Loading...
Minutes - 2023 - Design Review - 05/25/2023 - RegularTHE CITY OF EAGLE DESIGN REVIEW BOARD May 25, 2023 Minutes 1. CALL TO ORDER: Meeting called to order at 6:03 p.m. Madam Chairman Merrill presiding. 2. ROLL CALL: Present: SAYER, DUPERAULT, LINDGREN, MERRILL, MIHAN, GREER. Absent: GRUBB. A quorum is present. ALL CONSENT AGENDA ITEMS ARE CONSIDERED ACTION ITEMS. CONSENT AGENDA: ♦ Consent Agenda items are considered to be routine and are acted on with one motion. There will be no separate discussion on these items unless a Design Review Board member or City Staff requests an item to be removed from the Consent Agenda for discussion. Items removed from the Consent Agenda will be placed on the Regular Agenda in a sequence determined by the Rules of Order. Any item on the Consent Agenda that contains written recommendations from the City of Eagle shall be adopted as part of the Design Review's Consent Agenda approval motion unless specifically stated otherwise. A. Findings of Fact and Conclusions of Law for the Approval of DR-19-23 — Common Area Landscaping within Valnova Subdivision Lot 22 — GWC Capital, LLC: GWC Capital, LLC, represented by Eric Langvardt with Langvardt Design Group, is requesting design review approval for the common area landscaping within Valnova Subdivision — Lot 22 (Spring Valley PUMP No. 1). The 8.09-acre site is generally located approximately 3/4-mile northeast of the intersection of State Highway 16 and Equest Lane (approximately 1-mile north of Beacon Light Road and Linter Road intersection) (Ada County Assessor parcel numbers S0323336000 and S0323110015). (BAW) B. Findings of Fact and Conclusions of Law for the Approval of DR-22-23 — Common Area Landscaping within Rocking A Ranch Subdivision — Alscott Real Estate, LLC: Alscott Real Estate, LLC, represented by Rodney Evans with Rodney Evans + Partners, LLC, is requesting design review approval for the common area landscaping within Rocking A Ranch Subdivision. The 171.9- acre site is located on the east side of North Eagle Road, approximately 1,300-feet north of East Beacon Light Road at 3980 & 3250 North Eagle Road, 372 East Beacon Light Road, and Lots 1, 2, 3, & 4, Block 1, Equestrian Estates Subdivision No. 1. (ERG) C. Findings of Fact and Conclusions of Law for the Approval of DR-23-23 — Two Subdivision Entry Features with Gates and Four Subdivision Entry Monument Signs for Rocking A Ranch Subdivision — Alscott Real Estate, LLC: Alscott Real Estate, LLC, represented by Rodney Evans with Rodney Evans + Partners, LLC, is requesting design review approval for two subdivision entry features with gates and four subdivision entry monument signs for Rocking A Ranch Subdivision. The 171.9acre site is located on the east side of North Eagle Road, approximately 1,300-feet north of East Beacon Light Road at 3980 & 3250 North Eagle Road, 372 East Beacon Light Road, and Lots 1, 2, 3, & 4, Block 1, Equestrian Estates Subdivision No. 1. (ERG) Mihan present at 6:05 p.m. Duperault, Sayer and Greer abstain from voting on the Consent Agenda. Lindgren moves to approve the Consent Agenda. Seconded by Mihan. ALL AYE ... MOTION CARRIES. Lindgren and Mihan recuse themselves from items 5A, 513, and 5C. 4. UNFINISHED BUSINESS: None. Page 1 of 3 KADADR-05-25-23m in.dou 5. NEW BUSINESS: A. ACTIONITEM: DR-18-23 —Apartment Buildings [incl. 1,000-SF Retaill, and Common Area Landscaping within Molinari Park Subdivision — Silverado Management: Silverado Management, represented by Walter Lindgren with Lindgren:Labrie Architecture, is requesting design review approval for three (3) apartment buildings (one — 61,423-SF [including 1,000-SF retail], one — 82,686SF, one — 87,807-SF) and common area landscaping within Molinari Park Subdivision. The 7.16-acre site is located on the south side of East Plaza Drive approximately 1,200-feet east of the intersection of South 2nd Street and East Plaza Drive at 401 East Cedar Ridge Street. (ERG) Walter Lindgren with Lindgren:Labrie Architecture, 247 N. Eagle Road, Eagle, provides an overview of the application and responds to questions from the Board. Jim Milian, 2002 S. Vista, Boise, responds to questions from the Board regarding the landscape design. City Planner Emily Gero provides an overview of the application and responds to questions from the Board. Board discussion. Greer moves to approve DR-18-23 Apartment Buildings of Molinari with the conditions advised by staff and Board conditions. SSC# 1 and 2 to remain. Strike SSC# 3 on the 10-foot sidewalk. SSC# 4 is approved with the cross section of the building showing the rooftop mechanicals as presented by the applicant. SSC# 5 strike language. Replace language with: The landscape plan date stamped May 251h is approved. SSC#6 to remain. Add a pedestrian connection across the pathway from the shared parking through the proposed and existing planting beds. SSC# 7-13 to remain. Add SSC# 14 —Ask that the mail collection for each building be allowed assuming the US Postal Service approves the design and locations. Seconded by Sayer. THREE AYES, ONE NAY (DUPERAULT) ... MOTION CARRIES. B. ACTIONITEM: DR-24-23 — Office (Business and Professional) Building in Eagle Island Crossing —Aspire Realty Group: Aspire Realty Group, represented by Walter Lindgren with Lindgren:Labrie Architecture, is requesting design review approval for a 5,886-square foot office (business and professional) building within Eagle Island Crossing. The 0.55-acre site is generally located northeast of State Highway 44 and North Fisher Park Way at 62 North Fisher Park Way within Eagle Island Crossing (Lot 9, Block 2, Arts West Subdivision No. 2). (ERG) Walter Lindgren with Lindgren:Labrie Architecture, 247 N. Eagle Road, Eagle, provides an overview of the application and responds to questions from the Board. Brett Stimpson, 32 N. Fisher Park Way, Eagle, responds to questions from the Board regarding trash bin sizes and possible recycling. City Planner Emily Gero provides an overview of the application and responds to questions from the Board. Page 2 of 3 KADAD R-05-25-23m in. docx Merrill moves to approve DR-24-23 Office Building in Eagle Island Crossing with the site specific conditions including: Item number 3 that the existing pad will be sufficient and does not include any recycling. Strike number 2 as it was provided today to staff. Seconded by Sayer. ALL AYES... MOTION CARRIES. C. ACTIONITEM DR-25-33 — Two Building Wall Signs for Aspire Realty Group —Aspire Realty Group: Aspire Realty Group, represented by Walter Lindgren with Lindgren: Labrie Architecture, is requesting design review approval for two halo illuminated building wall signs. The 0.55-acre site is generally located northeast of State Highway 44 and North Fisher Park Way at 62 North Fisher Park Way within Eagle Island Crossing (Lot 9, Block 2, Arts West Subdivision No. 2). (ERG) Walter Lindgren with Lindgren:Labrie Architecture, 247 N. Eagle Road, Eagle, provides an overview of the application and responds to questions from the Board. City Planner Emily Gero provides an overview of the application and responds to questions from the Board. Merrill moves to approve DR-25-23 Two Building Wall Signs for the Aspire Realty Group. Strike number I as the sideview and night view have been provided by the applicant today. Seconded by Duperault. ALL AYES ... MOTION CARRIES. REPORTS: A. Design Review Board: None. B. Staff: City Planner, Emily Gero, provides an update regarding the items scheduled for the next Design Review Board meeting. ADJOURNMENT: Sayer moves to adjourn. Seconded by Greer. ALLAYES... MOTION CARRIES. Hearing no further business, the Design Review Board meeting adjourned at 7:57 p.m. RESPECTFULLY SUBMITTED: 14444 7& Ajmft� CHARLOTTE HUBINGER, CLERK OF THE MEETING APPROVED: R(IB RT RUBB, CHAIRMAN AN AUDIO RECORDING OF THIS MEETING IS AVAILABLE FOR DOWNLOAD AT WWWCITYOFEAGLE.ORG. Page 3 of 3 K: \D AD R-05-25-23m in. docx 3 APARTMENT BUILDINGS [INCL. 1,000-SF RETAIL], AND COMMON AREA LANDSCAPING WITHIN MOLINARI PARK SUBDIVISION DR-18-23 Eagle Design Review Board Meeting May 25, 2023 City Staff: Emily R. Gero, Planner II Phone: 939-0227 E-Mail: Vicinity Map 6/21/2023 6/21/2023 Landscape Details Landscape Details Landscape Details Building A Floor Plans Building B Floor Plans Building C Floor Plans 6/21/2023 13 14 6/21/2023 15 MR, N. Color Renderings" N � PW Parking Exhibit 6/21/2023 Z. 0 gpol. fALIMONIA L1A7H"dvG 7W, ASH 8 juno IUNO SUMFORM- LED SURFACE MOUNT DOWNUGHTS f0RJ[K)XINSIALLATK)N 5.,,—, 1 V, 13' RWhV —WAR JSFSERIES 19 20 BLADE 18-- D-Series Size 1 LED Wall L..i-i. 0 i" "!!— LDN6 10 6/21/2023 21 PJa 11 6/21/2023 23 24 12 6/21/2023 25 26 13 6/21/2023 27 28 IV SSC No. 5 • Building Design, Materials, and Colors — Deferred to the Board • Carport Lighting — SSC No. 2 • Pathway adjacent to Live/Work Units — SSC No. 3 • Rooftop Mechanical Units —SSC No. 4 r'aLnvvay iawus -- j-,)l.. iUu. Joint Parking Agreement — SSC No. 6 SSC No. 5 lip '�Ip I SSC No. 6 • Building Design, Materials, and Colors — Deferred to the Board • Carport Lighting —SSC No. 2 • Pathway adjacent to Live/Work Units — SSC No. 3 • Rooftop Mechanical Units —SSC No. 4 • Pathway Radius — SSC No. 5 joint i'arking Agreement — SSc No. b SSC No. 6 Summary • Building Design, Materials, and Colors — Deferred to the Board • Carport Lighting — SSC No. 2 • Pathway adjacent to Live/Work Units — SSC No. 3 • Rooftop Mechanical Units —SSC No. 4 • Pathway Radius — SSC No. 5 • Joint Parking Agreement — SSC No. 6 End of Presentation r, k OFFICE (BUSINESS AND PROFESSIONAL) BUILDING IN EAGLE ISLAND CROSSING DR-24-23 Eagle Design Review Board Meeting May 25, 2023 City Staff: Emily R. Gero, Planner II Phone: 939-0227 E-Mail: Vicinity Map 6/21/2023 ASPIRE REALTY -GROVP- 02i100RPUN MMANINE ,MMNlml Roof Plan Building Elevations 6/21/2023 Lighting Plan Issues of Special Concern • Building Design, Materials, and Colors — Deferred to the Board • Rooftop Mechanical Units — SSC No. 2 • Trash Enclosure Size — SSC No. 3 Building Design, Materials, and Colors • Building Design, Materials, and Colors — Deferred to the Board' • Rooftop Mechanical Units — SSC No. 2 • Trash Enclosure Size — SSC No. 3 Building Design, Materials, and Colors �® 6/21/2023 13 14 6/21/2023 15 16 Summary • Building Design, Materials, and Colors — Deferred to the Board • Rooftop Mechanical Units —SSC No. 2 • Trash Enclosure Size — SSC No. 3 End of Presentation Two BUILDING WALLS SIGNS FOR ASPIRE REALTY GROUP DR-25-23 Eagle Design Review Board Meeting May 25, 2023 City Staff: Emily R. Gero, Planner II Phone: 939-0227 E-Mail: Vicinity Map 6/21/2023 i �f SOUTH ELEVATION Z WEST ELEVATION 4 ASPIRE REALTY Ss G R O U P - r■ ASPIRE REALTY -GRouP- a DETAIL: LOGO AND LETTERS 2 6/21/2023 ASPIRE REALTY a Four -- I FASPI RE REALTY GIOUI- Z wes. c,cvnrwo 3 on" loco nxo nrrzu 6 3 6/21/2023 7 I. Provide aside view and night view of the building wall signs show ing the thickness of the letters, sign mounting. and how the signs are illuminated. The side view and night view of the signs shall be reviewed and approved by staff prior to the issuance of a sign permit. LOGO: REVERSE PAN CHANNEL LETTERS WITH 3 DEPTH RETURNS MINT TOP PORTKIN OF LOGO MATHEWS GREEN MATCH PANTONE PMS 356C SEMI -GLOSS FN. LOWERFOR TION MINTED BLACEN LED LMILKOW WHITE BACKERS WITH GREEN LED AT TOP TTO ■ AND WHITE LED HALO ILLUMINADON STAND LOGO OFF WALL 1 1,T FOR HALO LIGHTING ne LETTERS REVERSE PAN CHANNEL WITH 3'+- DEPTH PAINTED SEM111 OSS BLACK MATHEWS PAINT MILK WHITBACKERS WITH LETTERS 1 IIT OFF ASPIRE REALTY WALL FOR WHITE HALO ILLUMINATION WALL CONFIRM ACCESS BEHINDD WALLWKL FORFOR POWER ,.. GROUP SUPPLIESAT 120 VAC :S SF.. ROPU Prn w,Lt SGw) UNDERLINEROU TED IR-BLACK ACRYLIC WITH LOGO AND LETTERS 5 D"" �="' rtE ra sis NO ILLLUUMNATEDED STUD MWNDNG 8 0 Summary • Building Wall Signs — Deferred to the Board • Side and Night view of Signs— SSC No. 1 End of Presentation 6/21/2023 1 t n Eagle Island Crossing 62 N. Fisher Park Way Eagle Idaho 83616 2 W. STATE STREET .i Aerial Map o so 100 1 6/21/2023 EXISTING BUILDINGS IN EAGLE ISLAND CROSSING - SODALICIOI 3 t _ n VIEW TO SOUTHWEST — FULCRUM HOME LOANS 4 VIEW TO WEST — EXISTING PARKING LOT ADJACENT =;P 4 2 6/21/2023 VIEW TO NORTH —RESIDENTIAL NEIGHBORHOOD Armu— VIEW TO EAST — RESIDENTIAL NEIGHBORHOOD 5 GENERAL NOTES .� -. PROJECT INFORMATION^ I 00 ( f. I I I —"'J ,`• 1 DESIGN TEAM - sl� PLAN I 1 JSMEET NOTES _. w _A1.1ffn I 3 6/21/2023 SOUTH ^, s BAIRD _ L.. LANDSCAPE CALLOUT o o LEGEND a u — G w � �' I G' PLANT SCHEDULE —� •� m - " m .. G o LANDSCAPE _. _ J PLAN DSCAPE REQUIREMENTS_ I LAN ILAHDSCAPE PLAN - -........_.........r.,..,..>... _. - _ .--- 1_ SEE SHEET L1.2 FOR LANDSCAPE NOTES AND DETAILS _ L1 •� 7 } BAI RIk ^_ i � ---••- RD LANDSCAPE NOTES n SHRUS PLANTING -� �_-P, v /2P NNULL 6GRWNOCOVERR IRRIGATION NOTES:' ofvrt.eEv,fw y�� •_-_ - - LANDSCAPE -- - - �. •,._•.•••. - - NOTESAND DETMS •/\ KEYSTONE COUNTRY MANOR— �+- nDECIDUW5IREE FLAMING _..r. li RETAINING WAILLJ' SEE SHEET 1-I.1 FOR LANDSCAPE PLAN 1. 8 m 6/21/2023 Q Q O O O O Q Q ASPIRE REALTY O - - y --- - - - - -- 1 O __6FT1—.- -.I II +� } ! §3 O � - � <a 0 &LT� ao 2 FLOOR PLAN-MEZUNINE .. ��....r p. V ' a — - . ROOR PUN .\.1 FLOOR PUN- MAIN LEVEL �A2.1� 1 1 C C! E O r!) U ASPIRE REALTY rl U I a� q� a ROOF PLANwk 1� 1..... —A5.1 10 5 6/21/2023 1 euanu«: sEcnM C) O (7 n C3_ CD ZsuTING S cnIX 11 12 6/21/2023 EXTERIOR FINISH SCHEDULE LC QL ! x�.C• �;.` 'j SOUTH ELEVATION =% `-^•� e .v jEXTERIOR - ELEVATIONS ,t. 2 WEST ELEVATION A6.2t 13 27EPo00. HNLGi SCHEDULE I •' r.__ wsaw,-,�, uxD4aen:intue 1 SOUTH ELEVATION - �••••• �:� !-.� xK.a R� p-t rrb-• a � xfnn R mr.:. ..`.`. ... OF9f 10.�11 E EXTERIOR �•y�, EIEYATIONz 2 WEST ELEVATION A6.2 14 7 6/21/2023 2 NORTH ELEVATION 15 2 NORTH ELEVATION 16 1 EASTELEVATION EXTERIOR FINISH SCHEDULE a IF �•T I'- �— EXTERIOR ra ELEVATIONS Y. hash End— A6.1 EXTERIOR FINISH SCHEDULE EAS ELEVATION EXTERIOR -•-sl^�� ELEVATIONS �w Y Trash Enclosure A6.1 w N 6/21/2023 1/ W rm JR1, 0,11 _ '"��— �,�5. 3 d 18 wt 6/21/2023 19 rMTO1C SGL� GUT® "_ASPIRE REALTY GROUP [j LOI SCAT FIE 7L 9 �. i (TOTAL 2K rv.:19i6�1 WEST ELEVATION SCALE: 1/6-=1'-0- LOGO: REVERSE PAN CHANNEL LETTERS WITH 3' DEPTH RETURNS PAINT TOP PORTION OF LOGO MATHEWS GREEN MATCH PANTONE PHIS 356C SEMIGLOSS N. LOWER PORTION PAINTED BLACK SEMIGLOSS MILK WHITE BACKERS WITH GREEN LED AT TOP AND WHITE LED HALO ILLUMINATION STAND LOGO OFF WALL i IX FOR HALO LIGHTING LETTERS REVERSE PAN CHANNEL WITH T.- DEPTH PAINTED SEMIGLOSS BUCK MATHEWS PAINT MILK WHITE BACKERS WTTH LETTERS I t2'OFF WALLFOR WHITE HALO ILLUMINATION CONFIRM ACCESS BEHIND WALL FOR POWER SUPPLIESAT 120 VAC UNDERLINE ROUTED 1R' BUCKACRTLIC WITH f.T]Nf.FAI FD STI ID M[N INTNG � ASPIRE REALTY GROUP � O .... >n..,..,.. ... .dI ter.. a.-i 10 6/21/2023 SOUTH ELEVATION SCALE: 1/8'=1'-0' g9lden west ASPIRE REALTY GROUP 21 D�O 11 6/21/2023 ` 1 e A Design Review Application for a New 200-Unit Multi -Family Development for Molinari Park Eagle, Idaho — }"l. I" f 4 - yIN Molinari Park Multi -Family Developer: Y Silverado Management ��- Joe Brown Dave Hunter 2 1 POW "Vow. a a�5 Vi-ofE Cedar Ridge Street!ookng West M_ SITE PHOTOS - MOLINARI PARK 6/21/2023 ----------- - :ABLE PAVERS DRIVE AISLES PREUMNAW ti LAYWT PLAN DR2.1 ------------------ r --------------------- rn ass c If. SHF5T-V1.1- 0 to ')SHEET L1.3 .00 mill OS EE��LIA -------------- 0 �ZHEET 14 VICINIM�MAP - c: 0 0 0. L ---------------------- --- SHE'LT L1.5 0 It LANDSCAPE ET SHEINDEX C, .... 0 DISCLAIMER, --------------- 3 6/21/2023 1 LANDSCAPE LEGEND 1 � :-to 0 i It 0 • '1^y PLANT SCHEDULEM:�.�_ BUILDING A ilw _ O €J 1 1 r_ o 0 , 1 o i _ o _ 4 . . . . c . . . . "cc.. 1 1 - • EV.TCHl1NE-SEE It i ,rrrrr�--�--rrrrrrrNATCMLINE-EEE rr-----------rrrrr---�",.. ' , It 2 c +;;,�� ••• ••••^ — = N!'! LANDSCAPE RAN J•L CALLOW LEGEND o..,..-.r.. o..,..r.,_..... —Y L a C L �V1 M 2 c_0I 010 S+Or, RF/E\v LAND', L7.7' .- _ t LANDSCAPE LEGEND ------ -- ---TNE SEE 1 N-T-KIN11_ --- r g.ai l ..... I E .O. . . . % n 1 i[ . -:�•` ,� �+ PLANT SCHEDULEX'-'— w 1 BUILDING 8i --- .•." ..... _ ___ .. A.Y O ✓ 0. .,.,1 .. .' ,. N .> P 13 ...> , .•�t .. 1 - LANDSCAPE ' PLAN /1\ LANDSCAPE RAN T'J ll'—� ^ :,"��=' °•. _ • CALLOUT LEGEND c"=`•`�"'-•-• L7.2„1 4 6/21/2023 i I I 1 - LANDSCAPELEGEND '•`� f I 1 Iw O PLANT SCHEDULE:`::',.::..: i t�'�K�Sq�L Iv+ �...�.�....... .... •. ..�.J✓ co `cs'ncsi' BUILDINGC -r_ 'f� � .,..,.,� c•o . O . 1 r--------- 1 o ' tn-t NE 5EE L1J i ----------SE '—-- '--"-• A'AiCMII`IE-SEEL 1 O ( : lil LANDSCAPE PLAN LANDSCAPE PLAN CALLOUT LEGEND n=""==•' O=m=r Ds 00 Lt.3'41 10 5 6/21/2023 LANDSCAPE LEGEND ------------ ----- ------- MATCHLINE SEE Ll 4 Ic .0. 0 PLANT SCHEDULE=.'=--- BUILDINGC "o "D . . . . . . . . . . . .0. WCHLNE-SEEL1.4 r------------------ 1-5 ------ ----------- rErL LANDSCAPE PLAN CALLOUT LEGEND C)=---=,, 0::--,n— C) C) 00 11 2 HIT .......... . ......... LANDSCAPE LEGEND r------------------ -------------------- MTCHLNE-SEEL15 PLANT SCHEDULE=—.------ 0 M- —X 0 —27 CALLOUT LEGEND 12 LIA L1.5 11 6/21/2023 ".q FW CONCRrTESEATWALL Z 0 --- --- --- - .z PLAZA PAVER PATTERW 75 0 V) LANDSCAPE DETNLS �)S ';jZ TREE WWV7 6POM PATIO SLAB PATTERN TE,M . - 13 0 CKWE607GE CONIFEROUS TREE PLANTING GROUNDOOVER • 2 DECIDUOUS TREE PUNTMq 14 5 SHRUB PLANTING 6 WROUGKr IRON FENCE L2.0 mull 0 V) LANDSCAPE DETNLS 7 6/21/2023 i i Cfl� I U9 m "OPP, 0 POOLSIOE FmlWws 15 ---- ------------------ MOLINARI PARK - OVERALL PARKING EXHIBIT ",� - ig 16 PARKING F*l 6/21/2023 I ®R mg lap i AL 17 18 !r. 1 SLOG. A - GROUND LEVEL PLAN 00- F-I BLDG. A TUDOR PLAN GROUND UNEI -A2.lA 6/21/2023 uxocux.uuu m � I ' — Q L ED I...:. O C L a FF �� 12 I I •, i• I I I � p d� , i i n y _ ■ ,.._ a n—a ., FLOOR FUNw SECOND LEVEL l BLDG. A -SECOND LEVELPLAN A2.2A 19 O O n U J O rR 1BLDG. A -THIRD LEVEE PLAN 20 (0 Y e TS C L �,• xxaa — `• ' " •, ", RICC A Jl t FLOORPIAN THIRD Lau — r— KEY PIAN A2.3A 10 6/21/2023 4g, :n 1 BLDG. A- FOURTH LEVEL PLAN 21 Fl lz C: El n BLDG.A HOORPLAN FOURTHLEVEL YVAN -A2.4A 9 94 .... .......... . - - - ----- T a a 5 ru ROOF Pl,kN ----- ------ -- 1.L.G.-ROO"M .;KEY PLAN A25A 22 11 6/21/2023 TA EAST ELEVATION nt� Ll SOUTIIELEVAIM. BM A ELEVATIONS EAST & S" —ZZ7-- D A3.lA 23 MATERIAL& COLOR LEGEND ........ ...... :r 1WESTEINATION 10 :r2 NORTH ELEVATION S= A I LIMA IMIS NLST&NORN A c A3.2A 24 12 6/21/2023 r��3€ I, Vl :r I EMT ELEVATION (COURTYARD) Y", 2 WEST ELEVATION (COURTYARD) PR pw MATERIAL .StCOLOR LEGEND__ F1 .. .......... .. .. ............... jo DCVATCDLIRTYMD 'c -D KEY PLAN A33A 13 6/21/2023 W.— � 27 IT 0 15 '"RAN CROUNDLEVa A; A2.113 . . ....... .... ------ .. ..... Oil 40 (D O o DA . ..... ..... OOR �4 0 SEMNOLEVEL J-i I IL JT 11 . . .............. .. . ..... . ----- - 0 *!rjBLDG.B-SECd�D A2.213 28 14 6/21/2023 BDG. B-THIRD LEVEL PLAN 29 ., rr 1 BE B - FOURTH LEVEL PUN 30 j L I.C: LD i 1 p a 4 g2 Fl „ EJ BLDG.B � � FLOORP MEW I r— ___, �V'PUN A2.3B,r � Y e C L FtOOR mN C ; FOURTH LEVEL _ I l C � .KEY PUN A2.4B,• 15 6/21/2023 ------------- .......... pim� 0�- m o ... ..... . .. Fl ROOF FlAN —,A - ME— _J 6 6 ja 7,W-� j.lDG..-IIOOFP. �AISB 31 MATEWAL&CA LEGEND_ m"n ....... n LX-L ul 10 10 E] 1, A.- Ljuv- . . . M Flo EUYATKM EAST&SOUTH Ml 2 SOUTH ELEVATION AMB 32 16 6/21/2023 MATERIAL & COLOR LEGEND ld Olin —.0 n= J WEST ELEVATION 10 N-. 2 NORTH ELEVATION A ELEVATIONS WESTSNORTH _j A3.2B 33 ti SOUTH COURTYARD ELEVATION !n2 NORTHCO IRTYARDELEVATION 34 MATERIAL &COLOR LEGEND MINT'_ 20-1 Fl= am. B ELEVATIONS COURTYARD —,A -c d. A33B 17 6/21/2023 oil JL J t � R j,'' BUILDING'C' 35 36 * yam. 1 BLDG. C- GROUND LEVEL PLAN L3: J41 � y e � L 0 d BLDG.0 FLOOR PLAN I GROUND LEVEL IB REr v nn r A2.1C M 6/21/2023 *. !r jBLDG.C-SEaMDLMLPM 37 I& Y1 SLOG. C - THiRD LEVEL PLAN 38 1'L- c 1fa 0-1 SIM ms� RE� BLDG, C FLOOR PUN SECOND LEVEL ,A; r L --c wu .KEY PIAN -A2.2C ro 0 Um". . ... BLDG C FLOOR "" " E 10 LEVEL -c J i. B ..KEY PLAN A23C 19 6/21/2023 V,, M 1 BLOG. C• FONRM LEVEL PLAN 39 o_ o -- ID I � Y m _C L 1 0 a 1 �G Elf - H LJ ••• •, BIOG.0 FLOOR RAN FOUR7NLEVEL A -y FAN A2.4C., i t I C L o .___. .. O L1 g , z r i ROOF RAN - y ,J �, _Y_ 181OG. C- AOOF PLAN /�. KEY PIAN A2.5C,I 40 20 6/21/2023 WjLRIAL8�COLORUEGEqD-. -7 Fl Sr EAST ELEVATION m 0 0fr - tT Nn 2 SOUTH ELEVATION Kmc EkST&SOUTELEVATIONS H A L-8 t �MJC 41 MATERIAL & COLOR LEGEND 1WESTELEVATION c EO umc !IiM 2 NORTH ELEVATION ELEVATIONS WEST & NORTH A, o -- r 3 , A3.2C 42 21 6/21/2023 G END T T' :F- ISOLI'DACOURTYARDELLVATION .. ..... ................. 4T� 7-- m n= �-v UZI' . .... :r� 2 NORTH COURTYARD ELEVATION —R— BLDG, C ELEVATIONS COURTYARD A L -A3.3C 43 MATERIAL & COLOR LEGEND Fl COVERED PARKING FRONT ELEVATION (WP.) C: lo :'�-7 2 COVERED PARKING 510E ELEVATION MR) PAINNG &TRkkIENO- FLIT FRONT ELEVATIONS Fiib RIGHT HEAR ImM 3 TRASH ENCLOSURE ELEVATIONS jTFP.) A3.4 44 22 INTEGRAL PARKING STRUCTURE Overhead steel lattice assemblies connecting the primary OhIbuilding and parking structures create the effect that the parking structures aren't merely a 'tacked on' solution, but an extension of the building's architecture. The height and rhythm of these latticed connections are used to reinforce the onsite pedestrian circulation and create a more intimate and meaningful experience as residents and guests migrate from building to building. Vertical lattices with natural vegetation are introduced at both the ends and intermediate locations of these canopies to further obscure the view of parked vehicles. y 1 A ` I t ' Air am r A ` I t ' Air am r 6/21/2023 s ti Aw 47 a 48 24 6/21/2023 49 f � 50 _,._ram.• �: All 25 ^s , ,i L.IJ_ z,. IICcfF .��iV LIVE -WORK UNITS Commercial -like feel at the ground level with broader storefront openings and entry canopies. Units are located at the ends of the building wings adjacent to large courtyard areas, further reinforcing the commercial nature of these spaces. •r• 1v� FiA MIA t Mirk,� 6/21/2023 ke- µ�0 1. � l Questions? 53 27