved in writing by the Eagle Fire Department prior to the City Engineer signing the final plat. c. Minimum flow per hydrant shall be 1,000 gallons per minute for one and two family dwellings, 1,500 gallons per minute for dwellings having a fire area in excess of 3,600 square feet, and 1,500 gallons per minute (i.e.; Commercial, Industrial, Schools, etc.). Flow rates shall be inspected in accordance with all agencies having jurisdiction, and shall be verified in writing by the Eagle Fire Department prior to issuance of any building permits. d. The proposed fire protection system shall be reviewed and approved by the Eagle Fire Department prior to issuance of a building permit. 17. Covenants, homeowner's association by-laws or other similar deed restrictions, acceptable to the Eagle City Attorney which provide for the use, control and mutual maintenance of all common areas, storage facilities, recreational facilities, street lights or open spaces shall be reviewed and approved by the Eagle City Attorney prior to the City Engineer signing the final plat. A restrictive covenant must be recorded and a note on the face of the final plat is required, providing for mutual maintenance and access easements. Appropriate papers describing decision-making procedures relating to the maintenance of structures, grounds and parking areas shall be reviewed and approved by the Eagle City Attorney prior to the City Engineer signing the final plat. 18. Should the homeowner's association be responsible for the operation and maintenance of the storm drainage facilities, the covenants and restrictions, homeowner's association by-laws or other similar deed restrictions acceptable to the Eagle City Attorney shall be reviewed and approved by the Eagle City Attorney prior to the City Engineer signing the final plat. 19. The applicant shall submit an application for Design Review, and shall obtain approval for all required landscaping, common area and subdivision signage prior to the City Engineer signing the final plat. 20. Any recreation area, greenbelt area or pathway area along the Boise River, Dry Creek or any other area designated by the City Council or the Eagle Parks, Pathways, and Recreation Commission for a path or walkway shall be approved in writing by the Eagle City Parks, Pathways, and Recreation Commission prior to approval of the final plat by the City Council. 21. Conservation, recreation and river access easements(if applicable) shall be approved by staff and the City Engineer and shall be shown on the final plat prior to approval of the final plat by the City Council. Page 13 of 16 K:\Planning Dept\Eagle Applications\SUBS\2023\Ambrosia Garden Sub\Working Files\Ambrosia Gardens PZF.doc 22. The applicant shall place a note on the face of the plat which states: "Minimum building setback lines shall be in accordance with the applicable zoning and subdivision regulations at the time of issuance of the building permit or as specifically approved and/or required". 23. The applicant shall comply with the provisions of the Eagle City Code, pertaining to floodplain and river protection regulations(if applicable)prior to the City Engineer signing the final plat. 24. The development shall comply with the Boise River Plan (if applicable) in effect at the time of City Council consideration of the final plat. 25. The applicant shall obtain written approval of the development relative to the effects of the Boise River floodplain(if applicable) from the Corps of Engineers prior to approval of the final plat by the City Engineer. 26. The applicant shall obtain approval of the development relative to its effects on wetlands or other natural waterways(if applicable)from the Corps of Engineers and the Idaho Department of Water Resources and/or any other agency having jurisdiction prior to the City Engineer signing the final plat. 27. Basements in homes in the floodplain are prohibited. 28. The Americans with Disabilities Act, Uniform Building Code, Eagle City Code, Eagle Comprehensive Plan, and all applicable County, State and Federal Codes and Regulations shall be complied with. All design and construction shall be in accordance with all applicable City of Eagle Codes unless specifically approved by the Commission and/or Council. 29. Any changes to the plans and specifications upon which this approval is based, other than those required by the above conditions, will require submittal of an application for modification and approval of that application prior to commencing any change. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest submits application to the City of Eagle for a change to the planned use of the subject property. 30. No public board, agency, commission, official or other authority shall proceed with the construction of or authorize the construction of any of the public improvements required by the Eagle City Code Title 9 "Land Subdivisions" until the final plat has received the approval of the City Council(ECC 9-6-5 (A)(2)). After Council approval of the final plat, the applicant may construct any approved improvements before the City Engineer signs the final plat. The applicant shall provide a financial guarantee of performance in the amount of 150% of the total estimated cost for completing any required improvements (see resolution 98-3) prior to the City Engineer signing the final plat. The financial guarantee shall be a Letter of Credit, Certificate of Deposit, cash deposit or certified check. 31. In accordance with Eagle City Code, failure to obtain a recorded final plat for the subdivision within one year following City Council approval shall cause this approval to be null and void, unless a time extension is granted by the City Council. 32. Prior to submitting the final plat for recording, the following must provide endorsements or certifications: Owners or dedicators, Registered Land Surveyor, County Engineer, Central District Health Department, Ada County Treasurer, Ada County Highway District Commissioners,City Engineer,and City Clerk. 33. The City's actions on the application does not grant the applicant any appropriation of water or interference with existing water rights. The applicant indemnifies and holds the City harmless for any and all water rights, claims in any way associated with this application. Page 14 of 16 K:\Planning Dept\Eagle Applications\SUBS\2023\Ambrosia Garden Sub\Working Files\Ambrosia Gardens PZF.doc 34. The applicant shall take care to locate and protect from damage existing utilities, pipelines and similar structures. Documentation indicating that "Digline" has performed an inspection of the site shall be submitted prior to the issuance of any building permits for the site. 35. Place a note on the final plat which states in general that surrounding land with farm uses and related activities shall be protected pursuant to the Idaho Right to Farm Act. 36. The applicant shall install at the entrance to the subdivision a 4' x 4' plywood or other hard surface sign(mounted on two 4"x 4"posts with the bottom of the sign being a minimum of 3-feet above the ground) noticing the contractors to clean up daily, no loud music, and no dogs off leash. 37. The applicant shall provide a "Heavy Truck Traffic Plan" to be followed by any vehicle or equipment over 8000 GVWR. The plan shall show all designated routes and hours of operation. The heavy truck traffic routes shall maximize use of highways and major arterials while minimizing use of smaller residential streets. The plan will also cite that compression braking is prohibited everywhere in Ada County. The applicant is responsible for communicating the approved plan to all sub-contractors and for monitoring compliance. 38. The applicant shall provide a construction site dust control mitigation plan to be reviewed and approved by staff prior to the issuance of a"Notice to Proceed"with construction letter CONCLUSIONS OF LAW: 1. The Commission reviewed the particular facts and circumstances of this proposed preliminary plat (PP-04-23) and based upon the information provided concludes that the proposed preliminary plat application is in accordance with the City of Eagle Title 9(Subdivisions)because: a. The requested preliminary plat complies with the approved zoning designation of MU-DA (Mixed Use with a development agreement[in lieu of a PUD]). b. The subdivision will be harmonious with and in accordance with the general objectives of Title 9 of the Eagle City Code since the development is consistent with the Comprehensive Plan Land Use Map designation of Mixed Use, as shown within the findings provided within this document; c. The subdivision will be served adequately by essential public facilities such as streets, police and fire protection, schools, drainage structures, refuse disposal, water and sewer; or that the persons or agencies responsible for the establishment of the proposed use shall be able to provide adequately any such services, as noted in the documentation provided from said agencies and as required as a part of the conditions of approval; d. That based upon agency verification and additional written comments of ACHD, Eagle Fire District, and Eagle Sewer District as conditioned herein, there is adequate public financial capability to support the proposed development; e. There are no known capital improvement programs for which this development would prevent continuity; f. That any health, safety and environmental problems that were brought to the Commission's attention have been adequately addressed by the applicant or will be conditions of the preliminary plat and subsequent final plat approval as set forth within the conditions of approval herein. Page 15 of 16 K:\Planning Dept\Eagle Applications\SUBS\2023\Ambrosia Garden Sub\Working Files\Ambrosia Gardens PZF.doc DATED this 5th day of September, 2023. PLANNING AND ZONING COMMISSION OF THE CITY OF EAGLE Ada County,Idaho Trent Wright,Chairm �,,,', JEST: C o EA ., 0, sslk O.,,,,,,,,. .,`S ORAT'. . Tracy E. born,Eagle City Clerks : 04 ;u I. L � •. SE P � :•c .'.,ZtRPU? ' P�. ♦ tr G t, Page 16 of 16 K:\Planning Dept\Eagle Applications\SUBS\2023\Ambrosia Garden Sub\Working Files\Ambrosia Gardens PZF.doc EXHIBIT"A" 3 1 7 4 - F^ I 9tl>WllrnilR 36�N 'tl0 ,/ ONW 4wp�r0•"T o A 'M1MtlY1 _ _?.___--...- __'MN n .33 /ON °MI00*,os ON 100000 MOON WI m 9Hua0ual www l 1.9EE'ESE'902 y f0 -- — k. (�4 SO[E9 01'...9 1902'a15'antl�IA'S EZE2 + p- IKN.1 30Hrtl'NWI r V NI 301 6 *91*0 Jo 00 I �_ ' wuela'r+�3a�3ns puel•uaaulau au llnsua 9t T M'" /"//o xouaoa r w n1n9s OW so nxna r 'DWI•SM33NIDN3 M01W'1 N3J ,�!. uo!s!Aipgns uap B9 etsaquld maroon x.,o O N�lr. ,;,i aN -s-ky aM v NW Mho SO TON s uu 0 r r�r 008 y •-r 'ro A9/10ra i OS3OI 'A3n `9 f%mi., OBId,G9mw!IaJd Suors!Aay A-;,..,rs F g. iIIiI „FeM1IH 1S2lS M - R wars ONINN —' — g 6€ $ a'g'_ 11 z MilttR y g y kla� 4 I� �I, aua u9 i / f I� �'I l! gpsi xlg2�s lsXPII 8 g 1 t I, / S9o'9zro ,. '� 1 • a ea'u" 1 g 5 1 II / I 1 mil. _�_ 11 B a a F �li i— I _ 552 : 11 s g 1 1 P III l �,, yVlAllk,t�j( II = v k5 , ff g ,� a ,1 H .VI MN ero•', iI a 1g 2hil p R 1 `h'1 I 4 \ 4 j / ® I �;j I 11@��t A b y EQ � � \ y, II 3.RRR...AR3 dtl 1i98 i� � / 11 11 l �� II I I � s 8 I ; I 3 I ;y- e Y w $ i as 4 4; ' j I1.IB' £ •4s ` • ' ' e 1 i , a • 1 2 4 _ i i5 I II j I .... 1 1 I I I' 1 Il : I ; ! li z # /I N d(4,,,,' ,.....,,L..,--- . II I ,t 1 p"s@ $ r ks g £ ' 1"� O a t I ? ;: I ro� I .I _ — �� 1 66 ' 71 z e - - y - ' - - - £ . o I ' -I'; 1 ...) l`-- I I I avm�' C 1 I / .11. IR 4,111 I li 1 1 I I' , ) \ 1191 / ,, UI �•? 1� 11 Y 3� 3 I , Ear 24 T i II®.w' 9 JR,fir- asL ,• {p II fl �'� ' ypw' 4 IM 1' ®v gm' j'-Ia 1 —_1 `- F ii. ! j III I' _� �`11 M —1 11� \I,�� 1 I1 I I I' v \\\I �I' III 1 R , •,, ®F � � V'}...a s /I11\A I��lIYA_1� -----1 a �____— �Y --� ' II ® KM o ,J 1 1 I j *, 1 01 I 1 V a^ luluiE2M . g g" 1 gNi 111 $,, ke g g - AAA gstgg g SIR . i Y;Al iggIgg v 11 I I I I " 1 1 1 I I 1117 I I 1 11 II I . I ; ; 11 1 31 I ' 1 1 11 ' I 3 1g ; ' I I II! IePaaePI bz� PFk OO®OC I 10 1 I l 1 � 3 III �r i e l Ili ; I II ;li1 1 1 ,IIII cow 403N1O,,,,4 OS•tCZ1105 OB vlme I are n+Smool 91999'n IVO 30I1 CAW 10/1O0 MI LOSII .01800133'auwx �W OIAVI'AINoOO 3QI 31099 10.WO'NYgB311 yy S°LEB 01 xIOB 19°2'xS'iAY e9sIA'9 E2E? 4. a 3908 1�'1 331m1'0W09♦3051601'ZI 00113E 10 B31Bm0 WPM N vauueld 1.19Launi pun Inauglu3 8u131nsu9 1 UOlsl 30l 30 NOWM)d Y W 31Mll5 OW D WW1 Y a-< ROC ro aea 9315 i9owlg0 33?9 A 9W „' 1 IBEE'E BBZ ` 10 AU G a-- y UOISIAI R UB 133 E1SO1 - - ---- ---- --- WWI'JNI'$M33N1'JN3 NOIMILW37 r�„1''. •,/ .. .P9 S P 1J Q�+V -K1 O y0 �O , .a/31V0I 'x3a�'Aaa f101 ro 3 a 4 N ,11niN leld,C.lemmgaOd su°9SIAay �'. MONO WSW 1033 SW 53110n91 M.91Vrl CI 7 r _3 a1B1S'M mK^ .99'Z MIK. jill . Y _ 1 9 _ - - 0'— Xa 19I .- C e,SZ;i Etk Pik__ y pp 530OY NA S ball 5 101 -nn9--.- iy w. • a 14.3 44* 1 1 mN 91,0 * 5 0�61 g 3 B z I N 2 i 539N KO 4 199'R 9 i Ci03 $ a @ I U 9 3 I I P°IR O " - f l i g I d e @ 6 10anS A11W°[lsaM A0` Alit 3nal®s'oal.l i 4 t s 01 tl C r 1. 11IiInsi i ra J SRo/Zv0 C I 1 I E 211311 I Z103 ¢ I oO • • • -IF+ O 1II G .9I Ili 3°pins on IC a I aF a $ I ti a� z 'n R O W 5393 NO p !: 15 Z%'9C p. Iw 1 101 la a .0 Si 1 J } try ( • ¢\ ell EMI,55'9OZ /A99A16913 • C,U1U 13nId 1s1M R I 6'' u°Is1AIPgnS ma!AAIS 5 E