Agenda - 2002 - Design Review - 08/08/2002 - Regular
,¡
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
August 8, 2002
6:00 P.M.
ORIGINAL
1.
2.
CALL TO ORDER
ROLL CALL: MURRAY, MC CULLOUGH, BARNES, CHRISTENSEN, PAULSON,
STANGER, FLOEGEL
CONSENT AGENDA:
. Consent Agenda items are considered to be routine and are acted on with one motion.
There will be no separate discussion on these items unless a Design Review Board
member, City Staff, or a citizen requests an item to be removed from the Consent
Agenda for discussion. Items removed from the Consent Agenda will be placed on the
Regular Agenda in a sequence determined by the Rules of Order.
. Any item on the Consent Agenda that contains written recommendations from the
City of Eagle shall be adopted as part of the Design Review's Consent Agenda
approval motion unless specifically stated otherwise.
A. Minutes of July 11, 2002.
B. Minutes of July 18, 2002.
C. Findines of Fact and Conclusions of Law for DR-30-02 - Eaele Family Worship
Church Facility - Eaele Family Worship: Eagle Family Worship, represented by
Shawn Nickel with Land Consultants Inc., is requesting design review approval to
construct two phases of a three phased church facility. This application is for the
review and approval of a 23,200-square foot building and to convert a 1,300-square
foot residential home into an office. This 4.9-acre site is located on the northeast
comer of Floating Feather Road and Park Lane at 3838 Floating Feather Road.
D. Findines of Fact and Conclusions of Law for DR-3S-02 - Master Sien Plan for
the Ranch Buildine within Rocky Mountain Business Park - Heartland
Construction: Heartland Construction, represented by George Transtrum, is
requesting design review approval of a master sign plan for the Ranch Building. The
site is located on the south side of State Street approximately 200-feet east of Plaza
Drive within the Rocky Mountain Business Park at 1121 East State Street.
E. Findines of Fact and Conclusions of Law for DR-36-02 - Bledsoe Flex Space
Buildine within Rocky Mountain Business Park- Steve Bledsoe: Steve Bledsoe,
represented by George Transtrum with Heartland Construction, is requesting design
review approval to construct a 18,370-square foot flex space building within the
Rocky Mountain Business Park. The site is located on the north side of Iron Eagle
Drive, approximately 300-feet west of Edgewood Lane at 1468 East Iron Eagle Drive
(Lot 2, Block 1, Merrill Subdivision No.2).
3.
F. Findines of Fact and Conclusions of Law for DR-3S-02 - Six Professional Office
Buildines and Common Area Landscapine within Cottonwood Creek
Subdivision - Cottonwood Creek LLC: Cottonwood Creek LLC, represented by
David Waldron, is requesting design review approval to construct six (6) 5,300-
square foot professional office buildings and common area landscaping within
Cottonwood Creek Subdivision. The site is located on the west side of Eagle Road
Page 1 of 3
K:\DESCREV\AGENDAITemp Work Area\DR-O8-08-02ag.doc
/
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
August 8, 2002
6:00 P.M.
approximately 150-feet north of Colchester Drive at 2421 North Eagle Road.
G. Findines of Fact and Conclusions of Law for DR-39-02 - Common Area
Landscapine within Timberland Estates Subdivision - Capital Development
LLC: Capital Development LLC, represented by David Koga with The Land Group,
is requesting design review approval of the common area landscaping within
Timberland Estates Subdivision. The site is located on the north side of State
Highway 44 approximately lA-mile west of Ballantyne Road at 2800 West State
Street.
H. Findines of Fact and Conclusions of Law for DR-40-02 - Monument Sien for
Timberland Estates Subdivision - Capital Development LLC: Capital
Development LLC, represented by David Koga with The Land Group, is requesting
design review approval of a monument sign for Timberland Estates Subdivision. The
site is located on the north side of State Highway 44 approximately lA-mile west of
Ballantyne Road at 2800 West State Street.
I. Findines of Fact and Conclusions of Law for DR-41-02 - Monument Siens and
Directional Sien for Old Town SQuare - Old Town I. LLC: Old Town I, LLC,
represented by Mark Butler, is requesting design review approval to construct two
monument signs and one directional sign for Old Town Square. The site is located on
the northeast comer of State Street and 2nd Street at 222 - 360 East State Street.
4.
5.
UNFINISHED BUSINESS: None
PUBLIC HEARINGS:
A. DR-SO-Ol - Two Multi- Tenant Buildines - Mike Nihill: Mike Nihill, represented
by Mark Butler with Land Consultants Inc., is requesting design review approval to
construct two multi-tenant commercial buildings. The 2.6-acre site is located on the
east side of 2nd Street approximately 1,500-feet south of State Street. This item was
continued from the July 11, 2002 meeting.
B. DR-43-02 - Two Monument Siens for Cottonwood Creek Subdivision -
Cottonwood Creek LLC: Cottonwood Creek LLC, represented by David Waldron,
is requesting design review approval to construct two monument signs for
Cottonwood Creek Subdivision. The site is located on the west side of Eagle Road
approximately ISO-feet north of Colchester Drive at 2421 North Eagle Road.
C. DR-44-02 - Eaele First Baptist Church Facility - Eaele First Baptist Church:
The Eagle First Baptist Church, represented by Randy Haverfield with Architecture
Northwest, is requesting design review approval to remodel an existing 2,400-square
foot shop building and construct a 5,000-square foot addition to the existing shop for
a church facility and to convert the existing 1,986-square foot residence into an office
and classroom facility. The site is located on the north side of East State Street
approximately 300-feet east of 2nd Street at 350 East State Street.
Page 2 of 3
K:\DESCREV\AGENDAITemp Work Area\DR-O8-08-02ag.doc
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
August 8, 2002
6:00 P.M.
D. DR-4S-02 - Remodel an Existine Residence into an Office and Construct a Two
Story Addition for Office and Residence - Yesterday Properties LLC: Yesterday
Properties LLC, represented by Mark Butler with Land Consultants Inc., is requesting
design review approval to remodel an existing 817 -square foot residence into an
office and to construct a 1,839-square foot two story addition (914-square foot first
floor and 925-square foot second floor) for office with a residence located on the
second floor. The site is located on the east side of 2nd Street approximately ISO-feet
north of State Street at 148 North 2nd Street.
E. DR-47-02 - Eaele City Hall- City of Eaele: The City of Eagle, represented by Tom
Zabala with ZGA Architects and Planners, is requesting design review approval to
construct a 23,000-square foot City Hall facility (including Ada County Sheriffs
Department Sub-station). The site is located between the Post Office and the City
Library north of the east/west private lane approximately 400-feet north of State
Street.
7.
NEW BUSINESS:
A. DR-2S-01 - Extension of Time for Two Office Buildines within Casa Escuela
Subdivision - Larry and Vicky Coelho: Larry and Vicky Coelho, represented by
Mark Butler with Land Consultants Inc., are requesting a one year extension of time
for the two office buildings within Casa Escuela Subdivision. The site is located on
the east side of Academy Avenue approximately 3OO-feet north of State Street at 172
and 208 Academy Avenue (Lot 4 and 5, Block 1, Casa Escuela Subdivision).
REPORTS:
A. Design Review Board
B. Council Liaison:
6.
8.
C. Staff:
ADJOURNMENT:
Page 3 of 3
K:\DESCREV\AGENDAITel11' Work Area\DR-O8-08-02ag.doc