Minutes - 2023 - Parks Pathways & Recreation Commission - 01/19/2023 - RegularTHE CITY OF EAGLE
PARKS, PATHWAYS AND RECREATION COMMISSION
Eagle City Hall, 660 E. Civic Lane
January 19, 2023, 5:30 p.m.
1. CALL TO ORDER: The meeting was called to order at 5:33 P.M.
2. ROLL CALL: CROCKETT, DECKERS, ELWER, FAUSTINA, HUFFAKER, IVIE, LOFAS
LIAISON: COUNCIL MEMBER BAUN
Absent: CROCKETT
New Commission Member Peter Lofas introduced himself.
3. APPROVAL OF MINUTES:
A. Minutes of December 15, 2022
Commissioner Elwer moved to approve the minutes of December 15, 2022, as written.
Seconded by Commissioner Deckers. ALL AYES... MOTION CARRIES.
4. PUBLIC COMMENT:
Tyler Graham and Brian Graham 3855 W. Lorenzo Ln. Eagle. presented to propose a trail for biking and
provide updates on memorial.
5. REPORTS:
A. Recreation Report moved to next meeting.
B. Public Works Report moved to next meeting.
C. Steve Noyes presented on Trails and Pathways and discussed Avimor.
Brad Anderson 5038 W. Philomena St. Meridian. Discussed Beacon Light and Highway 55.
D. Liaison Report presented by Council Member Baun on the Sports Complex and Shooting Park.
6. NEW BUSINESS:
None
7. UNFINISHED BUSINESS:
None
9. ADJOURNMENT:
Adjournment made by Chairman Huffaker at 6:57pm
Page 1 of 1
K .Ci i c .C,mmnces.i Pj.0 }TEM? WORK AREASPPRC I-19-23mm docx
AN AUDIO RECORDING OF THIS MEETING IS AVAILABLE FOR DOWNLOAD AT
W W W:C 1TYOFEAGLE.ORG
Respectfully submitted:
CHRISTINA GARCIA
CLERK OF THE MEETING
APPROVED:
(;/".7„711,
AEL
MICH
CHAIRMAN
PRPP7of7
PPRC Report
January 1gt", 2023
Page 1
'City of Eagle Public Trail System
Public System Now
Greenbelt Pathways
Other Multi -User
Bike Only
Soft
Concrete or Asphalt vs. Natural or Native Surfaces
8-feet wide or wider, separated from motorized vehicle traffic
Singletrack, narrow, multi-user trails
Optimized f❑rSpeofic Bicycle Uses -- often one-way or Downhill Only
4.34 16.79
4.34 4.34
4.65 4.65
City Maintained Trails
13.33
25.78 Miles of Public Trails and Pathways Managed by City of Eagle
Not Maintained by City
12.61
20.21 Maintained and Managed by HOA's, BLM, Business Complexes, Etc.
Total Public System
45.99 Miles of PublicTrails in Eagle Now
Percent City Maintained
56% Includes all trails and pathways open to the public
Greenbelt Traffic Counters
Average Day
Average Month
Annual Trend
1,432
43,422
521,066
January through June 2021 (0ry Creek data incomplete)
There are four counters on the main Greenbelt System; Garden City Border at the North Channel, at the
Merrill Park Bridge, Highway 44 at Dry Creek, and at the Boise Border ❑n the South Channel. Each counter
averages 2.2-miles away from the next closest counter. Many users qo uncounted.
Pathway Development
Under Construction
Public Trails in Development
10-FootSidewalks in Development
1.42
26.56
2.40
All Surface Types Combined
Developments with a Notice to Proceed or City projects
Developments in the approval process or City projects
These adequately serve as low -stress 2-way bikefped travel
Developing
30.38 Total miles being built, recommended by the PPRC, or in approved Final Plats
Total System Whe
Completed
76.37
Potential
Undeveloped Easements
2.84
All Surface Types Combined
City has an option to build a trail on these properties
Bike Park
Natural or Native Surfaces
Eagle 7 Mainly Bike Optimized on 63.7 acres (included in above data)
Ma County Mix of Bike Optimized and Multi-user, Multi -directional on 244 acres(n❑t included, not in City limits}
Other Facilities
Bike Lanes
Sidewalks
49.40
268.00
Concrete or Asphalt
Bike lanes and Sharrows
Motor vehicle lanes delineated by sh arrows where bicycles have equal right-of-way
Canal Influence
Canal impacted Greenbelt
Percent of Greenbelt System
11.13
25%
All Surface Types Combined
Canal adjacent trails with shared access, recorded easements and written orinf❑rmalagreements
Percent of the existing and developing Greenbelt pathways impacted by canals and Ditch Companies
Page 2
System Table
201 separate public trail
segments including Bike Park
Eastfield Canal Pathway Update
Recommendation made by PPRC on November 19, 2020
• As with the Capella Subdivision on the last PPRC agenda, the New Dry Creek Ditch Company will not allow improvements to this levee at this
time. They are not approving pathways on canals with one-sided access.
• The City has an easement for public access when they do allow construction.
• The City also has an easement behind Estrada. Patrick Towne owns the two undeveloped lots between them.
Page 3
Rene Commons Pathway Update
mdmo
Page 4
7. OUT OF PROJECT IMPROVEMENT -- CONNECTION TO WYCLIFFE ESTATES:
FIGURE 5 below shows the connection area for Rene Commons Pathway "E" (FIGURE 1)
looking northward from Wycliffe Estates. There are a steep set of stairs, approximately 7-feet in
width that begin well into this common area. These stairs. if aligned directly to a straight
pathway, would create a potential safety concern far bicycles.
r1GURE 5
a.
The Rene Commons developer shall realise the pathway "E" design to the far west of their
common area, in order to provide a control point leading into the stairs. The red lines in FIGURE
6 show an approximate tread outline intended to act as a control point for wheeled traffic. This
control point shall be provided by Rene Commons Removal of the brick pavers and landscape
restoration will be required. Modifications to existing fencing are subject to City and Wycliffe
HOA approval.
FIGURE 6
b. To prevent traffic from shortcutting the pathway, the developer shall provide fence extensions in
Page 9 of 12
R.'91a�re5Dept' Y P.O. ApplicA.51115v'a2i'RmeCoom..O4-Apwor.dRm. Commrm. PPRC R.c m..doc
the postions shown in YELLOW in FIGURE 7.
FIGURE 7
c, An 18 x 1 S-inch CAUTION STAIRS AHEAD sign, similar to the example shown in FIGURE 8,
shall be installed on or near the west fence extension. This sign is to face to the north in alignment
with the pathway.
Eagle Road Pedestrian and Bicycle Bridge
Construction on the Eagle Road Ped/Bike Bridge began on October 1, 2022.
Pile driving is completed. Next step is concrete piers and walls The project continues to be on schedule, but as with all things, weather
impacts construction projects. Just a reminder: All construction is anticipated to occur during the day — no weekend or night work is
anticipated.
The project is on track to be out of the ordinary high-water mark by March with completion in April of 2023.
Page 6
Avimor Public Hearing —1/17/23
The PPRC Annexation Recommendation was cited as the key area of disagreement by the Avimor Team
Applicant's Response to Staff Recommended Conditions
5. ZOA-01-22 shall be amended to incorporate by reference Eagle City Code
Section 9-4-1-6: Trail and Pathway Regulations as the applicable pathway standards within the Avimor Planned Development Zone as
recommended by the Parks, Pathways, and Recreation
Commission, prior to Ordinance 895 being signed.
Applicant objects to condition #5 and requests approval of Title 11B as drafted.
Title 11B includes foothills -specific pathway and trail standards that recognize the
topography, vegetation, and extensive open spaces in the foothills.
6. Each preliminary plat submitted to the City for approval shall be subject to the review and recommendation process of the Parks and
Recreation Commission.
Applicant objects to condition #6 and requests approval of Title 11B as drafted.
Title 11B includes detailed standards and requirements for the type and placement of
pathways and trails that can be applied by the Planning and Zoning Commission and City
Council as portions of the project are platted and developed.
7. The Avimor Trail Board (ATB) shall include one representative from Eagle City staff.
Applicant agrees to condition #7.
Page 7
8. All existing trail and pathway easements within Avimor Phases 1-12 and within the
Property must provide the City rights to control of public access, recreation programing,
and all other trail and pathways events. All easements that require modification or
creation to satisfy this condition shall be approved by the City and recorded in the real
property records of the respective county.
a. If the applicant provides evidence showing any exclusive easement or legal right
of any party that would preclude the granting of a public access easement in the
same location, then the City requires a separate easement adjacent to the one
originally conditioned.
b. Easement provision language shall include the following: The City of Eagle may
construct, connect, or continue within this (or these) easement(s), public pathways
as part off future system expansion, and may authorize staff, contractors, or
neighboring developers to facilitate such improvements within this (or these)
easements from a boundary to another public pathway easement or easement, or
to parcels included in any public access agreement.
Applicant objects to conditions #8(a)-(b).
Applicant has developed a vast network of pathways and trails that are privately funded
and open to the public. Applicant has established the Avimor Stewardship Organization —
a non-profit entity organized to manage and maintain the pathway and trail network.
Applicant is committed to ensuring public access to private trails through public
easements, but management and maintenance responsibilities will remain at the direction
of the Avimor Stewardship Organization, on which the City will have a Board seat
pursuant to condition #7.
9. The developer or HOA will not, in the course of maintenance or modification change the
characteristics of any public trail to a degree that would increase or decrease the fitness
or skill level required to use the trail without City approval.
Applicant objects to condition #9.
As stated above, management (including design) and maintenance of Avimor trails will
remain with the Avimor Stewardship Organization.
Page 8
Meeting Breakdown:
• Chambers reached fire code maximum.
• Three meeting rooms with video screens were added as overflow.
• Commissioner McCauley recused himself due to a potential to profit from annexation.
• The Applicant, represented by Deborah Nelson (Given Pursley Law Offices) presented for 2-hours, 2-minutes.
• City Planner Morgan Bessaw presented for 57-minutes.
• I presented on trail and pathway concerns for 23-minutes.
• 24-minutes of public comment heard.
(Go to PowerPoint)
• 28 citizens are still signed up to make public comment. (98-minute estimated)
• Over 120 citizens provided written comments.
• Meeting was ended and public hearing was left open.
• Special meeting will be held on Monday, January 30th at 6PM to continue the hearing.
Page 9
END OF REPORT
Steve Noyes
Trails and Pathways Superintendent
City of Eagle
snoyes@cityofeagle.org
Office (208) 489-8769
Cell (208) 921-3726
Page 10
AVIMOR TRAILS AND PATHWAYS
Eagle Planning & Zoning Public Hearing
City Staff: Stephen T. Noyes
Trails and Pathways Superintendent
Phone: 208-489-8769
E-Mail: 31 ivyc3kwt,iLyofeagle.org
Parks, Pathways and Recreation Commission
Recommendation Motion Summary:
The PPRC does not support the creation of a unique trail and pathway
code for Avimor in proposed title 11B
INTER
OFFICE
Enna
sohhcr
Dane
AIxhnimoi.
copy To
City of Eagle
Planning nod Zoning Administration
Planning sad zoning cammissieeesa
Sieve NaYes. Trails and Pathways Superintendent
Parke, Parkways and Bttrean on Commission railway
]tee mmendatpoa-AL6219.2.0622b ZOA-0r-S2-Avrm01 De.1,,o, m-
Aeolmlron Fat Aottswon
O6I1]'10Z+
None
saran stann mown nesaaw, mad rfmamuller. Dan Richter All vauphat
On 61Id'22 the City of Eagle Parks. Pathways sad Recreation Com ission(PPRC) voted ummmousty10
recommend appzeeol efrhis item wit sire,endi,wns for approval Is ahv+n herein
PP...ima not d puawayoode nor Avmor m City
code I te. Fail c0miIrmwred a sot iore
an
o aetermwedmepgapnme (ar addiri3e I0 city can
9.4-1.e. Proper spMla cendtuona shall be added m tin
2 Each pier vohmmed m rue tidy Ilion be reviewedhydm PPRI'
The [IT shall lee myreseeud t 111531 m die plaenrng process when na2seze pmposee an he
added anywhere man ew rung pan of the annexed amnia
- Envtiny mil and pant mplacwi ro povpe 4w Citynphrst
Dad wnh� mxf.fl2acrisV iamion ,end e. programming, urn m. om etl e.
M 3
5 All pobhr mras cluenwon shall be 25-fmi m width unkssdhcsman aypmrcd by Me ray.
Regrew,. pahhe use visa r1 Barred l the nail orpethway Wad, arrUor to loedibes intended for
d. She env shall be premed mthe nab to connect 1ui or pathwaysm any eesnnanihat harden
Avimor
The developer or HOP, shall movide romolesiore to all pe mwy deargwaedommthan
Regional La pormlo env alrerx approved the Ouluand
8 The City shsllmemmoall rmtlaor pathways drummed Regional in papcnrluolesa
90wnise condilwned by ale Cry
RECOMMENDADON DETAIL
r w'.w✓yr M.. -➢o"a�Pmarl,14 +r q w�,.
TRAIL AND PATHWAY REGULATIONS.
A. Intent: The pleeemul n(oda, pathways. and slewdlc: aro .ended to encrnwage mslvruod
and no.molorized forms of use, to provide safe, mnveuieur, and aesthetic alternative 'revel
routes to common dcstulimu such as schools, parks. shopping center'. etc.. and to promote
economic development. areas thal allow it. The follnwinp (actors will be considered in the
placement of any Intl. pathway, or sidewalk: the inthty, need, and impact to existing
nmghMlhonds: complame with the mmprchrnskc plan and rails and pathways mason plan,
design a n relates to both come prevention and bac!ion. and the responsibiIilas of nw-5wrship
ens) mainteaanee,or
The development of defined planinntg process to include a standardized application anti review
process with landing and msmagemeol structure for tmplemcolafion and maintenance of the
system mperpemiry, In the event that, subdivision developed a suitable alrenahve to to cm/'s
process. it may be adopted using the terms and standards defined below
B Trwil and Pathway Taro,
1 Irelhways and'I'mis. arc areas improved to crest: molonzcd or non -motorized nudes, loops
and amuses. Pm the purposes of this regulation these tams are. in ,mat eases, interchangeable
t fiisraneally, the term ^pathway" has been tied to des,ribe the Greenbelt and other wide and
hard surface mutes. The term-nail"'a Dien associated wail, narrower paths and are usually
constructed from natural or native materials 1.
2 Tcend- the 53 ''shed usable surface of o path-
3 Nand Surfacerefers to [read materials such as concrete. asphalt, pavers, and rigidpemreablel
composites.
4 Neto al Slvfacc- refers to tread matcnnls made of store and other mhml m350o01s that have
been engineered for specific applications au;h as gravel, road mix, and :pusher Fines-
' Native Surface' refers to dead marmots made from the soil. aggregate. and reek round on or
adjacent to the finished path.
e Trailbead. Facility used for access to trails or pathways that may include ve.hiele pelting.
rtsuoonss. and other Mc ilia. relined In mud use.
C. Pathway Location_
1 The City should require the creation and maintenance of pathways Macao m cases where it
,s .1301V1310 be inappropriate), that provide access to adjacent:
a. 'Ennead,
b Pathway elements as Identified with. the comprehensive plan and the hugs and pathways
master plan including regional hair sputa
0. Existing pathways providing local and regional connectivity
2. In addmon, pathways may be mlmred to COMM-CI sins othu than Heaar noted alrove
-
P, Trail and runway Finished Grade- landscaped
I. All CUT maintained I, oLS and pathways more Iva d-&m in width that are surrounded
by, or adjacent ro landscaping shall be required to onhze the following_ elements in landscaped
a. Install a 24 inch (depth) Manama, along both antes of the mead m any area
wither 15-fat of a ties drip line or 311-feel Loon any tree trunk. whichever
dinaroY is grutat: No BivSasier is to he placed with ...mg -length of less
than do-f I. and no gaps of less than 30-fewlwdl ems, between PloBamer
section, Installed BioBmner top edge oetst be within I -arch of the grade prior
in3allalion of gravel margin
6- Install 5.5-inch-tall metal lawn edging mastde of the 1irokmrler as drown
below Note: fastening the B,onanter to time faun edging {minimum t.mch
overlap) pswr to backfdlmg will improve 3ioaamer fimctmn and ease installation,
(Edge material equivalent to Sure -Lac Sllte•Pdge 3t6" x 351
c. A compactedfuush grade along the rides ofthe imum. ofa-foot wide)shall
be sloped ar ,mum oft%drainage{slopiep away from wadi hut a ...mum of
5%for erosion resistance. No adjacent grades shall dram across the head rm1ess
approved by the City.
J. lasted! a 3-inch-depth of gravel adjacent to die head Gravel bad most extend a
minimum of 1-feel and a maximum of ,a -feet from the 11o:oh d budGravel. level
shall be I -inch below the timed edge m redone spread unto the trend. Clashed gravel
with a minimum hardness of basalt and screened particles between 110-inch and
3'4-nwb shall he used, Nate: No unga1'wrl elements may be placed in this arra
r. 1Ma1 grass seed or sod as approved 1 City approved landscape plan
Parks, Pathways and Recreation Commission
Recommendation Motion Summary:
Why should Avimor
comply with our code?
• Reduce maintenance cost to the taxpayer
• Lower the cost to the HOAs
• Produce a consistently safer public facility
• Consistent with all other recent developments who
have been required to comply
• It is flexible enough to adapt to specific locations and
soil compositions
Parks, Pathways and Recreation Commission
Recommendation Motion Summary:
How would an Avimor Trail Code
complicate City operations?
• Different classifications and construction specs would complicate the process
for City planning staff, the PPRC, the P&Z Commission and City Council. This
would result in increased administrative costs
• Different trail construction methods and standards, shorter maintenance
intervals (due to shorter life spans) would complicate Public Works
operations and capital maintenance planning
• Recreation event planning would be more complicated if trail types were
confusing
• Set a dangerous precedent for future planned communities and subdivisions
if they are permitted to establish even more variations
Parks, Pathways and Recreation Commission
Recommendation Motion Summary:
An Avimor Trail Code could freeze
all construction standards.
Forever.
• All City codes evolve over time for reasons that make sense.
• Any changes to an Avimor Trail Code would require a
development agreement amendment. Avimor would have to
agree with any changes that the City feels would reduce our cost
of maintenance or improve safety
• If we apply for mitigation grants to restore a damaged regional
pathway, whatever the current standard is for that area is the only
construction standard we can use.
Parks, Pathways and Recreation Commission
Recommendation Motion Summary:
Each plat submitted to the City shall be
reviewed by the PPRC and a
recommendation shall be made.
• Recommendations to the Planning and Zoning Commission begin there. It is
the City's best opportunity to influence the mix of recreation and alternate
transportation in the area at the time.
Parks, Pathways and Recreation Commission
Recommendation Motion Summary:
The City shall be represented throughout the planning process when
trails are proposed to be added anywhere in an existing part of the
annexed project.
• This is a response to Avimor's desire to continue their existing Open Space Committee planning process.
• Avimor has contributed greatly to the foothills recreational trail network in the Valley. They have created
recreational opportunities that are unique to their project.
• The City would benefit a great deal from taking part in their planning process, and that relationship would improve
all future development with similar topography and soil composition like the Bike Park, BLIV land, Spring Valley and
future public foothills trails.
• Representation on the committee would provide the City the opportunity to understand the impact of evolving
foothills trail changes on the entire system.
Parks, Pathways and Recreation Commission
Recommendation Motion Summary:
The City shall be granted to the right to connect trails or pathways to
any easement that borders Avimor.
• This is a standard requirement for conditions of approval. Easement language requirements are currently as follows:
"The City of Eagle may construct, connect, or continue within this (or these) easement(s), public pathways as part of future system expansion,
and may authorize staff, contractors, or neighboring developers to facilitate such improvements within this (or these) easement(s) from any
boundary to another public pathway easement or easements, or to parcels included in any public access agreement."
Parks, Pathways and Recreation Commission
Recommendation Motion Summary:
Existing trail and pathway easements must be amended or replaced to
provide the City rights to primary control of public access, maintenance,
and event programming, within the annexed areas and within Avimor
Phases 1, 2 and 3 (Avimor Subdivision Phases 1-12).
• Justification: copies of existing easements have been supplied to the City but must be reviewed and approved by the City Attorney.
• Easements granted to the City are required for various grant funding sources to qualify the City for the benefits of Idaho Code 36-1604.
Parks, Pathways and Recreation Commission
Recommendation Motion Summary:
But there aren't many trees on this land. Why
should Avimor install root barriers?
• If Avimor complies with Eagle landscaping requirements there will be trees.
• Eagle is full of subdivisions that were built on farmland that were treeless for over 100-years, many
have root damaged pathways.
• Our code does not require root barriers where trees do not exist or will not be planted in
development:
All City maintained trails and pathways more than 6-feet in width that are surrounded by, or
adjacent to landscaping shall be required to utilize the following elements in landscaped areas:
a. Install a 24-inch (depth) BioBarrier along both sides of the tread in any area within 15-
feet of a tree drip line or 30 feet from any tree trunk, whichever distance is greater. No BioBarrier
is to be placed with a running -length of less than 30 feet, and no gaps of less than 30-feet will
exist between BioBarrier sections. Installed BioBarrier top edge must be within 1-inch of the
grade prior to installation of gravel margin.
Parks, Pathways and Recreation Commission
Recommendation Motion Summary:
Avimor Existing Pathways Review:
The Northern Section — Built 2017 to Late 2018
• Tread edge failure due to a lack
of support from a narrow and
poorly compacted base, or
steep finished grade
Avimor Existing Pathways Review:
How we address Tread Edge Failure
Edge failure may be caused by
poor compaction and width of
base materials
This is usually fractured by vehicles
used in maintenance over 50 times
per year
g. %-inch minus and 6-inch minus layers are to extend 6-inches beyond both outer
edges of the tread material (intended to improve tread edge load resilience).
r,
Avimor Existing Pathways Review:
The Northern Section — Built Late 2018
Transverse cracking due to
expansion and contraction
(and a lack of sealcoating)
• 7 fractures in 1-mile
A depressions forming
because the fines in the base
are washing away
Asphalt expands much more
that concrete — about a foot
per mile for a 10-degree
increase
Avimor Existing Pathways Review:
How we Address Transverse Cracking
• Asphalt expands much more that concrete
• Solvents evaporate and flexibility is lost
• After expansion (compression) dry asphalt cracks in contraction
• Asphalt paving does not employ expansion joints
1. Concrete: provide a 3.5-inch-deep Portland cement 4000psi with fiber mesh reinforcement
(1.5 lbs/cy) additive tread surface, cross -sloped at 1.75% +1- 0.25%, and centered on the
gravel base. This surface is to be medium broom finished, with a 0.75-inch tooled radius
on edge. Control joints shall be 10-feet o.c., saw cut. Expansion joints shall be at 40-feet
o.c., shall provide and install (5) 24-inch length #3 rebar. Expansion joint material shall
comply with AASHTO M213 and shall be installed vertically extending to the full depth
and width of the concrete work.
Avimor Existing Pathways Review:
City approach to puddles
• Puddling caused by a lack of compaction in the base
and a lack of cross slope for runoff
Concrete: provide a 3.5-inch-deep Portland cement 4000psi with fiber mesh reinforcement
(1.5 lbs/cy) additive tread surface, cross -sloped at 1.75% +1- 0.25%, and centered on the
gravel base. This surface is to be medium broom finished, with a 0.75-inch tooled radius
on edge. Control joints shall be 10-feet o.c., saw cut. Expansion joints shall be at 40-feet
o.c., shall provide and install (5) 24-inch length #3 rebar. Expansion joint material shall
comply with AASHTO M213 and shall be installed vertically extending to the full depth
and width of the concrete work.
a. To be constructed on undisturbed native soil or compacted fill.
b. Install 8-inches of 6-inch minus pit run. It must be compacted to 95% on top of
undisturbed soil.
c. Apply monobar-chlorate and Trifluralin to base per manufacturers
specifications. Below an installed weed fabric (4 oz. Non -woven geotextile filter
fabric) under the entire 4-inch layer of 3/4-inch minus.
d. Insta11 4-inches of 3/4-inch minus crushed gravel base compacted to 95%.
e. Construct the approved tread surface as specified in Section C to the City
approved width.
Avimor Existing Pathways
Review:
The Park Section
Built Late 2007
or 2008
• Concrete tread failure due to
poor compaction and width
of base materials
• This is usually fractured by
vehicles used in maintenance
over 50 times per year
AM
Avimor Existing Pathways Review:
The Park Section
More concrete examples
Avimor Existing Pathways Review:
The Park Section
Concrete tread failure
due to saturation and
width of base materials
Avimor Existing Pathways Review:
Irrigation Impacts Addressed in Our Code
d. Install a 3-inch-depth of gravel adjacent to the tread. Gravel bed must extend a
minimum of 3-feet and a maximum of 4-feet from the finished tread. Gravel level
shall be 1-inch below the tread edge to reduce spread onto the tread. Crushed gravel
with a minimum hardness of basalt and screened particles between 3/8-inch and
3/4-inch shall be used. Note:
To irrigation elements may be placed in this area.
10. To increase user safety and extend the life of the tread surface, adjacent irrigation
systems must not distribute water onto the tread in calm weather conditions.
Avimor Existing Pathways Review:
The Southern Section
Built 2007 - 2008
Concrete patches going in where
asphalt failed
• Substandard repair methods
• Trimmed barrier, loosely
compacted native soil on edges
Avimor Existing Pathways Review:
Previously patched areas that
failed once, some failing
again
• Now being prepped for
concrete but...
Avimor Existing Pathways Review:
The newest 10-foot section on Avimor Drive
Eagle Existing Pathways Review:
The first build of the newest standards
• The pathway behind Riverwalk was constructed to the current Eagle
standard and completed in September of 2018.
• This serves as a heavy equipment access road for Little Pioneer Ditch
Company
• This is an asphalt pathway because we had not then switched to
concrete as the standard
Steve Noyes
Id; September 25, 2018 • Q • ••
So proud to play a small part in extending the Greenbelt towards Star. This section behind River
Walk is being built to the highest standards in Eagle's history. Thinking of Mike Aho today, who
hiked me through this site on my first day on his staff, and shared so much vision with us all. Miss
you, Boss!
✓ No transverse cracking
✓ No edge failure
✓ No irrigation impacts
✓ Cross slope is functioning
✓ No root intrusions
✓ Minimal puddling
Eagle Existing Pathways Review:
Our original code has brought
COUNTLESS examples of poorly
designed and constructed pathways
in our own 46-mile public system
Staff Recommendation to the Planning and Zoning Commission:
Avimor Trails and Pathways
ZOA-01-22 should be revised per the PPRC
recommendation
• Avimor should be subject to the City Codes and Standards as they
evolve.
• Ensure the lowest possible long-term maintenance cost to the
taxpayers of Eagle.
• Help create the safest and most sustainable alternate transportation
and recreation trail system in the Idaho.
• A system that is consistent with the high standards found in all Eagle
code.
Continue your consistent and fair support of City Code
9-4-1-6 and the City Design and Construction Standards
• Reduce City administrative costs.
• Maintain a level playing field for all developers for decades to come.
City of Eagle Public Trail System
Public System Now Hard
Greenbelt Pathways
Other Multi -User
Bike Only
AAA �t:,iL'EJL:S� IItfi�J9 —
Total Public System
Percent City Maintained
1,432
43,422
521,066
Pathway Development
Under Construction
Public Trails in Development
10-FootSidewalks in Development
Developing
Undeveloped Easements
Bike Park
Other Facilities
Bike [ones
Sidewalks
Canal Influence
Canal Impacted Greenbelt
Percent of Greenbelt System
Soft Concrete or4spholt vs Natural or Nobve sudoms
4.34 16.79 8-feet wide or wider, separated from motorized vehicle traffic
4.34 4.34 Singletrack, narrow, multi-user trails
4.65 4.65 Optimized forSpecific Bicycle Uses-- often one-way or Downhill Only
13.33 St7.f1s Iyila9AiAJOLaWA7iiiySiSYIVW:lliil:{:bcsil/IffaI6Y::�l,y
45.99 Miles of Public Trails in Eagle Now
56% Includes all trails and pathways open to the public
fanuary through rune 2021 (Dry' Creek data mwmpletej
There ore fourcounters on the main Greenbelt System; Garden City Corder at the North Channel, at the
Memll Park Cadge, Highway 44 at Dry Creek, and at the Bosse Corder on the South Channel Each counter
averages 2.2-miles away from the next closest mounter. Many users ao uncounted.
46 Ss y ce Types Combmed
1.42 Developments with a Notice to Proceed or City projects
26.56 Developments in the approval process or City projects
These ese adequately serve as low -stress 2-way bike/ped travel
36.38 Total miles being built, recommended by e PPRC, or ina y the pproved Final Plats
.w,
1111
Alf SuMmc Tyres Combmed
Orly has an option to build a trail on these properties
Natural or Nabve Surfaces
Mainly Bike Optimized on 53.7 acres (included in above data.)
Mix of Bike Optimized and Multi-user, Multi -directional on 244 acres/not lno'uded, not in City limits)
Concrete or Asphalt
Bike lanes and Shorrows
Motor vehicle lanes delineated by sharrows where bicycles have equal right-of-way
4/!Surfine Types Combined
Canal adjacent trails with shared access, recorded easements and written or informal agreements
Percent of the existing and developing Greenbelt pathways impacted by canals and Ditch Companies