Loading...
Minutes - 1992 - Planning & Zoning - 10/19/1992 - Regular EAGLE PLANNING AND ZONING MEETING MINUTES October 19, 1992 The Eagle Planning and Zoning Commission met in regular session on October 19, 1992. Chairman GERBER presiding. The following members were present: LLOYD GERBER, PAULINE HINMAN, BERT BRADLEY, KEN SMITH, DONALD BRINTON. Moved by SMITH and seconded by HINMAN to approve the minutes of the October 5, 1992 meeting as presented. ALL AYE: MOTION CARRIED. KEN SMITH addressed the recent loss of LOGAN BENNETT a member of the Commission for 3 1/2 years. He gave his personal appreciation of Mr. Bennett as a very credible and likeable person to have been associated with during the time of service with Planning and Zoning. Mr. Smith wanted to give testimony so that it becomes a permanent record. He will be missed. UNFINISHED BUSINESS: FINDINGS OF FACTS AND CONCLUSIONS OF LAW/DOWDING-CUP: Moved by HINMAN and seconded by BRINTON to approve the findings as presented. ALL AYE: MOTION CARRIED. A DISCLOSURE was given by BRADLEY, who announced he will be abstaining from the issues regarding Lexington Hills Subdivision as he is a board member and partner in the subdivision. Mr. Bradley said he will not vote but would like to remain in order to answer any questions or clarify any concerns. PUBLIC HEARING/Sinclair-Variance: Chairman GERBER announced that this was the time and place set for a public hearing on Sinclair-Variance application. Max Miller, representative of the Sinclairs' told the Commissioners that it was not the intent to encroach on the set backs, but by a series of events the footing and foundation was set in a different location than intended. They were not aware of a problem until placement of a sprinkler system. He gave the Commissioners his apologies. Applicant: Location: Proposal: David and Katie Sinclair Lexington Hills Subdivision variance Public Testimony: no opposition. An inquiry was made by Chuck Bower as to the responsibility of the building inspector with set backs. Public hearing closed at 8:05 p.m. Moved by SMITH and seconded by BRINTON to recommend approval of the variance as requested, with a warning that appropriate caution should be taken by builders and Lexington Hills developers to have check and balance system in order for this not to happen again. AYE: HINMAN, SMITH, BRINTON. ABSTAIN: BRADLEY. MOTION CARRIED. Chairman GERBER announced that this was the time and place set for a public hearing on Lexington Hills Phase II-Variances Applicant: Floating Feather Hills Inc. Location: Lexington Hills Subdivision C,D and E sections Proposal: VARIANCE APPLICATION, Phase 2, specifically the following lots: 1. LOTS 20-25 BLOCK 5, PHASE 2 2. LOTS 27-30 BLOCK 5, PHASE 2 3. LOTS 32-37 BLOCK 5, PHASE 2 4. LOTS 1-8 BLOCK 15, PHASE 2 5. LOTS 1-13 BLOCK 14, PHASE 2 and all C,D, and E sections of the outlined map submitted with the preliminary plat. Variance request: 1. approval of a rear yard setback variance of 15' on all lots listed above 2. Side setbacks of 5' on one side and 7.5' on the other side, provided the distance between homes is not less than 12.5' per total set back. Public Testimony: Opposed: Chuck Bower Sheryl Bower In favor: Max Miller Public hearing closed at 8:25 p.m. Discussion took place regarding ECC, Section 9-5-4-3 Site and Structure Requirements of a PUD, Section 8-6-6 PUD and Section 9-6- 3 Variances. Moved by HINMAN and seconded by BRINTON to deny the application as submitted because of non compliance with code, specifically Section 8-7-4-2. AYE: HINMAN, SMITH, BRINTON. ABSTAIN: BRADLEY MOTION CARRIED. A report was given by Barbara Montgomery regarding Council activities. She informed the Commissioners that Kelli Blair, Council ¥iOft\~Jt~dW~ll be attending the P&Z meetings as liaison for the counc~~~ 0 "f L:;,fl(,/~,.?~ .;.~ /","'",e,""'u".,-., "',t--, "'" ~ "",.. @,""'~' "",,',,' ~ The~* ~~)t~'J~rt~er business the meeting adjourned at 8:45 p.m. : g."" -.;: ': Res., t u <If" uQ¡Qi tied: :. '~~,,:. <r:"~"',f\,: :(~;~~ :;: -:. ",,'.,¿; J' ~, ,. ,::" ~, ZONING