Loading...
Agenda - 2000 - Design Review - 12/14/2000 - Regular THE CITY OF EAGLE DESIGN REVIEW BOARD AGENDA December 14,2000 6:00 P.M. ORIGINAL 1. CALL TO ORDER 2. ROLL CALL: ANDERSON, MC CULLOUGH, MURRAY, KENISON, BARNES 3. CONSENT AGENDA. . Consent Agenda items are considered to be routine and are acted on with one motion. There will be no separate discussion on these items unless a Design Review Board member, City Staff, or a citizen requests an item to be removed from the Consent Agenda for discussion. Items removed from the Consent Agenda will be placed on the Regular Agenda in a sequence determined by the Rules of Order. . Any item on the Consent Agenda that contains written recommendations from the City of Eagle shall be adopted as part of the Design Review's Consent Agenda approval motion unless specifically stated otherwise. A. Minutes of November 9, 2000. B. DR-64-00 - Buildin2 Wall Si2n for Pak Mail - Pak Mail: Pak Mail, represented by Debbie Anderson with Idaho Electric Signs, is requesting design review approval to construct an internally illuminated building wall sign for Pak Mail. The site is located on the north side of Plaza Drive within Eagle Plaza Shopping Center at 228 East Plaza Drive. 4. UNFINISHED BUSINESS: A. DR-44-00 - Common Area Landscapin2 for Trolley Square Shoppin2 Center - Coulter Properties LLC: Coulter Properties LLC, represented by Dakota Company Inc., is requesting design review approval of the landscaping within the common areas of Trolley Square Shopping Center. The site is located on the north side of State Street approximately 100-feet east of Palmetto Avenue. (Item continued from 11-9-00 meeting.) B. DR-53-00 - Professional Office Retail Buildin2 - Robert DeShazo. Jr.: Robert DeShazo Jr., represented by Douglas Landwer, is requesting design review approval to remove an existing structure of 1,532-square feet and to construct a 5,944-square foot professional retail building. The site is located on the north side of State Street approximately 600- feet west of Eagle Road at 172 West State Street. (Item continued from 11-9-00 meeting.) 5. NEW BUSINESS: NONE Page 1 of2 G:IDESI_REV\AGENDAITemp Work AreaIDR Minute template.doc 6. PUBLIC HEARINGS: A. DR-59-00 - Seven Oaks Elementary Classroom Addition - Meridian School District No.2: Meridian School District No.2, represented by Leatham-Krohn- VanOcker Architechts , is requesting design review approval to construct a 4,900-square foot classroom addition to Seven Oaks Elementary School. The site is located on the west side of Seven Oaks Way approximately 450-feet north of Floating Feather Road at 1441 North Seven Oaks Way. B. DR-60-00 - Office Buildin2 within Casa Escuela Subdivision - Geor2e Lund: George Lund, represented by Steve Teed, is requesting design review approval to construct a 2,278-square foot office building. The site is located on the east side of Academy Avenue approximately 210-feet north of State Street at 244 South Academy Avenue (Lot 3, Block I, Casa Escuela Subdivision). C. DR-61-00 - Buildin2 Wall Si2ns for Say-On Dru2S - Albertsons Inc.: Albertsons Inc., represented by Don Cobb with Image National Inc., is requesting design review approval of five building wall signs for Sav-On Drugs. The site is located on the northeast corner of Chin den Boulevard and Eagle Road within The Marketplace at Eagle at 3212 East Chinden Boulevard. D. DR-62-00 - Common Area Landscapin2 for Oakley Estates Subdivision - Stan Ray: Stan Ray is requesting design review approval ofthe landscaping within the common areas of Oakely Estates Subdivision. The site is located on the northeast corner of Floating Feather Road and Ballantyne Road. E. DR-63-00 - Master Si2n Plan for Ea2le Forum Buildin2 - David Waldron and Rod Graham: David Waldron and Rod Graham, represented by Debbie Anderson with Idaho Electric Signs, is requesting design review approval of a master sign plan for Eagle Forum Building. The site is located on the southeast corner of Cedar Ridge Drive and 2nd Street within Eagle Forum Subdivision at 408 South Eagle Road. 7. REPORTS: A. Design Review Board Members B. Council Liaison C. Staff 8. ADJOURNMENT Page 2 of2 G:IDESI_REV\AGENDAITemp Work AreaIDR Minute template.doc