Loading...
Minutes - 1992 - Planning & Zoning - 12/07/1992 - Regular EAGLE PLANNING AND ZONING MEETING December 7, 1992 The Eagle Planning and zoning Commission met in regular session on December 7, 1992. Chairman GERBER presiding. The following members were present: LLOYD GERBER, BERT BRADLEY, KEN SMITH, DONALD BRINTON, MARY BERENT. Absent: PAULINE HINMAN. Moved by SMITH and seconded by BRINTON to approve the minutes of the November 2, 1992 meeting as presented. ALL AYE: MOTION CARRIED. PUBLIC HEARING/LOT SPLIT-ORDINANCE '213 Chairman GERBER announced that this was the time and place set for a public hearing on an amendment to Title 9, regarding lot splits, requiring approval from City Council, Ordinance 213. Applicant: City of Eagle Proposal: require an application process in order to split a lot Public Testimony: none Public hearing closed at 7:45 p.m. Moved by SMITH and seconded by BRADLEY that consideration be given on this amendment to Title 9 to omit the Council approval and the application be approved by Barbara Montgomery as Zoning Administrator. ALL AYE: MOTION CARRIED. PUBLIC HEARING/LONGSON TOWNHOMES/PUD/CUP Chairman GERBER announced that this was the time and place set for a public hearing on Longson Townhomes. Applicant: Larry Van Hees Location: 1.5 miles S of Floating Feather on W side Eagle Rd Proposal: Subdivision preliminary plat, PUD/CUP 29 lot townhomes on 5 acres. R5 Public Testimony: Inquiries: Danny Allen and Keith Allen Presentation by Dave Roylance. Mr. Roylance explained the project as having central sewer and water. There is a sewer problem at this time and water has not been approved. All 3 streets in the subdivision are ACHD dedicated streets. There is a portion of the property in the flood plain, but will not build in that area. The townhomes will be sold individually and the common areas owned by the homeowners association. They will provide the proper city setbacks. Each unit will have a 2 car garage. The units will be 2 story. The rim lots will provide garages under the homes, the remainder of the townhomes will provide garages beside the units. Each unit will be 1400-1600 sq. ft. The P&Z had concerns about a pathway on the N. side of the project and want a right of way for a pathway. Concerns of the public: the drainage and irrigation. Public hearing closed at 8:15 p.m. Moved by SMITH and seconded by BRADLEY to continue the hearing until January 4, 1993 in order to give the P&Z Commissioners time to study plans and be provided answers on water and sewer, access on the eastern road, density and an architectural plan of the entire development. ALL AYE: MOTION CARRIED. PUBLIC HEARING/MELVINS EAGLE POINT '6 Chairman GERBER announced that this was the time and place set for a public hearing on Melvins Eagle Point '6. Applicant: Max Boesiger, Inc. Location: E of N Edgewood and S of floating Feather, adjacent to Melvins Eagle Point '3 Proposal: Subdivision preliminary plat,phase 6 of Melvins Eagle Point, E side of Edgewood, consisting of 20 lots (19 buildable and 1 common lot) Presentation by Becky Bowcott, Briggs Eng. subdivision to the Commissioners. She outlined the Public Testimony: none. The hearing closed at 8:40 p.m. Discussion of the Commissioners included proposal of a new road design, eliminating lot 7 and designing the entrance through that lot rather than to the N as the design indicates. The cuI de sac would have 2 turn around points, one to the N (lot 25) and the one indicated in the present design. The common lot would become, in part, lot 25. The Commissioners challenged the easement proposed by Farmers Union District of 15 feet. They would like to see a pathway along the canal. The Commission believes the district may not have exclusive rights to the easement and a pathway can be established in the same easement. The Commissioners would like a legal opinion on this concept. Moved by BRADLEY and seconded by BERENT to deny this project based on the concept and length of the cuI de sac, the lack of the completion of the Eagle Water Co. hydralic water analysis. If the application on this project comes back to P&Z the attorney should review the rights of way (easement of 15 ft.) in order to establish a pathway along the canal. ALL AYE: MOTION CARRIED. NEW BUSINESS: Ada County Transmittal: 92-52-PDR/92-37-PR/92-20-ZC (Washum Sub/Phil Whitner): Presentation by Phil Whitner for the project. Moved by BRADLEY and seconded by BRINTON to recommend approval as presented. Presentation by Dick Critser of ITD regarding a state gravel permit. They are asking the city for guidance on the problem of extracting in the area. They need to remove pit run material, take excess, remove it, aggregate, use it and come back with soil and reclaim it as useable ground, then sell it. They want public input and the city support in order to complete the project. They will establish further meetings in the future. There~ ing no further business the meeting adjourned at 9:30 p.m. \ submitted: APPROVED: ~~t~