Loading...
Agenda - 2015 - Design Review - 01/08/2015 - Regular THE CITY OF EAGLE DESIGN REVIEW BOARD AGENDA Eagle City Hall, 660 E. Civic Lane January 8, 2015 6:00 P.M. CALL TO ORDER: 1. ROLL CALL:GRUBB, BRASHER, SAYER, MARTIN, HASH, SCHAFER, BAER 2. CONSENT AGENDA: 3.  Consent Agenda items are considered to be routine and are acted on with one motion. There will be no separate discussion on these items unless a Design Review Board member, City Staff, or a citizen requests an item to be removed from the Consent Agenda for discussion. Items removed from the Consent Agenda will be placed on the Regular Agenda in a sequence determined by the Rules of Order.  Any item on the Consent Agenda that contains written recommendations from the City of Eagle shall be adopted as part of the Design Review’s Consent Agenda approval motion unless specifically stated otherwise. A.Minutes of December 11, 2014. Findings of Fact and Conclusions of Law forDR-30-05 MOD –Modification to the B. Landscaping at the Entrance to Laguna Pointe Subdivision – Laguna Pointe Home Owners Association: Laguna Pointe Home Owners Association, represented by Paul Norberg with Harvest Design, is requesting design review approval to modify the landscaping at the entrance to Laguna Pointe Subdivision. The site is located on the east side of South Eagle Road on the north and south sides of East River Meadow Drive. Findings of Fact and Conclusions of Law for DR-57-14 – Placement of 10-foot Tall C. Fiberglass Rooster in Drainage Pond at Reid W. Merrill Community Park – City of Eagle: The City of Eagle, represented by Mike Aho, is requesting design review approval to install a ten foot (10’) tall fiberglass rooster within the drainage pond located between the parking lot and East Shore Drive at Reid M. Merrill Community Park. The site is located on the southeast corner of East Shore Drive and East Riverside Drive at 637 East Shore Drive within Eagle River Development. Findings of Fact and Conclusions of Law forDR-59-14 – Multi-Tenant Commercial D. Building with Two Residential Apartments – Yesterday Properties LLC: Yesterday Properties LLC, represented by Walter Lindgren with Johnson Architects, is requesting design review approval to remove an existing residential dwelling and to construct an st 8,619-square foot two story commercial/ apartment building (1 floor – 4,144-square feet nd and 2 floor – 4,464-square feet). The 0.17-acre site is located on the southeast corner of ndnd North 2 Street and East Idaho Street at 166 North 2 Street. Findings of Fact and Conclusions of Law forDR-60-14 – Master Sign Plan for a E. Multi-Tenant Commercial Building – Yesterday Properties LLC : Yesterday Properties LLC, represented by Walter Lindgren with Johnson Architects, is requesting design review sign approval of the master sign plan for a multi-tenant commercial building. The 0.17-acre site is located on the southeast corner of North 2nd Street and East Idaho Street at 166 North 2nd Street. UNFINISHED BUSINESS: 4. None. NEW BUSINESS: 5. DR-36-06 MOD –Modification to Remove the Awnings from the West Building A. Elevation of Albertsons –Albertsons, Inc.: Albertsons, Inc., represented by Lee Young with CSHQA Architects, is requesting design review approval to modify the building elevations by removing the awnings from the west building elevation. The site is located on the southeast corner of South Eagle Road and Plaza Drive at 250 South Eagle Road. DR-61-14 – Entry Structure with Signage for Renovare Subdivision –MDG LLC: B. MDG LLC, represented by John Johnston with JD Johnston Construction, is requesting design review approval to construct an entry structure and signage for Renovare Subdivision. The 24-acre site is located on the east side of South Edgewood Lane approximately 970-feet south of State Highway 44. DR-67-14 – Common Area Landscaping within Gateway Subdivision – Northside C. Management: Northside Management, represented by Scott Noriyuki, is requesting design review approval to construct the common area landscaping within Gateway Subdivision. The 28.1-acre site is generally located at the southwest corner of East Sadie Drive and North Echohawk Way. DR-03-04 MOD – Modification to Exterior Building Elevations for Mountain D. America Credit Union – Mountain America Credit Union: Mountain America Credit Union, represented by David Tyson with EMA Architect, is requesting design review approval to modify the exterior building elevations of the Mountain America Credit Union building (formerly Home Federal Bank). The site is located north of East Riverside Drive and east of Eagle Road at 100 East Riverside Drive within Eagle River Development. DR-72-14 – Three Building Wall Signs for Mountain America Credit Union – E. Mountain America Credit Union: Mountain America Credit Union, represented by David Tyson with EMA Architect, is requesting design review sign approval to construct three (3) building wall signs for Mountain America Credit Union. The site is located north of East Riverside Drive and east of Eagle Road at 100 East Riverside Drive within Eagle River Development. REPORTS: 6. A. Design Review Board: B. Staff: ADJOURNMENT: 7. The City will make reasonable accommodations for anyone attending this meeting who require special assistance for hearing, physical or other impairments. Please contact the City Clerk’s Office at (208) 939-6813 at least 24 hours in advance of the meeting date and time.