Loading...
Minutes - 1994 - Design Review - 06/09/1994 - Regular ,. EAGLE CITY LANDSCAPING COMMITTEE MINUTES June 9, 1994 June 2, 1994: No quorum Those in at tendanc e I Barbar a Montgomery, Ph 11 Hu 11, La ur a Markham, Carol west, Franz witte, Tal Trautman. Absent' Kelli Blair, Morgan Masner, Pete centorino. SUBJECTS TO DISCUSS: Echo Creek #3 The plan for phase 3 was discussed at length. It was suggested t.hat retaining walls, constructed of keystone concrete blocks, Jocated on both siœs of the entrance be sh~ on a dr~ing, along with landsc~ing. The plan calls for cedar fencing along SH55 and the development. It was Suggested that landscaping should be included along the hig~~ as _ll. Bill ~hrke had objections to that idea, stating the State Hig~ay Dept. ~uld not want that, it is not in tM present budget aM there are areas that it ~uld not be possible to laooscape. The co_ittee felt that tOO dr~ing was not c=plete and asked Bill to return the plan to Pete Cinterino to complete and return to the conunittee. Meanwhile staff will contact ITD to discuSS the possibili~ of laMseaping in the right-of-~ areas of swdivisions a~ co=ercial areas. T~ Co=ittee SUggested ITO be i=ited to a future ~eting to discuSS the issue of right's-of-ways. PERIWINKLE SUBDIVISION/Eagle Apts: The plan was accepted as presented. IDAHO POWER: Franz will _et with an Idaho p~er representative at the site to discuSS the possibility of landscaping in connection to the lack of water in the area. The city staff will approach the council and the city Engineer on how to get _ter to that location and ~uld the city assist with the water and perhaps maintenance of that land. BOBS TROLLEY: The revised plan was discussed. ~t the c~ittee thought there should be additions made, and conditions of approval. Those conditions were: 1- 2. 3. require existing gravel removed from the site all deciduous trees must be 2" caliper or more, minimum the site will be professionally maintained 4. specify location of the island to be removed 6. The irrigation system and landscaping ~st inclu~ tM right- of-way 1. TMse conditions shall be put in letter fo~, signed ~ L~ra Markham, as chairman and sent to the applicant, The C=mittee voted to drop ~ri~ili Carnahan fr= t~ C=mittee, as she is unable to attend the meetings. ~he co~ittee voted to set up a ~rksoop to discuSS amending t~ rlesign revi~ a~ la~scaping code for t~ Ci~. The City Clerk will ~~ ~ =- - - ~-~~ ~= M- CÜ~ ~ ~h m er to review prior to the meeting. tted: bara Montgomery, ~c city of Eagle Eagle City Landscap ng commi tee Vice-Chairman Approved: Laura Markham, Chairman