Agenda - 2003 - Design Review - 09/25/2003 - Regular
/
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
September 25, 2003
6:00 P.M.
0 R f G , ~,' ^ ~
1.
CALL TO ORDER
2.
ROLL CALL: MC CULLOUGH, BARNES, CHRISTENSEN, STANGER, FLOEGEL,
BOWEN, GRUBB, COUNCIL LIAISON BASTIAN
3.
CONSENT AGENDA:
. Consent Agenda items are considered to be routine and are acted on with one motion.
There will be no separate discussion on these items unless a Design Review Board
member, City Staff, or a citizen requests an item to be removed from the Consent
Agenda for discussion. Items removed from the Consent Agenda will be placed on the
Regular Agenda in a sequence determined by the Rules of Order.
. Any item on the Consent Agenda that contains written recommendations from the
City of Eagle shall be adopted as part of th~ Design Review's Consent Agenda
approval motion unless specifically stated otherwise.
A. Minutes of August 28, 2003.
B. Minutes of September 11,2003.
C. Findine:s of Fact and Conclusions of Law for DR-43-98 MOD3 - Modification to
~aster Sie:n ~an for ~on Shoppine: Center - Pete Lova: Pete Loya,
represented by Chuck Buckner with Idaho Electric Signs Inc., is requesting design
review approval to modify the master sign plan for the Eagle Pavilion Shopping
Center. The site is located on the northeast comer of South Eagle Road and State
Highway 44 at 480 South Eagle Road.
D. Elli.line:s oU'act an4 Conclusions ot1!!!.!or DR-35-03 - Buildine: Wall Sie:n for
Carats Fine Diamonds and....!!2M - John Grene: John Grene, represented by Chuck
Buckner with Idaho Electric Signs Inc., is requesting design review approval to
construct a building wall sign for Carats Fine Diamonds and Gold. The site is located
within the Eagle Pavilion Shopping Center at 400 South Eagle Road.
E. Findine:s of Fact an4 Concl!!§jons of Law for DR-42-03 - Entrv Structure and
Monument Sie:n for Henrv's Subdivision - Henrv's North 40 LLC: Henry's North
40 LLC, represented by Peter Harris and Kristen Van Engelen, is requesting design
review approval to construct an entry structure and monument sign for Henry's
Subdivision. The site is located on the west side of Meridian Road approximately
1,320-feet south of Beacon Light Road.
F. =d Conclusions of Law for DR-43-03 - Modification to the
Existin Buildin Elevations fu!:..!þ.e Eae:~anor Apartment fuillQine: - Jl!!!
Tomlinson: Jim Tomlinson, represented by Ray Crowder with Crowder Associates
Architects, is requesting design review approval to modify the existing building
elevations of the Eagle Manor Apartment Building. The modifications include the
installation of dormers, and installing a higher roof over the two stair towers. The site
is located on the northeast comer of Cedar Ridge Road and 2nd Street at 276 Cedar
Ridge Road.
Page 1 of 3
K:\DESl_REV\AGENDAITerq> Work Area\DR-09-25-O3ag,doc
THE CITY OF EA G LE
DESIGN REVIEW BOARD AGENDA
September 25, 2003
6:00 P.M.
G. Findine:s of Fact an4 Conc~usions of Law for DR-45-03 - Buildine: Wall Sie:n For
Curves for Women - Cindy Heriford: Cindy Heriford with Curves for Women,
represented by Tony Meade with Idaho Electric Signs Inc., is requesting design
review approval to construct an internally illuminated building wall sign for Curves
for Women. The site is located on the south side of State Street within Bosanka
Village at 393 West State Street.
H. Findine:s of Fact and Conclusions of ~or DR-46-03 - Buildine: Wall Sie:n for
the UPS Store - W&H Limited Liabilitv Co.: W & H Limited Liability Company,
represented by Bruce Williams with Young Electric Sign Company, is requesting
design review approval to construct an internally illuminated building wall sign for
The UPS Store. The site is located within the Eagle Pavilion Shopping Center at 372
South Eagle Road.
4.
UNFINISHED BUSINESS:
A. DR-44-02 - Multi Phased ~or Eae:le First Baptist Church - Eae:le First
Baptist Church: The Eagle First Baptist Church, represented by Randy Haverfield
with Architects Northwest, is requesting design review approval of a multi phased
project to include constructing a 7,650-square foot church facility, remodeling the
existing 2,400-square foot shop building with a 450-square foot building addition, and
relocating and changing the use of the existing 1,986-square foot residential dwelling
into an office and classroom facility. The site is located on the north side of East
State Street approximately 300-feet east of 2nd Street at 350 East State Street. This
item was continued from the September 11, 2003 meeting.
B. DR-31-03 - Buili!jne: WalÅ’e:n and Monument Sie:n for Kellv Moore Paints -
Kellv Moore Paints: Kelly Moore Paints, represented by Douglas Smith with Sign
Designs Inc., is requesting design review approval to construct a non-illuminated
building wall sign on the north building elevation and to change the face of the
existing monument sign for Kelly Moore Paints paint store (formerly Ponderosa Paint
and Wallcovering). The site is located on the southeast comer of East State Street and
1 st Street at 127 East State Street. This item was continued from the September 11,
2003 meeting.
C. DR-44-03 - Master Sie:n Plan for Six Office Buildine:s within Cottonwood Creek
Subdivision - David Waldron: David Waldron, represented by Tony Meade with
Idaho Electric Sign Company, is requesting design review approval of a master sign
plan for six office buildings within Cottonwood Creek Subdivision. The master sign
plan includes two (2) monument signs and building wall signage for each of the office
buildings. The site is located on the west side of Eagle Road, approximately 3,500-
feet north of Chinden Boulevard at 2421 North Eagle Road. This item was continued
from the September 11, 2003 meeting.
Page 2 of 3
K:\DESCREV\AGENDAITemp Work Area\DR-09-25-O3ag.do<
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
September 25, 2003
6:00 P.M.
5.
NEW BUSINESS:
A. DR-41-03 - Three Story Retail/Apartment Buildine: - Edvthe Roe:ers Trust:
Edythe Rogers Trust, represented by James Gipson with James Gipson Associates, is
requesting design review approval to construct an 8,678-square foot three story
commercial/residential building. The site is located on the southeast comer of 2nd
Street and Idaho Street at 135 North 2nd Street. This item was continuedfrom the
September 11, 2003 meeting.
6. REPORTS:
A. Design Review Board:
B. Council Liaison:
C. Staff:
7. ADJOURNMENT:
Page 3 of 3
K:\DESCREV\AGENDAITemp Work Area\DR-09-25-03ag.doc