Loading...
Minutes - 1996 - Design Review - 06/19/1996 - Regular EAGLE DESIGN REVIEW AND LANDSCAPE MINUTES JUNE 19, 1996 Call to order: Roll Call: Vance, Hull, Markham, Witte, Merrill.. Absent: Montgomery, Trautman.. Request for approval: Minutes of May 22, 1996. Moved by Vance and seconded by Witte to approve the minutes with these changes New Business: 1. Roundy Pole Fence Co. Jim Gipson addressed the project. Doug Roundy has to move his existing buildings to allow the bypass through his property, at the same time an access road will be built on to this property. Doug Roundy plans to continue his business at the new sight. The development will be built in two phases, each will include two of the buildings. The application includes 4 buildings with metal siding and board & batt wood siding on the front elevation between the interior doors on each building. The committee explained that the City Code did not allow Metal buildings in the Design Review District, and they would like to see Roundy use a different siding, Roundy said he would be willing to do that and specified a stucco with wood trim. The percentage of landscaping does not meet the minimum requirements, it was suggested by Franze for heavy landscaping along the new bypass. Jim Gipson said they could widen the strip from 10 feet to 15 feet and add a strip of landscaping in phase 2 along the bypass. Phil suggested more trees and color. If the electrical boxes are going to be on the outside of the building they will have to be screened. The eaves on the building should be larger. Moved by Mike and seconded by Witte to table Roudy Pole Fence Co to allow them to make changes on the landscaping and siding on the buildings, and come back to this committee, ALL AYE.... MOTION CARRIED.... The meeting adjourned at 8:00 p.m. Respectfully sub itted S Laura Markham Approved: Mike Vance, Chairman