Loading...
Cost Share - 2023 - N. Channel Center Trail - Second Addendum To Cost Share Agreement - 4/13/2023 SECOND ADDENDUM TO COST SHARE AGREEMENT FOR REPAIR OF N.CHANNEL CENTER TRAIL THIS SECOND ADDENDUM TO COST SHARE AGREEMENT FOR REPAIR OF N. CHANNEL CENTER TRAIL is entered into as of the_day of April,2023,by and between the CITY OF EAGLE, an Idaho municipal corporation ("City")and B.B. One LC, and Idaho limited liability company("Owner"). City and Owner are sometimes collectively referred to as"Parties." RECITALS WHEREAS, City is constructing the Eagle Road Ped/Bike Bridge along Eagle Road. WHEREAS, as part of the project design for the Eagle Road PedBike Bridge, the City assumed responsibility for the N. Channel Center Trail that runs from the Eagle Road Bridge westward along the north channel of the Boise River in the North Channel Center development owned by Owner. WHEREAS high flows within the Boise River and human foot traffic have resulted in bank erosion along the N. Channel Center Trail which presents a great risk to the public trail system and risk to Owner's North Channel Center. WHEREAS the Parties desire to reduce the likelihood of future bank erosion in that area of the N. Channel Center Trail by designing, engineering and constructing/stabilizing repairs to said area. WHEREAS, the Parties entered into that certain Cost Share Agreement For Repair Of N. Channel Center Trail on April 13, 2022 and a First Addendum To Cost Share Agreement For Repair Of N Channel Center Trail on March 14, 2023, and Amendment To First Addendum To Cost Share Agreement For Repair ON. Channel Center Trail on April-, 2023 (collectively the "Cost Share Agreement") whereby the Parties agreed to share in all costs associated with the engineering, design, permitting, and construction related to the repair of the N. Channel Center Trail area with each Party paying 50%of the total cost. WHEREAS, City holds a greenbelt easement for a 600-ft section of the Boise River Greenbelt on the southwest side of the North Channel Center Development. WHEREAS,it has been determined that the most feasible bank stabilization occurs through the pinning of the bank restoration and stabilization under the City's 600-ft section of the Boise River Greenbelt. WHEREAS,the bank stabilization repairs required the removal of the 600-ft section of the Boise River Greenbelt trail section. SECOND ADDENDUM TO COST SHARE AGREEMENT FOR REPAIR OF N.CHANNEL CENTER TRAIL,page-9 WHEREAS the re-construction of the 600-ft section of the Boise River Greenbelt trail section is solely the financial responsibility of the City. WHEREAS Owner will agree to initially pay to re-construct the 600-ft section of the Boise River Greenbelt upon City agreeing to reimburse 100% Owner for all amounts paid. NOW, THEREFORE, based upon the mutual consideration,the receipt and sufficiency of which is hereby acknowledged,the Parties agree to the following addition(s): 1. Re-Construction Scone of Services: A new Exhibit C is added and incorporated into the Cost Share Agreement, setting forth the additional scope of work and cost associated with the re- construction of the of 600-ft section of the Boise River Greenbelt trail section.City shall reimburse Owner an amount not to exceed$58,740.00. CITY OF EAGLE: BB One LC: Dennis Baker Jason Pi 4mayor M Date:.{ ATTEST: Oka �• h f — Tracy Oorn, City Cle . • ,;¢' _; SECOND ADDENDUM TO COST SHARE AGREEMENT FOR REPAIR OF N. CHANNEL CENTER TRAIL page-2 Evolution Landscape&Nursery Inc. P.O. Box 2177 Eagle, ID 83616 _ Ir1, � .. hazel[c_welovetoplant.com � -L a jt �U LANDSCAPE AND NURSERY EStlmau ADDRESS ESTIMATE# 1078 BB One LC DATE 03/30/2023 1157 N.Summerbrook Ave. Suite 100 Meridian, ID 83642 PROJECT NAME JOB NUMBER North Channel Pathway Reconstru 23-205 -= C9IPTI0P. OT`' FATE AMOUNT Remove asphalt path and dispose 4,800 1.05 5,040.00 Excavate,and install drainage trenches as per plan 6 395.00 2,370.00 Add roadmix base and compact for concrete path (sq.ft.) 4,800 1.50 7,200.00 Concrete pathway installed 4,800 6.15 29,520.00 Sprinkler Modification 3 3,750.00 11,250.00 Fine grade for prep for sod or mulch 4,800 0.16 768.00 Square feet of Blue Grass/Rye sod installed 4,800 0.54 2,592.00 TOTAL ,740.00 Accepted By Accepted Date