Loading...
Agenda - 2003 - Design Review - 10/23/2003 - Regular / THE CITY OF EAGLE DESIGN REVIEW BOARD AGENDA October 23, 2003 6:00 P.M. ORIGINAL CALL TO ORDER 1. 2. ROLL CALL: MC CULLOUGH, BARNES, CHRISTENSEN, STANGER, FLOEGEL, BOWEN, GRUBB, COUNCIL LIAISON BASTIAN 3. CONSENT AGENDA: . Consent Agenda items are considered to be routine and are acted on with one motion. There will be no separate discussion on these items unless a Design Review Board member, City Staff, or a citizen requests an item to be removed from the Consent Agenda for discussion. Items removed from the Consent Agenda will be placed on the Regular Agenda in a sequence determined by the Rules of Order. . Any item on the Consent Agenda that contains written recommendations from the City of Eagle shall be adopted as part of the Design Review's Consent Agenda approval motion unless specifically stated otherwise. A. Minutes of October 9,2003. B. :fl!!9ine:s of fact aß(~ Conc~usions o~aw for DR-44-02 - Multi Phased Project ~aptist Cþurch - Eae:le First Baptist Church: The Eagle First Baptist Church, represented by Randy Haverfield with Architects Northwest, is requesting design review approval of a multi phased project to include constructing a 7,650-square foot church facility, remodeling the existing 2,400-square foot shop building with a 450-square foot building addition, and relocating and changing the use of the existing 1,986-square foot residential dwelling into an office and classroom facility. The site is located on the north side of East State Street approximately 300- feet east of 2nd Street at 350 East State Street. C. :fl!!9ine:s oU'act an4 Conclusions o~-49-03 - Monument Sie:n and lli!iliĊ¸ne: Wal!..§ÿmJor Eae:le Rib Shack - Eae:le Rib Shack. LLC: Eagle Rib Shack, LLC, represented by Lawson Casad, is requesting design review approval to construct a monument sign and a building wall sign for the Eagle Rib Shack. The site is located on the north side of East State Street approximately 160-feet east of 2nd Street at 360 East State Street. D. ~act an4 Conclusions ot1!!!.!or DR-50-03 - Master Sie:n for La Strada Place - Edvthe Roe:ers Revocable Trust: Edythe Rogers Revocable Trust, represented by John Serra, is requesting design review approval of a master sign plan for the three (3) story commercial/apartment building. The site is located on the southwest comer of 2nd Street and Idaho Street at 135 North 2nd Street. E. :fl!!9ine:s oU'act and Conc~R-53-03 - Buildine: Wall Sie:n For ~estaurant And-!)istillerv - Bardenav Eae:le. LLC: Bardenay Eagle, LLC, represented by Noel Weber with Classic Design Studio, is requesting design review approval to construct a building wall sign for Bardenay Restaurant and Distillery. The site is located within Eagle River Development on the south side of East Riverside Drive approximately 50-feet east of the Hilton Garden Inn at 155 East Riverside Drive. Page 1 of 2 K:\DESCREV\AGENDAITet11' Work Are.\DR-1D-23-O3ag.do< THE CITY OF EAGLE DESIGN REVIEW BOARD AGENDA October 23, 2003 6:00 P.M. 4. UNFINISHED BUSINESS: A. DR-31-03 - Buildine: Wall Sie:n and Monument Sie:n for Kellv Moore Paints- Kelly Moore Paints: Kelly Moore Paints, represented by Douglas Smith with Sign Designs Inc., is requesting design review approval to construct a non-illuminated building wall sign on the north building elevation and to change the face of the existing monument sign for Kelly Moore Paints paint store (formerly Ponderosa Paint and Wallcovering). The site is located on the southeast comer of East State Street and 1st Street at 127 East State Street. This item was continuedfrom the October 9,2003 meeting. 5. NEW BUSINESS: A. DR-41-03 - Domino's Pizza Restaurant - HB One LLC: HB One LLC, represented by Terry Butler and Robert Runyan, is requesting design review approval to construct a 2,312-square foot restaurant. The site is located on the north side of State Street approximately 1O0-feet west of Stierman Way at 498 East State Street. This item was continued from the October 9, 2003 meeting. REPORTS: 6. A. B. Design Review Board: Council Liaison: 7. e. Staff: ADJOURNMENT: Page 2 of 2 K:\DESCREV\AGENDAITerq> Work Area\DR-10-23-03ag.doc