Loading...
Minutes - 2000 - Design Review - 01/20/2000 - Regular ORIGINAL DESIGN REVIEW BOARD MINUTES January 20, 2000 The Design Review Board met in regular session on January 20,2000. Chairman Murray presiding. 1. CALL TO ORDER: 2. ROLL CALL: The following members were present: KAUFFMAN, MURRAY, MC CULLOUGH, KENISON. ANDERSON, Council liaison MERRILL - Absent. A quorum is present. 3. APPROVAL OF MINUTES: A. Minutes of December 9, 1999. Murray moves to table the approval of the minutes of December 9, 1999 to the February meeting so that Board member Anderson can be present to vote. Seconded by McCullough. ALL AYE...MOTION CARRIES 4. UNFINISHED BUSINESS: A. DR-25-99 MOD- Buildin2 Wall Si~n and Monument Sien for Pizza Hut within Ea~le Pavilion Shoppine Center - Pizza Hut: Pizza Hut, represented by Debbie Anderson with Idaho Electric Signs, is requesting design review approval to modify the existing building wall sign located on the west elevation to internally illuminated, to add a new internally illuminated building wall sign on the north elevation and a monument sign located along State Highway 44. This site is located within the Eagle Pavilion Shopping Center at the northeast comer of Eagle Road and State Highway 44 at 398 South Eagle Road. Murray introduces the item. Debbie Anderson 6528 Supply Way Boise, Idaho representing Pizza Hut. discusses the application. Cerda reviews staffs recommendations. Ms. Anderson Murray opens the public hearing. Murray closes the public hearing. Recording system is turned on at this point in the meeting Discussion amongst the Board, Ms. Anderson and Cerda. Murray moves to approve DR-25-99 MOD Building Wall Sign and Monument Sign for Pizza Hut within Eagle Pavilion Shopping Center with all site specific and standard conditions of approval with the following changes. Site specific condition #5 shall read: The Design Review Board recommends approval of the second wall sign on the north elevations as shown with this application. The justification of this Page 1 of? \\EAGLENTI \COMMON\DESI_REV\MINUTES\Temporary Minutes Work Area\DR-OI-20-00rnin.doc recommendation is to determine that a free standing pad site within a shopping center deserves equal sign age rights as that of a corner tenant within a retail strip center. The Design Review Board recommends an adjustment to the recently approved sign ordinance reflecting the same. #6 shall read: The location of the monument sign is approved on the south side of the existing pathway due to the conditions of the topography limitations that exist on the north of the same pathway. #7 shall read: The applicant shall submit a detailed landscape plan with the required 75-square feet of plantings at the base of the sign to be reviewed and approved by staff and one member of the Design Review Board member prior to issuance of any sign permits. Seconded by McCullough. ALL A YE...MOTION CARRIES. 5. PUBLIC HEARINGS: Chairman Murray announced it is the time and the place for the Public Hearing. A. DR-50-99 - Landscape and Recreation Facility within Tuscany at Two Rivers - Dennis Baker and Associates: Dennis Baker and Associates, represented by Phil Hull with The Land Group, is requesting design review approval for the landscape of the common areas, entry signage and for the 3,324-square foot recreation facility proposed within Tuscany at Two Rivers. The site is located on the west side of Eagle Road approximately % mile south of State Highway 44 (across from Island Woods Subdivision). Murray introduces the item. Phil Hull 128 S. Eagle Road Eagle Idaho, representing Dennis Baker and Associates. Mr. Hull reviews the proposed landscape plan. Jim Glancy 4477 Emerald Boise, Idaho is the architect for this project. Mr. Glancy discusses the proposed recreational facility. General discussion. Dan Torfin, 250 S. Beechwood Boise, Idaho a representative of Dennis Baker and Associates. Addresses questions raised by the Board regarding exterior lighting of the building, proposed trash enclosure, discussion of maintenance building and the installation of the street trees at the corners of the residential lots. Cerda discusses the staff report. Murray opens the public hearing. Murray closes the public hearing. Discussion amongst the Board. Murray moves to approve DR-50-99 Landscape and Recreation Facility within Tuscany at Two Rivers with all site specific and standard conditions of approval with the following changes. Site specific condition #4 shall read: The applicant shall be required to return to the Design Review Board for additional review and comment as necessary for the continued design efforts of the clubhouse and Page 2 of? \\EAGLENTI \COMMON\DESI_REV\MINUTES\Temporary Minutes Work Area\DR-OI-20-00rnin.doc maintenance buildings as presented. It is suggested that this item be placed on "Unfinished Business" at a regularly scheduled Design Review Board meeting as deemed necessary by the timing of the architect and that this will not require formal public meeting notice or proceedings. #5 shall read: A trash enclosure with required landscaping shall be drawn and identified on site. The materials shall match those used on the clubhouse and shall be reviewed and approved by staff and one member of the Design Review Board prior to issuance of any building permits. #6 shall read: Staff shall review the calculations for the tree loss due to the removal of trees on the site identified in the arborist report presented for compliance with Eagle City Code. #7 shall read: The applicant shall be required to comply with all conditions of approval set forth in the Findings of Fact and conclusions of Law (RZ- 10-98/CU-9-98/PPUD-2-98/PP-8-98) and CU-8-99 upon decision by City Council. #8 shall read: The applicant shall be required to identify the method used to screen any grade mounted mechanical equipment to be reviewed by the Design Review Board at a regularly scheduled Design Review Board meeting. Seconded by McCullough. ALL AYE...MOTION CARRIES. Murray calls a 5 minute recess: B. DR-51-99 - Ea~le United Methodist Church Buildin~ Expansion - Eaele United Methodist Church: Eagle United Methodist Church, represented by Bruce Poe with Cole/Associates Architects, is requesting design review approval for a 4,600-square foot expansion to the existing church. The site is located on the west side of Eagle Road approximately Y2 mile south of Floating Feather Road at 651 North Eagle Road. Murray introduces the item. Bruce Poe 960 Broadway Boise, Idaho representing Eagle United Methodist Church. Mr. Poe reviews the application. Jay Gibbons, 915 W Jefferson Boise, Idaho the landscape architect for the application, discusses the proposed landscaping. Mr. Poe further discusses the architecture of the proposed expansion. Cerda discusses the staff report. General discussion. Murray opens the public hearing. Murray closes the public hearing. Discussion amongst the Board. McCullough moves to approve DR-51-99 Eagle United Methodist Church Building Expansion with all site specific and standard conditions of approval with the following modifications. Site specific condition #4 shall read: The Additive Alternate plan submitted on January 20, 2000, for future plantings shall be the approved landscape plan. #5 shall read: The plant material around the existing mechanical units shall be upgraded to evergreen material of adequate height to screen the units. #6 shall read: A site lighting plan shall be reviewed and approved by the City Engineer prior to issuance of a building permit. Seconded by Kenison. Discussion. McCullough amends his motion to allow the Zoning Administrator to Page 3 of? \\EAGLENTI \COMMON\DESI_REV\MINUTES\Ternporary Minutes Work Area\DR-OI-20-00rnin.doc approve the site lighting instead of the City Engineer. amendment. ALL A YE...MOTION CARRIES. Second agrees to the C. DR-52-99 - Master Si~n Plan for The Marketplace at Ea2le - William Hodees: William Hodges represented by Phil Hull with The Land Group, is requesting design review approval for a master sign plan for the Marketplace at Eagle. The site is located at the northeast corner of Eagle Road and Chinden Boulevard at 3210 East Chinden Boulevard. Murray introduces the item. Phil Hull, 128 S. Eagle Road Eagle Idaho, represents Mr. Hodges. Mr. Hull reviews the application. William Hodges 1832 Spring Meadow Lane Boise, Idaho addresses the proposed signs for the building. Cerda reviews the Staff report and the comments on Mr. Hodges suggestions made tonight regarding signage. General discussion. Murray opens the public hearing. Jim Lylie 3410 E. Chinden Blvd Eagle, Idaho. A neighboring property owner expresses his desire for extra delivery signage for one ofthe entries to deter the use of his private road as a main access for the center. Murray closes the public hearing. Murray moves to approve DR-52-99 Master Sign Plan for The Marketplace at Eagle with all site specific and standard conditions of approval with the following modifications. Site specific condition #4 shall read: The Design Review Board recommends to the City Council that the awnings over the tenant doorways remain as approved with the original building design approval. If the City Council agrees to this recommendation the tenant sign age be allowed to circulate over the awnings similar to what was presented at the January 20, 2000 Design Review meeting for the City Market. #5 shall read: The light fixture presented at the January 20, 2000 Design Review meeting is approved for lighting the building wall signs. #6 shall read: At the developers request the tubular sign age over the City Market shall be substituted with the wall mounted sign age as indicated on the photo submit January 20, 2000. #7 shall read: The Design Review Board recommends to the City Council that additional directional sign age be reviewed by the Zoning Administrator in response to public testimony for access control. #8 shall read: The individual tenant signs, specifically "Do It Best Hardware", be restricted to complementing or matching the shopping centers master sign plan. Deviations from this would be permitted on a tenant by tenant bases with the review of staff and one member of the Design Review Board. Seconded by Kenison. Discussion. ALL A YE...MOTION CARRIES. Murray calls a 5-minute recess. D. DR-53-99 - Berkshire Estates Landscape Modification - Mike Aneelo: Mike Page 4 of? \\EAGLENTI \COMMON\DESl_REV\MINUTES\Temporary Minutes Work Area\DR-OI-20-00rnin.doc Angelo, represented by Jay Gibbons, is requesting design review approval to modify the approved landscaping within Berkshire Estates. The site is located on the south side of Floating Feather Road approximately 1/3 mile west of Highway 55. Murray introduces the item. Jay Gibbons representing Mr. Angelo reviews the application. Discussion. Cerda reviews the staff report. Murray opens the public hearing. Murray closes the public hearing. Murray moves to approve DR-53-99 Berkshire Estates Landscape Modification with the site specific and standard conditions of approval with the following changes. Item. #3 the existing landscaping as shown on the street frontages. #5 is deleted. All others remain the same. Seconded by McCullough. Discussion. ALL A YE...MOTION CARRIES. Murray requests the board to consent to rescind his motion. KAUFFMAN: AYE, KENISON: AYE, MCCULLOUGH: AYE, MURRAY: AYE. MOTION TO RECIND CARRIES CARRIES. Murray moves to approve DR-53-99 Berkshire Estates Landscape Modification with the site specific and standard conditions of approval with the following changes. Site specific condition #4 and #5 are to be deleted. #3 shall read: The landscape plan submitted with this application shall be allowed by the Design Review Board and approved for implementation. #9 shall read: Prior to issuance of a Certificate of Occupancy the street trees shown on the plan shall be installed on the specific lots. Seconded by McCullough. ALL AYE...MOTION CARRIES E. DR-55-99 - Buildine Wall Si2n for Vita Plus - Vita Plus: Vita Plus, represented by Debbie Anderson with Idaho Electric Signs, is requesting design review approval of a building wall sign for Vita Plus. The site is located on the north side of Plaza Drive within Eagle Plaza at 228 Plaza Drive. Murray introduces the item. Debbie Anderson 6528 Supply Way Boise, Idaho. Ms. Anderson presents the application. Cerda has nothing to add to the staff report. Murray opens the public hearing. Murray closes the public hearing. Murray moves to approve DR-55-99 Building Wall Sign for Vita Plus with all site specific and standard conditions of approval, with the following changes. Adding site specific condition #2 which shall read: The Design Review Board suggests that a discussion be set with staff and the Design Review Board to review the requirements of compliance with internally illuminated signs to maintain the American Northwest 1870's to 1930's architectural appeal. This is identified in Eagle City Code Section 8-2A-8 (E)(I). Seconded by McCullough. ALL AYE...MOTION CARRIES. F. DR-56-99 - Monument Si2n for Retail Center within Channel Center - Dennis Page 5 of 7 K:\DESl_REV\MINUTES\Temporary Minutes Work Area\DR-OI-20-0Ornin.doc building wall signage and for a monument sign to be located on Eagle Road. The site is located on the northwest corner of Rivershore Lane and Eagle Road within Channel Center Subdivision at 664 South Rivershore Lane. Murray introduces the item. Debbie Anderson 6528 Supply Way Boise, Id. Ms. Anderson presents the application. Cerda has nothing to add to the staff report. Murray opens the public hearing. Murray closes the public hearing. McCullough moves to approve DR-56-99 Monument Sign for Retail Center within Channel Center with all site specific and standard conditions of approval adding the following site specific condition. #5: The required landscaping at the base of the monument sign shall mirror the existing landscaping of the existing monument sign to the north. Seconded by Kenison. ALL A YE...MOTION CARRIES G. DR-57-99 - Buildin~ Wall Sien and Monument Si2n for Idaho Bankine Company- Idaho Bankine Company: Idaho Banking Company, represented by Debbie Anderson with Idaho Electric Signs, is requesting design review approval of two building wall signs and a monument sign to be located on State Highway 44. The site is located north of State Highway 44 within Eagle Pavillion Shopping Center at 402 South Eagle Road. Murray introduces the item. Debbie Anderson, 6528 Supply Way Boise, Idaho. Ms. Anderson presents the application. Cerda has nothing further to add to the staff report. Murray opens the public hearing. Murray closes the public hearing. General discussion. Murray moves to approve DR-57-99 Building Wall Sign and Monument Sign for Idaho Banking Company with all site specific and standard conditions of approval with the following changes. #1: Adding the following language: The Design Review Board recommends or agrees with the applicant that a second wall sign would be traded in lieu of this monument sign. #2: Shall read: The second wall sign shall be permitted on this free standing pad to allow an independent user sign age on two sides of the building. The Design Review Board suggests that City Council direct staff to amend the current City Code ordinance to reflect this change. #3: The Design Review Board recommends that the City Council direct staff to review current Eagle City Code with regard to internally illuminated cabinet style signage in hopes that the wording in the ordinance be approved to limit internal illuminated signage to letters and logos only. The sign age for the Eagle City Library on the building was fluorescent illuminated from below that could be used as an example of future wall mounted signs. Seconded by McCullough. ALL AYE...MOTION CARRIES. Page 6 of7 \\EAGLENTI \COMMON\DESI_REV\MINUTES\Ternporary Minutes Work Area\DR-OI-20-00rnin.doc 6. NEW BUSINESS: None REPORTS: A. Design Review Board Members: no report B. Council Liaison C. Staff 7. 8. ADJOURNMENT: Moved by McCullough and seconded by Kenison to adjourn. ALL AYE...MOTION CARRIES... RESPECTFULLY SUBMITTED: .'¡'40~~!.!~~"'~ ,"..:~ ,,/II' -"'II> '\;,. -\ ," lftJ"ì' .." "E' ~>" ;;: l ~VOl:.4:. ";.. '-:, If "c.~'" ~,q i,l , O :r.I.';t. '1,.1: ti "1{ ~ ~.".,,- ".iT ;: \ \)~J . "- '1."10 0:.5"", . '. . ' "'~~;Y Þ, " <':"",,:' " , -'<"", . .j"'" ~.ð-<. . ~ ð#L ..- SH ON K. MOORE CITY CLERK/TREASURER JAMES G. MURRAY CHAIRMAN A TRANSCRIBABLE RECORD OF THIS MEETING IS AVAILABLE AT CITY HALL. Page 7 of? \\EAGLENTI \COMMON\DESl_REV\MINUTES\Ternporary Minutes Work Area\DR-Ol-20-00rnin.doc Design Review Board PUBLIC HEARING SIGN-IN SHEET Subject:DR-57-99 Buildine Wall Sien and Monument Si2n for Idaho Bankine Company January 20, 2000 6:00 P.M. PLEASE PRINT LEGIBLY NAME ADDRESS TELEPHONE PRO? CON? Page 1 of 2 Design Review Board PUBLIC HEARING SIGN-IN SHEET Subject:DR-56-99 Monument Si2n for Retail Center within Channel Center January 20, 2000 6:00 P.M. PLEASE PRINT LEGIBLY NAME ADDRESS TELEPHONE PRO? CON? Page 1 of 1 Design Review Board PUBLIC HEARING SIGN-IN SHEET Subject:DR-55-99 Buildin~ Wall Sien for Vita Plus January 20, 2000 6:00P.M. PLEASE PRINT LEGIBLY NAME ADDRESS TELEPHONE PRO? CON? Page 1 of 1 Design Review Board PUBLIC HEARING SIGN-IN SHEET Subject:DR-53-99 Berkshire Estates Landscape Modification January 20, 2000 6:00 P.M. PLEASE PRINT LEGIBLY NAME ADDRESS TELEPHONE PRO? CON? Page 1 of 1 Design Review Board PUBLIC HEARING SIGN-IN SHEET Subject:DR-52-99 Master Sien Plan for the Marketplace at Ea~le January 20, 2000 6:00 P.M. PLEASE PRINT LEGIBLY NAME ADDRESS TELEPHONE PRO? CON? Page 1 of 1 NAME ADDRESS TELEPHONE PRO? CON? Design Review Board PUBLIC HEARING SIGN-IN SHEET Subject:DR-51-99 Ea~le United Methodist Church Buildine Expansion January 20, 2000 6:00 P.M. PLEASE PRINT LEGIBLY Page 1 of 1 Design Review Board PUBLIC HEARING SIGN-IN SHEET Subject:DR-50-99 Landscape and Recreation Facility within Tuscany at Two Rivers January 20, 2000 6:00 P.M. PLEASE PRINT LEGIBLY NAME ADDRESS TELEPHONE PRO? CON? Page 1 of 1 INTER City of Eagle Zoning Administration OFFICE To: Design Review Board Members From: Barbara A. Cerda, Plannet r' Subject: DR-53-99—Landscape a 1. -ntry sign plan for Berkshire Subdivision— Mike Angelo - AMENDED Date: January 18, 2000 Attachment(s): Application Alternative Method of Compliance Request 11 x 17 Landscape Plan Copy To: South Landscape Architects, P. C., Attn: Jay Gibbons, 915 West Jefferson, Boise, Idaho 83702 STAFF ANALYSIS: A. The applicant is required to have 10% open space. The site plan shows approximately 12%. B. The applicant is requesting an alternative method of compliance for Eagle City Code Section 8-2A-7 (J) (4) (b) which states: (NOTE: Floating Feather is a Minor Arterial in this location.) "Any road designated as a minor arterial on the APA Functional Street Classification Map: A minimum of fifty feet (50) wide buffer area (not including right of way) shall be provided with the following plants per one hundred(100) linear feet of right of way:five (5) shade trees, eight(8) evergreen trees, three (3)flowering/ornamental trees, and twenty four(24) shrubs. Each required shade tree may be substituted with two (2)flowering/ornamental trees, provided that not more than fifty percent (50%) of the shade trees are substituted. A minimum five foot(5) high, maximum eight foot (8) high, berm,panelized vinyl fence, decorative block wall or cultured stone, decorative rock, or similarly designed concrete wall, or combination thereof shall be provided within the buffer area. The maximum slope for any berm shall be three feet(3) horizontal distance to one foot (1) vertical distance. If a panelized vinyl fence, decorative block wall, or cultured stone, decorative rock, or similarly designed concrete wall is to be provided, in combination with the berm, a four foot (4) wide flat area at the top of the berm shall be provided for the placement of the fence or decorative block wall. Panelized vinyl fencing shall be no higher than four feet(4). Chainlink, cedar, and similar high maintenance and/or unsightly fencing shall not be permitted. " Page 1 of 3 K:\Planning Dept\Eagle Applications\DR&MSP\1999\DR-53-99 memo amdl.doc Regarding Eagle City Code Section 8-2A-7 (0) Alternative Methods Of Compliance, it states: "1. Project Conditions: It is not the intent of these landscape requirements to inhibit creative solutions to land-use problems. Under certain site conditions, a strict interpretation of requirements may be either physically impossible or impractical. Alternative compliance is a procedure that allows certain modifications to existing regulations within this Section. Requests for use of alternative landscaping schemes are justified only when one or more of the following conditions apply: a. The sites involve space limitations or unusually shaped parcels; b. Topography, soil, vegetation, or other site conditions are such that full compliance is impossible or impractical; c. Due to a change of use of an existing site, the required bufferyard is larger than can be provided; and d. Safety considerations are involved. 2. Request For Alternative Method Of Compliance: The applicant must provide the City with a written request if an alternative method of compliance is proposed. The request shall state which requirement as set forth within this Section is to be modified, what project conditions stated within subsection 01 of this Section justify using the proposed alternative, and how the proposed alternative equals or exceeds said requirement. " Staff believes that "a"—"space limitations" apply to Lot 1, Block 1, because of the location of the existing dwelling and to Lot 2, Block 2, because adding additional buffer area to Lot 1, Block 2, would decrease the lot size such that the design of the dwelling would be extremely peculiar in that it would be very narrow and long. Such a design would also be incompatible with the general dwelling design in the area. The applicant can still fit the required plantings into the area available (as was similarly done for the Lexington Hills East Subdivision) and add either a wall and/or fill material to the existing berm to meet the 5-foot minimum height requirement. The applicant should be required to provide a revised plan showing the required landscaping with additional berming and/or wall with cross sections showing the 5-foot minimum height. C. The applicant should be required to submit a revised plan showing landscaping to screen the pad mounted transformer located on Lot 2, Block 2. D. The applicant should be required to submit a revised plan showing all proposed deciduous trees to be a minimum of 3" in caliper(not to apply to existing tree). STAFF RECOMMENDATION: Based upon the information provided to staff to date, staff recommends approval with the site specific conditions of approval provided below. NOTE: Additional conditions will more than likely be placed on this application by the Design Review Board. The Board may also request a continuance of this item if they Page 2 of 3 K:\Planning Dept\Eagle AppIications\DR&MSP\I999\DR-53-99 memo amdl.doc determine that they need revised plans or other additional information to complete the review. SITE SPECIFIC CONDITIONS OF APPROVAL: 1. Due to space limitations (the location of the existing dwelling) the required 50-foot wide buffer on Lot 1, Block 1, shall be decreased to the 18-feet as shown on the submitted plan for Berkshire Estates. 2. Due to space limitations the required 50-foot wide buffer of Lot 1, Block 2, shall be decreased to 28-feet as shown on the submitted plan for Berkshire Estates (adding additional buffer area to the existing lot would decrease the size of Lot 2, Block 2, such that the design of the dwelling would be extremely peculiar in that it would be very narrow and long. Such a design would also be incompatible with the general dwelling design in the area.). 3. Provide a revised plan showing the following plants per one hundred (100) linear feet of right of way along Lot 1, Block 1, Lot 2, Block 1, and Lot 1, Block 2: five(5) shade trees, eight(8) evergreen trees, three(3) flowering/ornamental trees, and twenty four(24) shrubs. Each required shade tree may be substituted with two (2) flowering/ornamental trees, provided that not more than fifty percent(50%) of the shade trees are substituted. The revised plan shall be reviewed by staff and one Design Review Board member prior to issuance of any building permits. 4. Provide a revised plan showing additional berming (and/or wall details) with cross sections showing the 5-foot minimum height. The revised plan shall be reviewed by staff and one Design Review Board member prior to issuance of any building permits. (Berming/wall shall not encroach into the sight triangle for the Lot 1, Block 1, driveway.) 5. Provide a revised plan showing landscaping to screen the pad mounted transformer located on Lot 2, Block 2. 6. Provide a revised plan showing all proposed deciduous trees to be a minimum of 3" in caliper(not to apply to existing trees). 7. The floodlights used to illuminate the monument sign shall be screened or located so they do not shine onto the roadway or onto any nearby property. The light fixtures shall be concealed or screened with perimeter landscaping providing a 12 month screen of sufficient height and density to conceal such fixtures. 8. The applicant shall complete the improvements or provide a letter of credit for the cost of installation prior to issuance of any building permits for the site. Page 3 of 3 K.\Planning Dept\Eagle Applications\DR&MSP\l999\DR-53-99 memo amdl.doc — 11.16 Mr..... _,.......-.. gIr r i - ..• ,\I % ,, • _ . _ ... .......„,"" ,le ... ..---- _ •- . — s . . , . n.- . . :ni.7,it'2,,-.7.7---'.-.7'f• .:' - — ' • ' - . ...,4„..,:•,..!;,::- .: .„,. ..,. ...,,, .. -.4.'i:'!-..---'''-,',„- -•: .„:„. ... . . _ A•2., -..-„,,,,„..,....i„.•-,....,01.-; -. 4 ,,:;„i.• `,-.`,...,,,- ,i.: , . , ') s , ,,,." ,' i ::*$,At'-'...-- ..,:o• ',./f90*., ''''.':„1--.. - "----- -'" . • ,. . i . . . IN '-01:4;:.:',''.--''''.61'-':''. -.:. - - ' • s . 1,--.; ..,',..;.,-", ''''' '' "'---'''' .4 4 i. . . ...., .------1 i 1 it ; .,..c. i 1 ' 1 , t , ,, • 1 .... N. , - - - - .. ............... . N- -- , -,_ ',...,N, --- -• . _ ••_., ,„, . . , • _ •-•..f...-2,:,..„ , -_,.. iik 4, • . ...... T-_....t...' ....._- . -;‘. , . . . ——6‘..".•11. 0.- 44ift. • % 44 -.."'. ......,;.. '.'''',' i . I. r I:* r ' I, oP• , . ,.. 1 tii" i iTI`lt to‘kttei L. 1 i . I $ .4 • • I I Ik I . ..... • - ' - , , . , ,,, , r-,-, , . ,,,,, •,,,, ,, •., . _ . .,,,,-. , L..— (+4 k ,,•,.,k .. lE. 1. ' • ' "I . • : II- t • . 4, , . ,„, ., , 1 • , 1 . ;, , . ... .....i , . $ •* NK, # • .. , 1 , ,,, .e...„, ,. i % ' • r , •., . . .. ,._ , --.. ,,. ...• ,,-,. r:i 1. x‘k ,,•,:, .,,, NN i 1 ! iill.',`1 .. r,' .4... . • - .. A' 1 4.--- 1 •VI . . ... i . , ''''..,„ . , 4, , I• \ ' i 4, , ' ' • 1 • ..i.; • : ' tNi% , • , [' , , . ,1• , • •', I , . ' . ' • ,.. , , • , A- ; - c .., i .. . 1'•• . : . ,:-. , •f - I . t .t„. ; , r'' N. • g, • ••S A , r,, • ' F.. 1 1.C_ . . 7 ,...-- .. ., ...* " ..?".c..r, - .•,... , ---- • , .'",..--i;...._'_ , ,, , .e--4.,- ..-*'. '.' • .. ri, 2:-..,. t. " -*a- ,. -r4' ..• 1 : 1- 'Lie 1,..? .,.....-,-.....„0 . •:.• P•' .0.110' 7.-1_ .:' "'." '-; ''' 'A.. '•. - ' ,...... -b.. . IR"_- 1. : - •111 . ....., ,. ,,... ‘,. Ifk . ' '4'411\1.. •• . , r-• 11 I i •• •, s<k$, b. i - • *--. -. :-....- 4 • I.! II ) ,,*-.z. --- - - • -- • - , - I ill , I i• \ ` i f / 1 i i . .. i /... ...........__.---,----.. 1 t . . ) , r __ .. , , .f, 7 .., . __. ...,..LL r-- ii _ ,: _.._.�.::,.. ........ i +ram 1 � �4..... ..‘,...", le.~i Z 10 I.:a6ad wuwN 1j02s:wa j w.oy tap:ol Wd 1,0:C 000Z'ILL,Gamer'Rapsanl ... Tuesday,January 11,2000 3:04 PM To:dan loran From:scott kamrn Page:2 of 2 -..s—._.,-.. '—:.---4....-.....:.:... • 4 ' • —"0":40"73-1-r-.--.. ' -.11 ........... ....4.a. .1 F1 Pi 1 (il q • -1- ,1 ': . i 1 I . i I ! 1 %.,. I— Ilt 1 P I J .I •• -; r ri res•f-'....1--.. ....‘-:. ' "., .7.7.,./..;40,512 i . --., f• ';'//;,..) I i . I I . _..._ 1-13-200 12. 18PM FROM P. 1 Jan 13 00 0S:35a Boise Cammunitm Forestry 208-304-4178 p. 1 MEMORANDUM To: Dan To fin.Dennis Baker&Assoc. From: . Brian Jorgenson,Forestry Consultant Subject: Tree Evaluation, 1501 S Eagle Rd Date: January 12,2000 , ' tins Trees: . Austrian Pine Norway Spruce All trees range in size from 6-24 inches diameter. Scotch Pine Lodgepole Pine • Colorado Spruce Red Maple Crabapple American Linden Honeylocust Black Locust European Ash Norway Maple A visit to this site revealed several mature trees in varying health. A great majority of the frees art in fair or good condition. The proposed plan identifies several trees to be retained on site, and the client has expressed a desire to transplant several existing trees elsewhere on the site. The proposed layout of the site does allow many of the trees to*rein in their current locations. However,the intense construction and development of the site will likely darriage many of the trees irreparably,causing decline and eventual death unless measures are taken to protect the trees and their root systems. Recoatmeadaeions: 1) The west side of the site is populated with a demo windbreak which consists of mainly spruce and pine. Although some of these trees appear to be stunted and incapable of"normal"growth,I would recommend retaining most if not all of the trees. Removal of any trees will result in other trees showing as misshapen and partially dead. The existing planting is a vest'effective windbreak for the proposed use and will screen adjacent uses. 2) Protect any tree to rennin on site using methods outline on the attached sheet "Tree Protection Standards". If healthy trees are desired in the future,these measures are crucial. 1-13-200 12: 19PM FROM P. 2 Jan 13 00 09:35a Boise Communit8 Forestry 208-384-4178 p.2 3) Transplanting the Norway Maple trees that cwrentiy exist along the entry drive • onto the site maybe difficult given the size of most of these trees(10-12 inches diameter at Invest height). Transplanting these trees will require taking a snot ball of a size beyond what most tree spades are capable. Hand digging a larger • ball may be necessary. If t ansplanting is done,try to complete it prior to March 1,2000. Extra measures will need to be taken for at least the first two years alter transplanting I would encourage extra watering,a 4"deep mulch layer over the entire root ball and possibly a foliar mist during summer months. 4) I recommend pruning for all of the larger deciduous trees on the site. Removal of dead limbs,weak branches and a general diMaing will increase vigor on the rest of the!tree and prevent hazardous conditions for the tuners of the site after the subdivision is completed Recommend hiring a tree service which employs arborists certified by the International Society of Arboriculture. 5) Remove all of the Black Locust trees on the site. All are infested with the Locust Borer and the ores will continue to decline in the future. 6) If possible,adjust building locations,road locations and parking lot layout to increase distance from existing trees to remain. It is important tto minimize any • damage to tree root systems during construction(see attached Tree Protection Standards). Specifically: a. The Norway Spruce adjacent to the new building Increase the space . between the building and the tree to ensure an undamaged root none. b. Both crabapple adjacent to the new parking lot west of the proposed building. • c. The large Colorado Spruce adjacent to the entry driver. This tree is in • good condition. The proposed layout would eliminate about half of this trees root system. Recommend eliminating any curb cuts for a radius of • 25 feet from the trunk of this tree. If you have any questions regarding this report,please call me at 338-8866. Thank you. 1-13-200 12-20PM FROM P. 3 Jan 13 00 09:313a gcise Community Forestry 208-384-4178 p.3 Tree Protection Standards Retain,protect and water the trees to remain on the site using the blowing procedures: 1) Existing tees to remain should be protected babe arty site work/demditiot begins • Hire en amorist cent red by the international Society of Arboriculture to prune any low limbs. which may intervene with consd'uction activities. • Pie protective fencing around a tree protection zone. Protective fetes should consist ofe highly visible,physical barrier(a minimum 13-foot high,chain *We is recommended)to be placed at least 1011 outside the(hipline of the tree(s). • Absolutely no equipment,vehicles,building materiels,chemicals,stockpiles or debris should be placed Inside the tree proteclat zone. In addition,vehicular end equipment • Park end stave°of materiels should be limited in seas irtinedrateiy aciacent b the . bander. 2) Temporary irrigation is highly recommended to all remaining trees during coast xenon. This system should provide adequate coverage and quantity of water during all phases of construction. • 3) more the contractor leaves the she,'snil existing bees which have been damaged due to construction should be repaired/replaced at the expense of the Contractor. • 4). No changes in grade should be made wain the alpine of codshng heel. BEFORE THE EAGLE CITY COUNCIL IN THE MATTER OF AN APPLICATION FOR ) A REZONE, CONDITIONAL USE PERMIT, ) PLANNED UNIT DEVELOPMENT PRELIMINARY ) DEVELOPMENT PLAN,AND PRELIMINARY ) PLAT FOR QUARTER CIRCLE RANCH PLANNED ) UNIT DEVELOPMENT FOR B.W. INC. ) FINDINGS OF FACT AND CONCLUSIONS OF LAW CASE NUMBER RZ-10-98/CU-9-98/PPUD-2-98/PP-8-98 The above-entitled rezone, conditional use permit, planned unit development preliminary development plan, and preliminary plat applications came before the Eagle City Council for their action on April 13, 1999. The public hearing was closed at that time,and the Council having heard and taken oral and written testimony,and having duly considered the matter,makes the following Findings of Fact and Conclusions of Law; FINDINGS OF FACT: A. PROJECT SUMMARY: B.W.Inc.,represented by Dennis M.Baker,is requesting a rezone from A(Agricultural)to R-2-P (Residential two units per acre maximum-PUD),and conditional use,planned unit development preliminary development plan,and preliminary plat approvals for Quarter Circle Ranch Planned Community. The development consists of a 237-acre,419-lot(371-buildable)residential subdivision. The site is located on the west side of Eagle Road approximately 1600-feet south of State Highway 44 at 1505 S.Eagle Road(temp.address). B. APPLICATION SUBMITTAL: The applications for these items were received by the City of Eagle on December 24, 1998. C. NOTICE OF PUBLIC HEARING: Notice of Public Hearing on the application for the Eagle Planning and Zoning Commission was published in accordance for requirements of Title 67, Chapter 65,Idaho Code and the Eagle City ordinances on January 27, 1999. Notice of this public hearing was mailed to property owners within three-hundred feet(300-feet) of the subject property in accordance with the requirements of Title 67, Chapter 65, Idaho Code and Eagle City Code on January 15, 1999. Requests for agencies'reviews were transmitted on December 31, 1998 in accordance with the requirements of the Eagle City Code. Notice of Public Hearing on the application for the Eagle City Council was published in accordance for requirements of Title 67,Chapter 65,Idaho Code and the Eagle City ordinances on March 3, 1999. Notice of this public hearing was mailed to property owners within three-hundred feet(300-feet)of the subject property in accordance with the requirements of Title 67,Chapter 65, Idaho Code and Eagle City Code on March 5, 1999. D. HISTORY OF RELEVANT PREVIOUS ACTIONS:None E. COMPANION APPLICATIONS:None Page 1 of 22 \\EAGLENTI\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccfdoc . . • � . F. COMPREHENSIVE PLAN LAND USE MAP AND ZONING MAP DESIGNATIONS: COMP PLAN ZONING LAND USE DESIGNATION DESIGNATION Existing Low Density Residential A(Agricultural) Agricultural land (2-units per acre max.) Proposed No Change R-2-P(Residential PUD) Quarter Circle Ranch PUD housing development North of site Low Density Residential A(Agricultural) Agricultural land (2-units per acre max.) South of site Low Density Residential A(Agricultural),R-2 Residences,commercial (2-units per acre max.) (Residential),and C-2 business,and vacant land (Commercial) East of site Low Density Residential R-2-P(Residential) Residences and vacant land (2-units per acre max.) West of site Low Density Residential A(Agricultural)and A-R Residences and Agricultural (2-units per acre max.) (Agricultural-Residential) land G. DESIGN REVIEW OVERLAY DISTRICT:Not in the DDA,TDA or CEDA. H. SITE DATA: Total Acreage of Site-237.13-acres Total Number of Lots-419 Residential-371 Commercial-0 Industrial-0 Common-50 Total Number of Units- Single-family-329 Duplex-0 Multi-family -42 Total Acreage of Any Out-Parcels-0 Page 2 of 22 \\EAGLENTI\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc • • Additional Proposed Required Site Data Dwelling 1.56-units per acre 2-units per acre maximum Units Per Gross Acre Minimum Estate Lots: %-acre-2-acres 17,000 sq.ft.(minimum) Lot Size Luxury Lots: 14,375 s.f(approx.) Custom Lots: 8,000- 10,000 s.f.(approx.) Cottage Home Lots: 5,000 s.f.(minimum) Minimum Estate Lots: 75-feet 75-feet Lot Width Luxury Lots:75-feet Custom Lots:70-feet Cottage Home Lots:70-feet Minimum 35-feet 35-feet Street Frontage Total 57-acres 57-acres(minimum) Acreage of 23.71-acres for 10%minimum plus 33- Common acres for lots smaller than the minimum- Lots per ECC Section 8-2-4(G) Percent of 24% 24%(minimum-see above) Site as Common Area Page 3 of 22 \\EAGLENTI\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc t U Setbacks proposed for the Estate and Luxury lots: Front 30 feet Rear 30 feet Interior Side 7.5 feet Additional Setback for Multi-story structures 5 feet per story Street Side 20 feet U Setbacks proposed for the Custom lots: Front 20 feet Rear 25 feet Interior Side 7.5 feet Additional Setback for Multi-story structures 2.5 feet per story Street Side 20 feet U Setbacks proposed for the Carriage lots: Front 15 feet Rear 10 feet Interior Side 0 feet Additional Setback for Multi-Story structures 5 feet Street Side 15 feet GENERAL SITE DESIGN FEATURES: Open Space,Greenbelt Areas and Landscape Screening: Will provide a total of 24%of common area.(24%required-see site data above) "The paramount issue during planning for the Ranch was to retain and respect the Eagle Island environment as much as possible and to make the new development compatible with existing homes.To that end,the site plan has incorporated a variety of pathways,water features,open spaces,and natural areas.Large lots(within the floodplain)are located along the western edge of the project to buffer existing homes. Specimen trees will be retained,and nearly 48-acres of new landscaping areas,new ponds and lakes will be visible from every home.These attractive water features,supplied by the existing water table,will initially provide gravel and fill and also serve as storm water retention basins. Located at the center of the project,the existing Ranch home will be retained and converted to the Homeowners'community association facility. Similar to Island Woods,this family recreation center will be centrally located and membership will be included in annual homeowner fees. The Homeowners Association or private management will operate the 4,000-5,000 square foot community facility and recreation area that will feature tennis,swimming,volleyball and other sports.Throughout the Ranch,convenient public pathways and sidewalks will allow residents to walk and bike to the community center. In addition,the site's 16-foot natural gas easement, which runs in a northwest to southeast alignment,will provide easy access to the North Channel Greenbelt." Storm Drainage and Flood Control: Street drainage plans have been submitted by the applicant as required by the Subdivision Ordinance. Specific drainage system plans are to be submitted to the City Engineer for review Page 4 of 22 \\EAGLENT1\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc and approval prior to the City Engineer signing the fmal plat. The plans are to show how swales, or drain piping, will be developed in the drainage easements. Also, the CC&R's are to contain clauses to be reviewed and approved by the City Engineer and City Attorney, requiring that lots be so graded that all runoff runs either over the curb, or to the drainage easement, and that no runoff shall cross any lot line onto another lot except within a drainage easement. Utility and Drainage Easements,and Underground Utilities: Eagle City Code Section 9-3-6 requires utility easements to be not less than 12-feet wide. Fire Hydrants and Water Mains: Hydrants are to be located and installed as required by the Eagle Fire District. On-site Septic System(yes or no)-no Preservation of Existing Natural Features: The 237.13-acre Quarter Circle Ranch has been designed to retain the feel of openness and beauty of the cattle ranch and farmland. Existing views,water features, and existing, specimen trees will be preserved and enhanced. Preservation of Existing Historical Assets: Per the environmental assessment plan submitted by the applicant,no existing historical assets are located upon the site which would be required to be preserved. If during excavation or development of the site, any historical artifacts are discovered, state law requires immediate notification to the state. J. STREETS: Private or Public Streets: Both public and private streets are proposed within this development. Cul-de-Sac Design,Sidewalks and Curbs and Gutters: See ACHD staff report and site specific recommendations herein. The City recently required tree lined streets,with a five-foot planter strip between the sidewalk and curb, for Brookwood Planned Community and Feather Nest Estates Subdivision. Lighting: Lighting for the proposed public streets is required. Location and lighting specifications shall be provided to the City Zoning Administrator prior to the City Engineer signing the fmal plat. Street Names: Street name approval by the Ada County Street Names Committee has not been received to date. Approval from that committee is required prior to fmal plat approval. K. ON AND OFF-SITE PEDESTRIAN/BICYCLE CIRCULATION: See"Open Space,Greenbelt Areas and Landscape Screening"under"I"above. L. PUBLIC USES PROPOSED: A public pathway is proposed along Eagle Road abutting this site. A pathway/greenbelt system is also proposed to meander through the interior of the development. M. PUBLIC USES SHOWN ON FUTURE ACQUISITIONS MAP:No map currently exists N. SPECIAL ON-SITE FEATURES: Areas of Critical Environmental Concern- Portions of this area are designated a Hazard Area and Special Area in the Comprehensive Plan Page 5 of 22 \\EAGLENTI\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc Evidence of Erosion-no Fish Habitat-no Floodplain-yes Mature Trees-yes Riparian Vegetation-unknown Steep Slopes-no Stream/Creek: yes Unique Animal Life-no Unique Plant Life-no Unstable Soils-unknown Wildlife Habitat-yes O. SUMMARY OF REVIEW OF ENVIRONMENTAL ASSESSMENT PLAN(IF REQUIRED): (EAP plan submitted with the application) P. AGENCY RESPONSES: The following agencies have responded and their correspondence is attached: City Engineer: All comments within the engineer's letter dated January 21, 1999 are of special concern (see attached). Ada County Highway District Ada Planning Association Central District Health Division of Environmental Quality Eagle Fire Department EM2 Inc. Eagle Sewer District Meridian School District No.2 Idaho Transportation Department United Water Q. LETTERS FROM THE PUBLIC:None received to date R. PROPOSED TIME SCHEDULE FOR THE DEVELOPMENT OF THE SITE: The applicant states that,"Based on market conditions,it is anticipated that the Quarter Circle Ranch will have 8-12 phases with a 5-10 year phased construction schedule beginning in 1999." S. EAGLE CITY CODE FINDINGS FOR A PLANNED UNIT DEVELOPMENT PRELIMINARY DEVELOPMENT PLAN AND CONDITIONAL USE PERMIT: 1. That the proposed PUD is in the public interest, advances the general welfare of the community and neighborhood,and will not be detrimental to the economic welfare of the community. 2. That the development be designed, constructed, operated and maintained to be harmonious and appropriate in appearance with the existing or intended character of the general vicinity and how such use will not change the essential character of the same area. 3. That the development will not be hazardous or disturbing to existing or future neighborhood uses. 4. That the development does not involve uses, activities, processes, materials, equipment, and/or conditions of operation that will be detrimental to any persons, property or the general welfare by reason of excessive production of traffic,noise,smoke,fumes,glare or odors. 5. That the development will be served adequately by essential public facilities such as highways,streets, police and fire protection,drainage structures,refuse disposal,water and sewer,and schools. Page 6 of 22 \\EAGLENTI\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc . r 6. That the development will not create excessive additional requirements at public cost for public facilities and services. 7. That the development is provided with parks, ponds, open areas, areas of special interest, floodplain preservation, and/or other special features which would not typically be provided in a non-PUD proposal. 8. That the vehicular approaches to the property are designed to not create an interference with traffic on surrounding public thoroughfares. 9. That the development will not result in the destruction, loss, or damage of a natural, scenic or historic feature of major importance. 10. That the proposed development will be harmonious with and in accordance with the general objectives or with any specific objective of the Comprehensive Plan. 11. That the proposed development will be harmonious with and in accordance with the general objectives or with any specific objective of Eagle City Code Title 8. 12. That the benefits,combination of various land uses,and interrelationship with the surrounding area for this proposed development justifies any proposed deviation from any standard district regulations. In cased of large-scale PUDs(incorporating fifty(50)or more lots or dwelling units): 13. That public services shall be provided to the development including,but not limited to,fire protection, police protection, central water, central sewer, road construction, parks and open space, recreation, maintenance,schools and solid waste collection. 14. That an estimate of the public service costs to provide adequate service to the development has been provided by the developer. 15. That an estimate of the tax revenue that will be generated from the development has been provided by the developer. 16. That suggested public(or private) means of fmancing the services for the development if the cost for the public services would not be offset by the tax revenue received from the development has been provided by the developer. For a request of up to 10% of the gross land area to be directed to uses other than residential (ie; commercial, industrial,public and quasi public uses that are not allowed in the land use district): 17. That the uses are appropriate with the residential uses. 18. That the uses will serve principally the residents of the PUD. 19. That the uses are planned to be an integral part of the PUD. 20. That the uses located and designed to provide direct access to a collector or arterial street. 21. That the proposed street connections will not create congestion or traffic hazards. In cases where an increase in residential density of up to 15% of the allowable number of dwelling units is requested: 22. LANDSCAPING-For up to 5% That the quality of the designs for landscaping, streetscape, open spaces and plazas, use of existing landscape, pedestrian way treatment, and recreational areas, incorporated into this development, Page 7 of 22 \\EAGLENTI\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc C t exceed that of a non PUD development. 23. SITING-For up to 5% That the quality of the designs for visual focal points, use of existing features such as topography, view, sun orientation, prevalent wind direction, pedestrian/vehicular circulation pattern, physical environment, variation in building setbacks, and building grouping (such as clustering), incorporated into this development,exceed that of a non PUD development. 24. DESIGN FEATURES-For up to 5% That the quality of the designs for street sections, architectural styles, harmonious use of materials, parking areas broken by landscaping features, and varied use of housing types, incorporated into the development,exceed that of a non PUD development. T. GENERAL STANDARDS FOR APPROVAL OF PRIVATE STREETS: Section 9-3-2-5(A)General Standards:Private streets may be permitted if the Council determines that the private street is in compliance with each of the following standards: 1. Unique or special circumstances exist with respect to the proposed use,design,location, topography,or other features of the development or its surroundings such that private streets will serve to enhance the overall development; 2. The private street provides safe and effective movement of both vehicular and pedestrian traffic; 3. The private street provides adequate access for service and emergency vehicles; 4. The private street does not adversely affect access or good transportation planning to adjacent property and to the area travel networks; 5. The private street does not landlock adjacent property due to topography or parcel layout; 6. Other than to provide emergency access,the private street does not connect one public street to another,encouraging travel through the development served by the private street; 7. The use or alignment of the private street does not interfere with the continuity of public streets;and 8. An appropriate mechanism has been established for the repair and maintenance of the private street,including provisions for the funding thereof. STAFF ANALYSIS PROVIDED WITHIN THE STAFF REPORT: A. COMPREHENSIVE PLAN PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: COMMENTS ON SPECIFIC POLICIES AND GOALS FROM THE EAGLE COMPREHENSIVE PLAN Housing: #1. "A wide diversity of housing types and choice between ownership and rental dwelling units shall be encouraged for all income groups in a variety of locations suitable for residential development." #2. "The location of all housing shall be coordinated with provisions for adequate public facilities and services." #3. "Development of housing for all income groups close to employment and shopping centers shall be encouraged." Comment: Quarter Circle Ranch was designed as a neighborhood with a diversity of housing opportunities available for a wide-range of income groups. The plan calls for: • Small-lot carriage homes(5,000 square feet)for seniors,small families,young families and singles • Custom lots-8,000- 10,000 square feet • Luxury lots— 10,000 to 33,000 square feet ■ Estate lots—33,000 square feet to 2 acres Land Use: Page 8 of 22 \\EAGLENTI\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc r #1. "To preserve the rural transitional identity." #2. "To establish land use patterns and zoning districts that do not exhaust available services." #11."To identify the .Boise River Floodplain as Special Areas due to its environmental and scenic significance." #12. "To create special development and design review standards for properties characterized by a Special Area designation.Special Areas shall be given consideration for a Planned Unit Development(PUD)zoning classification." #20. "To provide for a broad spectrum of housing types including apartments,townhouses,condominiums, single family attached,affordable and subsidized housing and large acreage developments." #21. "To establish categories of residential land use based upon a range of possible residential densities. Residential density within a land use category may vary within the prescribed range from project to project..." #22. "To encourage clustering and density transfer techniques to provide for recreational opportunities and for the preservation and acquisition of open space as part of Planned Unit Developments(PUD)....When a PUD includes more than one land use and/or zoning designation,the boundary line between the designations may be moved within the PUD if approved by the City Council and if the total number of acres in each land use,or zoning designation remains substantially the same within the PUD." Comment:The design objectives of Quarter Circle Ranch were to: 1. Present to the city of Eagle a project in accordance with the Comprehensive Plan future land use map;and 2. Create a high-quality,creative Planned Unit Development that respects Eagle Island's beauty,and natural environment;and 3. Respect the community's strong interest in maintaining rural character,scenic views,and quality development;and 4. Create a neighborhood with an array of housing types and prices that encourages greater diversity of families in Eagle. B.W.Inc.,worked for over a year to design the optimum layout for the Quarter Circle Ranch and to design a project respecting the desires of the City of Eagle.After undertaking the adjacent Island Woods,and North Channel projects,B.W.Inc.,understands and supports the careful stewardship of Eagle Island for the community.There is no floodway in the project.The only floodplain area is on the western boundary where eight lots are approximately 2.0-acres in size or greater. Parks,Recreation and Open Spaces: #3. "To set aside for perpetual public enjoyment an adequate amount of open space such as natural river frontage,greenbelt-river trail,creeks,drainage ways,buffers,floodplains,wooded areas and viewpoints." #4. "Developers shall be encouraged to dedicate and develop areas for parks or tot lots in new residential developments." #6 "To encourage development of a bike path system which would relieve motorized transportation routes and connect parks,recreation and open space areas." Comment:The development of Quarter Circle Ranch centered around incorporating water features,open spaces and recreation into an overall plan.Approximately 57-acres were dedicated to open space. Significantly greater access for the public to Eagle Island has been incorporated. A public greenbelt,running northwest to southeast bisects the project and provides bike and pedestrian connection from the North and South Channels of the Boise River.Access to the greenbelt along the south side of North Channel will be within easy reach for all. For residents,and green belt users,water features,vistas or landscape areas will be within constant view. Landscaping plans call for native and compatible plants and tree species. The homeowners association clubhouse will be located on a 3.5-acre site and provide basketball,tennis,pool and meeting facilities for all residents,7-days a week. Special Areas or Sites: #3. "To protect and improve natural and man-made waterways and preserve their natural resource and recreational value." #4. "To preserve existing trees and natural growth wherever practicable and establish appropriate landscaping as a part of new developments." #8. "To require developers to prepare and submit an environmental assessment Page 9 of 22 \\EAGLENT1\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc #9. "To require a plan for the restoration of land which shall be made available for each parcel of land located within a Special Area or Site that is proposed for the extraction of sand,gravel,rock,or other mineral resource." Transportation: #5 "To require that new developments provide for pedestrian,equestrian and bicycle circulation in accordance with adopted local and regional pathway plans." #18 "To establish and require minimum setbacks between development and roadways and to encourage installation of berms and landscaping for all developments to enhance safety and to enrich the roadway and community appearance." B. ZONING ORDINANCE PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: • ECC Section 8-2-4(G):A decrease of minimum lot size in a subdivision may be allowed if there is an offsetting increase of the same percentage in open space and a planned unit development is applied for and approved. • ECC Section 8-7-3-3 CONDITIONAL USES "PUBLIC SITES AND OPEN SPACES" Public sites and open spaces shall conform to the following: B. Natural Features: Existing natural features which add value to residential development and enhance the attractiveness of the community (such as trees, water courses, historic spots and similar irreplaceable assets)shall be preserved in the design of the development. C.Special Developments: In the case of planned unit developments and large-scale developments, the Council may require sufficient park or open space facilities of acceptable size, location and site characteristics that may be suitable for the proposed development. • ECC Section 8-7-3-5:CONDITIONAL USE PERMIT: D. Conditions Of Permit: Upon the granting of a conditional use permit, conditions may be attached to said permit including,but not limited to,those: 1.Minimizing adverse impact on other development; 2.Controlling the sequence and timing of development; 3.Controlling the duration of development; 4.Assuring that development is maintained properly; 5.Designating the exact location and nature of development; 6.Requiring the provision for on-site or off-site public facilities or services;and 7.Requiring more restrictive standards than those generally required in this Title. • ECC Section 8-6-1:PURPOSE"PLANNED UNIT DEVELOPMENTS": It shall be the policy to guide a major development of land and construction by encouraging planned unit development(PUD)to achieve the following: A.A maximum choice of living environments by allowing a variety of housing and building types and permitting an increased density per acre and a reduction in lot dimensions. yards. building setbacks and area requirements; B. A more useful pattern of open space and recreation areas and, if permitted as part of the project, more convenience in the location of accessory commercial uses, industrial uses and services; C. A development pattern which preserves and utilizes natural topography and geologic features, scenic vistas,trees and other vegetation and prevents the disruption of natural drainage patterns; D. A more efficient use of land than is generally achieved through conventional development resulting in substantial savings through shorter utilities and streets;and E. A development pattern in harmony with land use density, transportation and community facilities objectives of the Comprehensive Plan. • ECC Section 8-6-5-2:COMMON OPEN SPACE: A. Required Common Open Space: A minimum of ten percent (10%) of the gross land area Page 10 of 22 \\EAGLENTI\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc C developed in any residential PUD project shall be reserved for common open space and recreational facilities for the residents or users of the area being developed. D. Clustering: Every property developed under the PUD approach should be designed to abut upon common open space or similar areas.A clustering of dwellings is encouraged. C. SUBDIVISION ORDINANCE PROVISIONS WHICH OF SPECIAL CONCERN REGARDING THIS PROPOSAL:(None) D. DISCUSSION: • The Comprehensive Plan's land use map designations set the maximum density limit at 474 units for a PUD for this site. The applicant is proposing 371 units,which is 103 units(21%)less than 474 units. • Eagle City Code Section 8-6-6-3,requires all fmal development plans to be reviewed by the Planning and Zoning Commission as well as the City Council. This is partly to allow for additional City review for flexibility needed for long range and large PUDs. • The proposed variation in lot sizes and setbacks will be to provide a wide range of housing choices in accordance with the comprehensive plan; to preserve Special Areas and to provide significant open space in parks and pathway systems; and to transition from the smaller dwellings along Eagle Road to the "Estate"residential area along the western portion of this site. • Regarding Eagle City Code fmdings for a rezone, conditional use permit, planned unit development preliminary development plan,preliminary plat, and private streets-As a part of the application submittal for this project, and in accordance with application submittal requirement#14, the applicant has provided an 8 page document,dated December 23, 1998 and a 4 page addendum document dated February 3, 1999. The documents outline how the applicant intends to guarantee that this project will meet the Eagle City Code required fmdings for a conditional use permit, planned unit development preliminary development plan,preliminary plat, and private streets. Staff has reviewed the document and believes that the fmdings have been well addressed. • Staff will provide detailed discussion regarding this proposed development during the oral presentation at the Planning and Zoning Commission and City Council meetings. STAFF RECOMMENDATION PROVIDED WITHIN THE STAFF REPORT: Staff recommends approval of the rezone as proposed. Staff recommends approval of the conditional use permit,preliminary development plan,preliminary plat, and private streets with site specific conditions of approval and the standard conditions of approval provided within the staff report. PUBLIC HEARING OF THE COMMISSION: A. A public hearing on the application was held before the Planning and Zoning Commission on February 16, 1999. Testimony was taken,the public hearing was closed and the Commission made their recommendation at that time. B. Oral testimony in opposition to the application was presented by three individuals before the Planning and Zoning Commission. The concerns addressed were related to increased traffic on Eagle Road, agricultural vehicles on residential streets, school overcrowding, decrease in rural view areas, possible depletion in irrigation water, artesian water, and subsurface water supplies, and the degradation of the natural state and uniqueness of Eagle Island caused by the additional density on the island. C. Oral testimony in favor of the application was presented by four individuals before the Planning and Zoning Commission. Favorable comments were related to the overall well-planned, environmentally-sensitive development, the larger lots proposed along the west portion of the development shows the responsiveness of the developer to the neighbors, good mix of lot sizes including the cluster area. One individual that was in favor of the application was also concerned about the agricultural traffic that will be using the residential streets Page 11 of 22 \\EAGLENTI\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc within the development,and the possible nuisance that may be caused by the animals, vehicles,blue tarps, etc. of the existing residences that abut this development. COMMISSION DECISION: The Commission voted 4 to 0 (Brinton left the meeting) to recommend approval of RZ-10-98. The Commission voted 4 to 0(Brinton left the meeting)to recommend approval of CU-9-98/PPUD-2-98/PP-8- 98 (Quarter Circle Ranch Planned Unit Development) with the site specific and standard conditions of approval shown within their Findings of Fact and Conclusions of Law document dated March 1, 1999. PUBLIC HEARING OF THE COUNCIL: A. A public hearing on the application was held before the City Council on April 13, 1999, at which time testimony was taken and the public hearing was closed. The Council took action at that time. B. Oral testimony in opposition to this proposal was presented to the City Council by no one. C. Oral testimony in favor of this proposal was presented to the City Council by no one (not including the applicants and their representatives). D. Oral testimony neither in favor nor in opposition was presented to the City Council by one individual whose major concern is the possibility of the property's existing water rights being transferred off-site thereby decreasing the level of involvement between the ditch company and the development(or its representatives). COUNCIL DECISION: The Council voted 4 to 0 to approve RZ-10-98. The Council voted 4 to 0 to approve CU-9-98/PPUD-2- 98/PP-8-98(Quarter Circle Ranch Planned Unit Development)with the following site specific and standard conditions of approval: SITE SPECIFIC CONDITIONS OF APPROVAL: 1. Comply with all site specific recommendations provided within the City's Engineering firm's (Holladay Engineering)letter dated January 21, 1999. 2. All development within area of the Property which is within the 100-year floodplain shall have finished floor level of all buildings which are at least two(2)feet above the Federal Emergency Management Association Base Flood Elevation(BFE). 3. Regardless of the maximum number of residential units allowed within the zoning designation, the maximum density for residential development within the 100-year floodplain shall be one (1) dwelling unit per one (1) acre and the floodway land area shall not be considered when calculating the maximum residential density permitted. 4. All buildings shall be set back a minimum of 100-feet from the floodway line except that when the 100-year floodplain line is 100-feet or less from the floodway line the floodplain line shall be the setback line. 5. Open areas such as greenbelt areas, non-residential parking lots, etc., within the 100 year floodplain, shall be designed and operated so that they may flood and provide storage capacity for waters during 100-year flood events. 6. A Flood Plain Development Permit application shall be submitted to and approved by the City prior to commencing any work within the 100-year flood plain 7. Grading plans shall show that grading shall be done in such a way that the floodwater storage volume in the 100-year floodplain,as bounded by the existing surface topography and the Base Flood Elevation surface,shall not be reduced from the current quantity. Depressions which will be filled with ground water and sections of Page 12 of 22 EAGLENTI\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc the 100-year floodplain which are restricted from floodwater conveyance due to roads built above the Base Flood Elevation shall not be considered when determining floodwater storage volumes. 8. Roadways and manholes within the 100-year floodplain shall be a minimum of 0.5-feet above Base Flood Elevation at center line and manhole ring respectively and all new roads built above the Base Flood Elevation shall not restrict conveyance of floodwater into sections of the 100-year floodplain which may be cut off by the proposed road. Culverts or bridges shall be provided under roads to allow floodwater conveyance for floodwater storage into sections of the 100-year floodplain which may be cut of by a road. 9. All public and private street sidewalks shall be separated from the curb to allow landscape strips and trees to be planted between the sidewalks and the street. 10. The developer shall provide 3-inch minimum caliper shade-class trees (to be reviewed and approved by the Design Review Board) along both sides of W. Islands Woods Drive, S. Channel Road, and W. River Pointe Drive(east of S.Channel Road). Trees shall be placed at each lot corner with the distance between trees to be no more than 80-feet or less than 35-feet. The trees shall be located in a landscape strip between the sidewalk and the curb. To assure the installation of the trees and landscaping required within this condition provide the City with a copy of the subdivision's CC&R's (to be reviewed and approved by the Design Review Board) showing requirements for: a. Types of trees and landscaping to be installed within the landscape strip; b. Trees to be installed prior to issuance of occupancy permits for the homes; C. An automatic,pressurized irrigation system to be installed by the homeowners prior to issuance of occupancy permits for the homes;and d. Requirements for homeowner maintenance of trees,other landscaping,and automatic irrigation system within the landscape strip. 11. Any private streets will be required to comply with the private street ordinance of the City of Eagle. 12. Other than the sidewalks along the streets,meandering pathway/trails within the subdivision shall be shall be 6- foot wide minimum asphalt or concrete. 13. Any stub street which is expected to be extended in the future shall be provided with a sign generally stating that,"This street is to be extended in the future". 14. Final development plans shall be reviewed as"New Business" items and not as "Public Hearing"items unless the City determines that any difference between the preliminary development plan and fmal development plan needs additional public comment because of possible impacts to surrounding property owners, to this development, or to the community, or inconsistency with the conditions herein. If the City determines that a public hearing shall be held on the fmal development plan,notice shall be provided for(as was required for the preliminary development plan). 15. The total surface area of the water amenities shown on the documents provided with this application shall not be decreased unless the decrease is approved by the City Council. The City Council may permit a maximum decrease of up to 10%of the total surface area of the water amenities as long as the decreased area is added to common area. 16. The street and pathway configuration shall remain substantially as shown on Preliminary Development Plan submitted to the City with this application. 17. The open space area shall not be permitted to be decreased from the 57-acres proposed. 18. The community facility/recreation area shall be completed prior to one year after ACHD accepts the public street providing access to the center. 19. Useable park amenities such as skateboard parks, picnic tables, gazebos, swing sets, basketball courts, ball fields and/or similar amenities shall be provided within the open space areas. Landscape plans showing open Page 13 of 22 \\EAGLENTI\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc space amenities shall be reviewed and approved by the Design Review Board. 20. Minimum building setbacks,lot sizes and lot widths shall be as stated within the"Site Data"section"H"within the City Council's Findings of Fact and Conclusions of Law with the following condition: The additional 5- foot setback required for two story structures shall be waived for the front, back and street sides of all units within the subdivision. The additional 5-foot per story setback required from interior lot lines shall permitted to be decreased to 2.5-feet only for those homes located on Custom Lots as noted in the above fmdings. 21. Additional specific criteria for the higher density clustered residential dwelling development area shown as Phase 5 on the submitted preliminary plat: a. Forty-two(42)dwelling units shall be permitted(carriage homes). b. Upon review of fmal development plans the City may encourage that dwelling units be designed with front porches with decreased front setbacks to provide a neo-traditional look. c. If decreased setbacks are approved garage doors will still be required to be a minimum of 18-feet from the garage side of any sidewalk to allow sufficient room for a car to park in front of the garage without blocking the sidewalk. d. Upon review of fmal development plans the City may encourage that dwelling units be designed with side entry garages. e. Upon review of fmal development plans the City shall consider approval of zero lot line development, town houses,condominiums and duplexes. f. Attached dwelling units (i.e.: duplex/townhouse units) shall be designed so that garage doors do not dominate the fronts of the dwellings. g. Common walls between attached units shall be insulated to decrease the transfer of noise between the units. The insulation method shall be reviewed and approved by the City Building Official prior to approval of the fmal development plan. 22. Subdivision signage, common area, recreation center, street trees, existing trees, pathways, buffer areas, perimeter fencing, and etc. shall be reviewed and approved by the Design Review Board prior to approval of fmal development plan. 23. The entire Quarter Circle Ranch development shall remain under the control of one Homeowners Association. 24. A maintenance building shall be provided of such size and in such location as is suitable for the service needs that are necessary for the repair and maintenance of all common areas. The building shall be reviewed an approved by the Design Review Board. 25. Provide a 5-foot wide concrete meandering sidewalk along Eagle Road abutting the site. 26. The City's actions on the application does not grant the applicant any appropriation of water or interference with existing water rights. The applicant indemnifies and holds the City harmless for any and all water rights, claims in any way associated with these applications. 27. Provide a note on the face of the plat and within the CC&R's stating that commercial and agricultural traffic will be using the public streets within the Quarter Circle Ranch development for access to and from Eagle Road to parcels not within the development. 28. Provide a note within the CC&R's stating that agricultural activities surrounding this development, which may include noise from farming equipment,may occur at any time(24-hours a day). STANDARD CONDITIONS OF APPROVAL: 1. The applicant shall comply with all requirements of the Ada County Highway District and/or the Idaho Transportation Department, including but not limited to approval of the drainage system, curbs, gutters, streets and sidewalks. 2. Correct street names,as approved by the Ada County Street Name Committee, shall be placed on the plat Page 14 of 22 \\EAGLENTI\COMMON\'&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc r prior to the City Engineer signing the fmal plat. 3. Complete water and sewer system construction plans shall be reviewed and approved by the City Engineer. Required improvements shall include,but not be limited to, extending all utilities to the platted property. The developer may submit a letter in lieu of plans explaining why plans may not be necessary. • 4. Idaho Department of Health & Welfare approval of the sewer and water facilities is required prior to the City Engineer signing the fmal plat(I.C.Title 50,Chapter 13 and I.C.39-118). 5. Written approval of all well water for any shared or commercial well shall be obtained from the Idaho Department of Water Resources prior to the City Engineer signing the fmal plat. 6. Unless septic tanks are permitted, wet line sewers will be required and the applicant will be required to furnish the City Engineer with a letter from the sewer entity serving the property, accepting the project for service,prior to the City Engineer signing the fmal plat(B.C.C.9-20-8.4) 7. All homes being constructed with individual septic systems shall have the septic systems placed on the street side of the home. 8. Per Idaho Code, Section 31-3805, concerning irrigation rights, transfer and disclosure, the water rights appurtenant to the lands in said subdivision which are within the irrigation entity will be transferred from said lands by the owner thereof; or the subdivider shall provide for underground title or other like satisfactory underground conduit to permit the delivery of water to those landowners within the subdivision who are also within the irrigation entity. See Eagle City Code Section 9-4-1-9(C) which provides overriding and additional specific criteria for pressurized irrigation facilities. Plans showing the delivery system must be approved by a registered professional engineer and shall be approved by the City Engineer prior to the City Engineer signing the fmal plat. 9. The applicant shall submit a letter from the appropriate drainage entity approving the drainage system and/or accepting said drainage;or submit a letter from a registered professional engineer certifying that all drainage shall be retained on-site prior to the City Engineer signing the fmal plat. A copy of the construction drawing(s)shall be submitted with the letter. 10. Drainage system plans shall be submitted to the City Engineer for review and approval prior to the City Engineer signing the fmal plat. The plans shall show how swales,or drain piping,will be developed in the drainage easements. The approved drainage system shall be constructed, or a performance bond shall be submitted to the City Clerk, prior to the City Engineer signing the fmal plat. The CC&R's shall contain clauses to be reviewed and approved by the City Engineer and City Attorney, prior to the City Engineer signing the fmal plat, requiring that lots be so graded that all runoff runs either over the curb, or to the drainage easement, and that no runoff shall cross any lot line onto another lot except within a drainage easement. 11. No ditch, pipe or other structure or canal, for irrigation water or irrigation waste water owned by an organized irrigation district,canal company,ditch association,or other irrigation entity,shall be obstructed, routed, covered or changed in any way unless such obstruction, rerouting, covering or changing has first been approved in writing by the entity. A Registered Engineer shall certify that any ditch rerouting,piping, covering or otherwise changing the existing irrigation or waste ditch(1) has been made in such a manner that the flow of water will not be impeded or increased beyond carrying capacity of the downstream ditch; (2)will not otherwise injure any person or persons using or interested in such ditch or their property; and (3) satisfied the Idaho Standards for Public Works Construction. A copy of such written approval and certification shall be filed with the construction drawing and submitted to the City Engineer prior to the City Engineer signing the fmal plat. 12. Street light plans shall be submitted and approved as to the location, height and wattage to the City Page 15 of 22 \\EAGLENTI\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc Engineer prior to the City Engineer signing the fmal plat. All construction shall comply with the City's specifications and standards. The applicant shall delineate on the face of the fmal plat an easement, acceptable to the City Engineer, for the purpose of installing and maintaining street light fixtures, conduit and wiring lying outside any dedicated public right-of-way,prior to the City Engineer signing the fmal plat. The applicant shall pay applicable street light inspection fees on the proposed subdivision prior to signing of the final plat by the Eagle City Engineer. 13. The applicant shall provide utility easements as required by the public utility providing service,and as may be required by the Eagle City Code,prior to the City Engineer signing the fmal plat. 14. An approval letter from the Eagle Fire Department shall be submitted to the City prior to the City Engineer signing the fmal plat. The letter shall include the following comments and minimum requirements, and any other items of concern as may be determined by the Eagle Fire Department officials: a. The applicant has made arrangements to comply with all requirements of the Fire Department. b. The proposed fire hydrant locations shall be reviewed and be approved in writing by the Eagle Fire Department prior to the City Engineer signing the final plat.. c. Minimum flow per hydrant shall be 1,000 gallons per minute for one and two family dwellings, 1,500 gallons per minute for dwellings having a fire area in excess of 3,600 square feet,and 1,500 gallons per minute for non-residential uses (i.e.: Commercial, Industrial, Schools, etc.). Flow rates shall inspected in accordance with all agencies having jurisdiction, and shall be verified in writing by the Eagle Fire Department prior to issuance of any building permits. d. The proposed fire protection system shall be reviewed and approved by the Eagle Fire Department prior to issuance of a building permit. 15. Covenants,homeowner's association by-laws or other similar deed restrictions,acceptable to the Eagle City Attorney which provide for the use, control and mutual maintenance of all common areas, storage facilities, recreational facilities, street lights or open spaces shall be reviewed and approved by the Eagle City Attorney prior to the City Engineer signing the fmal plat. A restrictive covenant must be recorded and a note on the face of the fmal plat is required, providing for mutual maintenance and access easements. Appropriate papers describing decision-making procedures relating to the maintenance of structures, grounds and parking areas shall be reviewed and approved by the Eagle City Attorney prior to the City Engineer signing the fmal plat. 16. Should the homeowner's association be responsible for the operation and maintenance of the storm drainage facilities, the covenants and restrictions, homeowner's association by-laws or other similar deed restrictions acceptable to the Eagle City Attorney shall be reviewed and approved by the Eagle City Attorney prior to the City Engineer signing the fmal plat. 17. The applicant shall submit an application for Design Review, and shall obtain approval for all required landscaping,common area and subdivision signage prior to the City Engineer signing the fmal plat. 18. Any recreation area, greenbelt area or pathway area along the Boise River, Dry Creek or any other area designated by the City Council or Eagle City Pathway/Greenbelt Committee for a path or walkway shall be approved in writing by the Eagle City Pathway/Greenbelt Committee prior to approval of the final plat by the City Council. 19. Conservation, recreation and river access easements (if applicable) shall be approved by the Eagle City Pathway/Greenbelt Committee and shall be shown on the final plat prior to approval of the final plat by the City Council. 20. The applicant shall place a note on the face of the plat which states: "Minimum building setback lines shall Page 16 of 22 \\EAGLENT I\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc be in accordance with the applicable zoning and subdivision regulations at the time of issuance of the building permit or as specifically approved and/or required". 21. The applicant shall comply with the provisions of the Eagle City Code, pertaining to floodplain and river protection regulations(if applicable)prior to the City Engineer signing the final plat. 22. The development shall comply with the Boise River Plan (if applicable) in effect at the time of City Council consideration of the fmal plat. 23. The applicant shall obtain written approval of the development relative to the effects of the Boise River Flood Plain (if applicable) from the Corps. of Engineers prior to approval of the final plat by the City Engineer. 24. The applicant shall obtain approval of the development relative to its effects on wetlands or other natural waterways (if applicable) from the Corps. of Engineers and the Idaho Department of Water Resources and/or any other agency having jurisdiction prior to the City Engineer signing the fmal plat. 25. Basements in homes in the flood plain are prohibited. 26. The Americans with Disabilities Act, Uniform Building Code, Eagle City Code, Eagle Comprehensive Plan, and all applicable County, State and Federal Codes and Regulations shall be complied with. All design and construction shall be in accordance with all applicable City of Eagle Codes unless specifically approved by the Commission and/or Council. 27. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the City of Eagle. The burden shall be upon the applicant to obtain written confirmation of any change from the City of Eagle. 28. No public board,agency, commission, official or other authority shall proceed with the construction of or authorize the construction of any of the public improvements required by the Eagle City Code Title 9 "Land Subdivisions"until the fmal plat has received the approval of the City Council(ECC 9-6-5(A)(2)). After Council approval of the final plat, the applicant may construct any approved improvements before the City Engineer signs the fmal plat. The applicant shall provide a fmancial guarantee of performance in the amount of 150%of the total estimated cost for completing any required improvements (see resolution 98-3)prior to the City Engineer signing the final plat. The fmancial guarantee shall be a Letter of Credit, Certificate of Deposit,cash deposit or certified check. 29. In accordance with Eagle City Code, failure to obtain a recorded fmal plat for the subdivision within one year following City Council approval shall cause this approval to be null and void,unless a time extension is granted by the City Council. 30. Prior to submitting the final plat for recording, the following must provide endorsements or certifications: Owners or dedicators, Registered Land Surveyor, County Engineer, Central District Health Department, Ada County Treasurer,Ada County Highway District Commissioners,City Engineer,and City Clerk. CONCLUSIONS OF LAW: A. The applications for this item were received by the City of Eagle on December 24, 1998. B. Notice of Public Hearing on the application for the Eagle Planning and Zoning Commission was published in accordance for requirements of Title 67, Chapter 65, Idaho Code and the Eagle City ordinances on January 27, 1999. Notice of this public hearing was mailed to property owners within three-hundred feet(300-feet) of the subject property in accordance with the requirements of Title 67,Chapter 65, Idaho Code and Eagle City Code on January 15, 1999. Requests for agencies' reviews were transmitted on December 31, 1998 in accordance with the requirements of the Eagle City Code. Page 17 of 22 \\EAGLENTI\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccfdoc Notice of Public Hearing on the application for the Eagle City Council was published in accordance for requirements-of Title 67,Chapter 65, Idaho Code and the Eagle City ordinances on March 3, 1999. Notice of this public hearing was mailed to property owners within three-hundred feet(300-feet) of the subject property in accordance with the requirements of Title 67, Chapter 65, Idaho Code and Eagle City Code on March 5, 1999. C. In accordance with Eagle City Code findings for a rezone, conditional use permit, planned unit development preliminary development plan,and preliminary plat the Eagle City Council makes the following conclusions for RZ-10-98/CU-9-98/PPUD-2-98/PP-8-98 (Quarter Circle Ranch Planned Unit Development), as proposed with the conditions recommended herein: 1. That the proposed PUD is in the public interest,advances the general welfare of the community and neighborhood,and will not be detrimental to the economic welfare of the community because; The existing Quarter Circle Ranch is no longer an economically feasible enterprise.B.W.&Assoc.,is acquiring the 237.13-acre ranch and developing it into a well-planned residential community that will continue the character and caliber of Island Woods. The Ranch will carefully transition to a planned residential community with large areas of landscaped open space and water features patterned after Island Woods and sensitive to Eagle Island. There will be a range of housing opportunities from 2-acre custom home sites to carriage house units. Large common areas, water features,pedestrian trails,construction phasing,and active homeowner associations are the hallmarks of B.W.&Assoc.projects.Each of the residential areas will function as small neighborhoods;yet all homeowners will be required to join the overall community association.In addition,a family recreational facility will be provided at a central location.Connection to the North Channel of the Boise River Greenbelt will be provided and residents will be able to conveniently walk or bicycle to North Channel and other Eagle retail businesses from the Ranch. 2. That the development be designed,constructed,operated and maintained to be harmonious and appropriate in appearance with the existing or intended character of the general vicinity and how such use will not change the essential character of the same area because; The 237.13-acre Quarter Circle Ranch has been designed to retain the feel of openness and beauty of the cattle ranch and farmland. Existing views,water features,and existing,specimen trees will be preserved and enhanced.Access to the site will be from Eagle Road at three locations;Island Woods Drive will be the main entrance. Primarily custom builders will build homes at the Ranch.Covenants,Conditions,and Restrictions(CCRs) will be established specifying appearance standards for "traditional"and"country"design that all property owners must follow.Design guidelines including roof slope,exterior colors,façade fmishes,lighting,etc., will be developed by B.W.,Inc.Professional landscaping design and will be located throughout the project. The Homeowners Association will enforce the development conditions at the Ranch in the same manner as Island Woods.All property owners will be required to join the Homeowners Association which will also be responsible for maintenance of the common areas and the community facilities.A fee will be set by the association and annually assessed all property owners for maintenance of the common areas and facilities. 3. That the development will not be hazardous or disturbing to existing or future neighborhood uses because; The Ranch will be built adjacent to Eagle Road,a major arterial. All access points will be off Eagle Road and will not intrude on existing homes located to the west of the proposed development.The site plan incorporates larger acreage lots on the western perimeter,which serve as a buffer to the existing adjacent residential uses. 4. That the development does not involve uses, activities,processes, materials, equipment, and/or conditions of operation that will be detrimental to any persons,property or the general welfare by reason of excessive Page 18 of 22 \\EAGLENTI\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc production of traffic,noise,smoke,fumes,glare or odors because; The Ranch will produce only normal traffic associated with residential 1 activities. 5. That the development will be served adequately by essential public facilities such as highways, streets, police and fire protection,drainage structures,refuse disposal,water and sewer,and schools because; All municipal services are available to the site. The area has been annexed into the Eagle Sewer District. Drainage structures, water, sewer, roads and other urban services will be provided at the developer's expense. Meridian School District is aware of the proposed development and B.W.&Assoc.has proposed a future elementary school site approximately 0.5 miles from the Ranch. 6. That the development will not create excessive additional requirements at public cost for public facilities and services because; B.W. & Assoc., is an experienced builder that has an excellent track record of providing well-designed project improvements. All the public facilities and services are provided by the developer and must be approved by the city at the time of installation and before acceptance by the sewer,water and road districts. The community recreational facility will be built at the inception of the project by the B.W.&Assoc. and funded and maintained by the developer and then turned-over to the Homeowners Association. In this way, the scheduled improvements are provided at the initial stage of development thus avoiding any potential city liability and expenditures. 7. That the development is provided with parks, ponds, open areas, areas of special interest, floodplain preservation, and/or other special features which would not typically be provided in a non-PUD proposal because; The paramount issue during planning for the Ranch was to retain and respect the Eagle Island environment as much as possible and to make the new development compatible with existing homes. To that end, the site plan has incorporated a variety of pathways,water features, open spaces, and natural areas. Large lots (within the floodplain) are located along the western edge of the project to buffer existing homes. Specimen trees will be retained,and nearly 48-acres of new landscaping areas,new ponds and lakes will be visible from every home.These attractive water features, supplied by the existing water table,will initially provide gravel and fill and also serve as storm water retention basins. Located at the center of the project,the existing Ranch home will be retained and converted to the Homeowners' community association facility. Similar to Island Woods,this family recreation center will be centrally located and membership will be included in annual homeowner fees. The Homeowners Association or private management will operate the 4,000-5,000 square foot community facility and recreation area that will feature tennis,swimming,volleyball and other sports.Throughout the Ranch, convenient public pathways and sidewalks will allow residents to walk and bike to the community center. In addition,the site's 16-foot natural gas easement,which runs in a northwest to southeast alignment,will provide easy access to the North Channel Greenbelt. 8. That the vehicular approaches to the property are designed to not create an interference with traffic on surrounding public thoroughfares because; There are three access points to the development: Eagle Road, Mace Road and South Channel Road. The main entrance at Eagle Road and Island Woods Drive will be signalized when traffic warrants are met. The development has been designed to restrict use of Mace Road so that it continues to primarily serve the existing homes to the west. On the western edge of the development, a stub street easement has been provided to connect the Ranch with future development. South Channel Road will continue to mainly access the existing homes in the area. 9. That the development will not result in the destruction, loss, or damage of a natural, scenic or historic feature of major importance because; Page 19 of 22 \\EAGLENTI\COMMON\'&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc An environmental impact assessment has been completed by Resource Systems,Inc. 10. That the proposed development will be harmonious with and in accordance with the general objectives or with any specific objective of the Comprehensive Plan because; As proposed, the Quarter Circle Ranch meets the land use and density envisioned in the 1997 Comprehensive Plan map. According to the plan, "Low Density Residential", for the 237.13-acre site is anticipated (2 or fewer dwelling units per acre). As proposed the Ranch has an overall density of 1.56 units/acre. Open spaces,water features,and large lots in the Ranch are in keeping with the Comprehensive Plan vision of promoting urban harmony within a rural environment. The project has been carefully designed to respect property values for existing property owners and to provide a quality lifestyle for new residents. 11. That the proposed development will be harmonious with and in accordance with the general objectives or with any specific objective of Eagle City Code Title 8 because; This application is requesting the following approvals: 1. Rezone from Agricultural to Residential R-2-P; 2. Preliminary Plat Application/Conditional Use Permit for PUDs;and 3. Flood Plain Development Permit The proposed Quarter Circle Ranch has been planned to be in conformity with the PUD intent and development guidelines as stated below: PUD "It shall be the policy to guide a major development of land and construction by encouraging planned unit development(PUD)to achieve the following: 8-6-1 Purpose A. A maximum choice of living environments by allowing a variety of housing and building types and permitting an increased density per acre and a reduction in lot dimensions,yards, building setbacks and area requirements. B. A more useful pattern of open space and recreation areas and, if pennitted as part of the project, more convenience in the location of accessory commercial....uses and services. C. A development pattern which preserves and utilizes natural topography and geologic features,scenic vistas, trees and other vegetation and prevents the disruption of natural drainage patterns." D. A more efficient use of land than is generally achieved though conventional development resulting in substantial savings through shorter utilities and streets;and E. A development pattern in harmony with land use density, transportation and community facilities objectives of the Comprehensive Plan." 12. That the benefits,combination of various land uses,and interrelationship with the surrounding area for this proposed development justifies any proposed deviation from any standard district regulations because; The Quarter Circle Ranch proposal envisions a variety of lot sizes within the R-2 Zone District. The variety of housing types in the Ranch is the significant element to creating and supporting an innovative open space and community facilities plan. 13. For a request of up to 10% of the gross land area to be directed to uses other than those permitted in the zone:Not applicable in this proposed PUD. 14. That public services shall be provided to the development including, but not limited to, fire protection, police protection, central water, central sewer, road construction, parks and open space, recreation, maintenance,schools and solid waste collection because; Page 20 of 22 \\EAGLENTI\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc tom . The public services that will be provided to the development include: fire and police protection, central water and sewer, road construction, schools and solid waste collection, and parks, open space and recreation. 15. That an estimate of the public service costs to provide adequate service to the development has been provided by the developer. The 1998-99 City of Eagle adopted budget shows total General Fund,including Library Fund expenditures of$3,386,534.Utilizing APA's household estimates for 1998 of 4,038 and adding approximately 250 new households (based on historic building permit activity) equals approximately 4,288 households in 1999. The resulting cost for city funded services is approximately$789.77 per dwelling unit. 16. That an estimate of the tax revenue that will be generated from the development has been provided by the developer. An analysis of the property tax revenue is reached by determining the average market value of properties in the Ranch at full build-out. Different home types have been assigned reasonable home values based on residential prices that exist today in the marketplace. Considering the homeowner exemption of$50,000, the average taxable home value is estimated at $250,000. The current property levy in Eagle is .014643586 with .003459464 specifically designated for Eagle's General Fund, Eagle Fire District and Eagle Sewer District. The resulting tax revenue generated by this project is $864.86 per housing unit (1998 dollars). 17. That suggested public (or private) means of financing the services for the development if the cost for the public services would not be offset by the tax revenue received from the development has been provided by the developer because; Based on the analysis provided in sections P and Q, the Ranch PUD will result in excess revenues to the city. Individual household public service costs to the City of Eagle General Fund, Eagle Fire District and Eagle Sewer District is estimated at $789.77. Anticipated revenues of$864.86 per household more than offset this cost. D. With regard Eagle City Code Section 9-3-2-5 (A),"General Standards"for private streets,the Commission has determined that: 1.Unique or special circumstances exist with respect to the proposed use, design, location,topography, or other features of the development or its surroundings such that private streets will serve to enhance the overall development because the applicant is planning 2-acre+/- lots along the western portion of this development to provide compatibility with the 5-acre+/- lots to west; because this design will limit the number of units in the 100-year floodplain; and because the private roads will be gated thereby further reducing traffic and potential nuisance to the rural lots to the west(public roads could not be gated); and because the applicant is planning to provide a unique housing opportunity within the carriage lots located at the southeast corner of the development by offering an intimate setting accomplished in part by providing narrow(less than public standards),non-continuous streets. 2.The private street provides safe and effective movement of both vehicular and pedestrian traffic because the roadways will be gated or designed to be non-continuous (thereby limiting the number of vehicles using the roadways) and will be a minimum of 24-feet wide (with an additional 6-feet which may be required to be provided as a stripped pedestrian/bicycle path when the final development plan is reviewed); and because the lot sizes are 2-acres+/- thereby further limiting the number of vehicles and pedestrians using the roadways. 3. The private street provides adequate access for service and emergency vehicles as the Eagle Fire Department will be required to approve the roadway and gated entries. 4. The private street does not adversely affect access or good transportation planning to adjacent property and to the area travel networks because the adjacent properties, and surrounding area, will be adequately Page 21 of 22 \\EAGLENTI\COMMON\P&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc served by public roads as shown on the proposed plan. 5. The private street does not landlock adjacent property due to topography or parcel layout as shown on the proposed plan. 6.Other than to provide emergency access, the private street does not connect one public street to another, encouraging travel through the development served by the private street because the street will be gated or will be designed to be non-continuous. 7.The use or alignment of the private street does not interfere with the continuity of public streets as can be seen by reviewing the proposed plan and because approval of the highway district having jurisdiction will be required to approve the private road/public road connection and gated entries. 8. An appropriate mechanism has been established for the repair and maintenance of the private street, including provisions for the funding thereof within the CC&R's for the development. DATED this 27th day of April, 1999. CITY COUNCIL OF THE CITY OF EAGLE Ada ,Idaho Rick guirr , 1 afr'or a�s'�'O '?r; Y 3S4320,L`.;'y t` .'.`b.. y ,`.v tf,44........i4j.....4..,".st7.:]AJ,0 S-.-:oevV:'1e. Sharon oore,E g City Cler = k-, .:1 •t c YY iv Page 22 of 22 \\EAGLENT1\COMMON\'&Z\Eagle Applications\SUBS\1998\Quarter Circle Ranch ccf.doc