Loading...
Minutes - 2003 - Design Review - 09/25/2003 - Regular ./ ORIGrNAl DESIGN REVIEW BOARD MINUTES The Design Review Board met in regular session on September 25, 2003, Chairman McCullough presiding. 1. CALL TO ORDER: Chairman McCullough calls the meeting to order at 6:00 p.m. 2. ROLL CALL: The following members were present: MC CULLOUGH, BARNES, CHRISTENSEN, STANGER, FLOEGEL, GRUBB. Absent: BOWEN, COUNCIL UAISON BASTIAN. A quorum is present. 3. CONSENT AGENDA. . Consent Agenda items are considered to be routine and are acted on with one motion. There will be no separate discussion on these items unless a Design Review Board member, City Staff, or a citizen requests an item to be removed from the Consent Agenda for discussion. Items removed from the Consent Agenda will be placed on the Regular Agenda in a sequence determined by the Rules of Order. . Any item on the Consent Agenda that contains written recommendations from the City of Eagle shall be adopted as part of the Design Review's Consent Agenda approval motion unless specifically stated otherwise. A. Minutes of August 28,2003. B. Minutes of September 11, 2003. C. Findines of Fact and Conclusions of Law for DR-43-98 MOD3 - Modification to the Master Sie:n Plan for Eaele Pavilion Shoppine: Center - Pete Lova: Pete Loya, represented by Chuck Buckner with Idaho Electric Signs Inc., is requesting design review approval to modify the master sign plan for the Eagle Pavilion Shopping Center. The site is located on the northeast comer of South Eagle Road and State Highway 44 at 480 South Eagle Road. D. Findine:s of Fact and Conclusions of Law for DR-35-03 - Buildine Wall Sie:n for Carats Fine Diamonds and Gold - John Grene: John Grene, represented by Chuck Buckner with Idaho Electric Signs Inc., is requesting design review approval to construct a building wall sign for Carats Fine Diamonds and Gold. The site is located within the Eagle Pavilion Shopping Center at 400 South Eagle Road. E. Findine:s of Fact and Conclusions of Law for DR-42-03 - Entrv Structure and Monument Sie:n for Henry's Subdivision - Henrv's North 40 LLC: Henry's North 40 LLC, represented by Peter Harris and Kristen Van Engelen, is requesting design review approval to construct an entry structure and monument sign for Henry's Subdivision. The site is located on the west side of Meridian Road approximately 1,320-feet south of Beacon Light Road. F. Findine:s of Fact and Conclusions of Law for DR-43-03 - Modification to the Existin Buildin Elevations for the Ea Ie Manor A artment Buildin - im Tomlinson: Jim Tomlinson, represented by Ray Crowder with Crowder Associates Architects, is requesting design review approval to modify the existing building Page 1 of 5 K:\DESCREV\MINUTES\Temporary Minutes Work Area\DR-09-25-03min l.doc elevations of the Eagle Manor Apartment Building. The modifications include the installation of dormers, and installing a higher roof over the two stair towers. The site is located on the northeast comer of Cedar Ridge Road and 2nd Street at 276 Cedar Ridge Road. G. Findine:s of Fact and Conclusions of Law for DR-45-03 - Buildine: Wall Sie:n For Curves for Women - Cindy Heriford: Cindy Heriford with Curves for Women, represented by Tony Meade with Idaho Electric Signs Inc., is requesting design review approval to construct an internally illuminated building wall sign for Curves for Women. The site is located on the south side of State Street within Bosanka Village at 393 West State Street. H. Findine:s of Fact and Conclusions of Law for DR-46-03 - Buildine: Wall Sie:n for the UPS Store - W &H Limited Liabilitv Co.: W & H Limited Liability Company, represented by Bruce Williams with Young Electric Sign Company, is requesting design review approval to construct an internally illuminated building wall sign for The UPS Store. The site is located within the Eagle Pavilion Shopping Center at 372 South Eagle Road. 4. Barnes moves to approve the consent agenda as written, containing items 3A, 3B, 3C, 3D, 3E, 3F, 3G and 3H. Seconded by Christensen. ALL A YE...MOTION CARRIES. UNFINISHED BUSINESS: A. DR.44-02 - Multi Phased Project for Eae:le First Baptist Church - Eae:le First Baptist Church: The Eagle First Baptist Church, represented by Randy Haverfield with Architects Northwest, is requesting design review approval of a multi phased project to include constructing a 7,650-square foot church facility, remodeling the existing 2,400-square foot shop building with a 450-square foot building addition, and relocating and changing the use of the existing 1,986-square foot residential dwelling into an office and classroom facility. The site is located on the north side of East State Street approximately 300-feet east of 2nd Street at 350 East State Street. This item was continued from the September 11, 2003 meeting. Christensen moves to continue DR-44-02 - Multi Phased Project for Eagle First Baptist Church - Eagle First Baptist Church to the October 9, 2003 Design Review Board meeting. Seconded by Floegel. ALL A YE...MOTION CARRIES. B. DR.31-03 - Buildine: Wall Shm and Monument Sie:n for Kellv Moore Paints - Kellv Moore Paints: Kelly Moore Paints, represented by Douglas Smith with Sign Designs Inc., is requesting design review approval to construct a non-illuminated building wall sign on the north building elevation and to change the face of the existing monument sign for Kelly Moore Paints paint store (formerly Ponderosa Paint and Wallcovering). The site is located on the southeast comer of East State Street and 1st Street at 127 East State Street. This item was continuedfrom the September 11, 2003 meeting. Floegel moves to continue DR-31-03 - Building Wall Sign and Monument Sign for Page 2 of 5 K:\DESCREV\MINUTES\ Temporary Minutes Work Area\DR -09- 25-03min l.doc Kelly Moore Paints - Kelly Moore Paints to the October 9, 2003 Design Review Board meeting. Seconded by Barnes. ALL A YE...MOTION CARRIES. C. DR.44-03 - Master Sie:n Plan for Six Office Buildine:s within Cottonwood Creek Subdivision - David Waldron: David Waldron, represented by Tony Meade with Idaho Electric Sign Company, is requesting design review approval of a master sign plan for six office buildings within Cottonwood Creek Subdivision. The master sign plan includes two (2) monument signs and building wall signage for each of the office buildings. The site is located on the west side of Eagle Road, approximately 3,500- feet north of Chinden Boulevard at 2421 North Eagle Road. This item was continued from the September 11, 2003 meeting. Barnes moves to continue DR-44-03 - Master Sign Plan for Six Office Buildings within Cottonwood Creek Subdivision - David Waldron to the October 9, 2003 Design Review Board meeting. Seconded by Christensen. ALL A YE...MOTION CARRIES. 5. NEW BUSINESS: A. DR-41-03 - Three Story Retail/Apartment Buildine: - Edvthe Roe:ers Trust: Edythe Rogers Trust, represented by James Gipson with James Gipson Associates, is requesting design review approval to construct an 8,678-square foot three story commercial/residential building. The site is located on the southeast comer of 2nd Street and Idaho Street at 135 North 2nd Street. This item was continued from the September 11, 2003 meeting. James Gipson, PO Box 219, Eagle, Idaho presents the application to the Board. Staff reviews the application. Barnes moves to approve DR-41-03 - Three Story Retail/Apartment Building- Edythe Rogers Trust with the site specific and standard conditions of approval as written with the following additions to the site specific conditions of approval: Site specific condition #9: The Design Review Board requests a new north elevation to be dressed up to eliminate the stark element of too much stucco to be presented to staff and one member of the Design Review Board. Site specific condition #10: Applicant should provide a cut sheet for the mail boxes to be used along 2nd Street. Site specific condition #11: Roof vents should be placed on the west side of the roof so as not to be seen from 2nd Street. Site specific condition #12: Applicant should provide revised elevations for materials for gates and trash enclosure, including color for those gates, as well as the fencing material for the mechanical units. Site specific condition #13: Applicant has indicated that the roof drainage will be utilizing exterior gutter and down spouts to ultimately drain in the parking lot. Site specific condition #14: Applicant should provide a revised landscape plan Page 3 of 5 K:\DESCREV\MINUTES\Temporary Minutes Work Area\DR-09-25-03minLdoc showing the trees along 2nd Street to be of a columnar species so as not to impede with pedestrian traffic along 2nd Street. These trees would be replacing the crab apples as shown on the landscape plan. A suggestion has been made that such trees should be non-fruit bearing such as the flowering pear. The landscape plan should also include a revised landscape plan showing the plantings along the north side of this property line showing a taller species close to the parking lot such as 3 to 4 feet with shorter species toward the sidewalk. It is intended that this plan be of a denser nature so as to utilize a softscape and provide screening. Site specific condition #15: The Board would recommend usage of a material other than wood fencing for the 4 ft. high solid wood fence as shown on the plan on the western side of this site, such suggestions made here tonight have been stucco or wrought iron fencing. It has also been indicated that while the plantings up against this fence will certainly obscure this fence in time that fencing material should be modified at this time. This can be submitted to staff and one member of the Design Review Board. Site specific condition #16: The revised plans should show the location of the power transformer. Modify site specific condition #11: The Design Review Board wishes to have a roof penetration plan approved. Site specific condition #17: It is recommended by the Design Review Board that soffit lighting be added to the garage area for additional security as well as safety of tenants as well as public safety and a cut sheets for all building lighting, including soffit lighting should be provided to staff. Seconded by Floegel. Discussion. Add to site specific condition #14: It has been noted that the mugo pine in the southern bed of the parking lot be changed to a plant material of a more upright nature. Strike site specific condition #4 as written. Second concurs. ALL A YE...MOTION CARRIES. The Board would like to add that they approve of the extended height of the building because of the design of the building. 6. REPORTS: A. Design Review Board: Member Barnes will be on the Board through the last meeting in October. Discussion on landscaping plans and checking to see if what was on the plans is what is planted and enforcement issues. J Bar K temporary sign. Landscaping at Pioneer Federal Credit Union. B. Council Liaison: Absent. C. Staff: Discussion on October meeting. ADJOURNMENT: 7. Page 4 of 5 K:\DESCREV\MINUTES\Temporary Minutes Work Area\DR-O9-25-03minl.doc .--- n______.--- n_- ------ Christensen moves to adjourn at 7:08 p.m. Seconded by Stanger. ALL A YE...MOTION CARRIES. RESPECTFULLY SUBMITTED: ~v--\---<. K~ SHARbN K. MOORE CITY CLERKffREAS URER æilfL CHAIRMAN ~~~~"""""". ........" ~AGL~ .####. .." O~ ........ ~ ".. '.. "" $' ~..8 o~^Tl! .."" \ :f.... ~ . ~ : "-<: "';- ,~: . u 8 n , ..... - : : V,..' \J:: 0 : .. -~ t:¡.::r:. ';.'. ,..' ,,~'.. -r $ ",-, e. /, ,'" .8 f'\' :: # e., ' "'\':.- ...:'Y .. "'-, w.w-.;-,.~",...." "'" 81'/" .~ 0 ...." "'" \ 1'-- ", ""'1111'11" A TRANSCRIBABLE RECORD OF THIS MEETING IS A V AILABLE AT CITY HALL. Page 5 of5 K\DESCREV\MINUTES\Temporary Minutes Work Area\DR-09-25-03minl.doc