Agenda - 2004 - Design Review - 06/10/2004 - Regular
y/
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
June 10, 2004
6:00 P.M.
ORIGINAL
L
CALL TO ORDER
2.
ROLL CALL: MC CULLOUGH, CHRISTENSEN, STANGER, FLOEGEL, BOWEN,
GRUBB, ZASTROW, COUNCIL LIAISON BASTIAN
3.
CONSENT AGENDA:
. Consent Agenda items are considered to be routine and are acted on with one motion.
There will be no separate discussion on these items unless a Design Review Board
member, City Staff, or a citizen requests an item to be removed from the Consent
Agenda for discussion. Items removed from the Consent Agenda will be placed on the
Regular Agenda in a sequence determined by the Rules of Order.
Any item on the Consent Agenda that contains written recommendations from the
City of Eagle shall be adopted as part of the Design Review's Consent Agenda
approval motion unless specifically stated otherwise.
.
4.
5.
A. Minutes of May 27, 2004.
B. Ii!!IDn2S of fact an4 Concl!!§jons of Law for DR-27-04 - Master Si2n Plan for a
Multi-te'nant Flex Space Buildin2 - Robnett Construction: Robnett Construction,
represented by Jason Martin with Backstreet Architecture, is requesting design review
approval of a master sign plan for a multi-tenant flex space building. The site is
located on the southwest comer of State Highway 44 and McGrath Road on Lot 1,
Block 1, of Ancona Business Park.
C. ~act an4 Concl!!§jons of Law for DR-28-04 - Master Si2n Plan for a
Multi-tenant Flex Space Buildin2 - Robnett Construction: Robnett Construction,
represented by Jason Martin with Backstreet Architecture, is requesting design review
approval of a master sign plan for a multi-tenant flex space building. The site is
located on the southwest comer of State Highway 44 and McGrath Road on Lot 2,
Block 1, of Ancona Business Park
D. ~act am' Concl!!§jons of Law for DR-37-04 - Monument Si2n For
Sisters Villa - Mercy Housin2 - Mercy Housing of Idaho, represented by Rich
Kenny, is requesting design review approval to construct a monument sign for Sisters
Villa (a Mercy Housing Senior Community). The site is located on the east side of
North Eagle Road approximately lA-mile north of State Street at 540 North Eagle
Road.
UNFINISHED BUSINESS: None
NEW BUSINESS:
A. DR-38~ - One MYlli-tenant Retail Buildin2. One Restaurant Facilitv, and One
Bank Facility - Thomas Development: Thomas Development, represented by
Patrick McKeegan with Patrick McKeegan Architects, is requesting design review
approval to construct one 9, llO-square foot multi-tenant retail building, one 4,500-
square foot restaurant building, and one 3,7oo-square foot bank facility. The site is
located on the southwest comer of East Iron Eagle Drive and Edgewood Lane within
Page 1 of 4
K:\DESCREV\AGENDAITemp Work Area\DR-06-10-04ag.doc
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
June 10, 2004
6:00 P.M.
Merrill Subdivision No.1 (formerly Rocky Mountain Business Park) at 1539 East
Iron Eagle Dri ve.
B. ~aster Si2n Plan for Ea2le Pointe Shoppin2 Center - Thomas
Development: Thomas Development, represented by Patrick McKeegan with Patrick
McKeegan Architects, is requesting design review approval of a master sign plan for
Eagle Pointe Shopping Center which includes a multi-tenant retail building, a
restaurant facility, and a bank facility. The site is located on the southwest comer of
East Iron Eagle Drive and Edgewood Lane within Merrill Subdivision No.1 (formerly
Rocky Mountain Business Park) at 1539 East Iron Eagle Drive.
C. ~Restaurant Facility for Cheerleaders Sports Bar and Grill - Robert
Godsill: Roger Godsill, represented by Rocky Towle with Design Resources
Architects, is requesting design review approval to construct a 5,789-square foot
restaurant facility. The site is located on the south side of East Shore Drive
approximately 820-feet east of Eagle Road within the Eagle River Development at
287 East Shore Drive.
D. ~uildin2 Wall Si2ns for Cheerleaders Sports Bar and Grill-
Robert Godsill: Rob Godsill, represented by John McMahon with Classic Design
Studio, is requesting design review approval to construct two (2) building wall signs
for Cheerleaders Sports Bar and Grill. The site is located on the south side of East
Shore Drive approximately 820-feet east of Eagle Road within the Eagle River
Development at 287 East Shore Drive.
E. ~aster S~an for a Multi-tenant Office Buildin2- Roddy Evans:
Roddy Evans is requesting design review approval of a master sign plan for a multi-
tenant office building, including a building wall sign for Idaho One Realty and Idaho
One Mortgage. The site is located on the northeast comer of East State Street and
Academy Lane at 1300 East State Street.
F. DR-49-04 - Modif the Existin Pizza Hut Monument Si n to include a Mone
Tree Si2n - Money Tree: Money Tree, represented by Russ Doughty with Lytle
Signs, is requesting design review approval to modify the existing Pizza Hut
monument sign to include a Money Tree sign. The site is located on the northeast
comer of State Highway 44 and Eagle Road within Eagle Pavilion Shopping Center at
396 South Eagle Road.
G. DR-50-04 - Multi-tenant Office Buildin2 - Dave Evans Construction: Dave
Evans Construction, represented by Tim Scharff, is requesting design review approval
to construct a 2,2oo-square foot multi-tenant office building. The site is located
within Merrill Subdivision No.4 (a re-subdivision of Lot 12, Block 3, Merrill
Subdivision No.2, formally known as Rocky Mountain Business Park) which is
located at 507 South Fitness Place. This building is proposed to be located on Lot 22,
Block 3, of Merrill Subdivision No.4.
H. ~ Master Sim Plan for a Multi-tenant Office Buildin2 within Merrill
Subdivision No.4 Lot 22 Block 3 - Dave Evans Construction: Dave Evans
Construction, represented by Tim Scharff with Dave Evans Construction, is
requesting design review approval of a master sign plan for a multi-tenant office
Page 2 of 4
K:\DESI_REV\AGENDAITemp Work Area\DR-06-1Q-04ag.doc
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
June 10, 2004
6:00 P.M.
building within Merrill Subdivision No.4 (a re-subdivision of Lot 12, Block 3,
Merrill Subdivision No.2, formally known as Rocky Mountain Business Park)
located at 507 South Fitness Place. This building is proposed to be located on Lot 22,
Block 3, of Merrill Subdivision No.4.
I. Jl.R-52-04 - Multi-tenant Office Buildin2 - Dave Evans Construction: Dave
Evans Construction, represented by Tim Scharff, is requesting design review approval
to construct a 4,500-square foot multi-tenant office building. The site is located
within Merrill Subdivision No.4 (a re-subdivision of Lot 12, Block 3, Merrill
Subdivision No.2, formally known as Rocky Mountain Business Park) which is
located at 515 South Fitness Place. This building is proposed to be located on Lot 23,
Block 3, of Merrill Subdivision No.4.
J. ~aster S!m..f!an for a Multi-tenant Office Buildin2 within Merrill
Subdivision No.4 Lot 23 Block 3 - Dave Evans Construction: Dave Evans
Construction, represented by Tim Scharff with Dave Evans Construction, is
requesting design review approval of a master sign plan for a multi-tenant office
building within Merrill Subdivision No.4 (a re-subdivision of Lot 12, Block 3,
Merrill Subdivision No.2, formally known as Rocky Mountain Business Park)
located at 515 South Fitness Place. This building is proposed to be located on Lot 23,
Block 3, of Merrill Subdivision No.4.
K. DR-54-04 - Multi-tenant Office Buildin2 - Dave Evans Construction: Dave
Evans Construction, represented by Tim Scharff, is requesting design review approval
to construct a 4,480-square foot multi-tenant office building. The site is located
within Merrill Subdivision No.4 (a re-subdivision of Lot 12, Block 3, Merrill
Subdivision No.2, formally known as Rocky Mountain Business Park) which is
located at 531 South Fitness Place. This building is proposed to be located on Lot 24,
Block 3, of Merrill Subdivision No.4.
L. ~aster S~lan for a Multi-tenant Office Buildin2 within Merrill
Subdivision No.4 ot 24 Block 3 -Dave Evans Construction: Dave Evans
Construction, represented by Tim Scharff with Dave Evans Construction, is
requesting design review approval of a master sign plan for a multi-tenant office
building within Merrill Subdivision No.4 (a re-subdivision of Lot 12, Block 3,
Merrill Subdivision No.2, formally known as Rocky Mountain Business Park)
located at 531 South Fitness Place. This building is proposed to be located on Lot 24,
Block 3, of Merrill Subdivision No.4.
M. DR-60-04 - Limited Industrial Facility - Perry Eliason: Perry Eliason,
represented by Stephen Teed with Stephen Teed Architects, is requesting design
review approval to construct a 6,838-square foot limited industrial facility. The site is
located south of East State Street and north of McGrath Road, approximately 720-feet
east of Edgewood Lane at 1800 McGrath Road.
N. ~onument Sim am'- Buildin2 Wall Si2n for Pro Concrete Art - Perry
Eliason: Perry Eliason, represented by Stephen Teed with Stephen Teed Architects, is
requesting design review approval to construct a monument sign and building wall
sign for Pro Concrete Art. The site is located south of East State Street and north of
Page 3 of 4
K\DESCREV\AGENDAITemp Work Area\DR-06-IO-04ag.doc
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
June 10, 2004
6:00 P.M.
McGrath Road, approximately 720-feet east of Edgewood Lane at 1800 McGrath
Road.
6.
REPORTS:
A. Design Review Board:
B. Council Liaison:
7.
e. Staff:
ADJOURNMENT:
Page 4 of 4
K:\DESI_REV\AGENDAITemp Work Area\DR-06-10-04ag.doc