Agenda - 2006 - Design Review - 04/13/2006 - Regular
THE CITY OF EAGLE
DESIGN REVIEW BOARD AMENDED AGENDA
Eagle City Hall, 660 E. Civic Lane
April 13, 2006
6:00 P.M.
CALL TO ORDER
1.
ROLL CALL:
2. MC CULLOUGH, STANGER, GRUBB, ZASTROW, BARNES,
WRIGHT, MACDONALD, COUNCIL LIAISON BASTIAN
CONSENT AGENDA:
3.
?
Consent Agenda items are considered to be routine and are acted on with one motion.
There will be no separate discussion on these items unless a Design Review Board
member, City Staff, or a citizen requests an item to be removed from the Consent
Agenda for discussion. Items removed from the Consent Agenda will be placed on the
Regular Agenda in a sequence determined by the Rules of Order.
?
Any item on the Consent Agenda that contains written recommendations from the City
of Eagle shall be adopted as part of the Design Review’s Consent Agenda approval
motion unless specifically stated otherwise.
A. Minutes of March 23, 2006.
Finding of Fact and Conclusions of Law forDR-1-05 MOD – Monument Sign
B.
for Zen Bento – ZB Eagle, LLC:
ZB Eagle, LLC, represented by Rene Iwamasa, is
requesting design review approval to construct a monument sign for Zen Bento. The
nd
site is located approximately 100-feet east of 2 Street on the north side of East State
Street at 342 East State Street.
Finding of Fact and Conclusions of Law for DR-10-06 – One Multi-Tenant
C.
Retail Building and Bank Facility – Mountain West Bank:
Mountain West Bank,
represented by Andrew Erstad with Erstad Architects, is requesting design review
approval to construct one 10,370-square foot multi-tenant retail building and one
4,290-square foot bank facility. The site is located on the southwest corner of East
Iron Eagle Drive and Edgewood Lane within Merrill Subdivision No. 1 (formerly
Rocky Mountain Business Park) at 1539 East Iron Eagle Drive.
Finding of Fact and Conclusions of Law forDR-11-06 – Master Sign Plan for a
D.
Single-Tenant Building and a Multi-Tenant Retail Building – Mountain West
Bank:
Mountain West Bank, represented by Andrew Erstad with Erstad Architects,
is requesting design review approval of a master sign plan for a single-tenant building
and a multi-tenant retail building. The site is located on the southwest corner of East
Iron Eagle Drive and Edgewood Lane within Merrill Subdivision No. 1 (formerly
Rocky Mountain Business Park) at 1539 East Iron Eagle Drive.
UNFINISHED BUSINESS:
4.
DR-18-06 – Single-Tenant Office Building within Winding Creek Subdivision –
A.
David Aspitarte:
David Aspitarte, represented by James Gipson, is requesting design
review approval to construct a 2,894-square foot single-tenant office building. The site
is located on the south side of East Winding Creek Drive within Winding Creek
Subdivision (Lot 6, Block 2) at 1045 East Winding Creek Drive.
This item was continued
from the March 23, 2006 meeting.
Page 1 of 2
K:\DESI_REV\AGENDA\2006\DR-04-13-06ag2.doc
THE CITY OF EAGLE
DESIGN REVIEW BOARD AMENDED AGENDA
Eagle City Hall, 660 E. Civic Lane
April 13, 2006
6:00 P.M.
DR-19-06 –Two Building Wall Signs for Bionomics– David Aspitarte:
B. David
Aspitarte, represented by James Gipson, is requesting design review approval to
construct two building wall signs for Bionomics. The site is located on the south side
of East Winding Creek Drive within Winding Creek Subdivision (Lot 6, Block 2) at
1045 East Winding Creek Drive.
This item was continued from the March 23, 2006 meeting.
NEW BUSINESS:
5.
DR-24-06 - Multi-tenant Office Building within Great Sky Subdivision No. 7 -
A.
Barclay Construction LLC:
Barclay Construction is requesting design review
approval to construct a 2,854-square foot multi-tenant office building. The site is
located approximately 160-feet south of Hill Road and 80-feet west of South
Wooddale Avenue within Great Sky Subdivision No. 7 (Lot 23, Block 11, Great Sky
Subdivision No. 7) at 225 South Wooddale Avenue.
DR-25-06 - Modification to the Common Area Landscaping within Corrente
B.
Bello Subdivision - Corrente Bello Estates, LLC:
Corrente Bello Estates, LLC,
represented by Matthew Adams with The Land Group, is requesting design review
approval to modify the central common area within Corrente Bello Subdivision Phase
2. The modification consists of the installation of two (2) ponds, gazebo, pathway and
a pedestrian bridge. The site is located on the north side of Floating Feather Road
approximately ½-mile west of Eagle Road on the west and north sides of Eagle Middle
School.
DR-73-05 MOD - Monument Signs for Corrente Bello Subdivision - Gemstar
C.
Development:
Gemstar Development, represented by Matt Adams with The Land
Group, Inc., is requesting design review approval to modify the monument signs for
Corrente Bello Subdivision. The site is located on the north side of Floating Feather
Road approximately ½-mile west of Eagle Road.
DR-26-06 - Special Portable Sign for The Black Pearl - Jamie Harnagel:
D. The
Black Pearl, represented by Jamie Harnagel, is requesting design review approval of a
special Portable Sign for a retail business, The Black Pearl. The site is located on the
ndnd
east side of 2 Street approximately 125-feet north of East State Street at 52 2
Street.
REPORTS:
6.
A.Design Review Board:
B.Council Liaison:
C.Staff:
ADJOURNMENT:
7.
Page 2 of 2
K:\DESI_REV\AGENDA\2006\DR-04-13-06ag2.doc