Findings - CC - 2018 - DR-13-17 - Dr Fro A Restroom Facility In Pamela Baker ParkBEFORE THE EAGLE CITY COUNCIL IN THE MATTER OF AN APPLICATION FOR A DESIGN REVIEW FOR A RESTROOM FACILITY WITHIN PAMELA BAKER PARK FOR C & 0 DEVELOPMENT, INC. FINDINGS OF FACT AND CONCLUSIONS OF LAW CASE NUMBER DR -13-17 MOD The above -entitled design review application came before the Eagle City Council for their action on October 23, 2018. The Eagle City Council having heard and taken oral and written testimony, and having duly considered the matter, makes the following Findings of Fact and Conclusions of Law; FINDINGS OF FACT: A. PROJECT SUMMARY: C & 0 Development, Inc., represented by James Marsh with CSHQA, is requesting design review approval to construct a 633 -square foot restroom facility within Pamela Baker Park. The site is located on the north side of East Colchester Drive, adjacent to Lakemoor Subdivision No. 2. B. APPLICATION SUBMITTAL: The City of Eagle received the application for this item on August 14, 2018. C. NOTICE OF AGENCIES' REVIEW: Requests for agencies' reviews were transmitted on August 20, 2018, in accordance with the requirements of the Eagle City Code. D. HISTORY OF RELEVANT PREVIOUS ACTIONS: On January 28, 1992, the City Council denied an annexation, rezone, and preliminary plat (A-91/ R2- 91/ PP -91) for Fall Creek Subdivision. On January 4, 1993, the City Council approved an annexation, rezone, and preliminary plat (A-91/ R2- 91/ PP -91) for a revised version of Fall Creek Subdivision. That preliminary plat approval has since lapsed. On July 22, 2003, the City Council approved a Comprehensive Plan Amendment (CPA -4-02) to change the land use designation on the Comprehensive Plan Land Use Map from Residential Two (up to two dwelling units per acre) to Mixed Use, an annexation and rezone (A-3-02 & RZ-5-02) from RUT (Rural Urban Transitional) to MU -DA (Mixed Use with Development Agreement) and a rezone from R-2 (Residential -up to two dwelling units per acre) to MU -DA (Mixed Use with Development Agreement) for this site for B.W. Eagle, Inc. On May 10, 2005, the City Council approved the preliminary plat for Lakemoor Subdivision a 178.52 - acre, 240 -lot (142 -residential, 53 -commercial, 45 -common) subdivision (PP -03-05). On February 28, 2006, the City Council approved the final plats for Lakemoor Subdivision No. 1 and Lakemoor Subdivision No. 2 for DMB Investments, Inc., (FP-13-05/FP-14-05). On June 19, 2007, the City Council approved a modification to the development agreement for DMB Investments, LLC, and Eagle Lifestyle Center, LLC, by amending and restating the original development agreement (recorded as Instrument No. 105048971) (RZ-05-02 MOD). Page 1 of 13 K:II'lanning Dept\Eagle Applications\Dr12I1171DR-13-17 MOD Pamela Baker restroom facility ccddocx On December 8, 2008, the City Council approved the final plat for Lakemoor Subdivision No. 3 for DMB Investments, LLC (FP -04-06). On December 15, 2009, the City Council approved a two (2) year extension of time for the final plat for Lakemoor Subdivision No. 3 for DMB Investments, LLC. The extension of time is valid until December 8, 2011 (EXT -21-09). On October 25, 2011, the City Council approved a one (1) year extension of time for the final plat for Lakemoor Subdivision No. 3 for DMB Investments, LLC. The extension of time is valid until December 8, 2012 (EXT -08-11). On February 26, 2013, the City Council approved a development agreement modification for DMB Investments (RZ-05-02 MOD2). On February 26, 2013, the City Council approved a modification of the preliminary plat associated with Lakemoor Subdivision (PP -03-05 MOD). On June 25, 2013, the City Council approved the final plat for Lakemoor Subdivision No. 4 for B.W. Eagle, Inc. and DMB Investments, Inc. (FP -04-13). On June 25, 2013, the City Council approved the final plat for Lakemoor Subdivision No. 5 for B.W. Eagle, Inc. (FP -07-13). On December 26, 2013, the Lakemoor Subdivision No. 4 final plat was recorded at the Ada County Recorder's Office. On June 13, 2014, the Lakemoor Subdivision No. 5 final plat was recorded at the Ada County Recorder's Office. On April 14, 2015, the City Engineer recommended approval of the Eagles Gates Drive Extension. On July 14, 2015, the City Council approved the final plat for Lakemoor Subdivision No. 6 for DMB Investments (FP -08-15). On April 12, 2016, the City Council approved the final plat for Lakemoor Commercial Subdivision for Hawkins Companies, LLC (FP -02-16). On August 9, 2016, the City Council approved a rezone with a development agreement, modifications to the preliminary plat and original development agreement associated with Lakemoor Subdivision (RZ-05-02 MOD4/RZ-03-16/PP-03-05 MOD2). On January 12, 2017, the Design Review Board approved a design review application for the common area landscaping, pool, and pool house within Lakemoor Subdivision No. 7 (DR -78-16). On February 14, 2017, the City Council approved the final plat for Lakemoor Subdivision No. 6 for DMB Development (FP -03-17). On April 25, 2017, the City Council approved the final plat for Pamela Baker Park Subdivision for DMB Development (FP -02-17). On May 25, 2017, the Design Review Board approved a design review application for the parking lot and pathway within Pamela Baker Park (DR -13-17). E. COMPANION APPLICATIONS: None Page 2 of 13 K:11'Ianning Ihpllliaglc Applications I)A2017 DR -13-17 MOL) Pamela Baker restmom facility ccf.docx F. COMPREHENSIVE PLAN LAND USE MAP AND ZONING MAP DESIGNATIONS: COMP PLAN ZONING DESIGNATION DESIGNATION Existing Mixed Use Proposed No Change North of site Mixed Use South of site Mixed Use East of site Not in Eagle Area of Impact West of site Mixed Use MU -DA (Mixed Use with a development agreement in lieu of a PUD) No Change LAND USE Pamela Baker Park No Change R -E -DA -P (Residential Single-family residences Estates with a development (Coast to Coast agreement in lieu of a PUD) Subdivision) MU -DA (Mixed Use with a development agreement in lieu of a PUD) A-1 (Agricultural) MU -DA (Mixed Use with a development agreement in lieu of a PUD) Proposed Lakemoor Subdivision No. 7 Boise City's Waste Water Treatment Facility Single-family residences (Lakemoor Subdivision No. 2) G. DESIGN REVIEW OVERLAY DISTRICT: Not in the DDA, TDA, CEDA, or DSDA. H. EXISTING SITE CHARACTERISTICS: The site has been developed with a parking lot and pathway for Pamela Baker Park. I. SITE DATA: Total Acreage of Site: 23.05 -acres J. PARKING ANALYSIS: N/A K. GENERAL SITE DESIGN FEATURES: Number and Uses of Proposed Buildings: The applicant is proposing to construct one (1) building to be utilized as a restroom facility. Height and Number of Stories of Proposed Buildings: The applicant is proposing an approximately 13 -foot high single -story structure. Gross Floor Area of Proposed Buildings: The proposed restroom facility is approximately 633 -square feet. On and Off -Site Circulation: On May 25, 2017, the Design Review Board approved a design review application for the trailhead parking lot within Pamela Baker Park (DR -13-17). L. BUILDING DESIGN FEATURES: Roof: Asphalt Composition Shingles (charcoal) Walls: Split face CMU (Basalite 665), Smooth face CMU (Basalite 615) Windows/Doors: Aluminum windows (medium bronze), metal doors (medium bronze) Page 3 of 13 K:U'lanning I)ept1l3aglc Applications\I)rt21117\1)R-13-17 MOD Pamela Baker restroom facility ccf.docx Fascia/Trim: Prefinished metal (Medium bronze) M. LANDSCAPING DESIGN: Retention of Existing Trees and Preservation Methods: There are no existing trees. Tree Replacement Calculations: N/A Proposed Tree Mix (Species & Number): To be reviewed by the Design Review Board. Street Trees: The street trees along East Colchester Drive and East Fishing Creek Drive were approved with DR -13-17. Maintenance Provisions and Proposed Irrigation Methods: Automatic irrigation required. Transition Zones: N/A Parking Lot Landscaping: N/A N. TRASH ENCLOSURES: N/A O. MECHANICAL UNITS: N/A P. OUTDOOR LIGHTING: A site and parking lot light plan showing location, height, and wattage is required to be reviewed and approved by the Zoning Administrator prior to issuance of any building permits. Q. SIGNAGE: No signs are proposed with this application. A separate design review application is required to be reviewed and approved prior to any signs being constructed on this site. R. PUBLIC SERVICES AVAILABLE: A preliminary approval letter from Eagle Fire Department has been received by the City. A water service approval has not been received to date. Approval of the water company having jurisdiction will be required prior to issuance of a building permit. S. PUBLIC USES PROPOSED: None. T. PUBLIC USES SHOWN ON FUTURE ACQUISITIONS MAP: No map currently exists U. SPECIAL ON-SITE FEATURES: Areas of Critical Environmental Concern - none Evidence of Erosion - no Fish Habitat - no Floodplain - no Mature Trees - no Riparian Vegetation - no Steep Slopes - no Stream/Creek - no Unique Animal Life - no Unique Plant Life - no Unstable Soils - unknown Wildlife Habitat - no V. SUMMARY OF REVIEW OF ENVIRONMENTAL ASSESSMENT PLAN (IF REQUIRED): Not required. Page 4 of 13 K:U'lanning Dept\Eagk Applications'DrL0171DR-13-17 MOl) Pamela 13aker restroom facility ccf.tlocx W. AGENCY RESPONSES: The following agencies have responded and their correspondence is attached to the staff report. Ada County Highway District Andeavor (fka Tesoro Logistics NW Pipeline) Eagle Fire Department Eagle Park, Pathway, and Recreation Flood Control District 10 Idaho Transportation Department X. LETTERS FROM THE PUBLIC: None received to date. STAFF ANALYSIS PROVIDED WITHIN THE STAFF REPORT: A. COMPREHENSIVE PLAN PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: Mixed Use Suitable primarily for a variety of uses such as limited office, limited commercial, and residential developments. Uses should complement uses within Downtown Eagle. Development within this land use designation should be required to proceed through the PUD and/or Development Agreement process, see specific planning area text for a complete description. B. DEVELOPMENT AGREEMENT PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: 3.18 Subject to the conditions and limitations set forth herein, Owner shall provide a 23.05 acre reconfigured park site along the eastern boundary of the Property in Area J and Area K as generally depicted in Exhibit A2 attached hereto (hereinafter "Park Site") which Park Site is to be owned and maintained by and at the expense of Eagle. Owner's obligations to provide said Park Site shall be fulfilled as follows: A. Upon the development of Areas H and I, as depicted on Exhibit A2, and/or a combination thereof and the recordation of a final plat for any portion of Areas H and I or a combination thereof, Owner through its Charitable Foundation shall complete certain public improvements to the Park Site for the benefit of the public and Eagle, as follows: 1. Construct a l0 -foot wide asphalt paved pathway, approximately 4000 lineal feet to intersect with the existing paved pathway along the south side of the south Channel of the Boise River, as depicted on attached Exhibit Al . 2. Construct a paved "Trailhead Parking Lot" consisting of 45 spaces within the subject Park Site, as depicted on attached Exhibit A2. 3. Construct and/or excavate approximately eight acres of ponds within the subject Park Site, as depicted on Exhibit A2. 4. Provide utility stubs to the Park Site. B. Upon completion of the above stated public improvements, the Owner through its foundation will dedicate the Park Site to Eagle, which such dedication shall be subject to the following restrictions: 1. The Park Site shall be restricted for use only as a public park and shall act as a non- residential buffer for Boise City's waste water treatment facility and any expansions thereof, located easterly of the Property. Page 5 of 13 K:1Planning DeptlEagle Applications\Dr120171DR-13-17 MOD Pamela Baker restroom facility cclldocx 2. Dedication of the Park Site shall be subject to all reservations, restrictions and easements established of record or by use upon the Premises. The Park Site shall not be made subject to any restrictive covenants Owner may impose upon any other portion of the Property. 3. Eagle shall obtain Owner's written approval for any and all improvements to be made to the Park Site prior to the commencement of construction or installation thereof, such approval not to be unreasonably withheld or delayed over thirty (30) days from the date sent to Owner. Failure of the Owner to respond to the City within the 30 -day period is deemed as approved by the Owner. C. Owner's dedication of the Park Site shall include any and all water rights and/or water shares or certificates evidencing the same, which are appurtenant to the Park Site, the amount or number of which shall be calculated on a proportionate basis with the rights appurtenant to the Property. D. To the extent permissible under the law, Owner shall be entitled to claim any available income tax benefits which may arise out of Owner's donation (and, if applicable, development) of the Park Site as set forth herein, and Eagle shall cooperate with Owner in seeking any such tax benefits. 3.20 Owner shall, as an accommodation to City, work with City to construct a public restroom in proximity to the "Trailhead Parking Lot" located within Area "J". On or before that date which is one (1) year from the date of execution of this Agreement by the parties, and prior to commencement of construction thereof, Owner and City shall reach an agreement for reimbursement of all of Owner's costs associated with its construction of the public restroom. The public restroom shall be constructed during the development of the Park Site as more fully set forth in Section 3.18, above; provided, however, that the requirements of this Section 3.20 shall not prevent, interfere with or unreasonably delay the Owner from timely commencing and completing construction of the subdivision infrastructure and Park Site improvements otherwise required of Owner, nor prevent, interfere with or unreasonably delay the Owner from seeking and obtaining such permits and approvals required therefore and/or for the recordation of one or more final plats of the Property, nor otherwise result in unreasonable delay or interference in the completion of Owner's proposed development. The public restroom shall be dedicated to City with the Park Site and upon dedication shall be maintained by City. C. ZONING CODE PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: • Eagle City Code Section 8-2A-1: GENERAL APPLICABILITY: This article applies to all proposed development located within the design review overlay district which shall include the entire city limits, and any land annexed into the city after the date of adoption hereof. Such development includes, but is not limited to, new commercial, industrial, institutional, office, multi -family residential projects, signs, common areas, subdivision signage, proposed conversions, proposed changes in land use and/or building use, exterior remodeling or repainting with a color different than what is existing, exterior restoration, and enlargement or expansion of existing buildings, signs or sites, and requires the submittal of a design review application pursuant to this article and fee as prescribed from time to time by the city council. D. DISCUSSION: • The applicant is donating 23.05 -acres of land to the City of Eagle for a park to be located on the northeast corner of East Colchester Drive and East Fishing Creek Drive adjacent to Lakemoor Subdivision No. 2. Pursuant to the development agreement, the applicant was required to provide a 10 -foot wide asphalt paved pathway, construct a "Trailhead Parking Lot" consisting of 45 - Page 6 of 13 K: Planning DepAlEagkk Applications1Dr120171DR-13-17 MOl) Pamela Baker restroom facilityccf.docx parking spaces, construct eight acres of ponds within the subject site, provide utility stubs to the site, and to construct a public restroom facility in proximity to the "Trailhead Parking Lot". For the purpose of this design review application, the applicant is requesting approval of the restroom facility and adjacent sidewalks and sidewalk connections. On May 25, 2017, the Eagle Design Review Board approved a design review application for the parking lot, pathway, and ponds within Pamela Baker Park (DR -13-17). The parking lot and pathway have been installed and the ponds are almost complete. The applicant is requesting design review approval to construct a 633 -square foot restroom facility in proximity to the "Trailhead Parking Lot". The building is to be constructed of smooth and split face CMU walls with metal doors and aluminum framed storefront windows all painted to complement the CMU colors. Staff defers comment regarding building design and colors to the Design Review Board. • On August 21, 2018, the Trail and Pathways Superintendent provided comments regarding the proposed restroom site plan with regard to ramps from the parking lot to the sidewalk proposed around the restroom facility, the width of the sidewalk proposed adjacent to the parking lot, the angle of the sidewalk connection to the greenbelt pathway, and the lack of bike racks. The applicant should be required to provide a revised site plan showing handicap parking spaces designated and striped within the existing Trailhead Parking Lot. Pedestrian ramps providing access from the parking lot and handicap parking spaces should be provided in accordance with ADA requirements. The revised site plan should be reviewed and approved by staff prior to the issuance of a zoning certificate. The site plan shows a 4 -foot wide sidewalk to be constructed adjacent to the northern 19 -parking spaces located south and east of the proposed restroom facility and a 4 -foot wide sidewalk to be constructed adjacent to the eastern 8 -parking spaces located west of the proposed restroom facility. Staff recommends the proposed sidewalk be constructed to be a minimum of 6 -feet in width in order to accommodate the bumpers of parked cars hanging over the sidewalk. The applicant should be required to provide a revised site plan showing the sidewalk adjacent to the northern 19 -parking spaces located south and east of the proposed restroom facility and the sidewalk adjacent to the eastern 8 -parking spaces located west of the proposed restroom facility to be a minimum of 6 -feet in width. The revised site plan should be reviewed and approved by staff prior to the issuance of a zoning certificate. STAFF RECOMMENDATION PROVIDED WITHIN THE REPORT: Based upon the information provided to staff to date, staff recommends approval with the site specific conditions of approval and the standard conditions of approval provided within the staff report. PUBLIC MEETING OF THE BOARD: A. A meeting to consider the application was held before the Design Review Board on September 27, 2018, at which time the Board made their decision. B. Oral testimony in opposition to the application was presented to the Design Review Board by no one. C. Oral testimony in favor of the application was presented to the Design Review Board by no one (not including the applicant/representative). BOARD DELIBERATION: (Granicus time 37:03) Upon completion of the applicant's and staff's presentations, the Board discussed during deliberation that: • The Board is in favor of the proposed restroom facility with the site specific and standard conditions of approval. Page 7 of 13 KAN'lanning Dcpt\iaglc ApplicationssDrl2O171DR-13-17 MOIL Pamela Baker restroom facility ccf.docx BOARD DECISION: The Board voted 5 to 0 (Brasher and Sayer absent) to recommend approval of DR -1 3-17 MOD for a design review application for a restroom facility within Pamela Baker Park for C & 0 Development, Inc., with the following site specific conditions of approval and standard conditions of approval provided within their findings of fact and conclusions of law document, dated October 11, 2018. PUBLIC MEETING OF THE COUNCIL: A. A meeting to consider the application was held before the City Council on October 23, 2018, at which time the Council made their decision. B. Oral testimony in opposition to the application was presented to the City Council by no one. C. Oral testimony in favor of the application was presented to the City Council by no one (not including the applicant/representative). COUNCIL DECISION: The Council voted 4 to 0 to approve DR -13-17 MOD for a design review application for a restroom facility within Pamela Baker Park for C & 0 Development, Inc., with the following Design Review Board recommended site specific conditions of approval and standard conditions of approval. SITE SPECIFIC CONDITIONS OF APPROVAL: 1. Comply with all conditions of RZ-05-02 MOD4, PP -03-05 MOD, and FP -02-17. 2. Comply with all conditions of DR -13-17. 3. Provide a revised site plan showing handicap parking spaces designated and striped within the existing Trailhead Parking Lot. Pedestrian ramps providing access from the parking lot and handicap parking spaces shall be provided in accordance with ADA requirements. The revised site plan shall be reviewed and approved by staff prior to the issuance of a zoning certificate. 4. Provide a revised site plan showing the sidewalk adjacent to the northern 19 -parking spaces located south and east of the proposed restroom facility and the sidewalk adjacent to the eastern 8 -parking spaces located west of the proposed restroom facility to be a minimum of 6 -feet in width. The revised site plan shall be reviewed and approved by staff prior to the issuance of a zoning certificate. 5. Coordinate the angle of the sidewalk connection to the greenbelt with the Trails and Pathways Superintendent. Provide written approval from the Trails and Pathways Superintendent prior to the issuance of a zoning certificate. 6. Coordinate with the Eagle Public Works Director with regard to the internal construction materials, colors, hardware, etc. to be used in the construction of the restroom facility. Provide written approval from the Eagle Public Works Director prior to the issuance of a zoning certificate. 7. A design review application shall be submitted, reviewed, and approved for the required perimeter landscaping, interior parking lot landscaping, and any pedestrian amenities prior to any of these improvements being constructed. 8. No ground mounted mechanical units are proposed with this application and none are approved. 9. Paint all electrical meters, phone boxes, etc. located on the building to match the color of the building. 10. No signs are proposed with this application and none are approved. NOTE: In the event a Standard Condition of Approval conflicts with a Site Specific Condition of Approval contained herein the Site Specific Condition of Approval shall control. Page 8 of 13 K:1Planning Dcpt\Eaglc Application.s1Dd20171DR-13-17 MOD Pamela Baker restroom facility ccf docx STANDARD CONDITIONS OF APPROVAL: 1. The applicant shall comply with all requirements of the Ada County Highway District and/or the Idaho Transportation Department, including but not limited to approval of the drainage system, curbs, gutters, streets and sidewalks. A letter of approval from the highway district having jurisdiction shall be submitted to the City prior to issuance of a Zoning Certificate for this site. 2. Idaho Department of Health & Welfare approval of the sewer and water facilities is required prior issuance of any building permits or Certificate of Occupancy, whichever occurs first. 3. All permits from Central District Health, Eagle Sewer District & Eagle Fire District shall be secured prior to issuance of building permit or Certificate of Occupancy, whichever occurs first. 4. Written approval of all well water for any shared or commercial well shall be obtained from the Idaho Department of Water Resources and shall be submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. 5. Unless septic tanks are permitted, wet line sewers will be required and the applicant will be required to furnish the City Engineer with a letter from the sewer entity serving the property, accepting the project for service, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. 6. The applicant shall submit a letter from the appropriate drainage entity approving the drainage system and/or accepting said drainage; or submit a letter from a registered professional engineer certifying that all drainage shall be retained on-site prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. A copy of the construction drawing(s) shall be submitted with the letter. 7. The applicant shall submit plans and calculations prepared by a registered professional engineer to handle the satisfactory disposal of all storm drainage on the applicant's site. Drainage system plans shall be submitted to the City Engineer for review and approval prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The plans shall show how swales, or drain piping, will be developed in the drainage easements. The approved drainage system shall be constructed, or a performance bond shall be submitted to the City Clerk, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The lot shall be so graded that all runoff runs either over the curb, or to the drainage easement and no runoff shall cross any lot line onto another lot except within a drainage easement. All design and calculations shall meet the requirements of Ada County Highway District. Construction of the storm drain disposal system shall be complete before an occupancy permit is issued. 8. No ditch, pipe or other structure or canal, for irrigation water or irrigation waste water owned by an organized irrigation district, canal company, ditch association, or other irrigation entity, shall be obstructed, routed, covered or changed in any way unless such obstruction, rerouting, covering or changing has first been approved in writing by the entity. A Registered Engineer shall certify that any ditch rerouting, piping, covering or otherwise changing the existing irrigation or waste ditch (1) has been made in such a manner that the flow of water will not be impeded or increased beyond carrying capacity of the downstream ditch; (2) will not otherwise injure any person or persons using or interested in such ditch or their property; and (3) satisfied the Idaho Standards for Public Works Construction. A copy of such written approval and certification shall be filed with the construction drawing and submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. 9. Encroachments including, but not limited to, landscaping, fencing, lighting, and/or pathways shall not be located within any easement or right-of-way for any ditch, pipe or other structure, or canal used for Page 9 of 13 K:11'lanning DeptViagle Applications1Dr120171DR-13-17 MOD Pamela Baker restroom facility cct:docx irrigation water or irrigation waste water without the express written approval of the organized irrigation district, canal company, ditch association, or other irrigation entity associated with such ditch, pipe or other structure, or canal. The applicant shall submit a copy of the written approval from the irrigation entity prior to the City Clerk signing the final plat. 10. Street light plans shall be submitted and approved as to the location, height and wattage to the City Engineer (if applicable) prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. All construction shall comply with the City's specifications and standards. The applicant shall provide a recorded easement, acceptable to the City Engineer, for the purpose of installing and maintaining street light fixtures, conduit and wiring lying outside any dedicated public right-of-way, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The applicant shall pay applicable street light inspection fees prior to issuance of any Certificate of Occupancy. 11. Parking lot light plan shall be submitted and approved as to the location, height and wattage by the City Engineer. All construction shall comply with the City's specifications and standards. Lighting is required in the parking area and shall be properly illuminated to avoid accidents. Any lights used to illuminate the parking lot shall be so arranged as to reflect the light away from the adjoining property. 12. The parking area shall be paved and shall be maintained in good condition without holes and free of all dust, trash, weeds and other debris. 13. One set of building plans, for any non single-family residential use, shall be submitted to the Eagle Fire Department for approval. An approval letter from the Eagle Fire Department shall be submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The letter shall include the following comments and minimum requirements, and any other items of concern as may be determined by the Eagle Fire Department officials: a. "The applicant has made arrangements to comply with all requirements of the Fire Department." b. The fire hydrant locations shall be reviewed and be approved in writing by the Eagle Fire Department prior to the City Engineer signing the final plat. c. Minimum flow per hydrant shall be 1,000 gallons per minute for one and two family dwellings, 1,500 gallons per minute for dwellings having a fire area in excess of 3,600 -square feet, and 1,500 gallons per minute for non-residential uses (i.e.; Commercial, Industrial, Schools, etc.). Flow rates shall be inspected in accordance with all agencies having jurisdiction, and shall be verified in writing by the Eagle Fire Department prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. d. The proposed fire protection system shall be reviewed and approved by the Eagle Fire Department prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 14. Any recreation area, greenbelt area or pathway area along the Boise River, Dry Creek or any other area designated by the City Council or Eagle City Park and Pathway Development Committee for a path or walkway shall be approved in writing by the Eagle City Park and Pathway Development Committee prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 15. Conservation, recreation and river access easements (if applicable) shall be approved by the Eagle City Park and Pathway Development Committee and shall be shown on the final plat prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 16. The applicant shall comply with the provisions of the Eagle City Code, pertaining to floodplain and river protection regulations (if applicable) prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. Page 10 of 13 K:IPlanning Uept\Caglc Applications\hr120I7\1DR-13-17 MOD Pamela Baker restroom facility ccf docx 17. The applicant shall obtain written approval of the development relative to the effects of the Boise River Flood Plain (if applicable) from the Corps. of Engineers prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 18. The applicant shall obtain approval of the development relative to its effects on wetlands or other natural waterways (if applicable) from the Corps. of Engineers and the Idaho Department of Water Resources and/or any other agency having jurisdiction prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 19. Basements in the flood plain are prohibited. 20. The Americans with Disabilities Act, Uniform Building Code, Eagle City Code, and all applicable County, State and Federal Codes and Regulations shall be complied with. All design and construction shall be in accordance with all applicable City of Eagle Codes unless specifically approved by the City Council. 21. New plans, which incorporate any required changes, shall be submitted for staff approval. Staff may elect to take those plans to the Design Review Board and the City Council for review and approval. 22. Any changes to the plans and specifications upon which this approval is based, other than those required by the above conditions, will require submittal of an application for modification and approval of that application prior to commencing any change. 23. Any modification of the approved design review plans, including, but not limited to building design, location and details, landscaping, parking, and circulation, must be approved prior to construction/ installation of such changes. Failure to do so may result in the requirement to modify the project to comply with the approved design review and/or result in the inability to issue a final approval for occupancy of this project. 24. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the City of Eagle of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. 25. Approval of any Design Review shall expire without notice to the applicant on the date of expiration of the Design Review if construction has not started prior to that date, as stipulated in Eagle City Code (one year from approval date). 26. All ground -mounted accent lighting fixtures and monument sign lighting fixtures shall be screened from view with the use of landscaping (top of the fixture shall be no higher than the surrounding landscaping). The light source itself shall otherwise be screened as provided for within Eagle City Code. 27. The City's actions on the application does not grant the applicant any appropriation of water or interference with existing water rights. The applicant indemnifies and holds the City harmless for any and all water rights, claims in any way associated with this application. CONCLUSIONS OF LAW: 1. The Council reviewed the particular facts and circumstances of this proposed design review application (DR -13-17 MOD) with regard to the Eagle City Code Title 8, Chapter 2, Article A, DR Design Review Overlay District, and based upon the information provided with the conditions required herein, concludes that the proposed design review application is in accordance with the Eagle City Code and the Eagle Comprehensive Plan. 2. The Council reviewed the particular facts and circumstances of the proposed design review in terms of Page 11 of 13 K:IPlanning 1) ptlEaglc ApplicationssDi 2U17U)R-13-17 MOI) Pamela Baker restroom facility cct docs Eagle City Code 8-2A- 13, "General Standards For Design Review" and has concluded that the proposed design review: A. Will function in conformance with the applicable strategies of the Eagle Comprehensive Plan and is in accordance with the regulations of this code since there are no inconsistencies with the comprehensive plan and restroom facility is permitted with the approval of a design review application within the MU -DA (Mixed Use with a development agreement in lieu of a PUD) zoning district; B. Is of a scale, intensity, and character that is in harmony with existing conforming and planned development in the vicinity of the site since the proposed restroom facility is designed to complement the general vicinity; C. Is designed with adequate off street parking facilities in such a way as to not interfere with ingress/egress to the site and will serve the intended use so as to not cause conflict with adjacent uses as anticipated within the zoning district since the site meets the requirement of the development agreement associated with Pamela Baker Park Subdivision; D. Will not interfere with the visual character, quality, or appearance of the surrounding area and city, and where possible, enhance the continuity of thematically common architectural features since the proposed restroom facility has been designed with quality materials and similar features utilized on other buildings within the development and will enhance the character of the area; E. Will have facades, features, and other physical improvements that are designed as a whole, when viewed alone as well as in relationship to surrounding buildings and settings since the proposed restroom facility has been designed with quality materials and similar features utilized on other buildings within the development; F. Will not obstruct views and vistas as they pertain to the urban environment and in relation to artistic considerations since the proposed restroom facility is in conformance with the required setbacks and height restrictions; G. Will provide safe and convenient access to the property for both vehicles and pedestrians through patterned traffic circulation and connectivity to abutting development H. Is in the interest of public health, safety, and general welfare promoting a pedestrian friendly and walkable environment in balance with protecting a viable residential center in the area; and I. No signs are proposed with this application. All signs, if proposed, will be required to be harmonious with the architectural design of the subdivision, and will not cover nor detract from desirable architectural features. Page 12 of 13 K:1Planning Ikpt\Eagle Applicatk nsll)r120171DR-13-17 MOI) Pamela Baker restroom facility cadocx DATED this 23' day of October 2018. CITY COUNCIL OF THE CITY OF EAGLE Ada County, Idaho ',C Stan Ridgeway, Mayor ATTEST: Sharon K. Bergmann, Eagle City Clkrk Reconsideration Notice. Applicant has the right. pursuant to Section 67-6535, Idaho Code, to request a reconsideration within fourteen (14) days of the final written decision Pa(ie 13 of 13 h il'Ismmng Ikpt\I.agk Apph..wti n.\I)r'n17\I )1i-1 17 \1(111 fame L. Balser re,tnxtm bruin)