Agenda - 2004 - Design Review - 01/22/2004 - Regular
/
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
January 22, 2004
6:00 P.M.
ORIGINAL
1.
CALL TO ORDER
2.
3.
ROLL CALL: MC CULLOUGH, CHRISTENSEN, STANGER, FLOEGEL, BOWEN,
GRUBB, ZASTROW, COUNCIL LIAISON BASTIAN
CONSENT AGENDA:
. Consent Agenda items are considered to be routine and are acted on with one motion.
There will be no separate discussion on these items unless a Design Review Board
member, City Staff, or a citizen requests an item to be removed from the Consent
Agenda for discussion. Items removed from the Consent Agenda will be placed on the
Regular Agenda in a sequence determined by the Rules of Order.
. Any item on the Consent Agenda that contains written recommendations from the
City of Eagle shall be adopted as part of the Design Review's Consent Agenda
approval motion unless specifically stated otherwise.
A. Minutes of January 8, 2004.
B. Findin2s of Fact and Conclusions of Law for DR- 72-03 - Master Si2n Plan for
Ea21e Medical Office Buildin2 - Heartland Holdin2s III, LLC: Heartland
AHoldings ill, LLC, represented by George Transtrum with Heartland Construction,
is requesting design review approval of a master sign plan for the Eagle Medical
Office Building. This application includes a building wall sign for Rocky Mountain
OBGYN and Rocky Mountain Health and Wellness. The site is located on the
southwest comer of East Plaza Drive and East Iron Eagle Drive within Rocky
Mountain Business Park at 951 East Plaza Drive.
e. Findin2s of Fact and Conclusions of Law for DR- 77 -03 - Common Area
Landscapin2 within Paddy Row Subdivision - Roth Construction, Inc.: Roth
Construction, Inc., represented by Phil Hull with The Land Group, is requesting
design review approval of the common area landscaping within Paddy Row
Subdivision. The site is located on the east side of 2nd Street approximately 450-feet
south of State Street at 150 South 2nd Street.
D. Findin2s of Fact and Conclusions of Law for DR- 78-03 - Master Si2n Plan for
Ea2le River Multi-tenant Office Buildin2 - Ea2le River, LLC: Eagle River, LLC,
represented by Phil Hull with The Land Group, is requesting design review approval
of a master sign plan for the Eagle River multi-tenant office building. This
application includes a building wall sign for SunCor, Pacific Republic Mortgage, and
two (2) building wall signs for LandAmerica Transnation. The site is located on the
south side of Riverside Drive within Eagle River Development at 485 East Riverside
Dri ve.
E. Findin2s of Fact and Conclusions of Law for DR- 79-03 - Two Retail Buildin2s
within Ea2le River Development - Venture Development Group, LLC: Venture
Development Group, LLC, represented by Billy Ray Strite with BRS Architects, is
requesting design review approval to construct two retail buildings, one 5,000-square
foot building and one 7,500-square foot building. The site is located near the
Page 1 of 3
K:IDESI_REV\AGENDAITemp Work AreaIDR-OI-22-04ag.doc
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
January 22, 2004
6:00 P.M.
southeast comer of Eagle Road and State Highway 44 within Eagle River
Development.
4.
UNFINISHED BUSINESS:
A. DR-58-03 - Monument Si2n and Buildin2 Wall Sim for Domino's Pizza
Restaurant - HB One. LLC: lIB One, LLC, represented by Roger Llewellyn with
Golden West Advertising Inc., is requesting design review approval to construct a
monument sign and building wall sign for the Domino's Pizza Restaurant. The site is
located on the north side of State Street approximately 1O0-feet west of Stierman Way
at 498 East State Street. This item was continued from the January 8,2004 meeting.
B. DR-63-03 - Buildin2 Addition and Site Improvements to Smith's Ea2le Chevron
- Rick and Sandy Smith: Rick and Sandy Smith, represented by Rick Toews with
BRS Architects, are requesting design review approval to construct a 960-square foot
addition to the convenience store and to complete other site improvements to the
Smith's Eagle Chevron. The site is located on the northwest comer of South Eagle
Road and West Inlet Bay within the Channel Center Subdivision at 503 South Eagle
Road. This item was continued from the January 8,2004 meeting.
5.
NEW BUSINESS:
A. DR- 76-03 - Common Area Landscapin2 within Merrill Subdivision No.4 - Dave
Evans Construction: Dave Evans Construction, represented by Tim Scharff with
Dave Evans Construction, is requesting design review approval of the common area
landscaping within Merrill Subdivision No.4. The site is located on Lot 12, Block 3,
Merrill Subdivision No.2, formally known as Rocky Mountain Business Park at 501
South Fitness Place.
B. DR- 73-03 - Master Si2n Plan for Merrill Subdivision No.4 - Dave Evans
Construction: Dave Evans Construction, represented by Tim Scharff with Dave
Evans Construction, is requesting design review approval of a master sign plan for
Merrill Subdivision No.4. The site is located within Merrill Subdivision No.4 (a re-
subdivision of Lot 12, Block 3, Merrill Subdivision no. 2, formally known as Rocky
Mountain Business Park) which is located at 501 South Fitness Place.
e. DR- 70-03 - Multi-tenant Office Buildin2 within Merrill Subdivision No.4 -
Dave Evans Construction: Dave Evans Construction, represented by Tim Scharff
with Dave Evans Construction, is requesting design review approval to construct a
5,822-square foot multi-tenant building. The site is located within Merrill
Subdivision No.4 (a re-subdivision of Lot 12, Block 3, Merrill Subdivision no. 2,
formally known as Rocky Mountain Business Park) which is located at 501 South
Fitness Place. This building is proposed to be located on Lot 20, Block 3, of Merrill
Subdivision No.4.
D. DR- 74-03 - Master Si2n Plan for Multi-tenant Office Buildin2 within Merrill
Subdivision No.4 - Dave Evans Construction: Dave Evans Construction,
represented by Tim Scharff with Dave Evans Construction, is requesting design
Page 2 of 3
K:IDES'-REV\AGENDAITemp Work AreaIDR-Ol-22-04ag.doc
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
January 22, 2004
6:00 P.M.
review approval of a master sign plan for the multi-tenant office building within
Merrill Subdivision No.4 (a re-subdivision of Lot 12, Block 3, Merrill Subdivision
No.2, formally known as Rocky Mountain Business Park) which is located at 501
South Fitness Place. This building is proposed to be located on Lot 20, Block 3, of
Merrill Subdivision No.4.
E. DR-71-03 - Multi-tenant Office Buildin2 within Merrill Subdivision No.4 - Dave
Evans Construction: Dave Evans Construction, represented by Tim Scharff with
Dave Evans Construction, is requesting design review approval to construct a 2,728-
square foot multi-tenant building. The site is located within Merrill Subdivision No.
4 (a re-subdivision of Lot 12, Block 3, Merrill Subdivision no. 2, formally known as
Rocky Mountain Business Park) which is located at 501 South Fitness Place. This
building is proposed to be located on Lot 19, Block 3, of Merrill Subdivision No.4.
F. DR- 75-03 - Master Si2n Plan for Multi-tenant Office Buildin2 within Merrill
Subdivision No.4 - Dave Evans Construction: Dave Evans Construction,
represented by Tim Scharff with Dave Evans Construction, is requesting design
review approval of a master sign plan for the multi-tenant office building within
Merrill Subdivision No.4 (a re-subdivision of Lot 12, Block 3, Merrill Subdivision
No.2, formally known as Rocky Mountain Business Park) which is located at 501
South Fitness Place. This building is proposed to be located on Lot 19, Block 3, of
Merrill Subdivision No.4.
G. Olde Towne Entry Si2n - Landscapin2 Around Base of New Sim: The City of
Eagle is requesting design review approval of the landscaping at the base of the new
Olde Town entry sign. The site is located on the northeast comer of State Highway
44 and Parkinson Avenue.
6. REPORTS:
A. Design Review Board:
B. Council Liaison:
C. Staff:
7. ADJOURNMENT:
Page 3 of 3
K:IDESI_REV\AGENDAITemp Work AreaIDR-Ol-22-04ag.doc