Loading...
Agenda - 1998 - Design Review - 10/08/1998 - Regular 1. 2. THE CITY OF EAGLE DESIGN REVIEW BOARD AGENDA October 8, 1998 (}?~I'It?f3 ¡> brJ-hÌ2~°o¡,;MCèI. J;ç;1f1 ~ 10 4 1 ~ lJ() Cj LLD VUØL . CALL TO ORDER ROLL CALL: MEMBERS - ANDERSON, GRECO, MC CULLOUGH, MURRAY, V ANCE. COUNCIL LIAISON - MERRILL 3. 4. APPROV AL OF MINUTES: None OLD BUSINESS: A. DR-25-98 - Maintenance Buildine For Banbury Meadows Golf Course - Banburv Meadows. LLC. : The Zoning Administrator is requesting reconsideration of Condition #2 ofDR-25-98. It states, "Install a minimum 6' high cedar fence instead of chain link (Chain-link fencing is not pennitted)." Based upon the fact that the code states, chain-link fencing is not pennitted for screening (and is not otherwise specifically prohibited), and since no screening is needed because a landscaped benn is planned, the proposed use is a golf course driving range, and the property owners have an agreement (approved by the City back in 1995) for chain-link, the Zoning Administrator recommends the following change to condition #2: "Install a minimum 6' high cedar fence instead of chain link except that chain link shall be pennitted between the Dillard property and the golf course driving range (from the north property line to a point approximately 350-feet south)." The 1.29-acre maintenance area is on the interior of the proposed Banbury Meadows golf course approximately 560-feet west of Eagle Road and Y2 mile north of Chin den Boulevard. 5. PUBLIC HEARINGS: A. DR-28-98 - Existine House Remodel and Chanee of Use from Residence to Office - James Beard: James Beard, represented by James Gipson Associates, is requesting design review approval to remodel and convert an existing 1,326 sq. ft. house into an office building. The O.21-acre site is located on the southwest comer of Aikens Road and ls1 Street, approximately 250-feet east of Eagle Road at 79 East Aikens Road. (This item was continued from the September 1O, 1998 meeting. The applicant has provided staff with no new information to date.) Page 1 of 2 H:\P&Z\MEETINGSIDES1- REV\AGENDA I 1998\DR-1 0-8-98ag. doc THE CITY OF EAGLE DESIGN REVIEW BOARD AGENDA October 8, 1998 6:00 P.M. B. DR-31-98 - Rocky Mountain Business Park Master Sien Plan and New Monument and Wall Si2n for Rocky Mountain Fitness Center - Reid Merrill: Reid Merrill is requesting design review approval for a master sign plan for Rocky Mountain Business Park and a new monument and building wall sign for the Rocky Mountain Fitness and Recreation Center. The 40+ acre site is generally located between State Street and the Highway 44 Alternate Route extending from the north/south section of State Street (extension of Edgewood Lane) eastward approximately Y2 mile (see maps on file at Eagle City Hall). C. DR-33-98 - New Addition to the Eaele Fire Station - Dan Friend: Dan Friend with the Eagle Fire Department, represented by Rocky Towle with Design Resources, is requesting design review approval for a 3,565 sq. ft. office addition to the existing Eagle Fire Department building. The .54-acre site is located on the south side ofW. State Street approximately 400-feet west of Eagle Road at 149 W. State Street. D. DR-34-98 - New Les Schwab Tire Center - Lance Hardy: Les Schwab Tire Centers, represented by Lance Hardy, is requesting design review approval for a 15,720 sq. ft. tire service and sales building. The 2-acre site is located on the north side of State Highway 44 approximately 500-feet west of the intersection of State Highway 44 and East State Street. 6. NEW BUSINESS: A. Desien Review euidelines for Eaele River - Bill Clark: The Zoning Administrator is requesting Design Review Board approval of the landscape, site design, and architectural design guidelines for Eagle River, LLc. (This item was previously on the August, 13, 1998 agenda and was continued to allow more time for a detailed review by individual Board members.) B. ZOA-1-98 - Desi2n Review Amendments - City of Eaele: The City Council has requested that the Zoning Administrator provide the Design Review Board with the proposed amendment to obtain input and recommendations from the Board. (Staff will provide you a copy of this as soon as possible). REPORTS: 7. A. Design Review Board Members B. Council Liaison C. Staff 8. ADJOURNMENT Page 2 of 2 H:\P&Z\MEETINGS\DESI - REV\AGENDA \ 1995\DR-l O-S-9Sag.doc