Loading...
Minutes - 1991 - Planning & Zoning - 10/07/1991 - Regular EAGLE PLANNING AND ZONING MEETING October 7, 1991 The Eagle Planning and Zoning Commission met in regular session on October 7, 1991. Chairman EASON presiding. The following members were present: KATHRYN MCPEAK, PAULINE HINMAN. LLOYD GERBER, LOGAN BENNETT, Moved by GERBER and seconded by MCPEAK to approve the minutes of September 30, 1991 meeting as presented. ALL AYE: MOTION CARRIED. PUBLIC HEARING/Hunter Ridge Subdivision: Chairman EASON announced that this was the time and place set for a public hearing on Hunter Ridge Subdivision. Applicant: John & Kathryn McCallum Representative: Larry Sale, Briggs Eng. Location: 12505 Highway 55 Proposal: R1, 23 lots on 50.73 acres, 14 acres in flood plain, density 0.45 per acre. Lot 20 access lot ( 30 ft. wide), currently in existence and use. Lot 22 and 23 have existing homes. Will have a bike path, no gutter curb or sidewalk. The subdivision has access on Beacon Light Road, other than Beacon Light the land is land-locked. Representative requested the following considerations: 1. variance in length of culdesacs(over 500 ft.) 2. building of lot 21 in the flood plain 3. 4 units for existing private rd. 4. variance of condition of approval to no curb, gutter and a 30 ft. rd. 5. variance in condition #6 for fire hydrants 6. condition #20 domestic wells approved by Dept. of Water Resources are normally approved after the signing of the final plat Public Testimony: Opposed: Richard Meier (submitted Patty Brubaker Ray Brubaker Diane Anderson pictures of area) Concerns of the public: flood plain and topographics of the land, density, wells (water issue), & traffic Public hearing closed at 9:05 p.m. Moved by GERBER and seconded by HINMAN to continue the meeting until November 4, 1991 in order for the representatives of the projects to answer the following concerns: 1. easement path and greenbelt through Dry Creek 2. butting of roads into Lexington 3. cutting lot 21 out 4. changing lot setback on lots 11, 12, 13, 14, and 15 to the other side of the creek 5. feasibility of a sewer connection to Lexington. ALL AYE: MOTION CARRIED. PUBLIC HEARING/MARVIN SUBDIVISION: Chairman EASON announced that this was the time and place set for a public hearing on Marvin subdivision. Applicant: Frank C. & Alma N. Marvin Representative: Dave Roylance, Engineer Location: 820 N. Edgewood Ln. Eagle Proposal: R5, 2 lots per acre,S lots on 2.73 acres Public Testimony: No opposition to the proposal The public hearing closed at 9:25 p.m. Moved by HINMAN and seconded by GERBER to recommend approval of this application to the Eagle City Council with standard subdivisions conditions. UNFINISHED BUSINESS: Findings of Fact and Conclusions of Law/ Young. Moved by MCPEAK and seconded by GERBER to approve the findings and conclusions as presented. ALL AYE: MOTION CARRIED. Findings of Fact and Conclusions of Law/ Martin. Moved by HINMAN and seconded by GERBER to approve the findings and conclusions as presented. ALL AYE: MOTION CARRIED. REPORT from Rick Yzaguirre concluded in a tentative meeting with Horizons, P&Z and Council on Monday, October 14, 1991, at 2:00 p.m. There being no further business the meeting adjourned at 10:10 p.m. ' "