Agenda - 2005 - Design Review - 09/22/2005 - Regular
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
September 22, 2005
6:00 P.M.
CALL TO ORDER
1.
ROLL CALL:
2. MC CULLOUGH, STANGER, BOWEN, GRUBB, ZASTROW, BARNES,
COUNCIL LIAISON BASTIAN
CONSENT AGENDA:
3.
?
Consent Agenda items are considered to be routine and are acted on with one motion. There will
be no separate discussion on these items unless a Design Review Board member, City Staff, or a
citizen requests an item to be removed from the Consent Agenda for discussion. Items removed
from the Consent Agenda will be placed on the Regular Agenda in a sequence determined by the
Rules of Order.
?
Any item on the Consent Agenda that contains written recommendations from the City of Eagle
shall be adopted as part of the Design Review’s Consent Agenda approval motion unless
specifically stated otherwise.
A. Minutes of September 8, 2005.
Findings of Fact and Conclusions of Law for DR-57-04 MOD –Master Sign Plan for a
B.
Multi-tenant Medical/Dental Office Building Including Building Wall Signs for Eagle
River Dentistry, Eagle River Homes, and Hart Designs – Dave Evans Construction:
Dave
Evans Construction, represented by Roger Llewellyn with Golden West Advertising Inc., is
requesting design review approval to modify the master sign plan for a multi-tenant
medical/dental office building. This modification includes the approval of building wall signs
for Eagle River Dentistry, Eagle River Homes, and Hart Designs. The site is located on the
southwest corner of East Shore Drive and Bridgeway Place at 325 East Shore Drive within Eagle
River Development (Lot 10, Block 4, Mixed Use Subdivision No. 3).
Findings of Fact and Conclusions of Law for DR-69-05 – Common Area Landscaping and
C.
Clubhouse within Lakemoor Subdivision – BW Eagle, LLC:
BW Eagle, LLC, represented
by Dave Koga with The Land Group, is requesting design review approval of the common area
landscaping and clubhouse within Lakemoor Subdivision. The site is located on the east side of
Eagle Road approximately ¼-mile north of Chinden Boulevard.
Findings of Fact and Conclusions of Law forDR-72-05 – Common Area Landscaping
D.
within Castlebury West Subdivision – Capitol Development:
Capitol Development,
represented by Dave Koga, ASLA, with The Land Group, is requesting design review approval
of the common area landscaping within Castlebury Subdivision. The site is located on the
northeast corner of Chinden Boulevard and North Meridian Road.
Findings of Fact and Conclusions of Law for DR-77-05 – Common Area Landscaping, Pool
E.
House, and Gazebos within Corrente Bello Subdivision – Carmen, LLC, and Gemstar
Development, LLC:
Carmen, LLC, and Gemstar Development, LLC, represented by Gina
Fegler, with The Land Group, are requesting design review approval of the common area
landscaping, pool house, and two (2) gazebos within Corrente Bello Planned Subdivision. The
site is located on the north side of Floating Feather Road approximately 1,300-feet east of
Ballantyne Road at 1400 West Floating Feather Road.
Findings of Fact and Conclusions of Law for DR-71-05 – Two Monument Signs for
F.
Castlebury West Subdivision – Capital Development Inc.:
Capital Development Inc.,
represented by David Koga with The Land Group, is requesting design review approval to
construct two monument signs at the entry to Castlebury West Subdivision on North Meridian
Road. The site is located at the northeast corner of North Meridian Road and Chinden
Page 1 of 3
K:\DESI_REV\AGENDA\Temp Work Area\DR-09-22-05ag.doc
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
September 22, 2005
6:00 P.M.
Boulevard.
UNFINISHED BUSINESS:
4.
DR-35-05 – Multi-tenant Office Building within Rocky Mountain Business Park No. 3 –
A.
Dave Evans Construction:
Dave Evans Construction, represented by Travis Burrows, is
requesting design review approval to construct a 2,500-square foot multi-tenant office building.
The site is located on the south side of East Iron Eagle Drive approximately 330-feet east of
South Fitness Place on Lot 5, Block 1, of Rocky Mountain Business Park No. 3, on East Iron
Eagle Drive. This item was continued from the August 25, 2005 meeting.
DR-34-05 – Master Sign Plan for a Multi-tenant Office Building – Dave Evans
B.
Construction:
Dave Evans Construction, represented by Travis Burrows, is requesting design
review approval of a master sign plan for a multi-tenant office building. The site is located on
the south side of East Iron Eagle Drive approximately 330-feet east of South Fitness Place on
Lot 5, Block 1, of Rocky Mountain Business Park No. 3, on East Iron Eagle Drive. This item
was continued from the August 25, 2005 meeting.
DR-39-05 – Multi-tenant Office Building within Rocky Mountain Business Park No. 3 –
C.
Dave Evans Construction:
Dave Evans Construction, represented by Travis Burrows, is
requesting design review approval to construct a 4,340-square foot multi-tenant office building.
The site is located on the south side of East Iron Eagle Drive approximately 330-feet east of
South Fitness Place on Lot 7, Block 1, of Rocky Mountain Business Park No. 3, on East Iron
Eagle Drive. This item was continued from the August 25, 2005 meeting.
DR-38-05 – Master Sign Plan for a Multi-tenant Office Building – Dave Evans
D.
Construction:
Dave Evans Construction, represented by Travis Burrows, is requesting design
review approval of a master sign plan for a multi-tenant office building. The site is located on
the south side of East Iron Eagle Drive approximately 330-feet east of South Fitness Place on
Lot 7, Block 1, of Rocky Mountain Business Park No. 3, on East Iron Eagle Drive. This item
was continued from the August 25, 2005 meeting.
DR-41-05 – Multi-tenant Office Building within Rocky Mountain Business Park No. 3 –
E.
Dave Evans Construction:
Dave Evans Construction, represented by Travis Burrows, is
requesting design review approval to construct a 4,200-square foot multi-tenant office building.
The site is located on the south side of East Iron Eagle Drive approximately 330-feet east of
South Fitness Place on Lot 9, Block 1, of Rocky Mountain Business Park No. 3, on East Iron
Eagle Drive. This item was continued from the August 25, 2005 meeting.
DR-40-05 – Master Sign Plan for a Multi-tenant Office Building – Dave Evans
F.
Construction:
Dave Evans Construction, represented by Travis Burrows, is requesting design
review approval of a master sign plan for a multi-tenant office building. The site is located on
the south side of East Iron Eagle Drive approximately 330-feet east of South Fitness Place on
Lot 9, Block 1, of Rocky Mountain Business Park No. 3, on East Iron Eagle Drive. This item
was continued from the August 25, 2005 meeting.
DR-43-05 – Multi-tenant Office Building within Rocky Mountain Business Park No. 3 –
G.
Dave Evans Construction:
Dave Evans Construction, represented by Travis Burrows, is
requesting design review approval to construct a 5,700-square foot multi-tenant office building,
which includes 1,800-square feet to be used as medical/dental office. The site is located on the
south side of East Iron Eagle Drive approximately 330-feet east of South Fitness Place on Lot
Page 2 of 3
K:\DESI_REV\AGENDA\Temp Work Area\DR-09-22-05ag.doc
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
September 22, 2005
6:00 P.M.
10, Block 1, of Rocky Mountain Business Park No. 3, on East Iron Eagle Drive. This item was
continued from the August 25, 2005 meeting.
DR-42-05 – Master Sign Plan for a Multi-tenant Office Building – Dave Evans
H.
Construction:
Dave Evans Construction, represented by Travis Burrows, is requesting design
review approval of a master sign plan for a multi-tenant office building. The site is located on
the south side of East Iron Eagle Drive approximately 330-feet east of South Fitness Place on
Lot 10, Block 1, of Rocky Mountain Business Park No. 3, on East Iron Eagle Drive. This item
was continued from the August 25, 2005 meeting.
DR-63-05 – Childcare Facility within Rocky Mountain Business Park – Dave Evans
I.
Construction:
Dave Evans Construction, represented by Travis Burrows, is requesting design
review approval to construct a 3,430-square foot childcare facility for Boise Christian Preschool
Academy. The site is located on the south side of East Iron Eagle Drive within Rocky Mountain
Business Park No. 3. This item was continued from the August 25, 2005 meeting.
DR-64-05 – Two Building Wall Signs for Boise Academy Christian Preschool – Dave Evans
J.
Construction:
Dave Evans Construction, represented by Travis Burrows, is requesting design
review approval to construct two (2) building wall signs for Boise Academy Christian Preschool.
The site is located on the south side of East Iron Eagle Drive within Rocky Mountain Business
Park No. 3 (Lot 3, Block 1). This item was continued form the August 25, 2005 meeting.
NEW BUSINESS:
5.
DR-70-05 – Music Academy Facility – Ken and Mary Cenell:
A. Ken and Mary Cenell,
represented by Chad Slichter with Slichter Architects, are requesting design review approval to
construct a three (3) story (22,659-square feet) music academy facility. The site is located on the
south side of West Flint Drive approximately 600-feet north of State Highway 44 at 3415 West
Flint Drive.
DR-75-05 – Multi-tenant Office Building within Hillcreek Business Park – Juli Vanwyk:
B.
Juli Vanwyk, represented by Bruce Poe with Cole Poe Architects, is requesting design review
approval to construct a 3,200-square multi-tenant office building. The site is located on the north
side of East State Street within Hillcreek Business Park on Lot 2, Block 1, Hillcreek Business
Park.
DR-76-05 – Master Sign Plan for Multi-Tenant Office Building – Juli Vanwyk:
C. Juli
Vanwyk, represented by Chris Pecoraro with Sign A Rama, is requesting design review approval
of a master sign plan for a multi-tenant office building. The site is located on the north side of
East State Street within Hillcreek Business Park on Lot 2, Block 1.
REPORTS:
6.
A.Design Review Board:
B.Council Liaison:
C.Staff:
ADJOURNMENT:
7.
Page 3 of 3
K:\DESI_REV\AGENDA\Temp Work Area\DR-09-22-05ag.doc