Cost Share - 2023 - N. Channel Center Trail Repair - Amendment To First Addendum To Cost Share Agreement - 4/13/2023 AMENDMENT TO FIRST ADDENDUM TO COST SHARE AGREEMENT FOR
REPAIR OF
N. CHANNEL CENTER TRAIL
THIS AMENDMENT TO FIRST ADDENDUM TO COST SHARE AGREEMENT FOR
REPAIR OF N. CHANNEL CENTER TRAIL is entered into as of the—day of April, 2023,by
and between the CITY OF EAGLE, an Idaho municipal corporation ("City") and B.B. One LC,
and Idaho limited liability company ("Owner"). City and Owner are sometimes collectively
referred to as"Parties."
RECITALS
WHEREAS, City is constructing the Eagle Road Ped/Bike Bridge along Eagle Road.
WHEREAS, as part of the project design for the Eagle Road Ped/Bike Bridge, the City
assumed responsibility for the N. Channel Center Trail that runs from the Eagle Road Bridge
westward along the north channel of the Boise River in the North Channel Center development
owned by Owner.
WHEREAS high flows within the Boise River and human foot traffic have resulted in bank
erosion along the N. Channel Center Trail which presents a great risk to the public trail system and
risk to Owner's North Channel Center.
WHEREAS the Parties desire to reduce the likelihood of future bank erosion in that area
of the N. Channel Center Trail by designing, engineering and constructing/stabilizing repairs to
said area.
WHEREAS,Owner desires to construct the bank stabilization at a 50% cost to the City in
exchange of the floodway protection the stabilization will offer to the Owner's property.
WHEREAS, the Parties entered into that certain Cost Share Agreement For Repair ON.
Channel Center Trail on April 13, 2022 and a First Addendum To Cost Share Agreement For
Repair ON. Channel Center Trail on March 14, 2023 whereby the Parties agreed to share in all
costs associated with the engineering, design,permitting, and construction related to the repair of
the N. Channel Center Trail area_
WHEREAS, it has been determined that the monetary amount for the scope of work and
costs initially identified in Exhibit B in the an amount totaling$61,500 is insufficient to complete
the intended bank stabilization.
AMENDMENT TO FIRST ADDENDUM TO COST SHARE AGREEMENT FOR REPAIR
OF N. CHANNEL CENTER TRAIL page-1
WHEREAS, the Parties desire to amend and replace Exhibit B with a new Amended
Exhibit B to increase the monetary amount from $61,500.00 to $137,953 resulting in each party
paying its 50% share in the amount of$68,976.50.
NOW,THEREFORE,based upon the mutual consideration,the receipt and sufficiency of
which is hereby acknowledged,the Parties agree to the following amendment:
1. Amendment to Exhibit B: Exhibit B is deleted in its entirety and replaced with a new
exhibit titled"Amended Exhibit B"and incorporated into the Cost Share Agreement,setting forth
the scope of work and cost associated with said work.
CITY OF EAGLE: BB One LC:
Dennis Baker
Jason er-e,Mayor Print:
Date: A art 1
ATTEST:
`,�aa►/11111+III•+�i
Tracy rn,City Clerk W . o
If• �. S
++�+++/lnaaaaaaa�
AMENDMENT TO FIRST ADDENDUM TO COST SHARE AGREEMENT FOR REPAIR
OF N. CHANNEL CENTER TRAIL page-2
EvduftnLwdseape&NunmyInc.
P.O.Box 2177Eagle
hazel, ID 83616 evol u 10
hazelt;�welovetaplant.com
LANDSCAPE AND NURSERY
Estimate
ADDRESS IDS F11uLAn# 1077
BB One LC DAIE 03/30/2023
1157 N.Summerbrook Ave.
Suite 100
Meridian,ID 83642
PROUECT NAME JOB NUMBER
Riverbank Stabilizaton 23-200
0EWRtgg0N pTY RATE AMOUNT
Clean-up Site,remove unwanted plants,and prune for views 2 1,950.00 3,900.00
Supply and Installed safety fence(Lin.Ft.) 700 4.11 2,877.00
Pit Run price per yard to supply and deliver 100 36.50 3,650.00
Tearout existing material and haul away 200 22.50 4,500.00
Construct encapsulation lifts with netting,stakes,soil(price per square facial 1,200 30.38 36,456.00
foot of lift)
Willow cuttings(created and Installed) 400 0.60 240.00
Seed bank with special blend of seed(sq.ft.) 4,800 0.15 720.00
Screened top soil delivered and installed to 6"depth on top of encapsulation. 64 52.50 3,360.00
---- ----------------- ------ ------------------------------------------------------------------ ------ -- .................. ----.------....-----.......--
TOTAL 054703-00
Accepted By Accepted Date
St. Clair Contractors,LLC Invoice
P.O.Box 140511
Garden City,ID 83714 Date Invoice#
3/31/2023 2322
Bill To
BB One LC
250 S Beechwood
Boise ID 83709
P.O.No. Terms Project
Quantity Description Rate Amount
North Channel Bank Repair-Eagle Greenbelt 0.00
189.75903 Furnish and Place Rip Rap 166.00 31,500.00
Quantity of imported Rip Rap is estimated.Unit price prevails.
St Clair intends to build the stairs with flat Rip Rap.If the Rip Rap material is
unsuitable for the stairs,then stair material will be at an additional price.
Estimate does not include permits,water turbidity monitoring,demo,site preparation or
restoration,any other improvements other than placing Rip Rap,
125 Furnish and Place additional Rip Rap 166.00 20,750.00
Total $52,250.00
TASK ORDER
This Task Order pertains to an Agreement by and between B.B. One LLC ("OWNER"),
and HDR Engineering, Inc. ("ENGINEER"), dated February 23, .2022, ("the
Agreement"). Engineer shall perform services on the project described below as
provided herein and in the Agreement. This Task Order shall not be binding until it has
been properly signed by both parties. Upon execution,this Task Order shall supplement
the Agreement as it pertains to the project described below.
TASK ORDER NUMBER: I -Amendment I
PROJECT NAME: Boise River North Channel Bank Stabilization
PART 1.0 PROJECT DESCRIPTION:See the attached letter
PART 2.0 SCOPE OF SERVICES TO BE PERFORMED BY ENGINEER ON THE
PROJECT: See the attached letter
PART 3.0 OWNER'S RESPONSIBILITIES: See the attached letter
PART 4.0 PERIODS OF SERVICE: February 27,2023-August 31,2023
PART 5.0 ENGINEER'S FEE: See the attached letter
Original Task Order. $20,000.00
Amendment 1: $10.000.00
Total: $30,000.00
PART 6.0 OTHER: NIA
TO 1
Amendment 1 North Channel Bank Stabilization