Agenda - 2004 - Design Review - 01/08/2004 - Regular
-
./
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
January 8, 2004
6:00 P.M.
ORIGINAL
f
1.
CALL TO ORDER
2.
ROLL CALL: MC CULLOUGH, CHRISTENSEN, STANGER, FLOEGEL, BOWEN,
GRUBB, ZASTROW, COUNCIL LIAISON BASTIAN
3.
CONSENT AGENDA:
. Consent Agenda items are considered to be routine and are acted on with one motion.
There will be no separate discussion on these items unless a Design Review Board
member, City Staff, or a citizen requests an item to be removed from the Consent
Agenda for discussion. Items removed from the Consent Agenda will be placed on the
Regular Agenda in a sequence determined by the Rules of Order.
. Any item on the Consent Agenda that contains written recommendations from the
City of Eagle shall be adopted as part of the Design Review's Consent Agenda
approval motion unless specifically stated otherwise.
A. Minutes of December 11, 2003.
B. Findin2s of Fact and Conclusions of Law for DR-56-03 - Flex-Space Buildin2 for
The Ba2maker - Owyhee Capital Corporation: Owyhee Capital Corporation,
represented by Clinton Yaka with BRS Architects, is requesting design review
approval to construct a 12,000-square foot flex space building for The Bagmaker.
The site is located on the south side of State Highway 44 approximately Y2-mile west
of State Highway 55 within the proposed Ancona Business Park.
e. Findin2s of Fact and Conclusions of Law for DR-51-03 - Buildin2 Wall Si2n for
The Ba2ffiaker - Owyhee Capitol Corporation: Owyhee Capitol Corporation,
represented by Ernie Cody with Golden West Advertising Inc., is requesting design
review approval to construct a building wall sign for The Bagmaker. The site is
located on the south side of State Highway 44 approximately '/2-mile west of State
Highway 55 within the proposed Ancona Business Park.
D. Findin2s of Fact and Conclusions of Law for DR-61-03 - Two Buildin2 Wall
Si2ns for The Money Tree - Money Tree Inc.: Money Tree Inc., represented by
Russ Doughty with Lytle Signs Inc., is requesting design review approval to construct
two (2) building wall signs for The Money Tree store. The site is located on the
northeast comer of Eagle Road and State Highway 44 within the Eagle Pavilion
Shopping Center at 396 East State Street.
E. Findin2s of Fact and Conclusions of Law for DR-68-03 - Master Si2n Plan for
Smith's Ea2le Chevron - Rick and Sandy Smith: Rick and Sandy Smith,
represented by Neil Caldwell with Idaho Electric Signs Inc., are requesting design
review approval of a master sign plan for Smith's Eagle Chevron. The site is located
on the west side of South Eagle Road within Channel Center Subdivision at 503
South Eagle Road.
Page 1 of 3
K:IDESI_REV\AGENDAITemp Work AreaIDR-OI-O8-04ag.doc
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
January 8, 2004
6:00 P.M.
4.
UNFINISHED BUSINESS:
A. DR-58-03 - Monument Si2n and Buildin2 Wall Si2n for Domino's Pizza
Restaurant - HB One. LLC: lIB One, LLC, represented by Roger Llewellyn with
Golden West Advertising Inc., is requesting design review approval to construct a
monument sign and building wall sign for the Domino's Pizza Restaurant. The site is
located on the north side of State Street approximately 1O0-feet west of Stierman Way
at 498 East State Street. This item was continued from the December 11,2003
meeting.
B. DR-63-03 - Buildin2 Addition and Site Improvements to Smith's Ea2le Chevron
- Rick and Sandy Smith: Rick and Sandy Smith, represented by Rick Toews with
BRS Architects, are requesting design review approval to construct a 960-square foot
addition to the convenience store and to complete other site improvements to the
Smith's Eagle Chevron. The site is located on the northwest comer of South Eagle
Road and West Inlet Bay within the Channel Center Subdivision at 503 South Eagle
Road. This item was continued from the December 11, 2003 meeting.
5.
NEW BUSINESS:
A. DR- 72-03 - Master Si2n Plan for Ea2le Medical Office Buildin2 - Heartland
Holdin2s III. LLC: Heartland Holdings ill, LLC, represented by George Transtrum
with Heartland Construction, is requesting design review approval of a master sign
plan for the Eagle Medical Office Building. This application includes a building wall
sign for Rocky Mountain OBGYN and Rocky Mountain Health and Wellness. The
site is located on the southwest comer of East Plaza Drive and East Iron Eagle Drive
within Rocky Mountain Business Park at 951 East Plaza Drive.
B. DR-77-03 - Common Area Landscapin2 within Paddy Row Subdivision - Roth
Construction. Inc.: Roth Construction, Inc., represented by Phil Hull with The Land
Group, is requesting design review approval of the common area landscaping within
Paddy Row Subdivision. The site is located on the east side of 2nd Street
approximately 450-feet south of State Street at 150 South 2nd Street.
C. DR- 78-03 - Master Si2n Plan for Ea2le River Multi-tenant Office Buildin2 -
Ea2le River. LLC: Eagle River, LLC, represented by Phil Hull with The Land
Group, is requesting design review approval of a master sign plan for the Eagle River
multi-tenant office building. This application includes a building wall sign for
SunCor, Pacific Republic Mortgage, and two (2) building wall signs for LandAmerica
Transnation. The site is located on the south side of Riverside Drive within Eagle
River Development at 485 East Riverside Drive.
D. DR-79-03 - Two Retail Buildin2s within Ea2le River Development - Venture
Development Group. LLC: Venture Development Group, LLC, represented by
Billy Ray Strite with BRS Architects, is requesting design review approval to
construct two retail buildings, one 5,OOO-square foot building and one 7,500-square
Page 2 of 3
K:IDES'-REV\AGENDAITemp Work AreaIDR-OI-O8-04ag.doc
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
January 8, 2004
6:00 P.M.
foot building. The site is located near the southeast comer of Eagle Road and State
Highway 44 within Eagle River Development.
E. DR-80-03 - Master Si2n Plan for Two Retail Buildin2s within Ea2le River
Development - Venture Development Group, LLC: Venture Development Group,
LLC, represented by Roger Llewellyn with Golden West Advertising Inc., is
requesting design review approval of a master sign plan for the two retail building
within Eagle River Development. The site is located near the southeast comer of
Eagle Road and State Highway 44 within Eagle River Development.
6.
REPORTS:
A. Design Review Board: Elect Chairman and Vice-Chairman for the 2004 Calendar
Year.
B. Council Liaison:
C. Staff:
7. ADJOURNMENT:
Page 3 of 3
K:IDESI_REV\AGENDAITemp Work AreaIDR-OI-O8-04ag.doc