Loading...
Building - 222777 - 402 E Presidio Ln - 05/25/2023Perrnit #: 222777 Property Owner ()wner A d dress Owner City State Zip Issue 'Date Fotmdation ()illy Issue Da B ui tder Name Builder Address Builder City State Zip Bui der 1 el ephone Builder Reczistration Subdivision City o Per it Eagle MOLINARI PARK DEVELOPMENT I...LC 402 II: PRESIDIO LN EA GILL 11) 83616 05/25/2023 e HOLMES HOMES INC 126 NV Sego Lily f)r #250 Sandy Li." 84070 so 1 -572-6363 RC'E - 59282 MOLINARI PARK SUB NO 01 Lot 08 Block 01 Property AcIlress 402 E PRESI DK) LN Type Deposit Receipt # 13.000569 Issue Receipt # 29.000572 !Living Area Square Feet' ['Porch Square Value or Improvement $209716 Feet' VEOLIA EN12 Fee. 1.',':agle Sewer 23.00083 lEaole Developtuent " ACV D Certificate .#11 Development/Impac Sq Ft. Living Sq Ft Porch Eie NVatcr Ni Basement SqltBillt1 I. Square Sq Ft. Grg 0 Feet) townhouse 2D Contractor's Printed NalTIC Contractor's Signature Clerk/Authorized Personnel Fees: New Home Plan Revlek., Deposit S200.00 P&Z, Review Fee, - Resi,iennal S50.00 iin gA& IV 1) Fee S1118.00 !hub:ling Pcrinit Fee $1,608.16 BuiLlinv RLlenizal PI,m Rvreu Fee 5362.86 Buildmg IFCC' - Resulom4.21 S50.00 Bialchng Impact re,.^ Fire S897.00 Budding Poitoe SI I 1.00 Building lrk ve foi,vnenr fee S1,1 15,72 kiudding Poilm",..iy Development impact s330.50 fe Torii! Fees 56,843.24 L es Deposit 1....ess Foundation Only iJanee Due Sti.o0 Call The City of Eagle Inspection Line (208) 939-4462 Said structure and/or use to conform to specifications and plans submitted and must be in full compliance with ordinances of the City of eagle subject to inspection permits and fees as required.