Loading...
Service Solicited - 2023 - Fatbeam - Fatbeam Service Order #2 - Change Order DocuSign Envelope ID:AEA50D7B-37FC-448A-BCFE-622C32B275F7 509-344-1008 1 www.fatbeam.com •:•:: • fatbeam January 3, 2023 Prepared for City of Eagle DocuSign Envelope ID:AEA50D7B-37FC-448A-BCFE-622C32B275F7 �• • • 2065 W.Riverstone Dr.Suite 105 •••0 Coeur d'Alene,ID 83814 i T(509)344-1008 fatbe• F(509)344-1009 am www.fatbeam.com Service Order # 2 — Change order This Service Order#2,Change order("Service Order")is to update the completion dates for the installation of conduit network("Service"), as more fully described below, pursuant to the terms and conditions of the Acceptable Use Policy, Terms, and Master Service Agreement entered into by and between Fatbeam, LLC ("Fatbeam") and City of Eagle Idaho ("City")on January 25th 2022("Agreement"),and is effective as of July 6,2022,(Effective Date").Capitalized terms used but not defined herein shall have the meaning set forth in the Agreement. Billing address:660 E Civic Ln,Eagle,ID 83616 Build Details: (Location(s)where Service will be delivered) Note: Fatbeam will be adhering to Ada County policy that requires all underground dry utilities be placed on the or side of the road. A)Joint Trench#1-Conduit will travel underground on at and travel to Build is 11,864 feet. All per foot costs will be calculated at 11,864 feet. o (2)- 1.25"conduits o Dirt bore conditions are expected for entire 11,864 feet. o Vaults-No vaults provided for this project Item Description Cost Total Feet Extended Cost Trench Per foot $ 4.00 0 $ - Bore- Dirt Per foot $ 12.50 11864 $148,300.00 Bore-Cobble Per foot $ 18.25 0 $ - 1.25" Conduit Per foot, per conduit $ 0.75 11864 $ 17,796.00 Total Extended Cost $166,096.00 Start Date: September 2022 Completion Date:December 301h,2022-Due Date Change to: January 30th,2023 Fatbeam Internet I Updated 2018 2 DocuSign Envelope ID:AEA50D7B-37FC-448A-BCFE-622C32B275F7 B)Joint Trench#2-Conduit will travel underground on starting of and travel to Build is 2,442 feet,all per foot costs will be calculated at 2,442 feet. o (2)- 1.25"conduits o Dirt bore conditions are expected for entire 2,442 feet. o Vaults-No vaults provided for this project Item Description Cost Total Feet Extended Cost Trench Per foot $ 4.00 0 $ - Bore- Dirt Per foot $ 12.50 2442 $ 30,525.00 Bore-Cobble Per foot $ 18.25 0 $ - 1.25" Conduit Per foot, per conduit $ 0.75 2442 $ 3,663.00 Total Extended Cost $ 34,188.00 Start Date: September 2022 Completion Date: December 301h,2022-Due Date Change to: March 3151,2023 C)Joint Trench#3-Conduit will travel underground on starting near traveling to near Build is 4,782 feet,all per foot costs will be calculated at 4,782 feet. o (2)- 1.25"conduits o Dirt bore conditions are expected for entire 4,782 feet. o Vaults-No vaults provided for this project Item Description Cost Total Feet Extended Cost Trench Perfoot $ 4.00 0 $ - Bore- Dirt Per foot $ 12.50 4782 $ 59,775.00 Bore-Cobble Per foot $ 18.25 0 $ - 1.25" Conduit Per foot, per conduit $ 0.75 4782 $ 7,173.00 Total Extended Cost $ 66,948.00 Start Date:September 2022 Completion Date:December 30th,2022-Due Date Change to:March 3151,2023 Fatbeam Internet I Updated 2018 3 DocuSign Envelope ID:AEA50D7B-37FC-448A-BCFE-622C32B275F7 D)Joint Trench#4-Conduit will travel underground on ,travel to ,and then to Build is 1,081 feet,all per foot costs will be calculated at 1081 feet. o (2)- 1.25"conduits o Dirt bore conditions are expected for entire 1,081 feet. o Vaults-No vaults provided for this project Item Description Cost Total Feet Extended Cost Trench Perfoot $ 4.00 0 $ - Bore- Dirt Per foot $ 12.50 1081 $ 13,512.50 Bore-Cobble Per foot $ 18.25 0 $ - 1.25" Conduit Per foot, per conduit $ 0.75 1081 $ 1,621.50 Total Extended Cost $ 15,134.00 Start Date:September 2022 Completion Date:December 301h,2022-Due Date Change to:January 315t,2023 E) Project-Build from to 1.Summary of Project:Fiber extensions from to Fatbeam will pull fiber through the existing conduit from vault located behind the From that point,Fatbeam will construct underground fiber optic cable to 2.Existing Conduit:Fatbeam will pull a 48-count fiber between the and the existing located behind 3.Fiber Optic Electronics:Fatbeam will provide buried conduit with 144-count fiber between the existing located behind to 4.Fiber Optic Hardware: Fatbeam will install fiber optic hardware( . This hardware will provide connectivity from end to end,lighting the fiber. Cost including construction and equipment.$153,620 Fatbeam Internet I Updated 2018 4 DocuSign Envelope ID:AEA50D7B-37FC-448A-BCFE-622C32B275F7 Ratification: This Service Order is requested by Customer and accurately describes the Service(s) being order and the terms and conditions which govern the Service Order.Except as specifically set forth in this Service Order,the Agreement is hereby ratified and affirmed in all respects and all other terms,covenants,and conditions of the Agreement shall remain unchanged and shall continue in full force and effect.In case of an inconsistency or conflict between this Service Order and the Agreement,the Agreement shall govern.All Exhibits are attached hereto and are incorporated herein by reference and made a part of this Service Order. IN WITNESS WHEREOF,the Parties have executed this document as of the date and year first above written. IN WITNESS WHEREOF, Fatbeam and the City have each duly executed and delivered this Services Agreement as of the Effective Date. Fatbeam: The City: Fatbeam, LLC City of Eagle 1E. By: by: G,a.� By: y: Name: Graham Taylor Name: 14dr Title: Director of Public Sector Title: m Date: 1/3/2023 1 17:05 PST Date: �/a ST: •` PGLE . AT E c •••......• O�•• �NTF O • Tracy E. O orn, City Clerk_ U; o '0• Qti ; Fatbeam Internet Updated 2018 6