Minutes - 2005 - Design Review - 08/25/2005 - Regular
../
DESIGN REVIEW BOARD
MINUTES
The Design Review Board met in regular session August 25, 2005, Vice-Chairman Stanger
presiding.
1. CALL TO ORDER: Vice-Chairman Stanger calls the meeting to order at 6:00 p.m.
2. ROLL CALL: The following members were present: STANGER, FLOEGEL, GRUBB,
ZASTROW, BARNES, COUNCIL LIAISON BASTIAN. ABSENT: MCCULLOUGH,
BOWEN. A quorum is present.
3. CONSENT AGENDA.
. Consent Agenda items are considered to be routine and are acted on with one motion.
There will be no separate discussion on these items unless a Design Review Board
member, City Staff, or a citizen requests an item to be removed from the Consent
Agenda for discussion. Items removed from the Consent Agenda will be placed on the
Regular Agenda in a sequence determined by the Rules of Order.
. Any item on the Consent Agenda that contains written recommendations from the
City of Eagle shall be adopted as part of the Design Review's Consent Agenda
approval motion unless specifically stated otherwise.
A. Minutes of August 11,2005.
B. Findinl!:s of Fact and Conclusions of Law for DR-32-05 - Master Sil!:n Plan for a
Multi-tenant Office Buildinl!: - Dave Evans Construction: Dave Evans
Construction, represented by Travis Burrows, is requesting design review approval of
a master sign plan for a two story multi-tenant office building. The site is located on
the south side of East Iron Eagle Drive approximately 330-feet east of South Fitness
Place on Lot 1, Block 1, of Rocky Mountain Business Park No.3, on East Iron Eagle
Drive.
C. Findinl!:s of Fact and Conclusions of Law for DR-33-05 - Two StOry Multi-tenant
Office Buildinl!: within Rockv Mountain Business Park No.3 - Dave Evans
Construction: Dave Evans Construction, represented by Travis Burrows, is
requesting design review approval to construct a 7,732-square foot two story multi-
tenant office building. The site is located on the south side of East Iron Eagle Drive
approximately 330-feet east of South Fitness Place on Lot 1, Block 1, of Rocky
Mountain Business Park No.3, on East Iron Eagle Drive.
D. Findinl!:s of Fact and Conclusions of Law for DR-36-05 - Multi-tenant Office
Buildinl!: within Rockv Mountain Business Park No.3 - Dave Evans
Construction: Dave Evans Construction, represented by Travis Burrows, is
requesting design review approval to construct a 3,300-square foot multi-tenant office
building. The site is located on the south side of East Iron Eagle Drive
approximately 330-feet east of South Fitness Place on Lot 6, Block 1, of Rocky
Mountain Business Park No.3, on East Iron Eagle Drive.
Page 1 of6
K:\DESI_REV\MINUTES\Temporary Minutes Work Area\DR-08-25-05min.doc
E. Findinl!:s of Fact and Conclusions of Law for DR-37-05 - Master Sil!:n Plan for a
Multi-tenant Office Buildinl!: - Dave Evans Construction: Dave Evans
Construction, represented by Travis Burrows, is requesting design review approval of
a master sign plan for a multi-tenant office building. The site is located on the south
side of East Iron Eagle Drive approximately 330-feet east of South Fitness Place on
Lot 6, Block 1, of Rocky Mountain Business Park No.3, on East Iron Eagle Drive.
F. Findinl!:s of Fact and Conclusions of Law for DR-44-05 - Storal!:e Facility with
Associated Office - Robert Drake: Robert Drake, represented by Mike Fairchild,
Architect, is requesting design review approval to construct a 79,563-square foot
storage facility and to convert an existing 2,300-square foot residential dwelling into
an office for the storage facility. The site is located on the south side of Hill Road and
east side of State Highway 55 at 2835 Hill Road.
G. Findinl!:s of Fact and Conclusions of Law for DR-61-05 - Hanl!:inl!: Wall Sil!:n for
Rembrandts - Rembrandt Coffee House: Rembrandt Coffee House, represented
by Golis Construction, is requesting design review approval of a perpendicular wall
sign for the coffee house. The site is located on the west side of South Eagle Road
approximately 250-feet south of East State Street at 93 South Eagle Road.
H. Findinl!:s of Fact and Conclusions of Law for DR-62-05 - Buildinl!: Addition to
the Eal!:le Church of the Nazarene - Eal!:le Church of the Nazarene: The Eagle
Church of the Nazarene, represented by Paul Tjelta with Design West Architects, is
requesting design review approval to construct a 9,934-square foot building addition
to the 36,330-square foot church facility. The site is located on the south side of West
State Street approximately 3,200-feet west of Eagle Road at 1001 West State Street.
1. Findinl!:s of Fact and Conclusions of Law for DR-65-05 - Multi-tenant Office
Buildinl!: within Windinl!: Creek Development - Sprinl!: Creek: Spring Creek,
represented by Robert Hess, is requesting design review approval to construct a
2,240-square multi-tenant office building. The site is located on the west side of East
Winding Creek Drive within Winding Creek Development at 842 East Winding
Creek Drive.
J. Findinl!:s of Fact and Conclusions of Law for DR-66-05 - Master Sil!:n Plan for a
Multi-tenant Office Buildinl!: - Sprinl!: Creek: Spring Creek, represented by Robert
Hess, is requesting design review approval of a master sign plan for a multi-tenant
office building. The site is located on the west side of East Winding Creek Drive
within Winding Creek Development (Lot 2, Block 1) at 842 East Winding Creek
Drive.
Barnes moves to approve the consent agenda as written, items 3A, 3B, 3C, 3D,
3E, 3F, 3G, 3H, 31 and 3J. Seconded by Floegel. ALL A YE...MOTION
CARRIES.
Page 2 of6
K:\DESI_REV\MINUTES\Temporary Minutes Work Area\DR-08-25-05min.doc
4. UNFINISHED BUSINESS:
A. DR-35-05 - Multi-tenant Office Buildinl!: within Rockv Mountain Business Park
No.3 - Dave Evans Construction: Dave Evans Construction, represented by Travis
Burrows, is requesting design review approval to construct a 2,500-square foot multi-
tenant office building. The site is located on the south side of East Iron Eagle Drive
approximately 330-feet east of South Fitness Place on Lot 5, Block 1, of Rocky
Mountain Business Park No.3, on East Iron Eagle Drive. This item was continued
from the August 11, 2005 meeting.
The applicant has requested to continue this item to the September 8, 2005 meeting.
Stanger moves to continue DR-35-05 - Multi-tenant Office Building within Rocky
Mountain Business Park No.3 - Dave Evans Construction to the September 8, 2005,
Design Review Board meeting. Seconded by Barnes. ALL A YE...MOTION
CARRIES.
B. DR-34-05 - Master Sil!:n Plan for a Multi-tenant Office Buildinl!: - Dave Evans
Construction: Dave Evans Construction, represented by Travis Burrows, is
requesting design review approval of a master sign plan for a multi-tenant office
building. The site is located on the south side of East Iron Eagle Drive approximately
330-feet east of South Fitness Place on Lot 5, Block 1, of Rocky Mountain Business
Park No.3, on East Iron Eagle Drive. This item was continuedfrom the August 11,
2005 meeting.
Stanger moves to continue DR-34-05 - Master Sign Plan for a Multi-tenant Office
Building - Dave Evans Construction to the September 8, 2005, Design Review Board
meeting. Seconded by Zastrow. ALL AYE...MOTION CARRIES.
C. DR-39-05 - Multi-tenant Office Buildinl!: within Rockv Mountain Business Park
No.3 - Dave Evans Construction: Dave Evans Construction, represented by Travis
Burrows, is requesting design review approval to construct a 4,340-square foot multi-
tenant office building. The site is located on the south side of East Iron Eagle Drive
approximately 330-feet east of South Fitness Place on Lot 7, Block 1, of Rocky
Mountain Business Park No.3, on East Iron Eagle Drive. This item was continued
from the August 11, 2005 meeting.
The applicant is present. Wes Steel, 1250 Iron Eagle Drive reviews the application. Staff
member Williams reviews the application with the Board. Board discussion. Dave
Evans, 5561 N. Glenwood, Garden City speaks to the Board. Further discussion.
Dave Evans speaks to the Board again.
Stanger moves to continue DR-39-05 - Multi-tenant Office Building within Rocky
Mountain Business Park No.3 - Dave Evans Construction to the September 8, 2005,
Design Review Board meeting with the following direction:
Through discussion tonight the Design Review Board requires the applicant to come
back with new consideration of design styles with direct correlation to roof styles,
pitches, footings. These changes shall also be coherent with changes made to
previous applications being continued tonight. Each application shall also be
Page 3 of6
K:\DESI_REV\MINUTES\Temporary Minutes Work Area\DR-08-25-05min.doc
presented with new elevations with color elevations of at least 2 sides of the
buildings and if colors varied from original design, new color boards and samples
will be required. Seconded by Barnes. Discussion. Stanger amends the motion to
continue to the September 22, 2005, Design Review Board meeting. Second concurs.
ALL AYE...MOTION CARRIES.
Stanger moves to amend the motion on items 4A & 4B to continue to the September
22, 2005, Design Review Board meeting. Seconded by Barnes. ALL
AYE...MOTION CARRIES.
Stanger moves to continue items 4D, 4E, 4F, 4G, 4H, 41 and 4J to the September 22,
2005, Design Review Board with guidance from the motion made for DR-39-05.
Seconded by Grubb. ALL AYE...MOTION CARRIES.
D. DR-38-05 - Master Sil!:n Plan for a Multi-tenant Office Buildinl!: - Dave Evans
Construction: Dave Evans Construction, represented by Travis Burrows, is
requesting design review approval of a master sign plan for a multi-tenant office
building. The site is located on the south side of East Iron Eagle Drive approximately
330-feet east of South Fitness Place on Lot 7, Block 1, of Rocky Mountain Business
Park No.3, on East Iron Eagle Drive. This item was continuedfrom the August 11,
2005 meeting.
This item was continued to the September 22, 2005 meeting.
E. DR-41-05 - Multi-tenant Office Buildinl!: within Rocky Mountain Business Park
No.3 - Dave Evans Construction: Dave Evans Construction, represented by Travis
Burrows, is requesting design review approval to construct a 4,200-square foot multi-
tenant office building. The site is located on the south side of East Iron Eagle Drive
approximately 330-feet east of South Fitness Place on Lot 9, Block I, of Rocky
Mountain Business Park No.3, on East Iron Eagle Drive. This item was continued
from the August 11, 2005 meeting.
This item was continued to the September 22, 2005 meeting.
F. DR-40-05 - Master Sil!:n Plan for a Multi-tenant Office Buildinl!: - Dave Evans
Construction: Dave Evans Construction, represented by Travis Burrows, is
requesting design review approval of a master sign plan for a multi-tenant office
building. The site is located on the south side of East Iron Eagle Drive approximately
330-feet east of South Fitness Place on Lot 9, Block 1, of Rocky Mountain Business
Park No.3, on East Iron Eagle Drive. This item was continued from the August 11,
2005 meeting.
This item was continued to the September 22, 2005 meeting.
G. DR-43-05 - Multi-tenant Office Buildinl!: within Rockv Mountain Business Park
No.3 - Dave Evans Construction: Dave Evans Construction, represented by Travis
Burrows, is requesting design review approval to construct a 5,700-square foot multi-
tenant office building, which includes I,800-square feet to be used as medical/dental
office. The site is located on the south side of East Iron Eagle Drive approximately
330-feet east of South Fitness Place on Lot 10, Block 1, of Rocky Mountain Business
Page 40f6
K;\DESI_REV\MINUTES\Temporary Minutes Work Area\DR-08-25-05min.doc
Park No.3, on East Iron Eagle Drive. This item was continuedfrom the August 11,
2005 meeting.
This item was continued to the September 22, 2005 meeting.
H. DR-42-05 - Master Sil!:n Plan for a Multi-tenant Office Buildinl!: - Dave Evans
Construction: Dave Evans Construction, represented by Travis Burrows, is
requesting design review approval of a master sign plan for a multi-tenant office
building. The site is located on the south side of East Iron Eagle Drive approximately
330-feet east of South Fitness Place on Lot 10, Block 1, of Rocky Mountain Business
Park No.3, on East Iron Eagle Drive. This item was continuedfrom the August 11,
2005 meeting.
This item was continued to the September 22, 2005 meeting.
1. DR-63-05 - Childcare Facility within Rocky Mountain Business Park - Dave
Evans Construction: Dave Evans Construction, represented by Travis Burrows, is
requesting design review approval to construct a 3,430-square foot childcare facility
for Boise Christian Preschool Academy. The site is located on the south side of East
Iron Eagle Drive within Rocky Mountain Business Park No.3. This item was
continuedfrom the August 11, 2005 meeting.
This item was continued to the September 22, 2005 meeting.
J. DR-64-05 - Two Buildinl!: Wall Sil!:ns for Boise Academy Christian Preschool-
Dave Evans Construction: Dave Evans Construction, represented by Travis
Burrows, is requesting design review approval to construct two (2) building wall signs
for Boise Academy Christian Preschool. The site is located on the south side of East
Iron Eagle Drive within Rocky Mountain Business Park No.3 (Lot 3, Block 1). This
item was continuedform the August 11, 2005 meeting.
This item was continued to the September 22, 2005 meeting.
K. DR-68-05 - Two Buildinl!: Wall Sil!:ns for Storal!:e 55 - Robert Drake: Robert
Drake, represented by Mike Fairchild, Architect, is requesting design review approval
to construct two (2) building wall signs for Storage 55 (a self storage facility). The
site is located on the south side of Hill Road and east side of State Highway 55 at
2835 Hill Road. This item was continuedfrom the August 11, 2005 meeting.
The applicant is not present. Board discussion.
Stanger moves to continue DR-68-05 - Two Building Wall Signs for Storage 55-
Robert Drake to the September 8, 2005, Design Review Board meeting. Seconded
by Floegel. ALL AYE...MOTION CARRIES.
5. NEW BUSINESS: None.
6. REPORTS:
A. Design Review Board: None.
B. Council Liaison: Ringo Ridge Subdivision.
C. Staff: Rembrandts Signage. The Board feels the signage looks good as presented.
Page50f6
K:\DESI_REV\MINUTES\Temporary Minutes Work Area\DR-08-25-05min.doc
7. ADJOURNMENT:
Floegel moves to adjourn at 7:20 p.m. Seconded by Grubb. ALL A YE...MOTION
CARRIES.
RESPECTFULL Y SUBMITTED:
Jl (. ~~. ~~ ~A'\A_'/
SHARDN K. BERGMANN
CITY CLERK/TREASURER
AD ~
ERI~ -
CHAIRMAN
A TRANSCRIBABLE RECORD OF THIS MEETING IS AVAILABLE AT CITY HALL.
Page 6 of6
K;\DESI_REVIMINUTES\Temporary Minutes Work Area\DR-08-25-05min.doc