Loading...
Minutes - 2009 - Planning & Zoning - 07/06/2009 - Regular THE CITY OF EAGLE PLANNING AND ZONING COMMISSION July 6, 2009 Minutes 1. CALL TO ORDER: 2. ROLL CALL: Present: TANNER, ROEHLING, SMITH, VILLEGAS. Absent: AIZPIT AR TE. A quorum is present. 3. CONSENT AGENDA: . Consent Agenda items are considered to be routine and are acted on with one motion. There will be no separate discussion on these items unless the Chairman, a Commissioner, member of City Staff, or a citizen requests an item to be removed from the Consent Agenda for discussion. Items removed from the Consent Agenda will be placed on the Regular Agenda in a sequence determined by the Rules of Order. . Any item on the Consent Agenda that contains written recommendations from the City of Eagle shall be adopted as part of the Planning & Zoning Commission's Consent Agenda approval motion unless specifically stated oth~~rwise. A. Minutes of June 15,2009. Tanner moves to approve the minutes as presented/amended. Seconded by Roehling. ALL AYE...MOTION CARRIES. 4. PUBLIC HEARINGS: A. RZ-05-09 - Rezone from R-4 (Residential - UP to four dwelline: units per acre) to CBD-DA (Central Business District with a Development Ae:reement) - M and H Development: M and H Development represented by Greg Hall, is requesting approval of a rezone from R-4 (Residential - up to four dwelling units per acre) to CBD-DA (Central Business District with development agreement). The 0.47-acre site is located on the east side of North Eagle Road approximately 175- feet north of Idaho Street at 220 North Eagle Road. (The applicant is requesting this item be continued to the August 3, 2009 meeting.) Tanner moves to continue RZ-05-09 - Rezone from R-4 (Residential - up to four dwelling units per acre) to CBD-DA (Central Business District with a Development Agreement) - M and H Development to the August 3, 2009 meeting. Seconded by Roehling ALL AYE...MOTION CARRIES. B. A-5-09 & RZ-6-09 Annexation and Rezone From RUT (Rural- Urban Transition - Ada County desie:nation) to A-R-DA (Ae:ricultural - Residential with a Development Ae:reement) - Ron Sali: Ron Sali, represented by Doug Russell with The: Land Group, Inc., is requesting approval of an annexation and rezone from RUT (Rural-Urban Transition-Ada County Designation) and A-R (Agricultural-Residentia1- up to one unit per five acn~s) to A-R-DA (Agricultural-Residential- up to one unit per five acres with a development agreement). The 65. 14-acre site is generally located on the south side ofW. Mace Road approximately 1.47 miles west ofS. Eagle Road. Tanner introduces the item. Doug Russell, with The Land Group, 462 E. Shore Dr. Eagle, Idaho, representing Ron Sali reviews the application. Mr. Russell reviews the gravel mining operation plan that was submitted to the Idaho Department of Lands and the wetland land that was altered in the site plan submitted tonight. The restrictions that are proposed on the site are reviewed including the time line, the preservation and environmental stipulations that are in place. The applicant is requesting that the site specific condition of approval 3.5 be altered to allow the crushing to take plac1e on the same schedule as that as Eagle Island. Russell notes that a flood plain application has been submitted to the City of Eagle and is currently under Page 1 of 4 KIP&Z\MINUTESITemporary Minutes Work AreaIPZ-07-06-09min.doc review. This will be a good project for the economy and the City of Eagle as a whole. Discussion between Mr. Russell and Commissioners. Th~: applicant is not able to give exact the duration of the operation beyond stating that it would be no more than 10 years. Reclamation will take place as the crushing occurs. Discussion of hours of operation and notification of neighboring property owners. Ron Sali 919 S. Linder Road Eagle, Idaho. Mr. Sali addresses the Commission regarding the mining industry processes and operations. Discussion regarding the mining process, gravel mound heights, what equipment will be operating at night, the number of neighbors within 300' of the property, hauls roads and the months and hours of operation. General discussion. City Planner, Mike Williams reviews the staff report. Williams discusses the development agreement. Staff explains the reasoning behind the suggestion of site specific condition 3.5. This City is somewhat concerned with the mention of an asphalt plant as it wasn't mentioned with previous meetings with the applicant. Zoning Administrator, Bill Vaughan provides clarification on the City's existing noise ordinance in an effort to address the Commission's concerns about noise pollution. Tanner opens the public hearing. Jay Berman 2205 Mace Rd. Eagle, Idaho. Mr. Berman supports the project. His property borders the project and he will be involved in it. He actually prefers the use of the crusher 12 months out of the year because it may allow for a quicker completion of the project. Ron Sali 919 Linder Road Eagle, Idaho. Mr. Sali supports the project and would like the crusher operation to be allowed for 12 months out of the year to allow more flexibility with the project. Don Newman (no address given) inquires if Ada County Highway District had been consulted on this project. It was his understanding that Mace Road could not handle any additional traffic. He also has concerns with the water table once digging begins. Russell rebuts testimony. There is no intent to open an asphalt plant as part of this project its mention was for illustrative purposes only. However, it is imperative to operate 12 months out of the year, they are not asking for permission for 24-hour operation or 1to crush at night. Their desire is to run their operation during normal business hours similar to what will be approved for the Eagle Island State park gravel extraction operation that is currently being reviewed by the Idaho Department of Lands. It is unknown for certain what those hours will be, but it is Mr. Russell's understanding that it would be 6 am to 8 pm and his client would like those hours as well. Russell comments on the letter of credit requirement, noise concerns and Mace Road access. Th~: gravel extraction aspect will not utilize Mace Road; it would only be when the residential element of this project is completed that Mace Road will be used. He didn't believe that Ada County Highway District had any problems with the effect on Mace when the residential aspect is developed. Russell comments on the type of gravel extraction process and how the water will be handled during that process. Discussion. Tanner closes the public hearing. Discussion amongst the Commission regarding months and hours of operation, ensuring that the approval of gravel extraction is legal and that the City is not violating any city codes by utilizing a development agreement for this project. General discussion. City Attorney, Jill Holinka discusses the City Code s~:ction that permits the use of a development agreement to allow for a land use that is not otherwise allowed in order to reach the "end use" of the land which will be the development of a residential project. The City has used the development agreement mechanism in the past to facilitate projects in this manner. Discussion. City Planner, Baird-Spencer states that a development aglreement has been used in the past, for example for the development of the property that is now Brookwood subdivision. The difference with this Page 2 of 4 KIP&Z\MINUTESITemporary Minutes Work AreaIPZ-07-06-09min.doc application is simply the size of this project. The City currently has development agreements executed that range in length from four years to forty years. Discussion amongst the Commission. Tanner moves to recommend approval of A-5-09 & RZ-6-09 Annexation and Rezone From RUT (Rural- Urban Transition - Ada County designation) lto A-R-DA (Agricultural- Residential with a Development Agreement) - Ron Sali subject to the recommendations currently proposed by staff for the annexation and rezone and subject to the staff recommended findings. With the following adjustments that a 10 year specific period of time be expressly be provided for in which mining may occur and within in which time reclamation shallll>e complete. No asphalt batch plant shall be allowed on the property or operate. The time frame to operate shall be extended to a 12 month period not to exceed the operating hours of 8:00 a.m. to 6:00 p.m. on any given day. That the property owned by Stewart Berhman be added and subject to the development agreement. That there be a height restriction of no more than 35' for stockpiling or structures on the property and that in the event the Department of Land does not require a letter of credit that the applicant be required to provide a letter of credit to the City in that event and/or in the event provided to IDL fails in any way. Seconded by Smith. Discussion. Tanner amends his motion to change the operating hours back to staff's recommendation of operating hours of 8:00 a.m. to 5:00 p.m. Second concurs. Planner Williams asks for clarification. He would suggest that condition 3.12 "The applicant shall not exceed the time frame for the mining of material as approved by the Idaho Department of Lands permit" and add the language "or ten years whichever is shorter" in the case the IDL decides on a shorter period of allowed operation. He will add no batch plant will be allowed. For item 3.5 will change the 6 months to U months of operation, and note the hours Monday through Friday 8:00 a.m. to 5:00 p.m., he will include the Berhman's and note the height of no more that 35'height for stockpiles. Williams suggests a condition of approval that if IDL does require a letter of credit that the applicant provide a copy of the letter of credit the City and in the event that IDL does not require a letter of credit the applicant shall provide to the City in the amount of 150% whatever cost it will be to reclaim that portion of the property. Additionally Williams suggests a condition that no retail sales shall occur from this site. Tanner amends the motion per Mike Williams's comments. Second concurs. ALL AYE.. .MOTION CARRIES. 5. UNFINISHED BUSINESS: A. RZ-19-06 MOD - Development Ae:reement Modification - M3 Companies. LLC.: M3 Companies, LLC, represented by Gerry Robbins, is requesting a modification to the pre-annexation/rezone/development agreement for the M3 Eagle Development to include site specific hillside and grading standards as required within the original development agreement. The 6,005 acre site is generally located north of the Farmers Union Canal and Homer Road, east of State Highway 16 and west of Willow Creek Road. This is a workshop no public testimony will be taken at this meeting. Tanner introduces the item. Tanner calls a five minute recess. Discussion amongst Commissioners, City Engineer Kasey Ketterling, City Attorney Holinka and representatives from M3 Companies, Chuck Carlise and Mark Tate regarding the proposed modifications to the development agreement. 6. NEW BUSINESS: None Page 3 of 4 KIP&Z\MINUTESITemporary Minutes Work AreaIPZ-07-06-09min.doc 7. REPORTS: a. Commission: b. City Attorney: c. Staff: 8. ADJOURNMENT: Tanner moves to adjourn. Seconded by Roehling. Hearing no further business, the Commission meeting adjourned at 10:00 p.m. RESPECTFULLY SUBMITTED: SHARO ERGMANN CITY CLERK/TREASURER ..',.........,.. .... ",GLl: ###, ..- ~ ~........ "... '0.. ....~ ,", ,. ~". TJ: ..,.. ':0. . ..... LtO .. ~~ ." ... :.....4: , .0: : u. 0 ,. ~ ._: .... : . · U h...y..... .... . : \ .G.f.....!!::: .... ... ... ~v ~. ~<tCl ", .... INCO"'9,'~ G ~ $ .. ...... 0" " " Sl'A~~ " '#., 1 "" .."......". APPROVED: L~ 2~-2 GARY TANNER- ,-~- - CHAIRMAN A TRANSCRIBABLE RECORD OF THIS MEETING IS AVAILABLE AT CITY HALL. Page 4 of 4 KIP&z\MINUTESITemporary Minutes Work AreaIPZ-07-06-09min.doc EAGLE PLANNING & ZONING COMMISSION PUBLIC HEARING SIGN -IN SHEET July 6, 2009 SUBJECT: RZ-05-09 - Rezone from R-4 (Residential - un to four dwelling units ner acre) to CBD -DA (Central Business District with a Development Agreement) - M and H Development: PLEASE PRINT LEGIBLY I NAME ADDRESS PHONE PRO? —7 2r r, �' ii'0' (,),3,f< -2,7r7`/ -n/7 7 V � r v�` , (:ft ccs •FC 3 `iti - Y ti vitt ii- C4la c °44 ,20 3 3 di4A-CE 9 35-6 E-5() CON? TESTIFY? EAGLE PLANNING & ZONING COMMISSION PUBLIC HEARING SIGN-IN SHEET July 6, 2009 SUBJECT: A-5-09 & RZ-6-09 Annexation and Rezone From RUT (Rural — Urban Transition — Ada County designation) to A-R-DA (Agricultural — Residential with a Development Agreement) — Ron Sali: NAME PLEASE PRINT LEGIBLY ADDRESS PHONE PRO? CON? TESTIFY? pz yl10lo9 THE LAND GROUP, INC. E LLC MACE ROAD AND BERMAN RESIDENCE- GRAVEL MINING OPERATION PLAN The temporary gravel operation is located on Mace Road in Eagle, Idaho. The parcels included are identified as Ada County Parcels S0518427825, S0518427820, and S0518314810. The site is located directly to the east of Eagle Island State Park and is bounded by the South Channel of the Boise River to the south, Mace Road to the north, and a private gravel road along the east. The site is located across the Boise River from two homes in the Clearvue Estates subdivision and is about 2/3 of a mile west of the Two Rivers subdivision. Additionally, there are four homes within 500 feet of the property; one to the west, two to the north, and one to the east. The predominant land use immediately surrounding the site to the north, east, and west is agricultural. The site is generally flat in nature and is flood irrigated. Natural riparian vegetation occurs along the south boundary adjacent to the Boise River. Gravel extraction has been done successfully by the applicant under Reclamation Plans RP -1126 and RP- 2065. The proposed gravel pit operation will be entirely confined to private property. All excavation will occur outside of the 6500 cfs high water limits and will not impact the Boise River; the existing levee shall be protected and remain in place. A 100 foot minimum buffer zone will be maintained between the property boundary and all main excavation activities. The south property boundary adjacent to the Boise River is based on the 6500 cfs high water limits. The operation will consist of: • Gravel excavation will be in operation for up to ten years. Excavation shall begin around September 1, 2009 at the central pit face and proceed north and then south. Phase 1 of the gravel operation including the pit, lot fills and access roads will consist of approximately 15 acres. The location of this pit makes it very desirable to be in operation as soon as possible to accommodate the upcoming Highway 16 construction project. The close proximity of this pit to the Highway 16 project will minimize trucking distances and therefore have less effect on infrastructure and the public at Targe. • A 100 foot minimum buffer zone will be maintained between the property boundary and all pit excavation activity. • All activities will be confined within the private properties noted on the application. Site Planning • Landscape Architecture • Civil Engineering • Golf Course Irrigation & Engineering • Graphic Design • Surveying 462 E. Shore Drive, Suite 100 • Eagle, Idaho 83616 • P 208.939.4041 • F 208.939.4445 • www.thelandgroupinc.com • The proposed reclamation plan has been developed to accommodate a permanent lake. • Fuel storage will be located upgrade from the floodway setback in the northwest portion of the property and shall comply with all DEQ storage guidelines.. • All topsoil within the area to be disturbed shall be stripped and stockpiled. The stockpiled soil will be utilized for reclamation. • All topsoil storage, overburden piles, and stockpiles will be placed along the boundary of the pit outside of the floodway limits and away from jurisdictional wetlands. • Erosion and sediment control from extraction activities will be provided on site utilizing small existing ponds located on the south end as settling ponds. Best Management Practices identified in IDL's November 1992 publication "Best Management Practices for Mining in Idaho" shall be utilized in all road development, settling ponds, stockpiles, hazardous material handling, soil stabilization, seeding, revegetation, runoff collection and dispersion, and sediment collection. A Storm Water Pollution and Prevention Plan (SWPPP)shall be developed prior to beginning mining operations and a Notice of Intent shall be filed with the U.S. Environmental Protection Agency. • The mining contractor through the direction of Ron Sali will utilize the "dry deck" method for mining. This is the same method used at the 3 Rivers Ranch gravel mine. This method allows for the controlled movement of water to the proposed de -watering well while providing a stable and dry excavation deck. Additionally, all drainage created by the mining process will be directed to the de -watering well. This method minimizes the amount of sediment present in the water and settling ponds. Owner approved contractors at this time include Idaho Sand and Gravel, Knife River, Central Paving, Mike's Sand and Gravel, and Western Construction. Others may be owner approved at a later date. • The heavy equipment to be used for the mining operation shall consist of the following: o (3) 980 Caterpillar Loaders o (2) 245 Caterpillar Excavators o (5) Off-road haul trucks o Standard highway approved hauling trucks will be utilized for moving gravel off the site • Settling ponds will be developed at the south end of the project and will be modified during the course of the project, as necessary, to meet capacity and water quality requirements. The proposed land application area is currently planted in pasture grass and is flood irrigated. • Dust will be controlled at all times. Site Planning • Landscape Architecture • Civil Engineering • Golf Course Irrigation & Engineering • Graphic Design • Surveying 462 E. Shore Drive, Suite 100 • Eagle, Idaho 83616 • P 208.939.4041 • F 208.939.4445 • www.thelandgroupinc.com Upon completion of the gravel mining operation, the remaining lake shall become the focal point of a residential development . The development of these lots will be similar to those located in Moon Lake Ranch and 3 Rivers Ranch. All proposed lots will have lake frontage with beaches and will be designed to accommodate estate homes with accessory buildings. An annexation and rezone application has been submitted to the City of Eagle for this proposed residential development. A development agreement outlining the future style of development for these properties is included as part of the rezone application. Beaches and bank reclamation are included as part of this agreement. The final reclamation plan will consist of: • The final reclamation plan will occur after the pit has been mined to the fullest extent allowed. Interim revegetation of disturbed areas shall occur periodically during the mining operation to minimize erosion and noxious weeds. The interim vegetation shall consist of rye grass seeding at a rate of 6lbs per 1000 square feet. All seed shall be applied uniformly utilizing a drill seeding process. All seed shall be placed during the months of March, April, September, and October. • The final excavation setback along the south property line will be no closer than 100 feet from the Boise River's ordinary high water mark (OHWM). The south property boundary has been identified as the OHWM through research and verification by Fox Land Surveys and the Idaho Department of Lands. • The final excavation of slopes shall be 3:1 to a depth of 10 feet then 1.5: 1 to a final depth of 35 feet. Final slopes shall be graded while the bottom of the pit shall remain irregular. • All disturbed areas above the high ground water level shall be reclaimed through beach development or shall receive topsoil and be planted as illustrated in detail 1/C1.00. All beaches will be constructed with coarse and durable sand with a maximum slope of 4:1. Sand will be a minimum of 12" deep. The mining contractor shall be responsible for construction of the beach areas as part of the gravel mining contract. A professional landscaper shall be responsible for the placement and grading of topsoil as well as the reclamation planting. • No bank reclamation will occur where jurisdictional wetlands intersect pit banks. These areas shall remain unaltered. During excavation, precautions will be taken to avoid incidental fallback into the wetland areas. • Re -vegetation will consist of creeping red fescue applied at a rate of 175 lbs/acre. All seed shall be placed during the months of March, April, September, and October. The red fescue areas shall be interspersed with a mix of trees and shrubs which shall include 25% Maple trees, 25% Cottonwood trees, 25% willow trees, 10% red twig dogwoods, 10% coyote willows, and 5% ninebark. Plants will be spaced to provide an ideal growing habitat along with a reasonable and appealing appearance. Site Planning • Landscape Architecture • Civil Engineering • Golf Course Irrigation & Engineering • Graphic Design - Surveying 462 E. Shore Drive, Suite 100 • Eagle, Idaho 83616 • P 208.939.4041 • F 208.939.4445 • www.thelandgroupinc.com • Noxious weeds shall be sprayed with approved chemicals for a minimum of two years after the operation is complete. • The estimate for the reclamation of the bank of the pit is as follows: o 7827 LF of total lake perimeter o 4,796 LF of 20' wide planting zone with topsoil o 4,796' x 20'x 0.33' = 31,654 CF = 1,172 CY of topsoil o 2,834 LF of 20' wide sand beaches o 2834' x 20'x 2' = 113,360 CF = 4,200 CY of sand Estimate of placement of topsoil @ $1.00 per SY 4,796' x 20'x 1= 95,920 SF = 10,658 SY x $1.00 = $10,658 Estimate of re -vegetation @ $0.50 per SY 4,796' x 20' = 95,920 SF = 10,658 SY x $.50 = $5,329 Estimate of placement of beach sand @ $1.00 per CY 2834' x 20'x 2' = 113,360 CF = 4,200 CY x $1.00 = $4,200 Estimate of interim seeding @ $.05 per SF Approximately 825,000 sf x $.05 = $41,250 Overburden Placement @ $1.00/ cy Approximately 16,000 cy x $1.50 = $16,000 Total Reclamation Costs: $77,437.00 The net impact of this operation should be positive from an environmental, economic and social point of view: • The operation will provide a source of high quality sand and gravel which shall support local construction activities for Ada and Gem counties. • The site is centrally located in close proximity to Eagle, Star, Meridian, and Boise. • The designated in —state agent, Ron Sall, has considerable prior experience in gravel extraction operations and understands how to minimize impacts to surrounding areas. • There is safe access to and from the property. Haul roads will be shared with the Idaho Department of Parks and Recreation minimizing impacts on Mace Road and utilizing to the fullest extent the shared facilities. This will minimize truck access points onto the ACHD road system. • The isolated location provides minimum conflict with children, pedestrians, bicyclists, and vehicles. • The project will result in an attractive water amenity that will be utilized within a future residential community. • The proposed lake will isolate the river environment from the impacts of existing agricultural activities. This separation will be an advantage for wildlife near the river. Site Planning • Landscape Architecture • Civil Engineering • Golf Course Irrigation & Engineering • Graphic Design • Surveying 462 E. Shore Drive, Suite 100 • Eagle, Idaho 83616 • P 208.939.4041 • F 208.939.4445 • www.thelandgroupinc.com • The proposed lake will provide additional conveyance which in turn will reduce flooding in the general area. We appreciate your attention on this application. Should you have any questions or need any further information, please do not hesitate to contact me. Doug Russell, ASLA The Land Group, Inc. 462 E Shore Drive Eagle, Idaho 83161 Phone: (208) 939-4041 Email: doug@thelandgroupinc.com 1 Site Planning • Landscape Architecture • Civil Engineering • Golf Course Irrigation & Engineering • Graphic Design • Surveying 462 E. Shore Drive, Suite 100 • Eagle, Idaho 83616 • P 208.939.4041 • F 208.939.4445 • www.thelandgroupinc.com /. J / • r. • • , • .• •••2-'1 • 1 3 ; •fpfam.15. 01/0.111111• p z_ /40 •••••... , I , o•c•••• .. . r• ....„ . ,•...........464..m.,- \ > /...."-.7.71"---T-T\ -"g;. 4- 'LLC -4,44--. .---447`,II• ' -..'. - . .--- Trz441': ' 'hi i .4:::::•:N*. , , 1 • \.......\ [... ---.41•••C•if...4.'1 \ 1 / •••••rima. Iona min 1 .••• Kama _ • \1/2 \ ‘, "r •11••2 it ••••• •••••••Iama 0. • Mai MEI 11 / • , / .1.0111.1110. sew...* - , --_ L. ,,. I q 1,• . 1 L___ ...LF — .,. ............. . .., ••••••••••••••.-/-, 1 ,,..--_____._ i , _ _ - -• _ - ... , I , - -.. _ _ ____ • =-._.--.• . • , m ma mu Ir.:‘,... DAMI1001 • I • ..........r,,,_-_,-----7....._ . - ..-••••• lamm• — • 11.4.1 .e, '.: -' 1!,.. 7: • ' I••••••••KI __ ._ -L. ---...,........-....._ , - • ' Y, . ; I ..r . MF.0•10•1•C• =7 ••••• ••••••••• ,••• .m..•••••••-, ; 1 <•••••• ..r- ,••••-/ - II at MIN•pra p ••••.a•Opsameri. I I ••••••.* moms I : ....r.11••.: I , .1:111: I I II III I ' I I LEGEND__ "'ma, Ira mu . . I I ER COM] INICATCP Ow•Da IITMOD.10•01.P.0 CARR. DOME MD .....e/ANCI RIK APPIPDIADDIMME ilcmArcpcom RITLIO NMI - WILT 61.011 0.1.011.11.1.11 AMA USTCPODLPINCL soryclo4r4o.a....‘ thal. POLO nIPPaCi. loP•11•L PDS.. 10.1••••rtIVARIVICI. COrtP1CID‘ VALI CCCISOOR AWAKE APD•1740011:111910,110012•10. molal 1.* LIMO Dic CaNILCDP VOIDLCIIMIT Dm:WWI MOLDY= 1“ SCIDDI/CALCIAL ranp•D•LIFICCIL orraikall•••••11.B. tro_k•••••• Site Plan WM:MA ODD 1,1010. •82.4.2041 (7\ TYPICAL BEACH RECLAMATION SECTION 1 444 IN•110110.013, omose41 •M•I 100101101 Conlaot Information OPMCINILOPOtIll. Z. CFM/Ealt MAL cliowalt ,•01•0•010fRO ROL.. %WWI IKI.000... PC .1.1,01[01.3,010 vauco.oer. .44Lons.441 MIIC1 BOOR A•31 OMER 05•001, Da WOOD. IC ....PC Man. LkOLL.Cam Ai lop•L•1 .V0L. , • „- - _ 1.•••• Noma 1163.41000▪ . TYPiCAL PIT RECLAMATION SECTION .41 1 • • • I • 1.••1 was if ibt • • • C 1 .00 (YAY1 0 r• ILA FAO to 1' (Tv) ...AP Posts ATTAC)400 1MIO 54 T FENCES r 4 1000.041 r 06060141wARI 10MAR MOB .4,41,11 .AfY 7Y 7 .00 AA% WKt: 1..340 N AG(i Al IMAM.. LECTICN.tw. 1 11'(IM1� 10061 i ELEVATION FLTIA FAORO 0/11COON OFF ON UOWOOFILodOUOU. TIW 0416 M/41 N MOP( Ca1rACT20MOORL AT Tool OP MTA LATONORA19o0r/N IN4TIOX1 KRIM PAOROC ANCHOR DETAIL. &IIs 1. MKS O YfS1 4741 4 0, 3 a YN CLQ 110 1• I. & OCORY740100 0 1 017 roc( L4 101 1 115Th 0 0.00 /0 AYY STRuCOCAC. LOO N T1( MLA O LC 40012140 1.101 SWM a 4AOOK nMO0 1007 IK OONS7A000OI 06(400 *680 AE40 E0 1774 (1C 3 M1N D1. .131 . 99971 AAO SI ST•4..1 0 4 1 ry1TA FOPS Suit t t I NO IO Win ..CCA sTA1A ott nlati 40 AMC. (0414 I ltoa FOPS 91Au a S7AYDN0 5100* o V Opti c0. r N0000W S =VAC' XI AS Y. FD EEOMN I¥10.11 0 .A3 OHM Stu 101(2 0781'jT NIL*.010 =OURIS N=OURt AS 2(12 ►p 10.9A15 1 1AQA1LCAT *5 W 041 acre. LVNKf0).. O *74001[3 100K Silt Fence Detail (BMP 36) NTi :ITER CLOTH -+ ErsrAc CaW+C 10'l4:V =7 4N 1I PROFILE :Cr 024 PLAN VIEW 3ENERALNOTES: tIM0roM10N07.aOM✓a1171NIOXIICOW1NLT. rOoNnina 111 . ImLemArorOURRDJa001011.1.14410401000110T0001A10 Q OICITA . L CCOICI R N1A.N.TA®T68/apNON as14010601.r100NI0102 C0100f/0a0R1cm7MClawnO 1 SOR10QOSISCOOOF01>•1.MRm44OIC4QOI0011.m0C1 Oe0144101004100101 KW1aO0N27m • 0a101TMELION00011VSANO 1040MOIIAITOI®040.9090/ 02I02701F100Q 1103001TLtgO1100ACCO L1100LD/0DIM/11 01.OICALROHR101010.1110Mo11171C011O010.O ACA 0.f ALOfS7NTZONITOIXF fNlNagiAA101C1fA[0011001010• MOCY06t7OA41• CALENATOte Ammar000 NOW= 4010.00 11.mN20471101 004.011 1071017URDA10A /01/7060420 700/446800 401N1ABLE BER4 J (OPnONAL) 1_9431RLICPON 0410711LP(MS 7 STONE 92E -USE MAKE, r STONE OR *,11.0..400 OR 410,0.E0 CONCRETE E0U90...E11T FOR TOP LAYER. 2•-6• DWETER FOR RASE ...ITER. 2 *3746 H-45 MUM, BUT NOT LESS THAN 50 FEET (EXCEPT CN A 5NQE nscavx L011 0 -ERE A 30 FOOT 4•.130404 LENGTH 00.05 APPLY) 1 1400(ESS-407 LESS THAN 0 NpEs 4 1001-1.0 FOOT MMAJY. BUT NOT ass THAN TUE itAy 40'11 AT 90/1TS *ERE INZFE55 OR EGRESS COORS 5 FUER CLOTH -RILL BE PLACED O*ER THE ENTFE AREA PTa0R TO FLACK 0 STONE. FXTER oh/ NOT BE RE017RED ON A 9441E FU1.17 12,5,0,111E 101. 6 SURFACE WATER-AII SURFACE RATER FLOW1IG 0R 0,336130 TOWARD CONSTRUCION ENTRANCES SNAIL BE PIPED ACROSS 104£ ,4112441E IF PPLYG IS IMPRACTICAL. A M0114TABLE BERM NTH 5 1 SLOPES Nll BE PER41T100. 7 MAiNTE.NANCE-THE ENTRANCE S4µ1 6( MAN7AUNEO 94 A CO101ON 11104 NLL PRE3NT TR4(R0G OR F109(40 0 SEDMENT ONTO R.6UC *0178 -OF -WAX MS MAT RECAAR£ PE000C TOP 0E59.0 NTN *00710441 5101E As C307045 Of6ANO Aro Wk. AND/OR 11£0.4001 0 ANT 0EASIRES 05,0 TO TRAP SED4£NT ALL %CAENF 546110. DROPPED, RASED 0 70*01[0 ONTO PUBIC R2041 -0 -WAY must 6E REMOVED 914(0*TEL!, 6 WA94.6-9NEEL5 SHALL BE CLEANED TO REMOVE %DREW PIIOR TO ENTRANCE ONTO PUBLIC ROIT-OF-RAT. 11EN WAVING 15 REEtCRREO. U 940.11 BE 00HE CO AN AREA STAB112E0 NTH SICK *N0 0001 GRANS INTO *N APPR09E0 SED*IENT TRAPPNG 0E7CE 9 4378 (0 NSPECTIGN AND HEEDED MAN1Fn*NCE 5Hµ1 BE PROMOED AFTER EACH RAN Stabilized Construction Entrance (BMP 5A) NUL GENERAL MAP NOTES: 00002/40121221081 401110101.41121 a4CT01fa01.OY1a.AmICID00LaRW IOC97► A 11.01a7L1T0r42Pi0OT.QLa ▪ 1o011BOUGS011068C'A030 0qa C 0:1C7•C100110 fF0A1M6a1Y0m000474Wa 4120.1011 M1.00011m 0. a% 1214111, mown= CIMA11 acomaiNC0A1049Or 41011104 OI100001102 aaA01A072111Na 00110 000N10O MM f00.CA000CIIACCOC100fb0N014 LOVININOW1P011011WARIADOCROIDALIONIAWOONICLO0014171 u7171Ta1rr.Iwlolm 100014213W01a14RN00.1124 T1r01A011•04.1N014AT U0R14ram.11155.o01N 41401NitM0.10.q 310/1010 R1T0. MOW. 40601121M01it/0r11O101000NtORMG1M040 AO7001A00 NOFS7 0.14112 101006 0.1011104011 4 0 0 11 0 7 1111111.1. NU2D OMI N I O OIIPOIDO C* 411014 IOWM 001001110017/'OIN1iOOm011117WAPR01OAM 01101 OAN1.N1101miDCATOI • 10/17,000001. 1111WFAT14./0R01C41X0201M01N . ONIUM21 111Aa1n q 41011061041.RN41000011ODITIOLCII16O010111N' 1t NNACCICATC01101141.1110 01M10r11OM100B1 11 TOULCO11ODMA/d0I1/a/1N1t001115,l 31OWL SO4 STWL ATION (BUPA 15.17.lit 21,7)) 11110110010.11WIR0161011.0011a1 Alpm1.r010C01 A1o0a0IRRIXO o1.ss t /m02/12WW IT110001ACT0117, ,OF0T1AOO4RA/oQtOOgF . 1001®aAFNOANWaPR000101QOFO71YAC71 • UrmtCOA20.14OYM000195TC00017t2DWOtaO.WaOO 1101.13061.7012061.411 OmNO LCOOOAPO40A04rQapa41109 01004101 • 020TW40R 10.01 1140 10J1a06*704 IOWON001N 44000424X01201004>mM0002MONOf01ACA0II4 ITOIR AIt 01 rO1N00t111A001U a /04.10111AT w000 NIA 9/ 071TA CTO.. IONNR904110001OM IN N4ROOAA *NAR AINNLYRNM •t NNIOA.21711109 /1rATIMOZIL0a'I11O000 21aN090 .OA000O70M 12+1.0.701 M1N1AOL WI 7 a M1T:o N 06711 ANA00g2. L1 0ECOQ11127. L7an044100010111a0.110/011111C0ICLMO 100137171INISCO0p681..A1iim/7NwOW 101210 OA.04O1 IA10pi0O W100fA0m0A9wiX000ICPO Q 906A01Q1gTe0gIp10.10.i 712001 1:011YLL.YtORaDa4 0191 MtN0400101000680RALCOLOI000701.1R0NO4370.9 t 4001414111•684.1O9444.31LOMPO 7.fOD01101100DA010 MO= MILK tl6Rd1OIAA4R.A144AW111a0 0004•101.21010 L ®17O12VRI-Am 110.Ii1oN07.1erO411.7micioar1NiaMN0 411000mt 1.2046}011N11tWWCOAC0M2A0a7rTOtNM04 L WITIO4111•0Wt1a WAVO SICIANCIPLAWRICOOTOCOAaWIDN1N0 A10o000.9110A1147 ATOIAA4MTOWIMACOPLUS000RWOL 104100.740.1012202124.01 440410Notoro0704/mmOT A TRO4.7i•000LM7210Y111a0.4/0. /140/11121.0:01NOT7.q 4101OAAND 06RA0600910M O77gf4141aM0.7T1171D4 f O714a71O/00otAt 091 OOl 111,11010110111111104111102111X10 MO11.100101M1a 40.000/4 X01010Raoi W.D001a0U.A00 EMBardralfflatigg • 16800001700SOIOIN4Yp101N0001101404107010IIroo 110406 L A0g.t1Duct..'0111arouppcunioA00rO eccurA001m01a rOYfN000111 CA111W01211014aRM0AOf41mm001.1 1112101 W Ittf.malmRM000RC001a72p1Oaosoo TO uouitSa1.2 0061210NALRRIO010110OAA00.139.0.4010 421.WAWQR0 WOOS • AR71a01a10121027.112MDMA07.00i01C01/1M19O COOOLO A17C71WC4 1111Ol002219 0.010 11T070R0110M0010 1104701. A A0ancrwam O0N7N1.O1>n07684AM0 • /x1CA'mlalwr4M001N1A01C9101Nam1011 COOO101114 1201001100/ud//1a04104®OL,1010100 OWEIWTOWSIT a1000.111191680A1m101110O10Mr4MN0 141 NO 7761101120410 A C O TTKr 101171 IC01 1124 10 *000114 • 449k4I 0NMWNNM100H011171FOAAOAA9M•0101UM9A 440•I4 C1. Mm00168r11Ma17WNm16N10►T00111tif4 woessa A.31101wU1n.ro11 OISTA.K 9011.005.401 114 4004211oSTLM 1 0 ce E ce U ria) LL O Li) a) 0 c o o a) ✓ Z Q 1 < ram PI v 4111109 1118 LAND GROUP • r �w.ww.�rw Wy •W - • - 1I0.mr.LN0 LwM NI 146800 4.140 01x4 C1.01 10.0.15.10.0/111CPIPV.M1 anauerpoo.crtnonarrruwa PIMA" 1308.01.0111.K.11.611 2540 Lal oomoomovo.souncoontolto WOW/ .1. V 110,0111.01110 ROM [1....0.1.01.30,1IIT, .11.101111.USIDYWIT WWI I.ONIUTC.D.Rf — — PPM= COMM ;I LIL! Grading and Drainage Plan .01k2OVIIL • /00. -Off CORM 0/17CUO '117.4 w C2.00 kbtg,LE_ P EAi t. (---._ V i „. # ..,_. . ,1•0111t lia• — --,..•/:•• . pill 1 i ',14.,,,, e 1 i ,, .,E ..; ' 1 ! •-ii 1. I li. I Ili, ;GI 1 i _ I •il.' r.i;r- ------._.1 - .....,_--.-• 1 • ,- .............: ... • i .-- ;.4 0- •' - • ............,.....______ --,,...•'''''.•-• "II. ...-... i i : ... 1 - r -1- f%.‘p;! - ; , p 4 ; 1 . ,i. .' ' • t., , •••1, • II.' ;111‘ •• .1b. .1ggfp.r!_e: --• !:! 15V fir r. ' ..- i i ''''' '. - -.1....61•• re 4 • , i li5 le 1 Ili 111 II: 14*I. • r•; e''', • 74t' 4. .rr*r h • 4. • • . • r , („ktik, ti: • '41' 14/1. '• • !. . Site Master Plan L • .01., , citAxv4.-=. Leer,0,:le E LLC Mace Road and Berman Properties Eagle lcaho