Loading...
Agenda - 1999 - Design Review - 04/08/1999 - Regular THE CITY OF EAGLE DESIGN REVIEW BOARD AGENDA April 8, 1999 6:00 P.M. ORJGINAL 1. 2. 3. CALL TO ORDER ROLL CALL: ANDERSON, MC CULLOUGH, MURRAY, VANCE. APPROVAL OF MINUTES: A. Minutes of February 11, 1999. B. Minutes of March 11, 1999. C. Minutes of March 25, 1999. OLD BUSINESS: A. DR-6-99 -Remodel Existinl! House from Residence to Offices - Beachwood Builders: Beachwood Builders, represented by Studio 'L' Design Collaborative, is requesting design review approval to remodel and convert an existing 2,024-square foot house into an office building. The 0.22-acre site is located on the north side of Aikens Street, approximately 90- feet east of Eagle Road at 150 East Aikens Road. (continued/rom the March 11, 1999.) B. DR-16-98 - Rite Aid- Rite Aid CorDoration: Rite Aid Corporation, represented by BRS Architects and The Land Group, is requesting approval of the elevation and landscape plans of the Rite Aid site per specific conditions of approval set forth by the Design Review Board. (continued/rom the March 11, 1999.) C. DR-7-99 mod - Two Professional Office Buildinl!s Oppenheimer Development Corporation: Oppenheimer Development Company, represented by Lombard-Conrad Architects, is requesting design review approval of the modified elevation plans of the two professional office buildings located at 650 East State Street. 4. 5. NEW BUSINESS: 6. A. DR-29-97 - Extension of Time - Real Vision Offices - Bill Atwell: Real Vision Offices, represented by Bill Atwell, is requesting a three-month time extension for DR-29-97. PUBLIC HEARINGS: A. ZOA-2-99 - Project Summary - Si!!n Re~ulation Amendments- Board of Directors Eal!le Chamber of Commerce: An Ordinance Amending Eagle City Code Title 8 "Zoning", Chapter 2 "Zoning Districts And Maps", Article A "DR Design Review Overlay District", Section 8 "Sign Regulations"; And Section 9 "Procedures", And Providing An Effective Date. The proposed amendments in part: would eliminate the City's prohibition of internally illuminated signs; would allow additional and larger monument signs; would allow additional and larger wall signs; would allow special portable signs; would provide criteria for temporary signs; would change the Design Review procedures so only master sign plans and internally illuminated signs would require Design Review Board approval with all other signs requiring review to be approved by the City staff. B. DR-1l-99 - Face Chanl!e on Existinl! Pole Si!!n at Ea!!le Grill Restaurant - Geor~e Wade and Lou Pejovich with Ea~le Grill: Eagle Grill, represented by George Wade and Lou Pejovich, is requesting design review approval for a face change of an existing sign located at the northwest comer of State Street and Edgewood Lane at 1396 East State Street. Page 1 of2 H: IP &z\MEETINGS \D ESI - REV\A GENDA \ I 999\D R -O4-08-99ag. doc C. DR-12-99 - Shop/Warehouse Buildin!! and Future Covered Parkin!! Facility - Robert DeShazo: Robert DeShazo, with Eagle Water Company, Inc., is requesting design review approval to constructed a 3,840-square foot shop/warehouse building and a 6, 1 44-square foot future covered parking facility. The 3.25-acre site is located on the west side of Horseshoe Bend Road approximately Ij.¡ mile north of Hill Road at 10255 North Horseshoe Bend Road. D. DR-13-99 - IMA Taekwondo - Tiffanv Grubbs: IMA Taekwondo, represented by Tiffany Grubbs, is requesting design review approval of an existing wall sign located on the south side of State Street at 349 East State Street. E. DR-14-99 - Chan!!e of Use From Warehouse to Office and From Retail to Office- RMJKC Develooers: RMJKC Developers, represented by Shelley Strate, is requesting design review approval to convert a 4,034-square foot warehouse building into an office building and an 1,204-square foot retail building into an office building. The 0.43-acre site is located on the south side of State Street approximately 1,000- feet west of Eagle Road at 333 and 335 West State Street. F. DR-20-99 - Master Si!!n Plan for Stetson Square - RMJKC DeveloDers: RMJKC Developers, represented by Shelley Strate, is requesting design review approval for a master sign plan, which includes four wall signs and one monument sign. The 0.43-acre site is located on the south side of State Street approximately 1,000-feet west of Eagle Road at 333 and 335 West State Street. G. DR-15-99 - New 138hv Sub-Transmission Line - Idaho Power: Idaho Power, represented by Jerry Ellsworth, is requesting design review approval to construct a new 138hv sub- transmission line to connect the existing HP Substation located on the east side of Cloverdale Road approximately Ij.¡-mile south of Chin den Blvd. to the existing 138hv sub-transmission line located near the northeast comer of State Highway 44 and State Highway 55. The portion that is proposed to be constructed within the Eagle City Limits is located at 2500 E. State Street (temp. address) near the intersection of State Highway 44 and State Highway 55 extending southward approximately ~-mile. H. DR-16-99 - Chan!!e of Use from Assembly (Funeral/Church Services) to Office/Retail- Mark Butler: Mark Butler, represented by The Land Group, is requesting design review approval to convert an existing 4,400-square foot funeral home into an office/retail building. The 0.085-acre site is located on the north side of State Street at the northeast comer of State Street and 2nd Street at 224 East State Street. 1. DR-17-99 - New Buildin~ Wall Si~n For The Montessori Center - Ea!!le Montessori Center-Jody Malterre: Eagle Montessori Center, represented by Jody Malterre, is requesting design review approval of a proposed wall sign on the new Montessori School located at 655 South Rivershore Lane, Suite 100. J. DR-18-99 - New Buildin!! Wall Si!!n For Jensen Real Estate Within Bosanka Villa~e- Jensen Real Estate: Jensen Real Estate, represented by Debbie Anderson with Idaho Electric Signs, is requesting design review approval of a proposed wall sign for Jensen Real Estate located within Bosanka Village at 391 West State Street, Suite B. 7. REPORTS: A. Design Review Board Members B. Council Liaison C. Staff ADJOURNMENT 8. Page 2 of 2 H: IP &Z\MEETIN GSIDESI - REV\A GENDA \ ] 999\D R -04-08- 99ag. doc