Loading...
Cost Share - 2023 - N. Channel Center Trail Repair - Amendment To First Addendum To Cost Share Agreement - 4/13/2023 AMENDMENT TO FIRST ADDENDUM TO COST SHARE AGREEMENT FOR REPAIR OF N. CHANNEL CENTER TRAIL THIS AMENDMENT TO FIRST ADDENDUM TO COST SHARE AGREEMENT FOR REPAIR OF N. CHANNEL CENTER TRAIL is entered into as of the—day of April, 2023,by and between the CITY OF EAGLE, an Idaho municipal corporation ("City") and B.B. One LC, and Idaho limited liability company ("Owner"). City and Owner are sometimes collectively referred to as"Parties." RECITALS WHEREAS, City is constructing the Eagle Road Ped/Bike Bridge along Eagle Road. WHEREAS, as part of the project design for the Eagle Road Ped/Bike Bridge, the City assumed responsibility for the N. Channel Center Trail that runs from the Eagle Road Bridge westward along the north channel of the Boise River in the North Channel Center development owned by Owner. WHEREAS high flows within the Boise River and human foot traffic have resulted in bank erosion along the N. Channel Center Trail which presents a great risk to the public trail system and risk to Owner's North Channel Center. WHEREAS the Parties desire to reduce the likelihood of future bank erosion in that area of the N. Channel Center Trail by designing, engineering and constructing/stabilizing repairs to said area. WHEREAS,Owner desires to construct the bank stabilization at a 50% cost to the City in exchange of the floodway protection the stabilization will offer to the Owner's property. WHEREAS, the Parties entered into that certain Cost Share Agreement For Repair ON. Channel Center Trail on April 13, 2022 and a First Addendum To Cost Share Agreement For Repair ON. Channel Center Trail on March 14, 2023 whereby the Parties agreed to share in all costs associated with the engineering, design,permitting, and construction related to the repair of the N. Channel Center Trail area_ WHEREAS, it has been determined that the monetary amount for the scope of work and costs initially identified in Exhibit B in the an amount totaling$61,500 is insufficient to complete the intended bank stabilization. AMENDMENT TO FIRST ADDENDUM TO COST SHARE AGREEMENT FOR REPAIR OF N. CHANNEL CENTER TRAIL page-1 WHEREAS, the Parties desire to amend and replace Exhibit B with a new Amended Exhibit B to increase the monetary amount from $61,500.00 to $137,953 resulting in each party paying its 50% share in the amount of$68,976.50. NOW,THEREFORE,based upon the mutual consideration,the receipt and sufficiency of which is hereby acknowledged,the Parties agree to the following amendment: 1. Amendment to Exhibit B: Exhibit B is deleted in its entirety and replaced with a new exhibit titled"Amended Exhibit B"and incorporated into the Cost Share Agreement,setting forth the scope of work and cost associated with said work. CITY OF EAGLE: BB One LC: Dennis Baker Jason er-e,Mayor Print: Date: A art 1 ATTEST: `,�aa►/11111+III•+�i Tracy rn,City Clerk W . o If• �. S ++�+++/lnaaaaaaa� AMENDMENT TO FIRST ADDENDUM TO COST SHARE AGREEMENT FOR REPAIR OF N. CHANNEL CENTER TRAIL page-2 EvduftnLwdseape&NunmyInc. P.O.Box 2177Eagle hazel, ID 83616 evol u 10 hazelt;�welovetaplant.com LANDSCAPE AND NURSERY Estimate ADDRESS IDS F11uLAn# 1077 BB One LC DAIE 03/30/2023 1157 N.Summerbrook Ave. Suite 100 Meridian,ID 83642 PROUECT NAME JOB NUMBER Riverbank Stabilizaton 23-200 0EWRtgg0N pTY RATE AMOUNT Clean-up Site,remove unwanted plants,and prune for views 2 1,950.00 3,900.00 Supply and Installed safety fence(Lin.Ft.) 700 4.11 2,877.00 Pit Run price per yard to supply and deliver 100 36.50 3,650.00 Tearout existing material and haul away 200 22.50 4,500.00 Construct encapsulation lifts with netting,stakes,soil(price per square facial 1,200 30.38 36,456.00 foot of lift) Willow cuttings(created and Installed) 400 0.60 240.00 Seed bank with special blend of seed(sq.ft.) 4,800 0.15 720.00 Screened top soil delivered and installed to 6"depth on top of encapsulation. 64 52.50 3,360.00 ---- ----------------- ------ ------------------------------------------------------------------ ------ -- .................. ----.------....-----.......-- TOTAL 054703-00 Accepted By Accepted Date St. Clair Contractors,LLC Invoice P.O.Box 140511 Garden City,ID 83714 Date Invoice# 3/31/2023 2322 Bill To BB One LC 250 S Beechwood Boise ID 83709 P.O.No. Terms Project Quantity Description Rate Amount North Channel Bank Repair-Eagle Greenbelt 0.00 189.75903 Furnish and Place Rip Rap 166.00 31,500.00 Quantity of imported Rip Rap is estimated.Unit price prevails. St Clair intends to build the stairs with flat Rip Rap.If the Rip Rap material is unsuitable for the stairs,then stair material will be at an additional price. Estimate does not include permits,water turbidity monitoring,demo,site preparation or restoration,any other improvements other than placing Rip Rap, 125 Furnish and Place additional Rip Rap 166.00 20,750.00 Total $52,250.00 TASK ORDER This Task Order pertains to an Agreement by and between B.B. One LLC ("OWNER"), and HDR Engineering, Inc. ("ENGINEER"), dated February 23, .2022, ("the Agreement"). Engineer shall perform services on the project described below as provided herein and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution,this Task Order shall supplement the Agreement as it pertains to the project described below. TASK ORDER NUMBER: I -Amendment I PROJECT NAME: Boise River North Channel Bank Stabilization PART 1.0 PROJECT DESCRIPTION:See the attached letter PART 2.0 SCOPE OF SERVICES TO BE PERFORMED BY ENGINEER ON THE PROJECT: See the attached letter PART 3.0 OWNER'S RESPONSIBILITIES: See the attached letter PART 4.0 PERIODS OF SERVICE: February 27,2023-August 31,2023 PART 5.0 ENGINEER'S FEE: See the attached letter Original Task Order. $20,000.00 Amendment 1: $10.000.00 Total: $30,000.00 PART 6.0 OTHER: NIA TO 1 Amendment 1 North Channel Bank Stabilization