Agenda - 2005 - Design Review - 07/14/2005 - Regular
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
July 14, 2005
6:00 P.M.
ORIGINAL
1.
CALL TO ORDER:
2.
ROLL CALL: MC CULLOUGH, STANGER, FLOEGEL, BOWEN, GRUBB,
ZASTROW, BARNES, COUNCIL LIAISON BASTIAN.
3.
CONSENT AGENDA
. Consent Agenda items are considered to be routine and are acted on with one motion.
There will be no separate discussion on these items unless a Design Review Board
member, City Staff, or a citizen requests an item to be removed from the Consent
Agenda for discussion. Items removed from the Consent Agenda will be placed on the
Regular Agenda in a sequence determined by the Rules of Order.
. Any item on the Consent Agenda that contains written recommendations from the
City of Eagle shall be adopted as part of the Design Review's Consent Agenda
approval motion unless specifically stated otherwise.
A. Minutes of June 23, 2005.
4.
5.
UNFINISHED BUSINESS: None.
NEW BUSINESS:
A. DR-24-05 - Common Area Landscapine and Club House within Eaele Creek
Subdivision - Goldcreek Developers LLC: Goldcreek Developers LLC,
represented by Phil Hull with The Land Group, is requesting design review approval
of the common area landscaping and aI, nO-square foot club house within Eagle
Creek Subdivision. The site is located west of Park Lane at 655 Park Lane.
B. DR-31-05 - Common Area Landscapine within Rocky Mountain Business Park
No.3 - Dave Evans Construction: Dave Evans Construction, represented by Travis
Burrows, is requesting design review approval of the common area landscaping
within Rocky Mountain Business Park No.3. The site is located on the south side of
East Iron Eagle Drive approximately 330-feet east of South Fitness Place within
Rocky Mountain Business Park at 1189 and 1267 East Iron Eagle Drive.
C. DR-33-05 - Two StOry Multi-tenant Office Buildine within Rocky Mountain
Business Park No.3 - Dave Evans Construction: Dave Evans Construction,
represented by Travis Burrows, is requesting design review approval to construct a
7,732-square foot two story multi-tenant office building. The site is located on the
south side of East Iron Eagle Drive approximately 330-feet east of South Fitness
Place within Rocky Mountain Business Park at 1189 and 1267 East Iron Eagle Drive.
D. DR-32-05 - Master Sien Plan for a Multi-tenant Office Buildine - Dave Evans
Construction: Dave Evans Construction, represented by Travis Burrows, is
requesting design review approval of a master sign plan for a two story multi-tenant
office building. The proposed building is located on Lot 1, Block I of Rocky
Page 1 of 4
K:\DESI_REV\AGENDA\Temp Work Area\DR-O7-14-05ag.doc
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
July 14,2005
6:00 P.M.
Mountain Business Park #3 on East Iron Eagle Drive.
E. DR-35-05 - Multi-tenant Office Buildine within Rocky Mountain Business Park
No.3 - Dave Evans Construction: Dave Evans Construction, represented by Travis
Burrows, is requesting design review approval to construct a 2,500-square foot multi-
tenant office building. The site is located on the south side of East Iron Eagle Drive
approximately 330-feet east of South Fitness Place within Rocky Mountain Business
Park at 1189 and 1267 East Iron Eagle Drive.
F. DR-34-05 - Master Sien Plan for a Multi-tenant Office Buildine - Dave Evans
Construction: Dave Evans Construction, represented by Travis Burrows, is
requesting design review approval of a master sign plan for a multi-tenant office
building. The proposed building is located on Lot 5, Block 1 of Rocky Mountain
Business Park #3 on East Iron Eagle Drive.
G. DR-36-05 - Multi-tenant Office Buildine within Rocky Mountain Business Park
No.3 - Dave Evans Construction: Dave Evans Construction, represented by Travis
Burrows, is requesting design review approval to construct a 3,300-square foot multi-
tenant office building. The site is located on the south side of East Iron Eagle Drive
approximately 330-feet east of South Fitness Place within Rocky Mountain Business
Park at 1189 and 1267 East Iron Eagle Drive.
H. DR-37-05 - Master Sien Plan for a Multi-tenant Office Buildine - Dave Evans
Construction: Dave Evans Construction, represented by Travis Burrows, is
requesting design review approval of a master sign plan for a multi-tenant office
building. The proposed building is located on Lot 6, Block 1 of Rocky Mountain
Business Park #3 on East Iron Eagle Drive.
I. DR-39-05 - Multi-tenant Office Buildine within Rocky Mountain Business Park
No.3 - Dave Evans Construction: Dave Evans Construction, represented by Travis
Burrows, is requesting design review approval to construct a 4,340-square foot multi-
tenant office building. The site is located on the south side of East Iron Eagle Drive
approximately 330-feet east of South Fitness Place within Rocky Mountain Business
Park at 1189 and 1267 East Iron Eagle Drive.
1. DR-38-05 - Master Sien Plan for a Multi-tenant Office Buildine - Dave Evans
Construction: Dave Evans Construction, represented by Travis Burrows, is
requesting design review approval of a master sign plan for a multi-tenant office
building. The proposed building is located on Lot 7, Block 1 of Rocky Mountain
Business Park #3 on East Iron Eagle Drive.
K. DR-41-05 - Multi-tenant Office Buildine within Rocky Mountain Business Park
No.3 - Dave Evans Construction: Dave Evans Construction, represented by Travis
Burrows, is requesting design review approval to construct a 4,200-square foot multi-
tenant office building. The site is located on the south side of East Iron Eagle Drive
Page 2 of 4
K:\DESI_REV\AGENDA\Temp Work Area\DR-O7-I4-05ag.doc
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
July 14, 2005
6:00 P.M.
approximately 330-feet east of South Fitness Place within Rocky Mountain Business
Park at 1189 and 1267 East Iron Eagle Drive.
L. DR-40-05 - Master Sien Plan for a Multi-tenant Office Buildine - Dave Evans
Construction: Dave Evans Construction, represented by Travis Burrows, is
requesting design review approval of a master sign plan for a multi-tenant office
building. The proposed building is located on Lot 9, Block 1 of Rocky Mountain
Business Park #3 on East Iron Eagle Drive.
M. DR-43-05 - Multi-tenant Office Buildine within Rocky Mountain Business Park
No.3 - Dave Evans Construction: Dave Evans Construction, represented by Travis
Burrows, is requesting design review approval to construct a 5,700-square foot multi-
tenant office building, which includes 1,800-square feet to be used as medical/dental
office. The site is located on the south side of East Iron Eagle Drive approximately
330-feet east of South Fitness Place within Rocky Mountain Business Park at 1189
and 1267 East Iron Eagle Drive.
N. DR-42-05 - Master Sien Plan for a Multi-tenant Office Buildine - Dave Evans
Construction: Dave Evans Construction, represented by Travis Burrows, is
requesting design review approval of a master sign plan for a multi-tenant office
building. The proposed building is located on Lot 10, Block 1 of Rocky Mountain
Business Park #3 on East Iron Eagle Drive.
O. DR-22-03 MOD - Modification to the Master Sien Plan for a Mult-tenant
Buildine (Jackson Square Center) - Eaele Water Company: Eagle Water
Company, Inc., represented by Darrel Farnsworth, is requesting design review
approval to modify the master sign plan for Jackson Square Center, to include a tenant
directory sign to be located on the water tower and to eliminate the previously
approved monument sign. The site is located on the north side of West State Street
approximately 600-feet east of Eagle Road at 172 West State Street.
P. DR-53-05 - Remove Internally Illuminated Buildine Wall Siens for the Eaele
Albertsons Facility and Replace with Halo Illuminated Siens - Albertsons:
Albertsons, represented by Jeff Carico with Image National Inc., is requesting design
review approval to remove the internally illuminated building wall signs for the Eagle
Albertsons facility and replace them with halo illuminated building wall signs. The
site is located on the southeast comer of South Eagle Road and Plaza Drive at 250
South Eagle Road.
Q. DR-59-05 - Common Area Landscapine within Venice Subdivision - William
Guhrke: William Guhrke, represented by Phil Hull with The Land Group, is
requesting design review approval of the common area landscaping within Venice
Subdivision. The site is located on the southeast comer of North Anacortes Lane and
West Beacon Light Road at 885 West Beacon Light Road.
Page 3 of 4
K:\DESI_REV\AGENDA\Temp Work Area\DR-O7-14-05ag.doc
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
July 14,2005
6:00 P.M.
6.
REPORTS:
A. Design Review Board:
B. Council Liaison:
C. Staff: Planter Width Discussion.
Page 4 of 4
K:\DESI_REV\AGENDA\Temp Work Area\DR-O7-14-05ag.doc