Loading...
Agenda - 2004 - Design Review - 06/10/2004 - Regular y/ THE CITY OF EAGLE DESIGN REVIEW BOARD AGENDA June 10, 2004 6:00 P.M. ORIGINAL L CALL TO ORDER 2. ROLL CALL: MC CULLOUGH, CHRISTENSEN, STANGER, FLOEGEL, BOWEN, GRUBB, ZASTROW, COUNCIL LIAISON BASTIAN 3. CONSENT AGENDA: . Consent Agenda items are considered to be routine and are acted on with one motion. There will be no separate discussion on these items unless a Design Review Board member, City Staff, or a citizen requests an item to be removed from the Consent Agenda for discussion. Items removed from the Consent Agenda will be placed on the Regular Agenda in a sequence determined by the Rules of Order. Any item on the Consent Agenda that contains written recommendations from the City of Eagle shall be adopted as part of the Design Review's Consent Agenda approval motion unless specifically stated otherwise. . 4. 5. A. Minutes of May 27, 2004. B. Ii!!IDn2S of fact an4 Concl!!§jons of Law for DR-27-04 - Master Si2n Plan for a Multi-te'nant Flex Space Buildin2 - Robnett Construction: Robnett Construction, represented by Jason Martin with Backstreet Architecture, is requesting design review approval of a master sign plan for a multi-tenant flex space building. The site is located on the southwest comer of State Highway 44 and McGrath Road on Lot 1, Block 1, of Ancona Business Park. C. ~act an4 Concl!!§jons of Law for DR-28-04 - Master Si2n Plan for a Multi-tenant Flex Space Buildin2 - Robnett Construction: Robnett Construction, represented by Jason Martin with Backstreet Architecture, is requesting design review approval of a master sign plan for a multi-tenant flex space building. The site is located on the southwest comer of State Highway 44 and McGrath Road on Lot 2, Block 1, of Ancona Business Park D. ~act am' Concl!!§jons of Law for DR-37-04 - Monument Si2n For Sisters Villa - Mercy Housin2 - Mercy Housing of Idaho, represented by Rich Kenny, is requesting design review approval to construct a monument sign for Sisters Villa (a Mercy Housing Senior Community). The site is located on the east side of North Eagle Road approximately lA-mile north of State Street at 540 North Eagle Road. UNFINISHED BUSINESS: None NEW BUSINESS: A. DR-38~ - One MYlli-tenant Retail Buildin2. One Restaurant Facilitv, and One Bank Facility - Thomas Development: Thomas Development, represented by Patrick McKeegan with Patrick McKeegan Architects, is requesting design review approval to construct one 9, llO-square foot multi-tenant retail building, one 4,500- square foot restaurant building, and one 3,7oo-square foot bank facility. The site is located on the southwest comer of East Iron Eagle Drive and Edgewood Lane within Page 1 of 4 K:\DESCREV\AGENDAITemp Work Area\DR-06-10-04ag.doc THE CITY OF EAGLE DESIGN REVIEW BOARD AGENDA June 10, 2004 6:00 P.M. Merrill Subdivision No.1 (formerly Rocky Mountain Business Park) at 1539 East Iron Eagle Dri ve. B. ~aster Si2n Plan for Ea2le Pointe Shoppin2 Center - Thomas Development: Thomas Development, represented by Patrick McKeegan with Patrick McKeegan Architects, is requesting design review approval of a master sign plan for Eagle Pointe Shopping Center which includes a multi-tenant retail building, a restaurant facility, and a bank facility. The site is located on the southwest comer of East Iron Eagle Drive and Edgewood Lane within Merrill Subdivision No.1 (formerly Rocky Mountain Business Park) at 1539 East Iron Eagle Drive. C. ~Restaurant Facility for Cheerleaders Sports Bar and Grill - Robert Godsill: Roger Godsill, represented by Rocky Towle with Design Resources Architects, is requesting design review approval to construct a 5,789-square foot restaurant facility. The site is located on the south side of East Shore Drive approximately 820-feet east of Eagle Road within the Eagle River Development at 287 East Shore Drive. D. ~uildin2 Wall Si2ns for Cheerleaders Sports Bar and Grill- Robert Godsill: Rob Godsill, represented by John McMahon with Classic Design Studio, is requesting design review approval to construct two (2) building wall signs for Cheerleaders Sports Bar and Grill. The site is located on the south side of East Shore Drive approximately 820-feet east of Eagle Road within the Eagle River Development at 287 East Shore Drive. E. ~aster S~an for a Multi-tenant Office Buildin2- Roddy Evans: Roddy Evans is requesting design review approval of a master sign plan for a multi- tenant office building, including a building wall sign for Idaho One Realty and Idaho One Mortgage. The site is located on the northeast comer of East State Street and Academy Lane at 1300 East State Street. F. DR-49-04 - Modif the Existin Pizza Hut Monument Si n to include a Mone Tree Si2n - Money Tree: Money Tree, represented by Russ Doughty with Lytle Signs, is requesting design review approval to modify the existing Pizza Hut monument sign to include a Money Tree sign. The site is located on the northeast comer of State Highway 44 and Eagle Road within Eagle Pavilion Shopping Center at 396 South Eagle Road. G. DR-50-04 - Multi-tenant Office Buildin2 - Dave Evans Construction: Dave Evans Construction, represented by Tim Scharff, is requesting design review approval to construct a 2,2oo-square foot multi-tenant office building. The site is located within Merrill Subdivision No.4 (a re-subdivision of Lot 12, Block 3, Merrill Subdivision No.2, formally known as Rocky Mountain Business Park) which is located at 507 South Fitness Place. This building is proposed to be located on Lot 22, Block 3, of Merrill Subdivision No.4. H. ~ Master Sim Plan for a Multi-tenant Office Buildin2 within Merrill Subdivision No.4 Lot 22 Block 3 - Dave Evans Construction: Dave Evans Construction, represented by Tim Scharff with Dave Evans Construction, is requesting design review approval of a master sign plan for a multi-tenant office Page 2 of 4 K:\DESI_REV\AGENDAITemp Work Area\DR-06-1Q-04ag.doc THE CITY OF EAGLE DESIGN REVIEW BOARD AGENDA June 10, 2004 6:00 P.M. building within Merrill Subdivision No.4 (a re-subdivision of Lot 12, Block 3, Merrill Subdivision No.2, formally known as Rocky Mountain Business Park) located at 507 South Fitness Place. This building is proposed to be located on Lot 22, Block 3, of Merrill Subdivision No.4. I. Jl.R-52-04 - Multi-tenant Office Buildin2 - Dave Evans Construction: Dave Evans Construction, represented by Tim Scharff, is requesting design review approval to construct a 4,500-square foot multi-tenant office building. The site is located within Merrill Subdivision No.4 (a re-subdivision of Lot 12, Block 3, Merrill Subdivision No.2, formally known as Rocky Mountain Business Park) which is located at 515 South Fitness Place. This building is proposed to be located on Lot 23, Block 3, of Merrill Subdivision No.4. J. ~aster S!m..f!an for a Multi-tenant Office Buildin2 within Merrill Subdivision No.4 Lot 23 Block 3 - Dave Evans Construction: Dave Evans Construction, represented by Tim Scharff with Dave Evans Construction, is requesting design review approval of a master sign plan for a multi-tenant office building within Merrill Subdivision No.4 (a re-subdivision of Lot 12, Block 3, Merrill Subdivision No.2, formally known as Rocky Mountain Business Park) located at 515 South Fitness Place. This building is proposed to be located on Lot 23, Block 3, of Merrill Subdivision No.4. K. DR-54-04 - Multi-tenant Office Buildin2 - Dave Evans Construction: Dave Evans Construction, represented by Tim Scharff, is requesting design review approval to construct a 4,480-square foot multi-tenant office building. The site is located within Merrill Subdivision No.4 (a re-subdivision of Lot 12, Block 3, Merrill Subdivision No.2, formally known as Rocky Mountain Business Park) which is located at 531 South Fitness Place. This building is proposed to be located on Lot 24, Block 3, of Merrill Subdivision No.4. L. ~aster S~lan for a Multi-tenant Office Buildin2 within Merrill Subdivision No.4 ot 24 Block 3 -Dave Evans Construction: Dave Evans Construction, represented by Tim Scharff with Dave Evans Construction, is requesting design review approval of a master sign plan for a multi-tenant office building within Merrill Subdivision No.4 (a re-subdivision of Lot 12, Block 3, Merrill Subdivision No.2, formally known as Rocky Mountain Business Park) located at 531 South Fitness Place. This building is proposed to be located on Lot 24, Block 3, of Merrill Subdivision No.4. M. DR-60-04 - Limited Industrial Facility - Perry Eliason: Perry Eliason, represented by Stephen Teed with Stephen Teed Architects, is requesting design review approval to construct a 6,838-square foot limited industrial facility. The site is located south of East State Street and north of McGrath Road, approximately 720-feet east of Edgewood Lane at 1800 McGrath Road. N. ~onument Sim am'- Buildin2 Wall Si2n for Pro Concrete Art - Perry Eliason: Perry Eliason, represented by Stephen Teed with Stephen Teed Architects, is requesting design review approval to construct a monument sign and building wall sign for Pro Concrete Art. The site is located south of East State Street and north of Page 3 of 4 K\DESCREV\AGENDAITemp Work Area\DR-06-IO-04ag.doc THE CITY OF EAGLE DESIGN REVIEW BOARD AGENDA June 10, 2004 6:00 P.M. McGrath Road, approximately 720-feet east of Edgewood Lane at 1800 McGrath Road. 6. REPORTS: A. Design Review Board: B. Council Liaison: 7. e. Staff: ADJOURNMENT: Page 4 of 4 K:\DESI_REV\AGENDAITemp Work Area\DR-06-10-04ag.doc