Loading...
Cost Share - 2023 - First Addendum To Cost Share Agreement For Repair Of N. Channel Center Trail - 3/14/2023 FIRST ADDENDUM TO COST SHARE AGREEMENT FOR REPAIR OF N. CHANNEL CENTER TRAIL THIS FIRST ADDENDUM TO COST SHARE AGREEMENT FOR REPAIR OF N. CHANNEL CENTER TRAIL is entered into as of theI4 day of aAprii, 2023,by and between the CITY OF EAGLE, an Idaho municipal corporation("City") and B.B. One LC, and Idaho limited liability company("Owner"). City and Owner are sometimes collectively referred to as "Parties." RECITALS WHEREAS, City is constructing the Eagle Road PedBike Bridge along Eagle Road. WHEREAS, as part of the project design for the Eagle Road PedBike Bridge, the City assumed responsibility for the N. Channel Center Trail that runs from the Eagle Road Bridge westward along the north channel of the Boise River in the North Channel Center development owned by Owner. WHEREAS high flows within the Boise River and human foot traffic have resulted in bank erosion along the N. Channel Center Trail which presents a great risk to the public trail system and risk to Owner's North Channel Center. WHEREAS the Parties desire to reduce the likelihood of future bank erosion in that area of the N. Channel Center Trail by designing, engineering and constructing/stabilizing repairs to said area. WHEREAS, the Parties entered into that certain Cost Share Agreement For Repair ON. Channel Center Trail on April 13,2022 (the"Cost Share Agreement")whereby the Parties agreed to share in all costs associated with the engineering, design, permitting, and construction related to the repair of the N. Channel Center Trail area. WHEREAS, City holds a greenbelt easement for a 600-ft section of the Boise River Greenbelt on the southwest side of the North Channel Center Development that City intends to repair. WHEREAS,it has been determined that the most feasible bank stabilization occurs through the pinning of the bank restoration and stabilization under the City's 600-ft section of the Boise River Greenbelt. WHEREAS, Owner desires to construct the bank stabilization at a 50%cost to the City in exchange of the floodway protection the stabilization will offer to the Owner's property. FIRST ADDENDUM TO COST SHARE AGREEMENT FOR REPAIR OF N. CHANNEL CENTER TRAIL page A NOW, THEREFORE,based upon the mutual consideration,the receipt and sufficiency of which is hereby acknowledged,the Parties agree to the following addition(s): 1. Addition to Scope of Services: A new Exhibit B is added and incorporated into the Cost Share Agreement, setting forth the scope of work and cost associated with said work CITY OF EAGLE: BB One LC: Dennis Baker _ Sign: - v E-.-- Jason P erce, NYayor Print: ZI k�•� Date: ATTEST: o` LE je� P.4P�E '•.•• Or, Tracy O rn, City Clerk x Council �P '�.nProvav3h4l 0A3 FIRST ADDENDUM TO COST SHARE AGREEMENT FOR REPAIR OF N. CHANNEL CENTER TRAIL page-2 EXHIBIT B March 1,2023 BB One LLC 6149 N Meeker PI. Suite 110 Boise, ID 83713 Dear Mr.Baker, BB One has requested that HDR Engineering, Inc.amend the existing task order to continue providing technical assistance on the Boise River North Channel Bank Stabilization (Task Order 1).This amendment increases the not to exceed amount of the existing contract to assist you with upcoming tasks: • Coordination before,during,and after construction with the contractor,City of Eagle, USACE,and IDWR as requested • Responding to contractor requests for information • Completing memo documenting project completion HDR's work will not include construction oversight or inspection. We propose the existing not to exceed amount of this contract be increased from$20,000 to$30,000(an increase of$10,000,roughly 50 to 60 hours of engineering time plus accounting support and administration). In the case that the total fee approaches the not-to-exceed amount, I will inform you to discuss if an additional increase of the Task Order not-to-exceed amount is needed. We're pleased to continue supporting you. Sincerely, HDR Engineering,Inc. Mike Schubert, PE Robert R. Hardgrove Water Resources Engineer Vice President hdrinc.com River Quarry at Parkcenter412 E.Parkcenter Blvd.Suite 100Boise,ID 83706-6659 (208)387-7000 TASK ORDER This Task Order pertains to an Agreement by and between B.B. One LLC ("OWNER"), and HDR Engineering, Inc. ("ENGINEER"), dated February 23, 2022, ("the Agreement"). Engineer shall perform services on the project described below as provided herein and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. TASK ORDER NUMBER: 1 -Amendment 1 PROJECT NAME: Boise River North Channel Bank Stabilization PART 1.0 PROJECT DESCRIPTION: See the attached letter PART 2.0 SCOPE OF SERVICES TO BE PERFORMED BY ENGINEER ON THE PROJECT: See the attached letter PART 3.0 OWNER'S RESPONSIBILITIES: See the attached letter PART 4.0 PERIODS OF SERVICE: February 27,2023-August 31,2023 PART 5.0 ENGINEER'S FEE: See the attached letter Original Task Order: $20,000.00 Amendment 1: $10,000.00 Total: $30,000.00 PART 6.0 OTHER: N/A TO 1 Amendment 1 North Channel Bank Stabilization St. Clair Contractors,LLC Estimate P.O.Box 140511 Garden City,ID 83714 Date Estimate# 2/24/2023 1076 Name/Address -aBB One LC `' r' / 250 S Beechwood Boise ID 83709 Project Description Qty Rate Total North Channel Bank Repair-Eagle Greenbelt 0.00 Furnish and Place Rip Rap 189.75903 166.00 31,500.00 Quantity of imported Rip Rap is estimated.Unit price prevails. St Clair intends to build the stairs with flat Rip Rap.If the Rip Rap material is unsuitable for the stairs,then stair material will be at an additional price. Estimate does not include permits,water turbidity monitoring, demo,site preparation or restoration,any other improvements other than placing Rip Rap. Total $31,500.00 This Task Order is executed this day of March 2023. BB One HDR ENGINEERING, INC. "OWNER" "ENGINEER" BY: BY: NAME: Dennis M. Baker NAME: Kate Eldridge TITLE: Vice President TITLE: Senior Vice President ADDRESS: 6149 N. Meeker Pl. ADDRESS: 412 E. Parkcenter Blvd., Suite 110 Suite 100 Boise, ID 83713 Boise, ID 83706 TO 1 Amendment 1 North Channel Bank Stabilization