Agenda - 2003 - Design Review - 10/23/2003 - Regular
/
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
October 23, 2003
6:00 P.M.
ORIGINAL
CALL TO ORDER
1.
2.
ROLL CALL: MC CULLOUGH, BARNES, CHRISTENSEN, STANGER, FLOEGEL,
BOWEN, GRUBB, COUNCIL LIAISON BASTIAN
3.
CONSENT AGENDA:
. Consent Agenda items are considered to be routine and are acted on with one motion.
There will be no separate discussion on these items unless a Design Review Board
member, City Staff, or a citizen requests an item to be removed from the Consent
Agenda for discussion. Items removed from the Consent Agenda will be placed on the
Regular Agenda in a sequence determined by the Rules of Order.
. Any item on the Consent Agenda that contains written recommendations from the
City of Eagle shall be adopted as part of the Design Review's Consent Agenda
approval motion unless specifically stated otherwise.
A. Minutes of October 9,2003.
B. :fl!!9ine:s of fact aß(~ Conc~usions o~aw for DR-44-02 - Multi Phased Project
~aptist Cþurch - Eae:le First Baptist Church: The Eagle First
Baptist Church, represented by Randy Haverfield with Architects Northwest, is
requesting design review approval of a multi phased project to include constructing a
7,650-square foot church facility, remodeling the existing 2,400-square foot shop
building with a 450-square foot building addition, and relocating and changing the use
of the existing 1,986-square foot residential dwelling into an office and classroom
facility. The site is located on the north side of East State Street approximately 300-
feet east of 2nd Street at 350 East State Street.
C. :fl!!9ine:s oU'act an4 Conclusions o~-49-03 - Monument Sie:n and
lli!iliĊ¸ne: Wal!..§ÿmJor Eae:le Rib Shack - Eae:le Rib Shack. LLC: Eagle Rib
Shack, LLC, represented by Lawson Casad, is requesting design review approval to
construct a monument sign and a building wall sign for the Eagle Rib Shack. The site
is located on the north side of East State Street approximately 160-feet east of 2nd
Street at 360 East State Street.
D. ~act an4 Conclusions ot1!!!.!or DR-50-03 - Master Sie:n for La
Strada Place - Edvthe Roe:ers Revocable Trust: Edythe Rogers Revocable Trust,
represented by John Serra, is requesting design review approval of a master sign plan
for the three (3) story commercial/apartment building. The site is located on the
southwest comer of 2nd Street and Idaho Street at 135 North 2nd Street.
E. :fl!!9ine:s oU'act and Conc~R-53-03 - Buildine: Wall Sie:n For
~estaurant And-!)istillerv - Bardenav Eae:le. LLC: Bardenay Eagle,
LLC, represented by Noel Weber with Classic Design Studio, is requesting design
review approval to construct a building wall sign for Bardenay Restaurant and
Distillery. The site is located within Eagle River Development on the south side of
East Riverside Drive approximately 50-feet east of the Hilton Garden Inn at 155 East
Riverside Drive.
Page 1 of 2
K:\DESCREV\AGENDAITet11' Work Are.\DR-1D-23-O3ag.do<
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
October 23, 2003
6:00 P.M.
4.
UNFINISHED BUSINESS:
A. DR-31-03 - Buildine: Wall Sie:n and Monument Sie:n for Kellv Moore Paints-
Kelly Moore Paints: Kelly Moore Paints, represented by Douglas Smith with Sign
Designs Inc., is requesting design review approval to construct a non-illuminated
building wall sign on the north building elevation and to change the face of the
existing monument sign for Kelly Moore Paints paint store (formerly Ponderosa Paint
and Wallcovering). The site is located on the southeast comer of East State Street and
1st Street at 127 East State Street. This item was continuedfrom the October 9,2003
meeting.
5.
NEW BUSINESS:
A. DR-41-03 - Domino's Pizza Restaurant - HB One LLC: HB One LLC,
represented by Terry Butler and Robert Runyan, is requesting design review approval
to construct a 2,312-square foot restaurant. The site is located on the north side of
State Street approximately 1O0-feet west of Stierman Way at 498 East State Street.
This item was continued from the October 9, 2003 meeting.
REPORTS:
6.
A.
B.
Design Review Board:
Council Liaison:
7.
e. Staff:
ADJOURNMENT:
Page 2 of 2
K:\DESCREV\AGENDAITerq> Work Area\DR-10-23-03ag.doc