Agenda - 1999 - Design Review - 07/08/1999 - Regular
THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
July 8, 1999
6:00 P.M.
ORiGINAL
1.
2.
3.
CALL TO ORDER
ROLL CALL: ANDERSON, KAUFFMAN, MC CULLOUGH, MURRAY, VANCE.
APPROVAL OF MINUTES:
4.
A. Minutes of June 10, 1999.
OLD BUSINESS:
5.
A. DR-23-99 - Retail Buildin~ within Channel Center Subdivision - B.B. One: B. B. One,
represented by Wes Steele with Habitec, is requesting design review approval to construct an
8,746-square foot retail building in Channel Center Subdivision. The 1. 13-acre site is
located north of Rivershore Lane on the west side of Eagle Road at 664 South Rivershore
Lane. This item was continued from the June 10, 1999 meeting.
PUBLIC HEARINGS:
A. DR-25-99 - Buildin!! Wall Si~n for Pizza Hut within Ea!!le Pavilion - Pizza Hut: Pizza
Hut, represented by Debbie Anderson with Idaho Electric Signs, is requesting design review
approval for a new building wall sign located on the proposed Pizza Hut in Eagle Pavilion
Subdivision on the east side of Eagle Road at 480 South Eagle Road.
B. DR-27-99 - Addition to Eaele Elementary School- Meridian Joint School District No.2:
Meridian Joint School District No.2, represented by Leatham and Krohn Architects, is
requesting design review approval to construct a 912-square foot addition for office,
reception and nurses' area to the front of the existing Eagle Elementary School. The 8-acre
site is located on the west side of Eagle Road approximately 1/3mile north of State Street at
475 North Eagle Road.
C. DR-28-99 - Monument and Wall Sien for Les Schwab Tire Center Les Schwab Tire
Centers: Les Schwab Tire Centers, represented by Lance Hardy, is requesting design review
approval for a monument and building wall sign for the proposed Les Schwab Tire Center
located within Rocky Mountain Business Park on the south side of Iron Eagle Drive (no
address assigned at this time).
6.
NEW BUSINESS:
A. DR-24-99 - Eaele Pavilion: Request for approval of shoe box style parking lot lights
apposed to previously approved historic style lights and request for approval of method for
screening pad mounted transformers.
7.
B. DR-16-99 -222 E. State Street: Request to move handicap ramp to east and expand deck
and request to eliminate center gable.
REPORTS:
A. Design Review Board Members
B. Council Liaison
C. Staff
8.
ADJOURNMENT
Page 1 of 1
K:\DESI_REV\AGENDAITemp Work Area\DR-O7-08-99ag.doc